Seamless Digital Environment – Data Analytics Use Case Study

Multiple research efforts in the U.S Department of Energy Light Water Reactor Sustainability (LWRS) Program studies the need and design of an underlying architecture to support the increased amount and use of data in the nuclear power plant. More specifically the three LWRS research efforts; Digital Architecture for an Automated Plant, Automated Work Packages, Computer-Based Procedures for Field Workers, and the Online Monitoring efforts all have identified the need for a digital architecture and more importantly the need for a Seamless Digital Environment (SDE). A SDE provides a mean to access multiple applications, gather the data points needed, conduct the analysis requested, and present the result to the user with minimal or no effort by the user. During the 2016 annual Nuclear Information Technology Strategic Leadership (NITSL) group meeting the nuclear utilities identified the need for research focused on data analytics. The effort was to develop and evaluate use cases for data mining and analytics for employing information from plant sensors and database for use in developing improved business analytics. The goal of the study is to research potential approaches to building an analytics solution for equipment reliability, on a small scale, focusing on either a single piece of equipment or a single system. The analytics solution will likely consist of a data integration layer, predictive and machine learning layer and the user interface layer that will display the output of the analysis in a straight forward, easy to consume manner. This report describes the use case study initiated by NITSL and conducted in a collaboration between Idaho National Laboratory, Arizona Public Service – Palo Verde Nuclear Generating Station, and NextAxiom Inc.

97 MATHEMATICS AND COMPUTING↗

A Public-Private-Acadmic Partnership to Advance Solar Power Forecasting

The National Center for Atmospheric Research (NCAR) is pleased to have led a partnership to advance the state-of-the-science of solar power forecasting by designing, developing, building, deploying, testing, and assessing the SunCast™ Solar Power Forecasting System. The project has included cutting edge research, testing in several geographically- and climatologically-diverse high penetration solar utilities and Independent System Operators (ISOs), and wide dissemination of the research results to raise the bar on solar power forecasting technology. The partners include three other national laboratories, six universities, and industry partners. This public-private-academic team has worked in concert to perform use-inspired research to advance solar power forecasting through cutting-edge research to advance both the necessary forecasting technologies and the metrics for evaluating them. The project has culminated in a year-long, full-scale demonstration of provide irradiance and power forecasts to utilities and ISOs to use in their operations. The project focused on providing elements of a value chain, beginning with the weather that causes a deviation from clear sky irradiance and progresses through monitoring and observations, modeling, forecasting, dissemination and communication of the forecasts, interpretation of the forecast, and through decision-making, which produces outcomes that have an economic value. The system has been evaluated using metrics developed specifically for this project, which has provided rich information on model and system performance. Research was accomplished on the very short range (0-6 hours) Nowcasting system as well as on the longer term (6-72 hour) forecasting system. The shortest range forecasts are based on observations in the field. The shortest range system, built by Brookhaven National Laboratory (BNL) and based on Total Sky Imagers (TSIs) is TSICast, which operates on the shortest time scale with a latency of only a few minutes and forecasts that currently go out to about 15 min. This project has facilitated research in improving the hardware and software so that the new high definition cameras deployed at multiple nearby locations allow discernment of the clouds at varying levels and advection according to the winds observed at those levels. Improvements over “smart persistence” are about 29% for even these very short forecasts. StatCast is based on pyranometer data measured at the site as well as concurrent meteorological observations and forecasts. StatCast is based on regime-dependent artificial intelligence forecasting techniques and has been shown to improve on “smart persistence” forecasts by 15-50%. A second category of short-range forecasting systems employ satellite imagery and use that information to discern clouds and their motion, allowing them to project the clouds, and the resulting blockage of irradiance, in time. CIRACast (the system produced by the Cooperative Institute for Atmospheric Research [CIRA] at Colorado State University) was already one of the more advanced cloud motion systems, which is the reason that team was brought to this project. During the project timeframe, the CIRA team was able to advance cloud shadowing, parallax removal, and implementation of better advecting winds at different altitudes. CIRACast shows generally a 25-40% improvement over Smart Persistence between sunrise and approximately 1600 UTC (Coordinated Universal Time) . A second satellite-based system, MADCast (Multi-sensor Advective Diffusive foreCast system), assimilates data from multiple satellite imagers and profilers to assimilate a fully three-dimensional picture of the cloud into the dynamic core of WRF. During 2015, MADCast (provided at least 70% improvement over Smart Persistence, with most of that skill being derived during partly cloudy conditions. That allows advection of the clouds via the Weather Research and Forecasting (WRF) model dynamics directly. After WRF-Solar™ showed initial success, it was also deployed in nowcasting mode with coarser runs out to 6 hours made hourly. It provided improvements on the order of 50-60% over Smart Persistence for forecasts up to 1600 UTC. The advantages of WRF-Solar-Nowcasting and MADCast were then blended to develop the new MAD-WRF model that incorporates the most important features of each of those models, both assimilating satellite cloud fields and using WRF-So far physics to develop and dissipate clouds. MAE improvements for MAD-WRF for forecasts from 3-6 hours are improved over WRF-Solar-Now by 20%. While all the Nowcasting system components by themselves provide improvement over Smart Persistence, the largest benefit is derived when they are smartly blended together by the Nowcasting Integrator to produce an integrated forecast. The development of WRF-Solar™ under this project has provided the first numerical weather prediction (NWP) model specifically designed to meet the needs of irradiance forecasting. The first augmentation improved the solar tracking algorithm to account for deviations associated with the eccentricity of the Earth’s orbit and the obliquity of the Earth. Second, WRF-Solar™ added the direct normal irradiance (DNI) and diffuse (DIF) components from the radiation parameterization to the model output. Third, efficient parameterizations were implemented to either interpolate the irradiance in between calls to the expensive radiative transfer parameterization, or to use a fast radiative transfer code that avoids computing three-dimensional heating rates but provides the surface irradiance. Fourth, a new parameterization was developed to improve the representation of absorption and scattering of radiation by aerosols (aerosol direct effect). A fifth advance is that the aerosols now interact with the cloud microphysics, altering the cloud evolution and radiative properties, an effect that has been traditionally only implemented in atmospheric computationally costly chemistry models. A sixth development accounts for the feedbacks that sub-grid scale clouds produce in shortwave irradiance as implemented in a shallow cumulus parameterization Finally, WRF-Solar™ also allows assimilation of infrared irradiances from satellites to determine the three dimensional cloud field, allowing for an improved initialization of the cloud field that increases the performance of short-range forecasts. We find that WRF-Solar™ can improve clear sky irradiance prediction by 15-80% over a standard version of WRF, depending on location and cloud conditions. In a formal comparison to the NAM baseline, WRF-Solar™ showed improvements in the Day-Ahead forecast of 22-42%. The SunCast™ system requires substantial software engineering to blend all of the new model components as well as existing publically available NWP model runs. To do this we use an expert system for the Nowcasting blender and the Dynamic Integrated foreCast (DICast®) system for the NWP models. These two systems are then blended, we use an empirical power conversion method to convert the irradiance predictions to power, then apply an analog ensemble (AnEn) approach to further tune the forecast as well as to estimate its uncertainty. The AnEn module decreased RMSE (root mean squared error) by 17% over the blended SunCast™ power forecasts and provided skill in the probabilistic forecast with a Brier Skill Score of 0.55. In addition, we have also developed a Gridded Atmospheric Forecast System (GRAFS) in parallel, leveraging cost share funds. An economic evaluation based on Production Cost Modeling in the Public Service Company of Colorado showed that the observed 50% improvement in forecast accuracy will save their customers $819,200 with the projected MW deployment for 2024. Using econometrics, NCAR has scaled this savings to a national level and shown that an annual expected savings for this 50% forecast error reduction ranges from $11M in 2015 to $43M expected in 2040 with increased solar deployment. This amounts to a $455M discounted savings over the 26 year period of analysis.

14 SOLAR ENERGY↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Final Technical Report DE-EE0006911 Vermont Solar Pathways

Solar PV is the fastest-growing form of energy in Vermont. From 2012 to 2017, Vermont’s solar energy capacity increased almost nine times to 227 MW, a compound annual growth rate of 54%. During this time, the portion of electricity from solar grew from 0.5% to 5%. The state is one of the national leaders in net metering, community solar, and solar jobs per capita. In 2011, the Vermont Comprehensive Energy Plan set a goal to have renewable energy supply 90% of the state’s total energy needs (including electricity, heating and cooling, and transportation) by 2050. The Department of Public Service completed a Total Energy Study to examine the feasibility and cost-effectiveness of various paths to the 90% goal and related emissions goals. The General Assembly created a Renewable Portfolio Standard (RPS) that includes credit for projects—such as electric vehicles and modern wood heating—that switch end uses away from fossil fuel, making the RPS essentially a total energy portfolio standard. Achieving the state’s energy goals will require major contributions from distributed resources and the development of supporting infrastructure such as energy storage, electric vehicle charging stations, and upgraded distribution systems. The Vermont Solar Pathways project used scenario modeling and stakeholder engagement to create a broadly supported plan to get 20% of the state’s electricity from solar by 2025. Scenario modeling provided numbers and graphs for examining issues, costs, and benefits, and spurred discussions at the 11 stakeholder meetings held over the course of the project. Stakeholders provided feedback to improve the model and made suggestions for variations on the scenarios.

14 SOLAR ENERGY↗

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.

99 GENERAL AND MISCELLANEOUS↗

The Strategic Value of Human Factors Engineering in Control Room Modernization

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can have almost as big an impact on operations as, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering, operational, and regulatory impacts. This will inevitably include several human factors considerations, such as workstation ergonomics, viewing angles, lighting, seating, new interaction modalities, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the United States Department of Energy researchers located at Idaho National Laboratory (INL) have developed research-based human factors design and evaluation methods to be used in the development of end-state concepts for modernized control rooms and to manage the various phases of the upgrade life cycle. The methodology includes interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes and operator-system interaction, and development of human-system prototypes to evaluate various aspects of proposed modifications. This methodology has been applied at a number of U.S. nuclear power plants where modernization projects are underway, including Exelon’s Braidwood and Byron plants, and Arizona Public Service's Palo Verde plant. It was demonstrated that including this methodology in the plant’s engineering process helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and provide substantial improvement in operator performance.

99 GENERAL AND MISCELLANEOUS↗

Case Study: Nuclear-Renewable-Water Integration in Arizona

This document reports the application of the N-R HES software framework to a case study for Arizona Public Service (APS); the manager and part owner of the Palo Verde (PV) nuclear power plant. The case study is a work in progress of which this report presents a detailed description of the current model input data, assumptions and the corresponding results produced by the developed software framework. The goal of the report is, that with this information APS (together with INL) should be able to identify where more detailed data and more accurate model assumptions are necessary to reproduce all driving physical and economic phenomena in order to capture enough complexity of the reality to allow APS to use the results for their strategic decisions. The N-R HES software framework started being developed at INL two years ago [ref]. The framework has reached some level of maturity so that it can be applied to more than simple demonstration cases, e.g. real industry problems. Nevertheless, more capabilities are constantly added to accommodate the special needs of these challenging real life problems. The N-R HES framework is built on top of the RAVEN code [ref] and uses it as driver and workflow manager for all calculations. The framework has specifically been developed for the economic assessment of N-R HES systems. There are four main cornerstones of the N-R HES simulation framework: 1) generation of stochastic time series, 2) a probabilistic analysis and optimization set of algorithms available in RAVEN, 3) a set of models for representation of the physical behavior of N-R HES, and 4) a RAVEN plug-in that maps physical performance into economic performance called CashFlow. Within this framework, a broad spectrum of questions related to N-R HES can be addressed. One of the challenges currently of high interest is that the increasing penetration of variable renewables is altering the profile of the net demand (demand after removing all non curtailable renewable energy sources), with which the other generators on the grid have to cope. The N-R HES software framework is capable to analyze the potential feasibility of mitigating the resultant volatility in the net electricity demand. One possible solution to that problem currently intensively studied by the energy industry is adding stabilizing loads to the grid. These loads can be external industrial processes that are able to ramp production up and down quickly or adding variable internal loads that will lift the base load of the power plant. The latter is a possible solution currently studied by APS. APS if currently anticipating several challenges that will likely arise in the near future. One of them is, as mentioned, coping with the rapid growth of variable renewable energy (VRE) sources put on the grid. Although APS can sell its electricity for a fixed retail price to cover the local demand first, it also sells electricity in excess of the local demand at the Palo Verde energy hub. Due to the growing VRE penetration, the Palo Verde hub electricity spot price is negative more and more frequently. To mitigate this price volatility, APS is seeking to add more base load, so that the quantity of excess energy to be sold for prices potentially less than the internal retail price or even negative prices at the hub is reduced. A second challenge APS is facing is that their cooling water acquisition contract with the Sub Regional Operating Group (SROG) will expire soon and a renewal can only be done for a significantly higher price of the water. Therefore, APS is also seeking for alternative sources for their cooling water. An opportunity currently under investigation is to pump a limited quantity of brackish water from the regional ground water. Although much cheaper than the water from the new SROG contract, the salinity of the brackish water is so high that a blend of brackish and SROG water would need additional treatment to improve its quality for use in the cooling towers. An on-site reverse osmosis (RO) desalination plant is envisaged to reduce the salinity to an acceptable level. This report investigates the economic impact of such an RO plant. As one can see, the RO plant would help with both problems APS is facing: First, it would rise the APS base load helping to mitigate VRE induced hub price volatility. From this perspective, the RO plant can be seen as a stabilizing load on the grid as would be any other industrial process. Second, the RO’s goods, e.g. the clean water produced can be used by APS itself for a (hopefully) lower cost than 100% SROG water would be. The report will first describe the APS water procurement strategy in detail and lay out the possible alternative scenarios studied in this document. This is covered in Chapter 2. Next, in Chapter 3, the APS case model developed within the N-R HES software framework is described. This chapter includes also a description of the needed framework developments to accommodate the APS study.

97 MATHEMATICS AND COMPUTING↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Module OT PNM Field Demonstration Test Procedure

This document will detail a field demonstration test procedure for the Module OT device developed for the joint NREL-SNL DOE CEDS project titled "Modular Security Apparatus for Managing Distributed Cryptography for Command & Control Messages on Operational Technology (OT) Networks." The aim of this document is to create the testing and evaluation procedure for field demonstration of the device; this includes primarily functional testing and implementation testing at Public Service Company of New Mexico's (PNM's) Prosperity solar site environment. Specifically, the Module OT devices will be integrated into the Prosperity solar site system; traffic will be encrypted between several points of interest at the site (e.g., inverter micrologger and switch). The tests described in this document will be performed to assess the impact and effectiveness of the encryption capabilities provided by the Module OT device.

97 MATHEMATICS AND COMPUTING↗

Congestion Estimation Using Traffic Cameras

Traffic cameras are becoming a popular form of surveillance in traffic bodies across the country. With recent advances in computer vision and deep learning, there is a great opportunity to leverage these images to provide real-time traffic estimates and other public services. In this report, we detail some of the challenges, current interests of the research community, and our early efforts in using traffic cameras for vehicle detection and traffic estimation. We also discuss a benchmark traffic dataset that we are assembling and plan to release to the research community to motivate further work in this area.

42 ENGINEERING↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

Maximizing Revenue from Electrical Energy Storage Paired with Community Solar Projects in NYISO Markets

The New York State Public Service Commission recently made significant changes to the compensation mechanisms for distributed energy resources, such as solar generation. The new mechanisms, called the Value of Distributed Energy Resources (VDER), alter the value proposition of potential installations. In particular, multiple time-of-generation based pricing alternatives were established, which could lead to potential benefits from pairing energy storage systems with solar installations. This paper presents the calculations to maximize revenue from a solar photovoltaic and energy storage system installation operating under the VDER pricing structures. Two systems in two different zones within the New York Independent System Operator area were modeled. The impact of AC versus DC energy storage system interconnections with solar generation resources was also explored. The results show that energy storage systems could generate significant revenue depending on the pricing alternative being targeted and the zone selected for the project.

14 SOLAR ENERGY↗

100% Carbon-Free Electricity for Sandia NM and KAFB Using Concentrating Solar Power (CSP) (SAND Report)

This report provides a design study to produce 100% carbon-free electricity for Sandia NM and Kirtland Air Force Base (KAFB) using concentrating solar power (CSP). Annual electricity requirements for both Sandia and KAFB are presented, along with specific load centers that consume a significant and continuous amount of energy. CSP plant designs of 50 MW and 100 MW are then discussed to meet the needs of Sandia NM and the combined electrical needs of both Sandia NM and KAFB. Probabilistic modeling is performed to evaluate inherent uncertainties in performance and cost parameters on total construction costs and the levelized cost of electricity. Total overnight construction costs are expected to range between ~$300M - $400M for the 50 MW CSP plant and between ~$500M - $800M for the 100 MW plant. Annual operations and maintenance (O&M) costs are estimated together with potential offsets in electrical costs and CO 2 emissions. Other considerations such as interconnections, land use and permitting, funding options, and potential agreements and partnerships with Public Service Company of New Mexico (PNM), Western Area Power Administration (WAPA), and other entities are also discussed.

14 SOLAR ENERGY↗

Probabilistic Modeling of Climate Change Impacts on Renewable Energy and Storage Requirements for NM's Energy Transition Act (SAND Report)

This report provides a study of the potential impacts of climate change on intermittent renewable energy resources, battery storage, and resource adequacy in Public Service Company of New Mexico’s Integrated Resource Plan for 2020 – 2040. Climate change models and available data were first evaluated to determine uncertainty and potential changes in solar irradiance, temperature, and wind speed in NM in the coming decades. These changes were then implemented in solar and wind energy models to determine impacts on renewable energy resources in NM. Results for the extreme climate-change scenario show that the projected wind power may decrease by ~13% due to projected decreases in wind speed. Projected solar power may decrease by ~4% due to decreases in irradiance and increases in temperature in NM. Uncertainty in these climate-induced changes in wind and solar resources was accommodated in probabilistic models assuming uniform distributions in the annual reductions in solar and wind resources. Uncertainty in battery storage performance was also evaluated based on increased temperature, capacity fade, and degradation in round-trip efficiency. The hourly energy balance was determined throughout the year given uncertainties in the renewable energy resources and energy storage. The loss of load expectation (LOLE) was evaluated for the 2040 No New Combustion portfolio and found to increase from 0 days/year to a median value of ~2 days/year due to potential reductions in renewable energy resources and battery storage performance and capacity. A rank-regression analyses revealed that battery round-trip efficiency was the most significant parameter that impacted LOLE, followed by solar resource, wind resource, and battery fade. An increase in battery storage capacity to ~25,000 – 30,000 MWh from a baseline value of ~14,000 MWh was required to reduce the median value of LOLE to ~0.2 days/year with consideration of potential climate impacts and battery degradation.

54 ENVIRONMENTAL SCIENCES↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

Scalable Technologies Achieving Risk-Informed Condition-Based Predictive Maintenance Enhancing the Economic Performance of Operating Nuclear Power Plants

The primary objective of the research presented in this report is to develop scalable technologies that are deployable across plant assets and across the nuclear fleet to achieve risk-informed predictive maintenance (PdM) strategies at commercial nuclear power plants (NPPs). Over the years, the nuclear fleet has relied on labor-intensive and time-consuming preventive maintenance (PM) programs, driving up operation and maintenance (O&M) costs to achieve high capacity factors. A well-constructed risk-informed PdM approach for an identified plant asset has been developed in this research, taking advantage of advancements in data analytics, machine learning (ML), artificial intelligence (AI), physics-informed modeling, and visualization. These technologies would allow commercial NPPs to reliably transition from current labor-intensive PM programs to a technology driven PdM program, eliminating unnecessary O&M costs. The work presented in the report is being developed as part of a collaborative research effort between Idaho National Laboratory and Public Service Enterprise Group Nuclear, LLC. This report (1) reflects the results of work by LWRS Program researchers with PSEG, Nuclear LLC-owned Salem and Hope Creek Nuclear Power Plants; (2) presents utilization of circulating water system (CWS) heterogeneous data and fault modes from both the Salem and Hope Creek nuclear power plant sites to develop salient fault signatures associated with each fault mode; (3) describes the integration of component-level predictive models into a robust system-level model enabled by the federated-transfer learning; (4) describes the development of physics-informed model of circulating water pump and motor; (5) develops a scalable risk and economic model; and (6) outlines the development of a user-centric visualization application. The outcomes presented in this report lays the foundation and provides a much-needed technical basis to focus on explainability and trustworthiness of ML and AI-based technologies, as part of future research.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Weather Analysis for Xcel Energy's 2030 Colorado Preferred Plan

The Public Service Company of Colorado (PSCo), a subsidiary of Xcel Energy (Xcel), plans to meet its target of an 80% reduction in CO 2 emissions over 2005 levels by 2030 through its Preferred Plan1,2 that includes increasing the wind and solar energy on its system, reducing coal, and adjusting the operation and dispatch of new and existing thermal generation. The objective of our analysis reported here is to identify how the PSCo generation and transmission of its Preferred Plan might operate in the face of specific weather events. We investigate weather events that currently cause stress to PSCo’s system, such as winter storms and extreme heat. In addition, we explore how the future system responds to scenarios that may be considered normal weather conditions today, but that have a large impact on wind and solar generation potential.