Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Free-Surface Liquid Lithium Flow Modeling and Stability Analysis for Fusion Applications

Liquid metal plasma facing components are considered an attractive design choice for fusion devices including pilot plants. Virtual prototyping of such devices includes modeling of free-surface flow of the electrically conductive liquid, which requires computational fluid dynamics (CFD) and magnetohydrodynamics (MHD) simulations. Numerical tools capable of simulating flows and heat transfer in the free-surface MHD flow were developed at PPPL based on the customized ANSYS CFX. Here, MHD is introduced using a magnetic vector potential approach. Free-surface flow capabilities are available in the code and were tested. Special stabilization procedures were derived and applied to improve convergence of the momentum equations with the source terms due to the Lorentz force and surface tension. Important characteristics of the fusion-relevant liquid metal flow is free surface smoothness and stability. Heat flux from the plasma impacts the liquid surface at a very acute angle, so any change of the free surface from axisymmetry can dramatically increase the local heat flux density and thus create excessive evaporation of liquid lithium into the plasma, which is detrimental to operations. Stability analysis of the liquid metal film flow was performed to determine applicable flow regimes. Thin film flow along horizontal wall is considered. Effects of gravity, magnetic field, and surface tension are included in the analysis.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

White Paper on Lithium-Ion Battery Safety for use in Safety Planning at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is an underground facility designed to safely dispose of radioactive waste. The WIPP uses many heavy vehicles to transport materials and equipment underground. Most of these vehicles are powered by traditional internal combustion engines (ICE) with diesel fuel. Recently, electric vehicles (EVs) powered with batteries have been used at the WIPP. EVs have very low operational and maintenance costs, not considering battery replacements, and they have zero emissions during operation. This absence of emissions makes them ideal for underground facilities with limited ventilation. Even if a facility has robust ventilation normally, ventilation systems can break down leading to restrictions in ICE powered operations. Figure 1 shows a rendering of the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear, Land marker for a Waste Isolation Site: International Architecture Competition - 18240

The design and construction of a nuclear waste marker must include many architectural considerations. Very little research has been conducted by architects to address this issue to date. Historically, the task of designating a nuclear waste site has been a discussion predominantly contained within the scientific and engineering communities. In an effort to engage architects within this dialogue, arch out loud hosted the NUCLEAR competition as an international, architectural investigation into the design of a nuclear waste site marker. The NUCLEAR competition asks participants to design a marker to designate the site of the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The marker will be meant to be a means of passive institutional controls (PICs) to deter inadvertent human intrusion upon the site and should last 10,000 years. The NUCLEAR competition defined the purpose of the nuclear waste site marker as a means to communicate the danger of inadvertent intrusion from future generations. The competition requires that entries must be both legible in communication and durable in their construction. The competition brief challenged participants to consider how customs and languages will evolve over time and to predict what motivations future generations might have for digging at the site. Other background information was provided about the site such as how waste was stored and how the unique geology of the site seals the waste. The 1993 Sandia National Laboratories report titled Expert Judgment on Markers to Deter Inadvertent Human Intrusion into the Waste Isolation Pilot Plant [1] was referenced along with the 1992 WIPP Land Withdrawal Act [2], interviews with WIPP scientists [3] involved with the WIPP PICs program and the Nuclear Energy Agency Records Knowledge and Memory working group. Competition participants were given digital 3-D Computer-Aided Design models for reference that included the underground storage portion of the site, existing buildings and the 16-square-mile site boundary identified in the 1992 WIPP Land Withdrawal Act [2]. This paper will: - Provide a detailed description of the submitted proposals including graphic analysis of the visualizations, diagrams, technical drawings, jury comments and statements. - Catalogue and identify the consistent themes within all submissions with possible categories including: 1) overall architectural form and language, 2) integration of written language and symbols within architecture, 3) use of technology and robotics, 4) construction methods and materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraterrestrial resources: Implications from terrestrial experience

Terrestrial mining experience indicates that the overwhelming criterion of a potentially economic deposit is its recoverable concentration of the desired mineral or element. Recovery can be based on contrast in physical and/or chemical properties, but processes based on physical properties are typically less expensive. As several processes generally are used in sequence, they have a profound effect on extraction costs. These criteria will also apply to extraterrestrial resources. Although the extreme cost of access to space makes even ordinary materials extremely valuable, this inaccessibility also makes capital and maintenance costs extremely high. The following four development stages will apply, especially with the additional unknowns of an extraterrestrial environment: (1) Exploration for the highest grade of the mineral or element desired (because the extraction plant must be simple, cheap, and rugged to minimize capital and maintenance costs, high grade is extremely important); (2) Laboratory testing of various physical and/or chemical separation techniques on the possible ore to determine if the material can indeed be recovered economically; (3) a pilot plant test, in which a large sample is dug from the deposit to determine excavation rates, power requirements, and equipment wear. (This sample is then run through a pilot mill designed on the basis of the laboratory testing. Pilot plant testing must be carried out at increasing scales, but several trials are generally necessary at each scale before the size of operations can be increased. Moreover, pilot testing is necessary for each new mineral deposit); and (4) Last is the full-scale mine and plant start-up. (New problems invariably occur at this point, but they can be kept to a minimum if the pilot plant tests were realistic). If such a development plan is followed rigorously, major cost overruns, with their potentially disastrous effects on resource developments, can be avoided.

Kuck, David L.↗

Comparison of Options for a Pilot Plant Fusion Nuclear Mission

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Commercialization of an Atmospheric Iron-based CDCL Process for Power Production: Phase II

This project is focused on supporting the use of coal for power production through the continued development of the Coal Direct Chemical Looping (CDCL) technology. The objective of the program is to evaluate the commercial viability of the CDCL technology. This report describes the results of Phase II of the project up to the date of the period of performance as listed above. The Phase II objectives are to reduce the technology gaps associated with the oxygen-carrier properties, coal conversion, and reducer design of the CDCL process. During this project, a 250 kWth CDCL pilot unit was designed, fabricated, installed and subsequently tested to demonstrate critical components. The pilot unit simulates actual design concepts envisioned for the commercial unit. The knowledge gained from laboratory and pilot-scale testing is used to refine the commercial plant design and cost analyses.

20 FOSSIL-FUELED POWER PLANTS↗

Reconsolidated Salt as a Geotechnical Barrier - 16535

Salt as a geologic medium has several attributes favorable to long-term isolation of waste placed in mined openings. Salt formations are largely impermeable and induced fractures heal as stress returns to equilibrium. Permanent isolation also depends upon the ability to construct geotechnical barriers that achieve nearly the same high-performance characteristics attributed to the native salt formation. Salt repository seal concepts often include elements of reconstituted granular salt. As a specific case in point, the Waste Isolation Pilot Plant recently received regulatory approval to change the disposal panel closure design from an engineered barrier constructed of a salt-based concrete to one that employs simple run-of-mine salt and temporary bulkheads for isolation from ventilation. The Waste Isolation Pilot Plant is a radioactive waste disposal repository for defense related transuranic elements mined from the Permian evaporite salt beds in southeast New Mexico. Its approved shaft seal design incorporates barrier components comprising salt-based concrete, bentonite, and substantial depths of crushed salt compacted to enhance reconsolidation. This paper will focus on crushed salt behavior when applied as drift closures to isolate disposal rooms during operations. Scientific aspects of salt reconsolidation have been studied extensively. The technical basis for geotechnical barrier performance has been strengthened by recent experimental findings and analogue comparisons. The panel closure change was accompanied by recognition that granular salt will return to a physical state similar to the halite surrounding it. Use of run-of-mine salt ensures physical and chemical compatibility with the repository environment and simplifies ongoing disposal operations. Our current knowledge and expected outcome of research can be assimilated with lessons learned to put forward designs and operational concepts for the next generation of salt repositories. Mined salt repositories have the potential to isolate permanently vast inventories of radioactive and hazardous wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconsolidated Salt as a Geotechnical Barrier

Salt as a geologic medium has several attributes favorable to long-term isolation of waste placed in mined openings. Salt formations are largely impermeable and induced fractures heal as stress returns to equilibrium. Permanent isolation also depends upon the ability to construct geotechnical barriers that achieve nearly the same high-performance characteristics attributed to the native salt formation. Salt repository seal concepts often include elements of reconstituted granular salt. As a specific case in point, the Waste Isolation Pilot Plant recently received regulatory approval to change the disposal panel closure design from an engineered barrier constructed of a salt-based concrete to one that employs simple run-of-mine salt and temporary bulkheads for isolation from ventilation. The Waste Isolation Pilot Plant is a radioactive waste disposal repository for defense-related transuranic elements mined from the Permian evaporite salt beds in southeast New Mexico. Its approved shaft seal design incorporates barrier components comprising salt-based concrete, bentonite, and substantial depths of crushed salt compacted to enhance reconsolidation. This paper will focus on crushed salt behavior when applied as drift closures to isolate disposal rooms during operations. Scientific aspects of salt reconsolidation have been studied extensively. The technical basis for geotechnical barrier performance has been strengthened by recent experimental findings and analogue comparisons. The panel closure change was accompanied by recognition that granular salt will return to a physical state similar to the halite surrounding it. Use of run-of-mine salt ensures physical and chemical compatibility with the repository environment and simplifies ongoing disposal operations. Our current knowledge and expected outcome of research can be assimilated with lessons learned to put forward designs and operational concepts for the next generation of salt repositories. Mined salt repositories have the potential to isolate permanently vast inventories of radioactive and hazardous wastes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptable for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.

Devenney, Martin↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Electro Catalytic Oxidation (ECO) Operation

The power industry in the United States is faced with meeting many new regulations to reduce a number of air pollutants including sulfur dioxide, nitrogen oxides, fine particulate matter, and mercury. With over 1,000 power plants in the US, this is a daunting task. In some cases, traditional pollution control technologies such as wet scrubbers and SCRs are not feasible. Powerspan's Electro-Catalytic Oxidation, or ECO{reg_sign} process combines four pollution control devices into a single integrated system that can be installed after a power plant's particulate control device. Besides achieving major reductions in emissions of sulfur dioxide (SO{sub 2}), nitrogen oxides (NOx), fine particulate matter (PM2.5) and mercury (Hg), ECO produces a highly marketable fertilizer, which can help offset the operating costs of the process system. Powerspan has been operating a 50-MW ECO commercial demonstration unit (CDU) at FirstEnergy Corp.'s R.E. Burger Plant near Shadyside, Ohio, since February 2004. In addition to the CDU, a test loop has been constructed beside the CDU to demonstrate higher NOx removal rates and test various scrubber packing types and wet ESP configurations. Furthermore, Powerspan has developed the ECO{reg_sign}{sub 2} technology, a regenerative process that uses a proprietary solvent to capture CO{sub 2} from flue gas. The CO{sub 2} capture takes place after the capture of NOx, SO{sub 2}, mercury, and fine particulate matter. Once the CO{sub 2} is captured, the proprietary solution is regenerated to release CO{sub 2} in a form that is ready for geological storage or beneficial use. Pilot scale testing of ECO{sub 2} began in early 2009 at FirstEnergy's Burger Plant. The ECO{sub 2} pilot unit is designed to process a 1-MW flue gas stream and produce 20 tons of CO{sub 2} per day, achieving a 90% CO{sub 2} capture rate. The ECO{sub 2} pilot program provided the opportunity to confirm process design and cost estimates, and prepare for large scale capture and sequestration projects. The objectives of this project were to prove at a commercial scale that ECO is capable of extended operations over a range of conditions, that it meets the reliability requirements of a typical utility, and that the fertilizer co-product can be consistently generated, providing ECO with an economic advantage over conventional technologies currently available. Further objectives of the project were to show that the ECO system provides flue gas that meets the inlet standards necessary for ECO{sub 2} to operate, and that the outlet CO{sub 2} and other constituents produced by the ECO{sub 2} pilot can meet Kinder-Morgan pipeline standards for purposes of sequestration. All project objectives are consistent with DOE's Pollution Control Innovations for Power Plants program goals.

54 ENVIRONMENTAL SCIENCES↗

Advanced gasifier and water gas shift technologies for low cost coal conversion to high hydrogen syngas

The Gas Technology Institute (GTI) and team members RTI International (RTI), Coanda Research and Development, and Nexant, are developing and maturing a portfolio of technologies to meet the United States Department of Energy (DOE) goals for lowering the cost of producing high hydrogen syngas from coal for use in carbon capture power and coal-to-liquids/chemicals. This project matured an advanced pilot-scale gasifier, with scalable and commercially traceable components, to readiness for use in a first-of-a-kind commercially-relevant demonstration plant on the scale of 500-1,000 tons per day (TPD). This was accomplished through cold flow simulation of the gasifier quench zone transition region at Coanda and through an extensive hotfire gasifier test program on highly reactive coal and high ash/high ash fusion temperature coals at GTI. RTI matured an advanced water gas shift process and catalyst to readiness for testing at pilot plant scale through catalyst development and testing, and development of a preliminary design basis for a pilot scale reactor demonstrating the catalyst. A techno-economic analysis was performed by Nexant to assess the potential benefits of the gasifier and catalyst technologies in the context of power production and methanol production. This analysis showed an 18%reduction in cost of power and a 19%reduction in cost of methanol relative to DOE reference baseline cases.

01 COAL, LIGNITE, AND PEAT↗

Operation and Process Control Development for a Pilot-Scale Leaching and Solvent Extraction Circuit Recovering Rare Earth Elements from Coal-Based Sources

The US Department of Energy in 2010 has identified several rare earth elements as critical materials to clean technologies. As part of ongoing research in REEs recovery from coal sources, the University of Kentucky has designed, developed and is demonstrating a ¼ ton/hour pilot-scale processing plant to produce high grade REEs from coal sources. To accomplish process control, PLC systems design/deployment, overall operational design and the utilization of Six Sigma design methodology by the team will be presented. Furthermore, application of the controls design, both procedural and electronic, team’s utilization of data analysis and integration for database decision-making will be discussed.

Leaching↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗