Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Rainbow Coverage Path Planning for a Patrolling Mobile Robot With Circular Sensing Range

In this paper, we proposed a coverage path (CP) planning approach for a mobile robot moving in a dynamically changing environment. Our family of algorithms begins by finding the first path around the center of interior obstacles/disks of a given target region (TR) through the Graham scan algorithm. The first path is then used as a foundational path to generate a collision free, first order differentiable, and observable CP through a complete set of input and output transformation algorithms which together form the rainbow CP planning approach. The last algorithm of the rainbow CP planning approach finds a sufficient number of observation points on the CP needed to observe the TR. The novelty of our rainbow CP planning approach is that it partitions the TR into different shapes with different properties needed to obtain complete coverage while achieving first order path differentiability. The main technical contributions of the proposed approach is to provide a holistic solution that segments any TR, uses triangulation to determine the line of sights and observation points, and computes the collision-free CP within a quadratic runtime. The proposed method can be readily generalized to address problems of higher dimensions, and it is scalable with respect to the size of TR and the number of robots. Computer simulations are used to illustrate the effectiveness and correctness of the proposed approach.

54 ENVIRONMENTAL SCIENCES↗

Initial Process Planning of a Hybrid Multi-Tasking Platform

Abstract Applications of hybrid technology are expanding from refurbishment and repair to low quantity, specialty part production, which are staple characteristics in medical implant, energy, and aerospace industry sectors, among others. This expansion has led to the development of the Mazak VC-500A/5X AM HWD, a wire fed laser cladding unit equipped with a standard 5 axis CNC. This unit is capable of building near net geometry of complex medium to large parts within a profitable timeframe, due to its comparatively high rate of deposition to that of a powder fed hybrid system. In this study, deposition and machining capabilities of the VC-500A/5X AM HWD are assessed through the production of three different test geometries by different process plans. Production of these test geometries is supported by an open loop sensor package primarily for monitoring machine health, data collection, and machine operator aid. The viability of extended deposition followed by machining is evaluated against a more cyclical strategy of reoccurring deposition and machining operations. Lastly, common defects in as-built geometries are evaluated and addressed through revisions to original process plans and toolpaths, indicating the need for continued innovation in hybrid manufacturing specific CAM/CAD software, as well as closed loop machine monitoring and quality control.

DeWitte, Lisa N.↗

Removal Action Design Plan (RADP) with Effectiveness Monitoring Plan (EMP) for the C-Area Groundwater (CAGW) Operable Unit (OU) (U)

The purpose of this Removal Action Design Plan (RADP) with Environmental Monitoring Plan (EMP) is to provide the final design information for the implementation of the non-time critical (NTC) removal action at the C-Area Groundwater (CAGW) Operable Unit (OU) and the post-construction plan for monitoring. Groundwater associated with the CAGW OU is contaminated with tritium and volatile organic compounds (VOCs), primarily trichloroethylene (TCE), due to releases associated with reactor operations. This removal action focusses on the TCE contamination in the distal portion of the groundwater plume. The United States Department of Energy (USDOE), US Environmental Protection Agency (USEPA), and South Carolina Department of Health and Environmental Control (SCDHEC), and USDOE agreed to conduct a NTC removal action at the CAGW OU to reduce potential risk to human health and the environment. This RADP presents the design details for the removal action including a description of the removal action construction strategy, removal action activities, and effectiveness monitoring plan. The removal action along with the Applicable or Relevant and Appropriate Requirements are presented in the Action Memorandum (AM), Revision 0 (USDOE 2018) for the CAGW OU and the Removal Site Evaluation Report/Engineering Evaluation/Cost Analysis (RSER/EE/CA) for C-Area Groundwater Operable Unit (SRNS 2018).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NTESS Retirement Income Plan, Summary Plan Description

National Technology & Engineering Solutions of Sandia, LLC (NTESS) has recently amended the NTESS Retirement Income Plan (Pension Plan). The updated Summary Plan Description (SPD) for the Pension Plan effective January 1, 2022 is provided.

99 GENERAL AND MISCELLANEOUS↗

Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

Source record↗

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.↗

Alaska SAR Facility Mission planning software - An interactive mission planning system

The Alaska Synthetic Aperture Radar (SAR) Facility Mission Planning Subsystem is an interactive mission planning software system on the VAXStation 2000. This system has the capability to generate satellite ephemerides and mission parameters related to synthetic aperture radar missions. The mission data can be viewed as overlays on the world map in various projections and zooms. The system also provides schedule planning capabilities, using the INGRES DBMS to keep track of the various plans and schedules generated by the mission planner.

Lo, Martin W.↗

Mission planning for Shuttle Imaging Radar-C (SIR-C) with a real-time interactive planning software

The Shuttle Imaging Radar-C (SIR-C) mission will operate from the payload bay of the space shuttle for 8 days, gathering Synthetic Aperture Radar (SAR) data over specific sites on the Earth. The short duration of the mission and the requirement for realtime planning offer challenges in mission planning and in the design of the Planning and Analysis Subsystem (PAS). The PAS generates shuttle ephemerides and mission planning data and provides an interactive real-time tool for quick mission replanning. It offers a multi-user and multiprocessing environment, and it is able to keep multiple versions of the mission timeline data while maintaining data integrity and security. Its flexible design allows one software to provide different menu options based on the user's operational function, and makes it easy to tailor the software for other Earth orbiting missions.

Potts, Su K.↗

NASCOM system development plan: System description, capabilities, and plans, FY 94-2

The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

Source record↗

Three Dimensional Rover/Lander/Orbiter Mission-Planning (3D-ROMPS) System: A Modern Approach to Mission Planning

NASA's current mission planning system is based on point design, two-dimensional display, spread sheets, and report technology. This technology does not enable engineers to analyze the results of parametric studies of missions plans. This technology will not support the increased observational complexity and data volume of missions like Cassini, Mars Reconnaissance Orbiter (MRO), Mars Science Laboratory (MSL), and Mars Sample Return (MSR). The goal of the 3D-ROMPS task has been to establish a set of operational mission planning and analysis tools in the Image Processing Laboratory (IPL) Mission Support Area (MSA) that will respond to engineering requirements for planning future Solar System Exploration (SSE) missions using a three-dimensional display.

Scharfe, Nathan D.↗

Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package, 2005: Composite Report on FAA Flight Plan and Operational Evaluation Plan. Version 7.0

The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.

Source record↗

FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.

Source record↗

Field-in-field plan does not improve the dosimetric outcome compared with the wedged beams plan for breast cancer radiotherapy

To evaluate and compare the dosimetry of field-in-field (FIF) and wedged beams (WB) techniques for patients with breast cancer receiving adjuvant radiotherapy after conservative surgery. A total of 89 patients with breast cancer participated in this study. Each patient received a computed tomography–based treatment plan with opposed tangential fields. Two planning techniques (FIF and WB) were generated for each patient by using the Pinnacle treatment-planning system. Three indices, the homogeneity index (HI), conformity index (CI), and uniformity index (UI), as well as maximum dose (D{sub max}), median dose (D{sub 50}), number of portals, monitor unit (MU), and lung volume at 20 Gy (lung{sub 20}) were used for comparison. The mean values tested using a t-test indicated that the WB technique had a significantly lower HI (p < 0.0001), a significantly higher CI (p < 0.0001), and a significantly higher D{sub 50} (p = 0.0002) than did the FIF technique. The FIF technique had a significantly higher D{sub max} compared with the WB technique, but lung{sub 20} did not exhibit a significant difference. By contrast, the FIF technique had a significantly higher UI and a significantly lower MU compared with the WB technique, but a significantly higher number of portals were found in the FIF technique. The FIF technique did not demonstrate superior dosimetric results. The WB technique had a significantly lower HI, higher CI, lower D{sub max}, and lower number of portals; but the FIF technique had a significantly higher UI and lower MU.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

WE-A-17A-06: Evaluation of An Automatic Interstitial Catheter Digitization Algorithm That Reduces Treatment Planning Time and Provide Means for Adaptive Re-Planning in HDR Brachytherapy of Gynecologic Cancers

Purpose: To evaluate an automatic interstitial catheter digitization algorithm that reduces treatment planning time and provide means for adaptive re-planning in HDR Brachytherapy of Gynecologic Cancers. Methods: The semi-automatic catheter digitization tool utilizes a region growing algorithm in conjunction with a spline model of the catheters. The CT images were first pre-processed to enhance the contrast between the catheters and soft tissue. Several seed locations were selected in each catheter for the region growing algorithm. The spline model of the catheters assisted in the region growing by preventing inter-catheter cross-over caused by air or metal artifacts. Source dwell positions from day one CT scans were applied to subsequent CTs and forward calculated using the automatically digitized catheter positions. This method was applied to 10 patients who had received HDR interstitial brachytherapy on an IRB approved image-guided radiation therapy protocol. The prescribed dose was 18.75 or 20 Gy delivered in 5 fractions, twice daily, over 3 consecutive days. Dosimetric comparisons were made between automatic and manual digitization on day two CTs. Results: The region growing algorithm, assisted by the spline model of the catheters, was able to digitize all catheters. The difference between automatic and manually digitized positions was 0.8±0.3 mm. The digitization time ranged from 34 minutes to 43 minutes with a mean digitization time of 37 minutes. The bulk of the time was spent on manual selection of initial seed positions and spline parameter adjustments. There was no significance difference in dosimetric parameters between the automatic and manually digitized plans. D90% to the CTV was 91.5±4.4% for the manual digitization versus 91.4±4.4% for the automatic digitization (p=0.56). Conclusion: A region growing algorithm was developed to semi-automatically digitize interstitial catheters in HDR brachytherapy using the Syed-Neblett template. This automatic digitization tool was shown to be accurate compared to manual digitization.

60 APPLIED LIFE SCIENCES↗

Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Standard review plan for evaluating nuclear power reactor license termination plans

This standard review plan (SRP) guides the staff of the U.S. Nuclear Regulatory Commission (NRC) in conducting safety reviews of license termination plans (LTPs). The principal purpose of this SRP is to ensure the quality and uniformity of NRC staff reviews and to present a well-defined base from which to evaluate the requirements for terminating the license of a nuclear power plant. It is also the purpose of this SRP to make information about regulatory matters widely available, so that interested members of the public and the nuclear industry can gain a better understanding of the NRC staff's review process. Specific guidance for licensees is included in Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors." Licensees may also use this SRP to assist in developing an LTP. The SRP presents the acceptance criteria for all areas of review for license termination, and identifies the matters to be reviewed, the basis for the review, and the conclusions that are sought. For example, NUREG-1757, "Consolidated Decommissioning Guidance" offers additional guidance on how to demonstrate compliance with the unrestricted release, restricted release, and alternative criteria for license termination, in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 20, "Standards for Protection against Radiation," Subpart E, "Radiological Criteria for License Termination." To avoid duplication of information, this SRP references applicable sections of NUREG-1757 for additional guidance. In addition, the NRC has issued supplemental guidance that will subsequently be consolidated into NUREG-1757 to address partial site release before LTP approval, and compliance with 10 CFR Part 20, Subpart E. It should be noted that the memorandum of understanding (MOU) between the Environmental Protection Agency and NRC may contain consultation triggers for some radionuclides that may be lower than the NUREG-1757 Vol. 2 Revision 1, Appendix H screening values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Duke Energy’s Integrated System and Operations Planning: A comparative analysis of integrated planning practices

Lawrence Berkeley National Laboratory and the National Renewable Energy Laboratory provided technical assistance to the South Carolina Office of Regulatory Staff to examine how Duke Energy’s Integrated System Operations Planning (ISOP) framework interacts with other electricity planning processes in South Carolina. While this report was prepared for the South Carolina ORS, the information contained herein may be useful to audiences in other states who are interested in IDP, including public utility commissions, state energy offices, other state agencies, utilities, and stakeholders. The report discusses how to access the ISOP process diagram created for the report, provides observations about Duke Energy’s ISOP from our interviews and review of publicly available materials; and assesses ISOP, based on best practices for integrated distribution planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗