Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PRA Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Supply and Resource Management to Progressively Enable EIMO

BACKGROUND: Current medical operations in Low Earth Orbit (LEO) allow for real-time audio-video communication with a flight surgeon at mission control, resupply, and medical evacuation to earth on the order of hours. As mission profiles change from LEO to the Moon, Mars, and beyond, medical risk as a contribution to overall mission risk is anticipated to rise substantially. Concurrently, due to the distance, the medical systems on board vehicles proposed for these mission types are expected to have reduced mass and volume allocation. Together, astronaut crews will be at a higher risk of major medical events, be required to perform a broader set of tasks, and have substantially reduced resources and support to do so. Earth Independent Medical Operations (EIMO) aims to identify and fill the gaps present in this progressively changing paradigm. OVERVIEW: Medical supplies, resources, and skills are central to spaceflight medical systems. Vehicles used for non-LEO missions are anticipated to be smaller and thus the medical system will also need to have reduced mass, volume, and power. Medical resources are another form of consumable and may need resupply or pre-deployment to meet crew needs. One particular concern is the degradation of medications which become less efficacious and potentially toxic with time, particularly given environmental conditions such as temperature, humidity, oxygen, and radiation which have not yet been fully studied. Supply and resource management in LEO is dependent on resupply, however the supply chain of transporting equipment does not yet have a clear infrastructure for missions beyond LEO. DISCUSSION: EIMO is intended to systemically identify and fill these gaps with forward-looking solutions. In mission monitoring of resources with technology like RFID, improving medical resource longevity, targeted resupply and careful pre-mission planning will be central to facilitate crew health and performance. One approach to optimizing resources is the Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool, which uses probabilistic risk assessment (PRA) to quantitatively predict medical risk and identify resources and skills that mitigate this risk. This evidence based, quantitative analysis prediction tool and several other approaches to meeting the challenge of supply and resource management are discussed.

Arian Anderson↗

Design for Reliability and Safety Approach for the New NASA Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new launch vehicles, the ARES I and ARES V. Specifically, the paper addresses the use of an integrated probabilistic functional analysis to support the design analysis cycle and a probabilistic risk assessment (PRA) to support the preliminary design and beyond.

Safie, Fayssal M.↗

Dynamic event tree analysis with the SAS4A/SASSYS-1 safety analysis code

The consequences of a transient in an advanced sodium-cooled fast reactor are difficult to capture with the traditional approach to probabilistic risk assessment (PRA). Numerous safety-relevant systems are passive and may have operational states that cannot be represented by binary success or failure. In addition, the specific order and timing of events may be crucial which necessitates the use of dynamic PRA tools such as ADAPT. The modifications to the SAS4A/SASSYS-1 sodium-cooled fast reactor safety analysis code for linking it to ADAPT to perform a dynamic PRA are described. A test case is used to demonstrate the linking process and to illustrate the type of insights that may be gained with this process. Finally, newly-developed dynamic importance measures are used to assess the significance of reactor parameters/constituents on calculated consequences of initiating events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

New Methods and Tools to Perform Safety Analysis within RISMC

The Risk Informed Safety Margins Characterization (RISMC) Pathway uses a systematic approach developed to characterize and quantify safety margins of nuclear power plant structures, systems and components. What differentiates the RISMC approach from traditional probabilistic risk assessment (PRA) is the concept of safety margin. In PRA, a safety metric such as core damage frequency (CDF) is generally estimated using static fault-tree and event-tree models. However, it is not possible to estimate how close we are to physical safety limits (say peak clad temperature) for most accident sequences described in the PRA. In the RISMC approach, what we want to understand is not just the frequency of an event like core damage, but how close we are (or not) to this event and how we might increase our safety margin through margin management strategies in a Dynamic PRA (DPRA) fashion. This paper gives an overview of methods that are currently under development at the Idaho National Laboratory (INL) with the scope of advance the current state of the art of dynamic PRA.

97 MATHEMATICS AND COMPUTING↗

Data Analysis Approaches for the Risk-Informed Safety Margins Characterization Toolkit

In the past decades, several numerical simulation codes have been employed to simulate accident dynamics (e.g., RELAP5-3D, RELAP-7, MELCOR, MAAP). In order to evaluate the impact of uncertainties into accident dynamics, several stochastic methodologies have been coupled with these codes. These stochastic methods range from classical Monte-Carlo and Latin Hypercube sampling to stochastic polynomial methods. Similar approaches have been introduced into the risk and safety community where stochastic methods (such as RAVEN, ADAPT, MCDET, ADS) have been coupled with safety analysis codes in order to evaluate the safety impact of timing and sequencing of events. These approaches are usually called Dynamic PRA or simulation-based PRA methods. These uncertainties and safety methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). The scope of this paper is to present a broad overview of methods and algorithms that can be used to analyze and extract information from large data sets containing time dependent data. In this context, “extracting information” means constructing input-output correlations, finding commonalities, and identifying outliers. Some of the algorithms presented here have been developed or are under development within the RAVEN statistical framework.

97 MATHEMATICS AND COMPUTING↗

Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment

In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards such as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Root Cause Analysis of the Data Refinement Process – Medical Conditions Capability Resource Tables

The medical system for spaceflight thus far has been designed to support missions in low earth orbit (LEO). Crew capabilities are limited and heavily dependent on the team of medical support staff at Mission Control Center (MCC) to guide diagnosis and management. However, missions to the Moon and Mars will suffer from several constraints that will make this ground support focused approach to care ineffective. In order to update and modify medical system design, NASA has relied on Probabilistic Risk Assessment (PRA) modeling to mitigate medical risk through trade space analysis. Specifically, capability resource tables (CRT’s) were developed to create a dataset of resources required to manage a list of accepted medical conditions significant in exploration spaceflight. With 120 conditions, this dataset contained hundreds of capabilities and thousands of resources with tens of thousands of cells of data. Initially these tables were built in excel for high throughput during development, but ultimately had to be transferred, managed, and modified into the Evidence Library database for modeling purposes. The process of collating and reviewing the Evidence Library revealed numerous errors in the dataset that had to be corrected through iterative changes. Several error types emerged during this process and can be broken into specific classifications defined as “input”, “transcription”, “structural”, “branching”, and “information”. In reviewing these error types through the root cause analysis (RCA) approach, we were able to identify the contributors to these errors which included single data review points, changing product end goals, limited software selection, time constraints and several others. By reviewing and evaluating the underlying causes we can provide possible system improvements that can be implemented for current and future data management in PRA model inputs.

A. Anderson↗

Development of Advanced Numerical Tools for the Nonlinear Seismic Analysis of Nuclear Systems

In the framework of Probabilistic Risk Assessment (PRA) of nuclear facilities, a rigorous dynamic characterization of all structural and non-structural components is of paramount concern. The common features of nuclear facilities lies in the combination of three characteristics: 1. low aspect ratio; 2. large mass; and 3. significant embedment in soil. These characteristics make the interaction between the structural system and the surrounding soil a key aspect to consider for seismic risk evaluations. The methodologies and numerical tools currently in use for simulating the seismic response of a nuclear facility with significant Soil Structure Interaction (SSI) date back to the 1970's and rely on a number of simplifying idealizations, mainly related to the characterization of the incident seismic waveforms, the assumption of linear-elastic behavior of the superstructures, and idealization of equivalent linear behavior of the supporting soils. Given this background and taking advantage of the substantial progress in computational mechanics in the last decades, the ongoing research aims at developing advanced numerical tools for the nonlinear, time history simulation of nuclear facilities. This translates into the availability of a robust nonlinear time-domain simulation tool that can accurately model the nonlinearities of coupled soil-structure systems, and whose development includes robust verification and validation. The work described herein is supported by the U.S. Department of Energy (DOE) and focuses on delivering the next-generation, high performance simulation tool in support of DOE needs and mission. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Modeling the Risk of Fire/Explosion Due to Oxidizer/Fuel Leaks in the Ares I Interstage

A significant flight hazard associated with liquid propellants, such as those used in the upper stage of NASA's new Ares I launch vehicle, is the possibility of leakage of hazardous fluids resulting in a catastrophic fire/explosion. The enclosed and vented interstage of the Ares I contains numerous oxidizer and fuel supply lines as well as ignition sources. The potential for fire/explosion due to leaks during ascent depends on the relative concentrations of hazardous and inert fluids within the interstage along with other variables such as pressure, temperature, leak rates, and fluid outgasing rates. This analysis improves on previous NASA Probabilistic Risk Assessment (PRA) estimates of the probability of deflagration, in which many of the variables pertinent to the problem were not explicitly modeled as a function of time. This paper presents the modeling methodology developed to analyze these risks.

Ring, Robert W.↗

U.S. Nuclear Operating Experience Program for Probabilistic Risk Assessment Parameter Estimations

This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.

99 GENERAL AND MISCELLANEOUS↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

U.S. NRC CONFIRMATORY LEVEL 1 PRA SUCCESS CRITERIA ACTIVITIES

The U.S. Nuclear Regulatory Commission’s standardized plant analysis risk (SPAR) models are used to support a number of risk-informed initiatives. The fidelity and realism of these models are ensured through a number of processes including cross-comparison with industry models, review and use by a wide range of technical experts, and confirmatory analysis. This paper will describe a key activity in the latter arena. Specifically, this paper will describe MELCOR analyses performed to augment the technical basis for confirming or modifying specific success criteria of interest. The analyses that will be summarized provide the basis for confirming or changing success criteria in a specific 3-loop pressurized-water reactor and a Mark-I boiling-water reactor. Initiators that have been analyzed include loss-of-coolant accidents, loss of main feedwater, spontaneous steam generator tube rupture, inadvertent opening of a relief valve at power, and station blackout. For each initiator, specific aspects of the accident evolution are investigated via a targeted set of calculations (3 to 22 distinct accident analyses per initiator). Further evaluation is ongoing to extend the analyses’ conclusions to similar plants (where appropriate), with consideration of design and modeling differences on a scenario-by-scenario basis. This paper will also describe future plans.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment and Control of Spacecraft Charging Risks on the International Space Station

The International Space Station (ISS) operates in the F2 region of Earth's ionosphere, orbiting at altitudes ranging from 350 to 450 km at an inclination of 51.6 degrees. The relatively dense, cool F2 ionospheric plasma suppresses surface charging processes much of the time, and the flux of relativistic electrons is low enough to preclude deep dielectric charging processes. The most important spacecraft charging processes in the ISS orbital environment are: 1) ISS electrical power system interactions with the F2 plasma, 2) magnetic induction processes resulting from flight through the geomagnetic field and, 3) charging processes that result from interaction with auroral electrons at high latitude. Recently, the continuing review and evaluation of putative ISS charging hazards required by the ISS Program Office revealed that ISS charging could produce an electrical shock hazard to the ISS crew during extravehicular activity (EVA). ISS charging risks are being evaluated in an ongoing measurement and analysis campaign. The results of ISS charging measurements are combined with a recently developed model of ISS charging (the Plasma Interaction Model) and an exhaustive analysis of historical ionospheric variability data (ISS Ionospheric Specification) to evaluate ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA combines estimates of the frequency of occurrence and severity of the charging hazards with estimates of the reliability of various hazard controls systems, as required by NASA s safety and risk management programs, to enable design and selection of a hazard control approach that minimizes overall programmatic and personnel risk. The PRA provides a quantitative methodology for incorporating the results of the ISS charging measurement and analysis campaigns into the necessary hazard reports, EVA procedures, and ISS flight rules required for operating ISS in a safe and productive manner.

Koontz, Steve↗

Event Tree Success Branch Modeling Approaches in SAPHIRE/SPAR

Standardized Plant Analysis Risk (SPAR) models are a set of linked fault tree/event tree PRA models that have been used by the Nuclear Regulatory Commission (NRC) to evaluate the risk of operations at U.S. nuclear power plants since 1990s. The models use the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) code developed by the NRC and Idaho National Laboratory (INL). Currently Version 8, SAPHIRE is a powerful software with advanced features to perform separated or integrated Level 1, Level 2, internal events, external events, at-power, and low power shutdown PRA [1]. One of its features is the availability of three different approaches to model the success branch of a top event in event tree: delete term, complement of system logic, and developed event. However, improper choosing and modeling success branch might yield unexpected and incorrect results. This paper will discuss the two most often used success branch modeling approaches, delete term and developed event, and provide recommendations for using proper approaches in different models. A potential SAPHIRE code enhancement is also proposed to address the adverse impact brought by the developed event approach.

99 GENERAL AND MISCELLANEOUS↗

Methods for the Enhancement of Security Probabilistic Risk Assessments

The US Department of Energy is exploring the methods associated with probabilistic risk assessment (PRA) and how they could be used to enhance physical security evaluations for nuclear facilities. A brief review of both international and US Nuclear Regulatory Commission physical security assessment methods is presented. From this review, and with an understanding of the technical elements associated with a traditional nuclear safety PRA, several observations are made pertaining to where physical security analysis methods could be enhanced. These observations principally support and enhance the answers within a physical security context to the risk triplet: (1) What can go wrong? (2) What is the likelihood? and (3) What are the consequences? Finally, benefits and technical challenges toward the development of a full security PRA are presented.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

NNL.Fe.qSNAP-ZBL.2024.1: A Fe Spectral Neighbor Analysis Potential for Radiation Damage Simulations

The NNL.Fe.qSNAP-ZBL.2024.1 machine-learned potential (MLP) has been generated to support the development of an elemental body-centered cubic (BCC) Fe athermal recombination corrected neutron damage model and simulations of primary recoil atom (PRA) cascades in BCC Fe. This MLP is a quadratic spectral neighbor analysis potential (qSNAP) hybridized with the universal Ziegler-Beirsack-Littmark (ZBL) potential at short-range and is named according to Naval Nuclear Laboratory MLP naming conventions (NNL.material-system.MLP-type.year.version). Training set calculations for Fe are presented along with the subsequent MLP fitting procedure. A key criterion of the fitting procedure is that ZBL describes the short-range interaction with minimal impact on the MLP. The MLP is compared to density functional theory (DFT) predicted properties relevant to radiation damage simulation, including threshold displacement energies, for validation. The NNL.Fe.qSNAP-ZBL.2024.1 potential is considered suitable for molecular dynamics (MD) simulations of radiation defects up to 800 K and PRA cascades in BCC Fe up to around 10 keV. The potential can additionally be used on a limited basis for recoils of 10–20 keV, within which range the emergence of structures outside the training set in cascade simulations may cause system instabilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗