Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Planning Package”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Rules of Use Report Engineering evaluations of nuclear material storage containers against the packaging requirements at TA-55

A set of obligations in the yearly storage container surveillance program, ensures that a retrospective approach is applied with loaded containers in inventory to confirm compliance with all “users” to ensure nuclear material storage container requirements are being followed. Validation that packaged containers are properly used, within a specific set of container types prescribed “bounding conditions of use,” is based on meeting requirements as identified in operating procedures associated with TA55-DOP-091, TA-55 Nuclear Material Packaging, and PA-RD-01022, Nuclear Material Packaging Requirements. The surveillance plan obligation requires the application of local area nuclear material accountability software or (LANMAS) to produce queries. The data queries are used to assess attributes of containers in storage these investigations are conducted on a bi-annual basis. This rules of use (ROU) compliance process ensures proper usage of storage containers as containment systems and therefore provides effective worker protection. It is structured as a supporting effort by implementing aspects of PA-AP-01207, Nuclear Material Container Safety Management at TA-55.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering evaluations of nuclear material storage containers against the packaging requirements at TA-55 (FY22 Rules of Use Report)

A set of obligations in the yearly storage container surveillance program, ensures that a retrospective approach is applied with loaded containers in inventory to confirm compliance with all “users” to ensure nuclear material storage container requirements are being followed. Validation that packaged containers are properly used, within a specific set of container types prescribed “bounding conditions of use,” is based on meeting requirements as identified in operating procedures associated with TA55-DOP-091, TA-55 Nuclear Material Packaging, and PA-RD-01022, Nuclear Material Packaging Requirements. The surveillance plan obligation requires the application of local area nuclear material accountability software or (LANMAS) to produce queries. The data queries are used to assess attributes of containers in storage these investigations are conducted on a bi-annual basis. This rules of use (ROU) compliance process ensures proper usage of storage containers as containment systems and therefore provides effective worker protection. It is structured as a supporting effort by implementing aspects of PA-AP-01207, Nuclear Material Container Safety Management at TA-55.

36 MATERIALS SCIENCE↗

Impact of Drilling Operations on Lunar Volatiles Capture: Thermal Vacuum Tests

In Situ Resource Utilization (ISRU) enables future planetary exploration by using local resources to supply mission consumables. This idea of 'living off the land' has the potential to reduce mission cost and risk. On the moon, water has been identified as a potential resource (for life support or propellant) at the lunar poles, where it exists as ice in the subsurface. However, the depth and content of this resource has yet to be confirmed on the ground; only remote detection data exists. The upcoming Resource Prospector mission (RP) will 'ground-truth' the water using a rover, drill, and the RESOLVE science package. As the 2020 planned mission date nears, component level hardware is being tested in relevant lunar conditions (thermal vacuum). In August 2014 a series of drilling tests were performed using the Honeybee Robotics Lunar Prospecting Drill inside a 'dirty' thermal vacuum chamber at the NASA Glenn Research Center. The drill used a unique auger design to capture and retain the lunar regolith simulant. The goal of these tests was to investigate volatiles (water) loss during drilling and sample transfer to a sample crucible in order to validate this regolith sampling method. Twelve soil samples were captured over the course of two tests at pressures of 10(exp-5) Torr and ambient temperatures between -80C to -20C. Each sample was obtained from a depth of 40 cm to 50 cm within a cryogenically frozen bed of NU-LHT-3M lunar regolith simulant doped with 5 wt% water. Upon acquisition, each sample was transferred and hermetically sealed inside a crucible. The samples were later baked out to determine water wt% and in turn volatile loss by following ASTM standard practices. Of the twelve tests, four sealed properly and lost an average of 30% of their available water during drilling and transfer. The variability in the results correlated well with ambient temperature (lower the temperature lower volatiles loss) and the trend agreed with the sublimation rates for the same temperature. Moisture retention also correlated with quantity of sample: a larger amount of material resulted in less water loss. The drilling process took an average of 10 minutes to capture and transfer each sample. The drilling power was approximately 20 Watt with a Weight on Bit of approximately 30 N. The bit temperature indicated little heat input into formation during the drilling process.

drilling↗

Optics of Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII): Delay Lines and Alignment

We present the optics of Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII) as it gets ready for launch. BETTII is an 8-meter baseline far-infrared (30-90 microns) interferometer mission with capabilities of spatially resolved spectroscopy aimed at studying star formation and galaxy evolution. The instrument collects light from its two arms, makes them interfere, divides them into two science channels (30-50 microns and 60-90 microns), and focuses them onto the detectors. It also separates out the NIR light (1-2.5 microns) and uses it for tip-tilt corrections of the telescope pointing. Currently, all the optical elements have been fabricated, heat treated, coated appropriately and are mounted on their respective assemblies. We are presenting the optical design challenges for such a balloon borne spatio-spectral interferometer, and discuss how they have been mitigated. The warm and cold delay lines are an important part of this optics train. The warm delay line corrects for path length differences between the left and the right arm due to balloon pendulation, while the cold delay line is aimed at introducing a systematic path length difference, thereby generating our interferograms from where we can derive information about the spectra. The details of their design and the results of the testing of these opto-mechanical parts are also discussed. The sensitivities of different optical elements on the interferograms produced have been determined with the help of simulations using FRED software package. Accordingly, an alignment plan is drawn up which makes use of a laser tracker, a CMM, theodolites and a LUPI interferometer.

Dhabal, Arnab↗

Reactor Vessel and Reactor Vessel Internals Segmentation at Zion Nuclear Power Station - 13230

Zion Nuclear Power Station (ZNPS) is a dual-unit Pressurized Water Reactor (PWR) nuclear power plant located on the Lake Michigan shoreline, in the city of Zion, Illinois approximately 64 km (40 miles) north of Chicago, Illinois and 67 km (42 miles) south of Milwaukee, Wisconsin. Each PWR is of the Westinghouse design and had a generation capacity of 1040 MW. Exelon Corporation operated both reactors with the first unit starting production of power in 1973 and the second unit coming on line in 1974. The operation of both reactors ceased in 1996/1997. In 2010 the Nuclear Regulatory Commission approved the transfer of Exelon Corporation's license to ZionSolutions, the Long Term Stewardship subsidiary of EnergySolutions responsible for the decommissioning of ZNPS. In October 2010, ZionSolutions awarded Siempelkamp Nuclear Services, Inc. (SNS) the contract to plan, segment, remove, and package both reactor vessels and their respective internals. This presentation discusses the tools employed by SNS to remove and segment the Reactor Vessel Internals (RVI) and Reactor Vessels (RV) and conveys the recent progress. SNS's mechanical segmentation tooling includes the C-HORCE (Circumferential Hydraulically Operated Cutting Equipment), BMT (Bolt Milling Tool), FaST (Former Attachment Severing Tool) and the VRS (Volume Reduction Station). Thermal segmentation of the reactor vessels will be accomplished using an Oxygen- Propane cutting system. The tools for internals segmentation were designed by SNS using their experience from other successful reactor and large component decommissioning and demolition (D and D) projects in the US. All of the designs allow for the mechanical segmentation of the internals remotely in the water-filled reactor cavities. The C-HORCE is designed to saw seven circumferential cuts through the Core Barrel and Thermal Shield walls with individual thicknesses up to 100 mm (4 inches). The BMT is designed to remove the bolts that fasten the Baffle Plates to the Baffle Former Plates. The FaST is designed to remove the Baffle Former Plates from the Core Barrel. The VRS further volume reduces segmented components using multiple configurations of the 38i and horizontal reciprocating saws. After the successful removal and volume reduction of the Internals, the RV will be segmented using a 'First in the US' thermal cutting process through a co-operative effort with Siempelkamp NIS Ingenieurgesellschaft mbH using their experience at the Stade NPP and Karlsruhe in Germany. SNS mobilized in the fall of 2011 to commence execution of the project in order to complete the RVI segmentation, removal and packaging activities for the first unit (Unit 2) by end of the 2012/beginning 2013 and then mobilize to the second unit, Unit 1. Parallel to the completion of the segmentation of the reactor vessel internals at Unit 1, SNS will segment the Unit 2 pressure vessel and at completion move to Unit 1. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Disposal to Optimize Decommissioning Waste Management - 17455

Cavendish Fluor Partnership (CFP) is teaming with the UK government's Nuclear Decommissioning Authority (NDA) to explore opportunities for onsite disposal of structures and wastes from decommissioning of twelve Magnox nuclear sites. CFP is piloting implementation of draft guidance issued by the Environmental Agency (EA), Scottish Environmental Protection Agency (SEPA) and Natural Resources Wales (NRW) designed to optimise management of wastes generated in closing nuclear sites positioned across Scotland, Wales and England. Where it can be demonstrated to be the best overall solution for people and the environment, on-site / in situ disposal as an option for optimising waste management could save millions of pounds sterling in the overall costs for site closure as opposed to previous plans that required retrieval, packaging, transportation and offsite disposal of all radioactive wastes generated during site decommissioning. The UK government's Department for Business, Energy and Industrial Strategy (BEIS), NDA, and UK regulators are consulting with stakeholders on a proposal to amend legislation and enable better, more proportionate regulation of nuclear sites in the final stages of decommissioning and clean-up. Practical application of existing UK legislation typically means removing most, if not all, radioactive waste and residual contamination from the nuclear licensed site for disposal or management elsewhere, irrespective of any wider health and safety, social, environmental or economic considerations. Proposed changes to legislation would give greater weight to the environment agencies' guidance and provide for a more sustainable approach where optimization could include on-site/in situ disposal solutions and early opportunities to reuse land with appropriate regulatory oversight. Recent characterization activities at two reactor sites have identified areas of sub-grade low level contamination in structures and soil around used fuel ponds. CFP, a partnership of UK-based Cavendish Nuclear Limited and US-based Fluor Corporation, has initiated preliminary site modelling that indicates much of this material, including significant volumes of sub-grade structures would be conducive for in situ disposal under the new proposed guidance. Based on Fluor experience with similar decommissioning projects at US Department of Energy sites, CFP will look to leverage in situ disposal to optimise decommissioning waste management and consequently optimise overall facility decommissioning strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Roadmap for Microelectronics: Charting the Semiconductor Industry's Path Over the Next 5, 10, and 20 Years

In the past, the role of strategic planning for semiconductor industry was met by the International Technology Roadmap for Semiconductors (ITRS), serving as a guiding light that provided manufacturers, designers, equipment suppliers, and researchers with direction years in advance. By providing a common framework for coordination across semiconductor industry stakeholders, technology development efforts were efficient and aligned. However, the dissolution of the ITRS in 2015 left a void, leading to years of disjointed efforts. Recognizing the need for unified guidance, the industry rallied for the creation of a new strategic plan, the Microelectronics and Advanced Packaging Technologies (MAPT) Roadmap (2023) was developed, through the efforts of hundreds of industry, academic and government experts, to provide detailed strategies for achieving these goals. This comprehensive plan outlines ambitious goals for the industry's future.

HPC, Roadmap, AI, Liquid Cooling, Power, Silicon, ↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Documentation of Radioactive Waste Packages for Disposal in the Konrad Repository - 16253

For the Konrad repository, the plan approval procedure has been completed in 2002. In 2007 all complaints filed against the repository were dismissed, so that there is a legal and un-appealable license decision available. The waste acceptance requirements were revised taking into account additional requirements from the plan approval decision. Today, there are already several hundred waste packages produced that meet all requirements for final disposal in Konrad. The acquisition, verification and quality assurance of the data relevant for disposal is performed in parallel to the waste treatment and packaging. This constitutes the development of database applications, on the one hand to capture and handle specific data for the waste packages to another to manage the disposal procedures. The development of a database application for recording disposal-relevant data of waste packages has already been completed with regard to the radiological requirements. Additional aspects based on the requirements of the plan approval decision, e.g. water law relevant aspects, have to be taken into account. Thus, an upgrade relating to the recording of groundwater debilitating substances will be carried out in a second step, which is expected to be completed in 2016. In parallel, the development of a database application is carried out to coordinate the waste package deliveries to the repository and to document their disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plan for Development and Application of Risk Assessment Approach for Transportation Package Approval of an MNPP for Domestic Highway Shipment

For nuclear reactors, Probabilistic Risk Assessment (PRA) has been conducted since the 1970s [e.g., see WASH-1400 (NRC 1975), NUREG-1150 (NRC 1990), and NUREG-1935 (Chang et al. 2012)]. PRA has also been used to assess a dry cask storage system at a nuclear power plant [see NUREG-1864 (NRC 2007)]. PRA techniques have also been applied to the transportation of spent nuclear fuel, most notably in NUREG/CR-4829 (Fischer et al. 1987), NUREG/CR-6672 (Sprung et al. 2000), and NUREG-2125 (NRC 2014). Additional guidance is provided in International Atomic Energy Agency (IAEA) IAEA-TECDOC-1346 (2003). Transportation PRA was also used in the evaluations of transportation impacts in reports such as the Repository Final Environmental Impact Statement (DOE 2002) and the Repository Final Supplemental Environmental Impact Statement (DOE 2008).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementing and diagnosing magnetic flux compression on the Z pulsed power accelerator

We report on the progress made to date for a Laboratory Directed Research and Development (LDRD) project aimed at diagnosing magnetic flux compression on the Z pulsed-power accelerator (0-20 MA in 100 ns). Each experiment consisted of an initially solid Be or Al liner (cylindrical tube), which was imploded using the Z accelerator's drive current (0-20 MA in 100 ns). The imploding liner compresses a 10-T axial seed field, B z ( 0 ) , supplied by an independently driven Helmholtz coil pair. Assuming perfect flux conservation, the axial field amplification should be well described by B z ( t ) = B z ( 0 ) x [ R ( 0 ) / R ( t )] 2 , where R is the liner's inner surface radius. With perfect flux conservation, B z ( t ) and dB z / dt values exceeding 10 4 T and 10 12 T/s, respectively, are expected. These large values, the diminishing liner volume, and the harsh environment on Z, make it particularly challenging to measure these fields. We report on our latest efforts to do so using three primary techniques: (1) micro B-dot probes to measure the fringe fields associated with flux compression, (2) streaked visible Zeeman absorption spectroscopy, and (3) fiber-based Faraday rotation. We also mention two new techniques that make use of the neutron diagnostics suite on Z. These techniques were not developed under this LDRD, but they could influence how we prioritize our efforts to diagnose magnetic flux compression on Z in the future. The first technique is based on the yield ratio of secondary DT to primary DD reactions. The second technique makes use of the secondary DT neutron time-of-flight energy spectra. Both of these techniques have been used successfully to infer the degree of magnetization at stagnation in fully integrated Magnetized Liner Inertial Fusion (MagLIF) experiments on Z [P. F. Schmit et al. , Phys. Rev. Lett. 113 , 155004 (2014); P. F. Knapp et al. , Phys. Plasmas, 22 , 056312 (2015)]. Finally, we present some recent developments for designing and fabricating novel micro B-dot probes to measure B z ( t ) inside of an imploding liner. In one approach, the micro B-dot loops were fabricated on a printed circuit board (PCB). The PCB was then soldered to off-the-shelf 0.020- inch-diameter semi-rigid coaxial cables, which were terminated with standard SMA connectors. These probes were recently tested using the COBRA pulsed power generator (0-1 MA in 100 ns) at Cornell University. In another approach, we are planning to use new multi-material 3D printing capabilities to fabricate novel micro B-dot packages. In the near future, we plan to 3D print these probes and then test them on the COBRA generator. With successful operation demonstrated at 1-MA, we will then make plans to use these probes on a 20-MA Z experiment.

47 OTHER INSTRUMENTATION↗

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine↗

Designing Flexibility into the Authorized Radioactive Contents of the 9982 Shipping Package (Midterm Report)

With regards to the planned contents for the 9982, three sets of radionuclides have been analyzed. A set of percentages by weight for plutonium from 3013 canisters, training sources sent in 9977’s, and americium standards from 9978’s were used as the bases for realistic contents that could be shipped in a 9982 package. Using the tables and limits located in G-BDR-A-00001 Rev. E, the calculations began by determining the mass limits for the radionuclides in each source. These mass limits were then used alongside the mass of the radionuclides in the sum-of-the-fractions methodology present in the content description. If this summation is less than or equal to one, the contents are allowed for shipment in the 9982. For the aforementioned sets, the listed radionuclides could be shipped as-is; however, the goal of the calculations is to determine the maximum content mass allowed. To do so, the percentages of weight were used to find where the summations would equal one rather than simply satisfy the inequality. By solving for the content mass when the inequality equals one, the maximum content mass is calculated, which can then be multiplied by each percent weight to get each radionuclide’s mass. The MCNP input files have also been compared to find differences between the oxide and metals forms of the radionuclides. While there are several differences present that make sense, such as oxides have more mass and a lower density due to the presence of oxygen in the oxide forms, there are other differences that are possibly unintentional. With the input files for the metals, both with and without a shielding pig, neutrons are being used in the photon models, seen by “imp:n” being present within the file instead of “imp:p”, where “imp” stands for the importance of a region for either neutrons or photons. Effectively, this results in the dose due to photons being modelled with neutrons instead, potentially resulting in the calculated dose rates being incorrect. As MCNP is proprietary, I do not have access to it here and must consult with the person handling the shielding calculations to discuss what these differences may affect and how to change them. If he remains out of the office or if fixing these files takes longer than expected, the final report may focus more on the contents while discussing these differences; however, it could potentially lack discussion on finalizing the planned contents due to the mass limits still needing to be calculated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spacelab utilization for future optics technology and applications

During the timeframe from 1980 to the year 2000, optics technology and applications experiments will require spacecraft that yield the maximum benefit at minimum cost. Current NASA plans include Spacelab, Power Extension Package (PEP), 25 kW Power System (PS), and a Science Applications and Space Platform (SASP), to satisfy the user needs in low earth orbit (LEO) and geosynchronous orbit (GEO). The purpose of this paper is to acquaint the optics technology user with NASA planning applicable to his future needs. This paper identifies current NASA concepts, including Spacelab hardware, that can be utilized to achieve a broad spectrum of optics scientific and application missions. Evolving configurations of Spacelab hardware elements will be shown that can be utilized as an orbital test platform in LEO and GEO.

De Sanctis, C. E.↗

Supplemental Environmental Project, Supplemental Sampling and Monitoring Work Plan Regarding Settlement Agreement and Stipulated Final Order HWB-14-20, Addendum 3: Certification Package: Sampling and Monitoring

In accordance with the Supplemental Environmental Project (SEP), Settlement Agreement and Stipulated Final Order HWB-14-20 (signed January 22, 2016), Addendum 3: Supplemental Sampling and Monitoring Work Plan (sent December 12, 2016), this correspondence certifies that the Sampling and Monitoring subproject has been completed. When all Supplemental Sampling and Monitoring SEP subprojects are completed, Department of Energy (DOE) and TRIAD, LLC shall submit a signed and sworn Certification of Completion in accordance with the approved SEP Addendum 3.

54 ENVIRONMENTAL SCIENCES↗