Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pneumatic Valves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The Dual-Rasp Sampling System Design with Closed Pneumatic Sample Transfer

The novel Dual-Rasp sampling system has been developed for landed missions to low gravity planetary bodies and is particularly well suited for the unique environment of Saturn’s moon Enceladus. The Dual-Rasp sampling system has two counter-rotating rasp cutters that remove material from the surface and direct it into a guide. The cuttings follow the guide into a sample collection cup. When the sampling collection completes, the tool reconfigures by rotating the guide to create a closed circuit for pneumatic sample transfer from the collection cup to science instruments on the lander. A valve opens a gas tank and the gas flows from that tank into the sample collection cup and down rigid tubing to the science instruments chamber on the lander. A two degree of freedom arm with base actuators is used to deploy the sampler and control its sampling location.

Heness, Andrew B.↗

A method for calculating transient thrust and flow-rate levels for Mariner type attitude control nitrogen gas jets

The purpose of this report is to define and program the transient pneumatic flow equations necessary to determine, for a given set of conditions (geometry, pressures, temperatures, valve on time, etc.), the total nitrogen impulse and mass flow per pulse for the single pulsing of a Mariner type reaction control assembly valve. The rates of opening and closing of the valves are modeled, and electrical pulse durations from 20 to 100 ms are investigated. In developing the transient flow analysis, maximum use was made of the steady-state analysis. The impulse results are also compared to an equivalent square-wave impulse for both the Mariner Mars 1971 (MM'71) and Mariner Mars 1964 (MM'64) systems. It is demonstrated that, whereas in the MM'64 system, the actual impulse was as much as 56 percent higher than an assumed impulse (which is the product of the steady-state thrust and value on time i.e., the square wave), in the MM'71 system, these two values were in error in the same direction by only approximately 4 percent because of the larger nozzle areas and shorter valve stroke used.

Ferrera, J. D.↗

Fail-safe bidirectional valve driver

Cross-coupled diodes are added to commonly used bidirectional valve driver circuit to protect circuit and power supply. Circuit may be used in systems requiring fail-safe bidirectional valve operation, particularly in chemical- and petroleum-processing control systems and computer-controlled hydraulic or pneumatic systems.

Fujimoto, H.↗

Miniature pressure valve for on-board calibration of pressure transducers.

This paper describes the development and testing of a miniature one-pole, three-position pressure valve and actuation mechanism. This valve was designed primarily for installation with a pressure transducer directly in a wind-tunnel model, thereby reducing lag time effects resulting from long connecting tubes to the transducer. This valve provides for the in-situ calibration of the transducer during testing by providing one position for transducer zero, a second position for a known calibrate pressure, and a third position for measurement of the unknown test pressure. The valve is driven from the spring loaded test pressure position to the zero and calibrate positions by a pneumatically operated dual-piston yoke assembly. Large numbers of transducers can be simultaneously calibrated from a remote location in a matter of seconds.

Rollins, G. N.↗

2021 NE-XF Pathways Internship Student Showcase Presentation

Branch of Fluid Mechanics concern with the mechanics and properties of gases and its application to engineering systems. Applications of Pneumatics in the Aerospace systems: (1) Flight Hardware - Reaction Control, Systems, Rocket Pressure Fed Systems (2) Ground Operations – Valve Actuation, Inert Environment (Purge), Tube Drying/Cleaning NE-XFPneumatics Engineering provides design & operation expertise to support EGS. Commodities used at KSC systems: Gaseous Helium (GHe) Gaseous Oxygen (GO2) Gaseous Nitrogen (GN2) Breathing Air (BAIR) Support other subsystems: LH2, LO2, Ground Main Propulsion System (GMPS), etc.

Environmental and Life Support Systems↗

Evacuation of coal from hoppers/silos with low pressure pneumatic blasting systems

The need for an efficient, economical, effective and quiet device for moving coal and other difficult bulk solids was recognized. Thus came the advent of the low pressure pneumatic blasting system - a very efficient means of using a small amount of plant air (up to 125 PSI) to eliminate the most troublesome material hang-ups in storage containers. This simple device has one moving part and uses approximately 3% of the air consumed by a pneumatic vibrator on the same job. The principle of operation is very simple: air stored in the unit's reservoir is expelled directly into the material via a patented quick release valve. The number, size, and placement of the blaster units on the storage vessel is determined by a series of tests to ascertain flowability of the problem material. These tests in conjunction with the hopper or silo configuration determine specification of a low pressure pneumatic blasting system. This concept has often proven effective in solving flow problems when all other means have failed.

Fischer, J. S.↗

Pneumatic binary encoder replaces multiple solenoid system

Pneumatic binary encoder replaces solenoid system in the pilot stage of a digital actuator. The encoder operates in flip-flop manner to valve gas at either high or low pressures. By rotating the disk in a pinion-to-encoding gear ratio, six to eight adder circuits may be operated from single encoder.

Source record↗

Software For Graphical Representation Of A Network

System Visualization Tool (SVT) computer program developed to provide systems engineers with means of graphically representing networks. Generates diagrams illustrating structures and states of networks defined by users. Provides systems engineers powerful tool simplifing analysis of requirements and testing and maintenance of complex software-controlled systems. Employs visual models supporting analysis of chronological sequences of requirements, simulation data, and related software functions. Applied to pneumatic, hydraulic, and propellant-distribution networks. Used to define and view arbitrary configurations of such major hardware components of system as propellant tanks, valves, propellant lines, and engines. Also graphically displays status of each component. Advantage of SVT: utilizes visual cues to represent configuration of each component within network. Written in Turbo Pascal(R), version 5.0.

Mcallister, R. William↗

Gas chromatograph sample-transfer valve

Slide-type gate valve incorporates sampling volume and transfer passageway for guiding a metered quantity of gas from pressurized test cell to gas chromatograph. Gate is moved by pneumatic bellows-type actuator.

Wang, W. S.↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Load deflection characteristics of inflated structures

A single, closed form relationship to relate load to the deformed dimensions of the horizontal torus was developed. Wall elasticity was included in the analysis, and special care was taken to predict the final footprint area of the loaded structure. The test fixture utilized is shown. The tori used for the bulk of the testing were rubber inner tubes for a 32 and 160 pneumatic tire. The inner tube being tested was plumbed, to a mercury-filled manometer, which had a 50 inch measurement capacity, by use of a special adapter. The adapter fit over the valve stem and allowed air to be added from a shop-air source and to be bled through the standard valve mechanism. In this fashion, tests requiring the maintenance of a constant indication of air pressure could be run with little difficulty.

Baumgarten, J. R.↗

Causal Analysis of the Inadvertent Contact with an Uncontrolled Electrical Hazardous Energy Source (120 Volts AC)

On September 25, 2013, a Health Physics Technician (HPT) was performing preparations to support a pneumatic transfer from the HFEF Decon Cell to the Room 130 Glovebox in HFEF, per HFEF OI 3165 section 3.5, Field Preparations. This activity involves an HPT setting up and climbing a portable ladder to remove the 14-C meter probe from above ball valve HBV-7. The HPT source checks the meter and probe and then replaces the probe above HBV-7, which is located above Hood ID# 130 HP. At approximately 13:20, while reaching past the HBV-7 valve position indicator switches in an attempt to place the 14-C meter probe in the desired location, the HPT’s left forearm came in contact with one of the three sets of exposed terminals on the valve position indication switches for HBV 7. This resulted in the HPT receiving an electrical shock from a 120 Volt AC source. Upon moving the arm, following the electrical shock, the HPT noticed two exposed electrical connections on a switch. The HPT then notified the HFEF HPT Supervisor, who in turn notified the MFC Radiological Controls Manager and HFEF Operations Manager of the situation. Work was stopped in the area and the hazard was roped off and posted to prevent access to the hazard. The HPT was escorted by the HPT Supervisor to the MFC Dispensary and then preceded to CFA medical for further evaluation. The individual was evaluated and released without any medical restrictions. Causal Factor (Root Cause) A3B3C01/A5B2C08: - Knowledge based error/Attention was given to wrong issues - Written Communication content LTA, Incomplete/situation not covered The Causal Factor (root cause) was attention being given to the wrong issues during the creation, reviews, verifications, and actual performance of HFEF OI-3165, which covers the need to perform the weekly source check and ensure placement of the probe prior to performing a “rabbit” transfer. This resulted in the hazard not being identified and mitigated in the procedure. Work activities with in HFEF-OI-3165 placed the HPT in proximity of an unmitigated hazard directly resulting in this event. Contributing Factor A3B3C04/A4B5C04: - Knowledge Based Error, LTA Review Based on Assumption That Process Will Not Change - Change Management LTA, Risks/consequences associated with change not adequately reviewed/assessed Prior to the pneumatic system being out of service, the probe and meter were not being source checked together. The source check issue was identified and addressed during the period of time when the system was out of service. The corrective actions for this issue resulted in the requirement that a meter and probe be source checked together as it is intended to be used. This changed the activity and required an HPT to weekly, when in use, remove and install the probe from above HBV-7 to meet the requirement of LRD 15001 Part 5 Article 551.5. Risks and consequences associated with this change were not adequately reviewed or assessed. Failure to identify the hazard associated with this change directly contributed to this event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of fluidics to new control components

The inherent tolerance for nuclear radiation makes fluidic devices candidates for nuclear rocket control systems. Also, they are being considered for supersonic jet engine inlet control because of their high temperature and vibration tolerance. Three new control components being considered for these applications are described. A fluidic circuit to control a pneumatic stepping motor for nuclear rocket control drum actuation is discussed. An all-fluidic sensor being developed for determining the position of the normal shock in the inlet of a supersonic jet engine is outlined. A new vortex valve configuration is developed to prevent supersonic jet engine inlet unstarts by regulating bypass flow.

Dustin, M. O.↗

Electrokinetic Sample Preconcentration and Hydrodynamic Sample Injection for Microchip Electrophoresis Using a Pneumatic Microvalve

A microfluidic platform was developed to perform online electrokinetic sample preconcentration and rapid hydrodynamic sample injection for electrophoresis using a single microvalve. The PDMS microchip consists of a separation channel, a side channel for sample introduction, and a control channel which is used as a pneumatic microvalve aligned at the intersection of the two flow channels. The closed microvalve, created by multilayer soft lithography, can serve as a preconcentrator under an applied electric potential, enabling current to pass through while blocking bulk flow. Once analytes are concentrated, the valve is briefly opened and the stacked sample is pressure injected into the separation channel for electrophoretic separation. Fluorescently labeled peptides were enriched by a factor of ~450 in 230 s. The performance of the platform was validated by the online preconcentration, injection and electrophoretic separation of fluorescently labeled peptides. This method enables both rapid analyte concentration and controlled injection volume for high sensitivity, high resolution capillary electrophoresis.

capillary↗

Small Business Innovations (Cryostat)

General Pneumatics Corporation, Scottsdale, AZ, developed an anti- clogging cryostat that liquifies gases by expansion for high pressure through a nozzle to produce cryorefrigeration based on their Kennedy Space Center Small Business Innovation Research (SBIR) work to develop a Joule-Thomson (JT) expansion valve that is less susceptible to clogging by particles or condensed contaminants in the flow than a non-contaminating compressor in a closed cycle Linde-Hampson cryocooler used to generate cryogenic cooling for infrared sensors, super conductors, supercooled electronics and cryosurgery.

Source record↗

Ignition of nonmetallic materials by impact of high-pressure oxygen. II - Evaluation of repeatability of pneumatic impact test

The gaseous oxygen pneumatic impact test is used to evaluate the suitability of nonmetallic materials for use in high-pressure oxygen systems. The test was evaluated by testing the reactivity of four materials over a range of impact pressures. The evaluation also investigated the effect of valve opening time and other test variables on the frequency of reaction. The variability of the data obtained for each test material was too large for the test method to be capable of distinguishing other than gross differences in the reactivity of materials. No relation was found between this variability and changes in valve opening time and other test variables. The materials studied were found to be unacceptable for use as reference standards. Because of the high variability of the test data, it is recommended that new methods be developed for evaluating the suitability of materials for use in high-pressure oxygen systems.

Schmidt, Naomi↗

Quantifying Leak Rates and Vacuum Impact on Granular Soil Column Pneumatic Seal

Introduction: All In-Situ Resource Utilization (ISRU) regolith reactor systems that aim to extract gases or vapors must maintain a seal along the flow path of the regolith from the inlet hopper to where extracted gases or vapors are generated. Using a column of regolith at the inlet has been proposed as an alternative to systems using series of mechanical valves to reduce mass and complexity. Preliminary investigations into the use of regolith itself as a barrier to escaping fluids have been conducted, which this research seeks to expand upon. Different vertical regolith simulant plug diameters and heights were tested under vacuum with dry nitrogen to observe leak rates and approximate steady state pressure gradient equilibria. The effect of absolute ambient pressure was also studied by repeating tests at incremental pressures ranging from 10e-5 Torr up to 1 atm to corroborate ambient bench tests from previous work. The impact of regolith dynamics was addressed to emulate continuous-feed regolith reaction processes by measuring leak rates through continuously draining simulant columns. OB-1 lunar highlands regolith simulant was used. Experimental Setup: Regolith simulant columns were constructed using a motorized butterfly valve separating upper acrylic tubes of various diameters from a larger, lower aluminum pipe plenum (See Figure 1). The butterfly valve was cracked open such that gas could freely pass through whereas regolith would bridge and stay suspended as a cohesive plug above in the acrylic portion. These assemblies were loaded into a vacuum chamber, and a compressed dry nitrogen line was routed into the lower plenum. Pressure transducers measured the absolute pressure of the lower plenum, which was compared to absolute chamber pressure to monitor the pressure gradient across the regolith simulant. A precision mass flow controller enabled fine control of plenum pressure. The plenum pressure was quasi-statically increased to set points informed by previous work [1] before shutting off the gas supply to allow the now pressurized gas volume to dissipate through the simulant into the chamber in what was referred to as a ‘leak test.’ In a separate set of tests, the pressure was allowed to quasi-statically build until visual disturbances in the soil were observed via remote camera feeds. Initial leak rate tests were repeated on the disturbed soil to observe changes in leak rates between initial as-poured and post-bubbling soil conditions. This test schedule was applied to simulant columns of three different diameters (approximately 2, 4, and 6 inches) as well as two different heights (around 8 and 16 inches) and was repeated at least three times for each configuration. Plenums were also pressurized while the butterfly valves were opened slightly further to facilitate slow, controlled, constant flowrate draining of the simulant to observe the impact that continuous-feed systems might have on leak rate through the regolith column. Finally, the regolith columns were reset and refilled and static leak rate tests were repeated approximately every decade in ambient pressure from 10e-5 Torr up to ambient conditions to observe the impact of transitioning out of the molecular flow regime on regolith column seal performance. Analysis: Trends with respect to each factor examined were constructed and reported alongside commentary on the most likely responsible physical phenomena. Confidence intervals were applied to the predictive findings of the data by quantifying instrumentation error and accounting for probabilistic impacts of curve fitting the generic exponential function onto pressure decay data. The leak rate is assumed directly proportional to the exponential term coefficient, while the steady-state static pressure gradient is assumed to be the asymptotic limit of each curve fit. Finally, a generic model developed by Ogino et al. [2] and later tuned for ambient testing was re-tuned using vacuum data to estimate leak rates on the lunar surface. Results: Pressure decay rates decreased up to 27-fold under vacuum when compared to ambient pressure, as shown in Figure 2. Simulant column diameter was found to exponentially correlate to both regolith column leak rate and steady-state equilibrium pressure delta. Height was found to be linearly related to leak rate –doubling the regolith column height consistently yielded around a 40% reduction in leak rate. Dynamic regolith draining was found to slightly increase leak rate, although to a lower degree than expected. Conclusion: Because of the transition into molecular gas flow through regolith, vacuum testing is required to properly estimate performance. Regolith columns should be designed as narrow as possible to avoid bridging and minimize leak rate, and as tall as is feasible to both further reduce leak rate and to help prevent bubbling, which has been shown to degrade the quality of the regolith seal. Disrupted soil was found to exhibit higher leak rates than pristine, as-poured soil, indicating the need to consider the impact of recovery from depressurization events. Regolith columns appear equally feasible for both dosed and continuous-feed reactors.

ISRU↗