Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Periodic systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Compounding climate change impacts during high stress periods for a high wind and solar power system in Texas

Power system planning aims at ensuring that sufficient supply- and demand-side assets exist to meet electricity demand at all times. For a Texas electric power system with high wind and solar penetrations, we quantify how climate change will affect supply and demand during three types of high stress periods for the power grid: high demand hours, high net demand hours, and high system ramp hours. We specifically quantify effects on demand, reductions in available thermal capacity (i.e. thermal deratings), wind and solar generation, and net demand. We estimate each using meteorological variables from five climate change projections (2041-2050) assuming Representative Concentration Pathway 8.5 and from a reference period (1996-2005). All five projections indicate that climate change will increase demand by up to 2 GWh during high demand hours (4% of demand in the reference period) and increase net demand by up to 3 GWh during high net demand periods (6% of net demand in the reference period). All five projections also indicate thermal deratings will increase during high demand and net demand periods by up to 2 GWh and high net demand ramps will increase by up to 2 GW. Overall, our results indicate compounding effects of climate change in Texas will necessitate greater investment in peak and flexible capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

The Discovery of the Long-Period, Eccentric Planet Kepler-88 d and System Characterization with Radial Velocities and Photodynamical Analysis

We present the discovery of Kepler-88 d (P{sub d} = 1403±14 days, Msini{sub d}=965±44 M{sub ⊕}=3.04±0.13 M{sub J}, e{sub d}=0.41±0.03) based on six years of radial velocity (RV) follow-up from the W. M. Keck Observatory High Resolution Echelle Spectrometer spectrograph. Kepler-88 has two previously identified planets. Kepler-88 b (KOI-142.01) transits in the NASA Kepler photometry and has very large transit timing variations (TTVs). Nesvorný et al. performed a dynamical analysis of the TTVs to uniquely identify the orbital period and mass of the perturbing planet (Kepler-88 c), which was later was confirmed with RVs from the Observatoire de Haute-Provence (OHP). To fully explore the architecture of this system, we performed photodynamical modeling on the Kepler photometry combined with the RVs from Keck and OHP and stellar parameters from spectroscopy and Gaia. Planet d is not detectable in the photometry, and long-baseline RVs are needed to ascertain its presence. A photodynamical model simultaneously optimized to fit the RVs and Kepler photometry yields the most precise planet masses and orbital properties yet for b and c: P{sub b}=10.91647±0.00014 days, M{sub b}=9.5±1.2 M{sub ⊕}, P{sub c}=22.2649±0.0007 days, and M{sub c}=214.0±5.3 M{sub ⊕}. The photodynamical solution also finds that planets b and c have low eccentricites and low mutual inclination, are apsidally anti-aligned, and have conjunctions on the same hemisphere of the star. Continued RV follow-up of systems with small planets will improve our understanding of the link between inner planetary system architectures and giant planets.

79 ASTRONOMY AND ASTROPHYSICS↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-the-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-tlie-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Shedding far-ultraviolet light on the donor star and evolutionary state of the neutron-star LMXB Swift J1858.6−0814

ABSTRACT The evolution of accreting X-ray binary systems is closely coupled to the properties of their donor stars. Consequently, we can constrain the evolutionary track a system is by establishing the nature of its donor. Here, we present far-ultraviolet (far-UV) spectroscopy of the transient neutron-star low-mass X-ray binary J1858 in different accretion states (low-hard, high-hard, and soft). All of these spectra exhibit anomalous N v, C iv, Si iv, and He ii lines, suggesting that its donor star has undergone CNO processing. We also determine the donor’s effective temperature, Td ≃ 5700 K, and radius, Rd ≃ 1.7 R⊙, based on photometric observations obtained during quiescence. Lastly, we leverage the transient nature of the system to set an upper limit of $\dot{M}_{\rm acc} \lesssim 10^{-8.5}~{\rm M}_{\odot }~\mathrm{ yr}^{-1}$ on the present-day mass-transfer rate. Combining these with the orbital period of the system, Porb = 21.3 h, we search for viable evolution paths. The initial donor masses in the allowed solutions span the range 1 M⊙ ≲ Md,i ≲ 3.5 M⊙. All but the lowest masses in this range are consistent with the strong CNO-processing signature in the UV line ratios. The present-day donor mass in the permitted tracks are 0.5 M⊙ ≲ Md,obs ≲ 1.3 M⊙, higher than suggested by eclipse modelling. Since Porb is close to the so-called bifurcation period, both converging and diverging binary tracks are permitted. If the former is confirmed, J1858 will end its life as an ultracompact system with a substellar donor.

Castro Segura, N. (ORCID:0000000258700443)↗

Economic and environmental impacts of a non-traditional combined heat and power system for a discrete manufacturing facility

Combined heat and power (CHP) is an electricity generation strategy that benefits all sides with a vested interest in the nations’ energy future. The technology allows for the efficient production of electricity and heat, which in turn reduces the carbon footprint and energy costs of a facility with significant heat and electricity loads. This paper investigates, through a detailed dynamic simulation, how a highly non-traditional CHP facility can leverage those forces to economically and environmentally benefit. Four system configurations of a composites manufacturing facility, one existing and three proposed systems, including two CHP configurations and one combined cooling, heating, and power (CCHP) configuration are evaluated from both economic and environmental views. The three proposed configurations are based on a 600 kW microturbine as the primary mover. The dynamic model showed great potential to capture the dynamics of the system configurations including the dynamics of temperature, oven exhaust fraction, electrical efficiency, and overall efficiency of the system configurations. All 3 CHP systems have a payback period between 8.03 and 8.33 years. The proposed system configurations reduce up to 22.7% of the CO 2 emission compared to the existing facility, supplying the demands in a cleaner manner.

42 ENGINEERING↗

Extended Lagrangian Born–Oppenheimer molecular dynamics for orbital-free density-functional theory and polarizable charge equilibration models

We report extended Lagrangian Born–Oppenheimer molecular dynamics (XL-BOMD) is formulated for orbital-free Hohenberg–Kohn density-functional theory and for charge equilibration and polarizable force-field models that can be derived from the same orbital-free framework. The purpose is to introduce the most recent features of orbital-based XL-BOMD to molecular dynamics simulations based on charge equilibration and polarizable force-field models. These features include a metric tensor generalization of the extended harmonic potential, preconditioners, and the ability to use only a single Coulomb summation to determine the fully equilibrated charges and the interatomic forces in each time step for the shadow Born–Oppenheimer potential energy surface. The orbital-free formulation has a charge-dependent, short-range energy term that is separate from long-range Coulomb interactions. This enables local parameterizations of the short-range energy term, while the long-range electrostatic interactions can be treated separately. The theory is illustrated for molecular dynamics simulations of an atomistic system described by a charge equilibration model with periodic boundary conditions. The system of linear equations that determines the equilibrated charges and the forces is diagonal, and only a single Ewald summation is needed in each time step. The simulations exhibit the same features in accuracy, convergence, and stability as are expected from orbital-based XL-BOMD.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Phase Modeling of the TRAPPIST-1 Planetary Atmospheres

Transiting compact multiplanet systems provide many unique opportunities to characterize the planets, including studies of size distributions, mean densities, orbital dynamics, and atmospheric compositions. The relatively short orbital periods in these systems ensure that events requiring specific orbital locations of the planets (such as primary transit and secondary eclipse points) occur with high frequency. The orbital motion and associated phase variations of the planets provide a means to constrain the atmospheric compositions through measurement of their albedos. Here we describe the expected phase variations of the TRAPPIST-1 system and times of superior conjunction when the summation of phase effects produce maximum amplitudes. We also describe the infrared flux emitted by the TRAPPIST-1 planets and the influence on the overall phase amplitudes. We further present the results from using the global circulation model ROCKE-3D to model the atmospheres of TRAPPIST-1e and TRAPPIST-1f assuming modern Earth and Archean atmospheric compositions. These simulations are used to calculate predicted phase curves for both reflected light and thermal emission components. We discuss the detectability of these signatures and the future prospects for similar studies of phase variations for relatively faint M stars.

79 ASTRONOMY AND ASTROPHYSICS↗

Unveiling User Behavior on Summit Login Nodes as a User

We observe and analyze usage of the login nodes of the leadership class Summit supercomputer from the perspective of an ordinary user—not a system administrator—by periodically sampling user activities (job queues, running processes, etc.) for two full years (2020–2021). Our findings unveil key usage patterns that evidence misuse of the system, including gaming the policies, impairing I/O performance, and using login nodes as a sole computing resource. Our analysis highlights observed patterns for the execution of complex computations (workflows), which are key for processing large-scale applications.

Wilkinson, Sean↗

Phosphorus budgets of intensively managed row crops at a long–term agroecosystem research site in the upper US Midwest

Phosphorus (P) budgets for cropping systems provide insights for keeping soil P at optimal levels for crops while avoiding excess inputs. We quantified 12 years of P inputs (fertilizer and atmospheric deposition) and outputs (harvest and leaching losses) for replicated maize (Zea mays L.)—soybean (Glycine max L.)—wheat (Triticum aestivum) crop rotations under conventional, no-till, reduced input, and biologically based (organic without compost or manure) management systems at the Kellogg Biological Station LTAR site in southwest Michigan. Conventional, no-till, and reduced input systems were fertilized between 13 and 50 kg P ha –1 depending on year. Soil test phosphorus (STP) was measured at 0- to 25-cm depth every autumn. Leached P was measured as dissolved P in the soil solution sampled beneath the rooting depth and combined with modeled percolation. Fertilization and harvest were the predominant P fluxes in the fertilized systems, whereas only harvest dominated P flux in the unfertilized organic system. Leaching losses were minor terms in the budgets, but leachate concentrations were nevertheless close to the range of concern for downstream eutrophication. Over the 12-year study period, the organic system exhibited a negative P balance (–82.0 kg P ha –1 ), coinciding with suboptimal STP levels, suggesting a need for P supplementation. In contrast, the fertilized systems showed positive P balances (mean: 70.1 kg P ha –1 ) with STP levels well above agronomic optima. Results underscore the importance of tailored P management strategies to sustain crop productivity while mitigating environmental impacts.

60 APPLIED LIFE SCIENCES↗

Many-Body Physics in the NISQ Era: Quantum Programming a Discrete Time Crystal

Recent progress in the realm of noisy intermediate-scale quantum (NISQ) devices represents an exciting opportunity for many-body physics by introducing new laboratory platforms with unprecedented control and measurement capabilities. We explore the implications of NISQ platforms for many-body physics in a practical sense: we ask which physical phenomena, in the domain of quantum statistical mechanics, they may realize more readily than traditional experimental platforms. While a universal quantum computer can simulate any system, the eponymous noise inherent to NISQ devices practically favors certain simulation tasks over others in the near term. As a particularly well-suited target, we identify discrete time crystals (DTCs), novel nonequilibrium states of matter that break time translation symmetry. These can only be realized in the intrinsically out-of-equilibrium setting of periodically driven quantum systems stabilized by disorder-induced many-body localization. While promising precursors of the DTC have been observed across a variety of experimental platforms—ranging from trapped ions to nitrogen-vacancy centers to NMR crystals—none have all the necessary ingredients for realizing a fully fledged incarnation of this phase, and for detecting its signature long-range spatiotemporal order. We show that a new generation of quantum simulators can be programmed to realize the DTC phase and to experimentally detect its dynamical properties, a task requiring extensive capabilities for programmability, initialization, and readout. Specifically, the architecture of Google’s Sycamore processor is a remarkably close match for the task at hand. We also discuss the effects of environmental decoherence, and how they can be distinguished from ‘internal’ decoherence coming from closed-system thermalization dynamics. Already with existing technology and noise levels, we find that DTC spatiotemporal order would be observable over hundreds of periods, with parametric improvements to come as the hardware advances.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Infinite temperature at zero energy

We construct a family of static, geometrically local Hamiltonians that inherit eigenstate properties of periodically-driven (Floquet) systems. Our construction is a variation of the Feynman-Kitaev clock -- a well-known mapping between quantum circuits and local Hamiltonians -- where the clock register is given periodic boundary conditions. Assuming the eigenstate thermalization hypothesis (ETH) holds for the input circuit, our construction yields Hamiltonians whose eigenstates have properties characteristic of infinite temperature, like volume-law entanglement entropy, across the whole spectrum -- including the ground state. We then construct a family of exactly solvable Floquet quantum circuits whose eigenstates are shown to obey the ETH at infinite temperature. Combining the two constructions yields a new family of local Hamiltonians with provably volume-law-entangled ground states, and the first such construction where the volume law holds for all contiguous subsystems.

FOS: Physical sciences↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flexible Ramping Product Procurement in Day-Ahead Markets

Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. Here, in many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

The SDSS-HET Survey of Kepler Eclipsing Binaries. A Sample of Four Benchmark Binaries

The purpose of this work is to extend a sample of accurately modeled, benchmark-grade eclipsing binaries (EBs) with accurately determined masses and radii. We select four "well-behaved" Kepler binaries, KIC 2306740, KIC 4076952, KIC 5193386 and KIC 5288543, each with at least eight double-lined spectra from the Apache Point Observatory Galactic Evolution Experiment instrument that is part of the Sloan Digital Sky Surveys III and IV, and from the Hobby–Eberly High Resolution Spectrograph. We obtain masses and radii with uncertainties of 2.5% or less for all four systems. Three of these systems have orbital periods longer than 9 days, and thus populate an undersampled region of the parameter space for extremely well-characterized detached EBs. We compare the derived masses and radii against MESA MIST isochrones to determine the ages of the systems. All systems were found to be coeval, showing that the results are consistent across MESA MIST and PHOEBE .

79 ASTRONOMY AND ASTROPHYSICS↗

Device Design and Periodic Motion Control of an Ocean Kite System for Hydrokinetic Energy Harvesting (Final Technical Report)

This project focused on the modeling, device design, control system design, and progressive experimental validation of an energy-harvesting underwater kite harvesting energy through cyclic spooling motion. This adds to the portfolio of the DoE Water Power Technologies Office has resulted in several key outcomes that will further the development of energy-harvesting kites, as detailed in the report.

16 TIDAL AND WAVE POWER↗