Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Predictive and Cooperative Voltage Control with Probabilistic Load and Solar Generation Forecasting

This paper proposes predictive cooperative voltage control method in a power system with high penetration of photovoltaic (PV) units. Cooperative distributed control of the reactive power output of PV inverters is coordinated with operation of voltage regulators (VRs) to maintain system voltages within an appropriate bandwidth. Probabilistic forecasting of the solar power generation and the loads is applied to estimate voltage changes which, in turn, are used to set the VR tap positions for preventing large voltage fluctuations with the lowest risk considering the voltage distribution estimation. The fine tuning of voltage adjustment is achieved by cooperative control of PV inverters to maintain a uniform voltage profile across the system. The proposed method is tested on the modified IEEE 123-node test feeder with high PV penetration using real insolation data and with constant loads replaced by several different load profiles. Simulation results demonstrate the effectiveness of the coordinated approach for voltage control with cooperative PV and predictive VR controls taking into account probabilistic load and solar power forecasts.

Cooperative Control↗

Robust Deep Gaussian Process-Based Probabilistic Electrical Load Forecasting Against Anomalous Events

The abnormal events, such as the unprecedented COVID-19 pandemic, can significantly change the load behaviors, leading to huge challenges for traditional short-term forecasting methods. This article proposes a robust deep Gaussian processes (DGP)-based probabilistic load forecasting method using a limited number of data. Since the proposed method only requires a limited number of training samples for load forecasting, it allows us to deal with extreme scenarios that cause short-term load behavior changes. In particular, the load forecasting at the beginning of abnormal event is cast as a regression problem with limited training samples and solved by double stochastic variational inference DGP. The mobility data are also utilized to deal with the uncertainties and pattern changes and enhance the flexibility of the forecasting model. The proposed method can quantify the uncertainties of load forecasting outcomes, which would be essential under uncertain inputs. Extensive comparison results with other state-of-the-art point and probabilistic forecasting methods show that our proposed approach can achieve high forecasting accuracies with only a limited number of data while maintaining the excellent performance of capturing the forecasting uncertainties.

anomalous events↗

A Nonparametric Bayesian Framework for Short-Term Wind Power Probabilistic Forecast

To improve the energy system resilience and economic efficiency, the wind power as a renewable energy starts to be deeply integrated into smart power grids. However, the wind power forecast uncertainty brings operational challenges. In order to provide a reliable guidance on operational decisions, in this paper, we propose a short-term wind power probabilistic forecast. Specifically, to model the rich dynamic behaviors of underlying physical wind power stochastic process occurring in various meteorological conditions, we first introduce an infinite Markov switching autoregressive model. This nonparametric time series model can capture the important properties in the real world data to improve the prediction accuracy. Then, given finite historical data, the posterior distribution of flexible forecast model can correctly quantify the model estimation uncertainty. Built on it, we develop the posterior predictive distribution to rigorously quantify the overall forecasting uncertainty accounting for both inherent stochastic uncertainty and model estimation error. Furthermore, the proposed approach can provide accurate and reliable short-term wind power probabilistic forecast, which can be used to support smart power grids real-time risk management.

17 WIND ENERGY↗

A Data-Driven Nonparametric Approach for Probabilistic Load-Margin Assessment Considering Wind Power Penetration

A modern power system is characterized by an increasing penetration of wind power, which results in large uncertainties in its states. These uncertainties must be quantified properly; otherwise, the system security may be threatened. Facing this challenge, here we propose a cost-effective, data-driven approach to assessing a power system's load margin probabilistically. Using actual wind data, a kernel density estimator is applied to infer the nonparametric wind speed distributions, which are further merged into the framework of a vine copula. The latter enables us to simulate complex multivariate and highly dependent model inputs with a variety of bivariate copulae that precisely represent the tail dependence in the correlated samples. Furthermore, to reduce the prohibitive computational time of traditional Monte-Carlo simulations that process a large amount of samples, we propose to use a nonparametric, Gaussian-process-emulator-based reduced-order model to replace the original complicated continuation power-flow model through a Bayesian-learning framework. To accelerate the convergence rate of this Bayesian algorithm, a truncated polynomial chaos surrogate, which serves as a highly efficient, parametric Bayesian prior, is developed. This emulator allows us to execute the time-consuming continuation power-flow solver at the sampled values with a negligible computational cost. Results of simulations that are performed on several test systems reveal the impressive performance of the proposed method in the probabilistic load-margin assessment.

17 WIND ENERGY↗

Physics-Informed Sparse Gaussian Process for Probabilistic Stability Analysis of Large-Scale Power System with Dynamic PVs and Loads

This work proposes a physics-informed sparse Gaussian process (SGP) for probabilistic stability assessment of large-scale power systems in the presence of uncertain dynamic PVs and loads. The differential and algebraic equations considering uncertainties from dynamic PVs and loads are reformulated to a nonlinear mapping relationship that allows the application of SGP. Thanks to the nonparametric characteristic of Gaussian process, the proposed framework does not require distributions of uncertain inputs and this distinguishes it from existing approaches. As the original Gaussian process is not scalable to large-scale systems with high dimensional uncertain inputs, this paper develops the SGP with a stochastic variational inference technique. It leads to approximately two orders of complex reduction. A data pre-processing step is also introduced to tackle the coexistence of stable and unstable cases by sample clustering and constructing separate SGPs. The probabilistic transient stability index is analyzed to assess system stability under different uncertain dynamics loads and PVs. Comparisons are performed with the sampling-based, the polynomial chaos expansion-based, and traditional Gaussian process-based methods on the modified IEEE 118-bus and Texas 2000-bus systems under various scenarios, including different levels of uncertainties and the existence of nonlinear correlations among dynamic PVs. The impacts of data quality and quantity issues are also investigated. It is shown that the proposed SGP achieves significantly improved computational efficiency while maintaining high accuracy with a limited number of data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Model for Joint Probabilistic Forecast of Solar Photovoltaic Power and Outdoor Temperature

In this paper, a stochastic model is proposed for a joint statistical description of solar photovoltaic (PV) power and outdoor temperature. The underlying correlation emerges from solar irradiance that is responsible in part for both the variability in solar PV power and temperature. The proposed model can be used to capture the uncertainty in solar PV power and its correlation with the electric power consumption of thermostatically controlled loads. First, a model for solar PV power that explicitly incorporates the stochasticity due to clouds via a regime-switching process between the three classes of sunny , overcast and partly cloudy is proposed. Then, the relationship between temperature and solar power is postulated using a second-order Volterra model. This joint modeling is leveraged to develop a joint probabilistic forecasting method for solar PV power and temperature. Real-world datasets that include solar PV power and temperature measurements in California are analyzed and the effectiveness of the joint model in providing probabilistic forecasts is verified. The proposed forecasting methodology outperforms several reference methods thus portraying that the underlying correlation between temperature and solar PV power is well defined and only requires a simple lower-complexity sampling space.

14 SOLAR ENERGY↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Reducing the sensitivity of IMPT treatment plans to setup errors and range uncertainties via probabilistic treatment planning

Treatment plans optimized for intensity modulated proton therapy (IMPT) may be very sensitive to setup errors and range uncertainties. If these errors are not accounted for during treatment planning, the dose distribution realized in the patient may by strongly degraded compared to the planned dose distribution. The authors implemented the probabilistic approach to incorporate uncertainties directly into the optimization of an intensity modulated treatment plan. Following this approach, the dose distribution depends on a set of random variables which parameterize the uncertainty, as does the objective function used to optimize the treatment plan. The authors optimize the expected value of the objective function. They investigate IMPT treatment planning regarding range uncertainties and setup errors. They demonstrate that incorporating these uncertainties into the optimization yields qualitatively different treatment plans compared to conventional plans which do not account for uncertainty. The sensitivity of an IMPT plan depends on the dose contributions of individual beam directions. Roughly speaking, steep dose gradients in beam direction make treatment plans sensitive to range errors. Steep lateral dose gradients make plans sensitive to setup errors. More robust treatment plans are obtained by redistributing dose among different beam directions. This can be achieved by the probabilistic approach. In contrast, the safety margin approach as widely applied in photon therapy fails in IMPT and is neither suitable for handling range variations nor setup errors.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

TU-AB-BRB-01: Coverage Evaluation and Probabilistic Treatment Planning as a Margin Alternative

The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. The treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.

60 APPLIED LIFE SCIENCES↗

WE-H-BRC-06: A Unified Machine-Learning Based Probabilistic Model for Automated Anomaly Detection in the Treatment Plan Data

Purpose: The purpose of this work was to investigate the ability of a machine-learning based probabilistic approach to detect radiotherapy treatment plan anomalies given initial disease classes information. Methods In total we obtained 1112 unique treatment plans with five plan parameters and disease information from a Mosaiq treatment management system database for use in the study. The plan parameters include prescription dose, fractions, fields, modality and techniques. The disease information includes disease site, and T, M and N disease stages. A Bayesian network method was employed to model the probabilistic relationships between tumor disease information, plan parameters and an anomaly flag. A Bayesian learning method with Dirichlet prior was useed to learn the joint probabilities between dependent variables in error-free plan data and data with artificially induced anomalies. In the study, we randomly sampled data with anomaly in a specified anomaly space.We tested the approach with three groups of plan anomalies – improper concurrence of values of all five plan parameters and values of any two out of five parameters, and all single plan parameter value anomalies. Totally, 16 types of plan anomalies were covered by the study. For each type, we trained an individual Bayesian network. Results: We found that the true positive rate (recall) and positive predictive value (precision) to detect concurrence anomalies of five plan parameters in new patient cases were 94.45±0.26% and 93.76±0.39% respectively. To detect other 15 types of plan anomalies, the average recall and precision were 93.61±2.57% and 93.78±3.54% respectively. The computation time to detect the plan anomaly of each type in a new plan is ∼0.08 seconds. Conclusion: The proposed method for treatment plan anomaly detection was found effective in the initial tests. The results suggest that this type of models could be applied to develop plan anomaly detection tools to assist manual and automated plan checks. The senior author received research grants from ViewRay Inc. and Varian Medical System.

60 APPLIED LIFE SCIENCES↗

E-Area LLWF Vadose Zone Model: Probabilistic Model for Estimating Subsided-Area Infiltration Rates

A probabilistic model employing a Monte Carlo sampling technique was developed in Python to generate statistical distributions of the upslope-intact-area to subsided-area ratio (Area UAi /Area SAi ) for closure cap subsidence scenarios that differ in assumed percent subsidence and the total number of intact plus subsided compartments. The plan is to use this model as a component in the probabilistic system model for the E-Area Performance Assessment (PA), contributing uncertainty in infiltration estimates.

97 MATHEMATICS AND COMPUTING↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

iTOUGH2-IFC: An Integrated Flow Code in Support of Nagra's Probabilistic Safety Assessment:--User's Guide and Model Description

This document describes the development and use of the Integrated Flow Code (IFC), a numerical code and related model to be used for the simulation of time-dependent, two-phase flow in the near field and geosphere of a gas-generating nuclear waste repository system located in an initially fully water-saturated claystone (Opalinus Clay) in Switzerland. The development of the code and model was supported by the Swiss National Cooperative for the Disposal of Radioactive Waste (Nagra), Wettingen, Switzerland. Gas generation (mainly H{sub 2}, but also CH{sub 4} and CO{sub 2}) may affect repository performance by (1) compromising the engineered barriers through excessive pressure build-up, (2) displacing potentially contaminated pore water, (3) releasing radioactive gases (e.g., those containing {sup 14}C and {sup 3}H), (4) changing hydrogeologic properties of the engineered barrier system and the host rock, and (5) altering the groundwater flow field and thus radionuclide migration paths. The IFC aims at providing water and gas flow fields as the basis for the subsequent radionuclide transport simulations, which are performed by the radionuclide transport code (RTC). The IFC, RTC and a waste-dissolution and near-field transport model (STMAN) are part of the Integrated Radionuclide Release Code (IRRC), which integrates all safety-relevant features, events, and processes (FEPs). The IRRC is embedded into a Probabilistic Safety Assessment (PSA) computational tool that (1) evaluates alternative conceptual models, scenarios, and disruptive events, and (2) performs Monte-Carlo sampling to account for parametric uncertainties. The preliminary probabilistic safety assessment concept and the role of the IFC are visualized in Figure 1. The IFC was developed based on Nagra's PSA concept. Specifically, as many phenomena as possible are to be directly simulated using a (simplified) process model, which is at the core of the IRRC model. Uncertainty evaluation (scenario uncertainty, conceptualization uncertainty, parametric uncertainty) is handled by the outer shell of the PSA model; it is not further discussed in this report. Moreover, justifications for the inclusion or exclusion of FEPs as well as for certain simplifying assumptions are available or can be obtained using detailed process models and other supporting information. The IFC is both a numerical code and a model of a repository system. The numerical code is a modification of the multiphase, multicomponent simulator TOUGH2 (Pruess et al., 1999), as implemented within the iTOUGH2 (Finsterle, 2007abc) framework. The code modifications are mainly concerned with the implementation of relevant FEPs as outlined in Nagra (2007a, AN 07-115), as well as removal of processes and features that are not needed within the IFC; the modifications are summarized in Appendix A1. In addition, the IFC includes a model, i.e., a simplified representation of the repository system. Specifically, a computational grid was generated, which includes the emplacement tunnels for spent fuel, high-level wastes, as well as long-lived intermediate-level wastes. Moreover, the model represents engineered barriers (backfill, seals, plugs, etc.), various tunnels and other underground facilities, and includes a simplified representation of the geological structure, i.e., the host rock (including the excavation disturbed zone (EDZ) around the underground openings), confining units, local aquifers, and a highly transmissive zone. The IFC model was designed in close collaboration with Nagra. This report describes all functional requirements of the IFC and how they are implemented in the IFC. The input formats needed to invoke added modeling capabilities are documented. Finally, the IFC model grid is described, and results from a test simulation are presented.

54 ENVIRONMENTAL SCIENCES↗

Data-Driven Probabilistic Anomaly Detection for Electricity Market under Cyber Attacks

Information and communication technologies have been widely used in smart grid for efficient operation. However, these technologies are vulnerable to malicious cyber attacks, which may lead to severe reliability and economic issues. Recently, a variety of data-driven anomaly detection approaches have been explored to detect potential cyber attacks in smart grids. In this paper, we researched on the electricity market data aiming to identify anomalies from the locational marginal prices (LMPs) and provide a new indicator for potential cyber attacks in power grids. Specifically, a novel data-driven probabilistic anomaly detection framework is proposed for electricity market, which consists of three major components: long short-term memory (LSTM) based deterministic electricity price forecasting, probabilistic electricity price forecasting and anomaly detection. This framework is tested on a model-based electricity market simulator under two types of cyber attacks, i.e., load redistribution attack (LRA) and price responsive attack (PRA). Numerical results on the simulated LMPs show that the proposed framework is capable of detecting data anomalies over these attacks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Assessment and Uncertainty Analysis of CO2 Storage Capacity of the Morrow B Sandstone—Farnsworth Field Unit

This paper presents probabilistic methods to estimate the quantity of carbon dioxide (CO2) that can be stored in a mature oil reservoir and analyzes the uncertainties associated with the estimation. This work uses data from the Farnsworth Field Unit (FWU), Ochiltree County, Texas, which is currently undergoing a tertiary recovery process. The input parameters are determined from seismic, core, and fluid analyses. The results of the estimation of the CO2 storage capacity of the reservoir are presented with both expectation curve and log probability plot. The expectation curve provides a range of possible outcomes such as the P90, P50, and P10. The deterministic value is calculated as the statistical mean of the storage capacity. The coefficient of variation and the uncertainty index, P10/P90, is used to analyze the overall uncertainty of the estimations. A relative impact plot is developed to analyze the sensitivity of the input parameters towards the total uncertainty and compared with Monte Carlo. In comparison to the Monte Carlo method, the results are practically the same. The probabilistic technique presented in this paper can be applied in different geological settings as well as other engineering applications.

03 NATURAL GAS↗

An Optimization-Based Framework to Define the Probabilistic Design Space of Pharmaceutical Processes with Model Uncertainty

To increase manufacturing flexibility and system understanding in pharmaceutical development, the FDA launched the quality by design (QbD) initiative. Within QbD, the design space is the multidimensional region (of the input variables and process parameters) where product quality is assured. Given the high cost of extensive experimentation, there is a need for computational methods to estimate the probabilistic design space that considers interactions between critical process parameters and critical quality attributes, as well as model uncertainty. In this paper we propose two algorithms that extend the flexibility test and flexibility index formulations to replace simulation-based analysis and identify the probabilistic design space more efficiently. The effectiveness and computational efficiency of these approaches is shown on a small example and an industrial case study.

60 APPLIED LIFE SCIENCES↗

A Probabilistic Approach to Fitting Period–luminosity Relations and Validating Gaia Parallaxes

Pulsating stars, such as Cepheids, Miras, and RR Lyrae stars, are important distance indicators and calibrators of the “cosmic distance ladder,” and yet their period–luminosity–metallicity (PLZ) relations are still constrained using simple statistical methods that cannot take full advantage of available data. To enable optimal usage of data provided by the Gaia mission, we present a probabilistic approach that simultaneously constrains parameters of PLZ relations and uncertainties in Gaia parallax measurements. We demonstrate this approach by constraining PLZ relations of type ab RR Lyrae stars in near-infrared W 1 and W 2 bands, using Tycho- Gaia Astrometric Solution (TGAS) parallax measurements for a sample of ≈100 type ab RR Lyrae stars located within 2.5 kpc of the Sun. The fitted PLZ relations are consistent with previous studies, and in combination with other data, deliver distances precise to 6% (once various sources of uncertainty are taken into account). To a precision of 0.05 mas (1 σ ), we do not find a statistically significant offset in TGAS parallaxes for this sample of distant RR Lyrae stars (median parallax of 0.8 mas and distance of 1.4 kpc). With only minor modifications, our probabilistic approach can be used to constrain PLZ relations of other pulsating stars, and we intend to apply it to Cepheid and Mira stars in the near future.

79 ASTRONOMY AND ASTROPHYSICS↗