Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Macroscopic trends of neoclassical tearing stability in high-field H-mode tokamak pilot plants

The neoclassical tearing mode (NTM) stability metric—minimum marginally stable island width $w$$^{*}_{m}$—was compared across 14651 inductive high-field tokamak pilot plant equilibria. Larger devices with reduced elongation and/or increased minor radius demonstrated an order-of-magnitude increase in $w$$^{*}_{m}$, primarily due to a reduction in bootstrap drive. This work is part of an ongoing effort to ensure passive NTM-stability in the ARC tokamak, in which the technology to achieve active tearing-suppression with localised electron cyclotron current drive does not yet exist. The equilibrium scenarios in the database were Monte Carlo generated and normalised to the same >400MW fusion power, minimum pressure scenario at a range of plasma currents, before tearing analysis using the modified Rutherford equation was applied for all resonant poloidal and toroidal m, n modes up to n = 4. Single-helicity toroidal Δ' calculations in resistive DCON set the minimum marginally stable island width, and a simple modal scaling proportional to –m 2 n –1 was identified for high-m Δ' values. The dominant correlates of $w$$^{*}_{m}$ and Δ' across the database were analysed using interpretable machine learning techniques.

NTM seeding↗

Improbability of Nuclear Criticality in Compacted Criticality Control Overpacks after Room Closure by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, nuclear criticality is improbable after salt creep causes compaction of criticality control overpacks (CCOs) disposed at the Waste Isolation Pilot Plant, an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality potential has been updated here because of the introduction of CCOs, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCOs during two representative conditions: (1) large salt block fall, and (2) gradual salt compaction (without brine seepage and subsequent gas generation to permit maximum room closure). Geomechanical models of rock fall demonstrate three tiers of CCOs are not greatly disrupted. Geomechanical models of gradual room closure from salt creep predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Criticality models of spheres and cylinders of 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular spacing demonstrate that an array of CCOs is not critical when surrounded by salt and magnesium oxide, provided the amount of hydrogenous material shipped in the CCO (usually water and plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbial Gas Generation Under Expected Waste Isolation Pilot Plant Repository Conditions: Final Report

Gas generation from the microbial degradation of the organic constituents of transuranic (TRU) waste under conditions expected in the Waste Isolation Pilot Plant (WIPP) was investigated. The biodegradation of mixed cellulosic materials and electron-beam irradiated plastic and rubber materials (polyethylene, polyvinylchloride, hypalon, leaded hypalon, and neoprene) was examined. We evaluated the effects of environmental variables such as initial atmosphere (air or nitrogen), water content (humid ({approx}70% relative humidity, RH) and brine inundated), and nutrient amendments (nitogen phosphate, yeast extract, and excess nitrate) on microbial gas generation. Total gas production was determined by pressure measurement and carbon dioxide (CO{sub 2}) and methane (CH{sub 4}) were analyzed by gas chromatography; cellulose degradation products in solution were analyzed by high-performance liquid chromatography. Microbial populations in the samples were determined by direct microscopy and molecular analysis. The results of this work are summarized.

03 NATURAL GAS↗

Design of a Coal-Based Allam Cycle Large Pilot Plant

Conference presentation at 44th International Technical Conference on Clean Energy (Clearwater Clean Energy Conference), Clearwater, Florida, June 16–21, 2019. This presentation describes a proposed pilot project to demonstrate a coal-based Allam Cycle power system, which uses supercritical CO₂ to generate electricity with high efficiency and near-zero emissions. It outlines the technology concept, pilot plant scale, potential sites, costs, and next steps toward detailed design and construction.

01 COAL, LIGNITE, AND PEAT↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the eighth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste that contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the ninth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste which contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biomass and salt-dependent effects of Bacillus spores on radionuclide migration from the Waste Isolation Pilot Plant

Spores of a Bacillus sp., isolated from radioactive waste, were tested for their ability to influence the fate and transport of neodymium (Nd3+) under high salt conditions expected at the Waste Isolation Pilot Plant (WIPP) nuclear waste repository. Spores were suspended in neodymium-spiked saline solutions up to 4 M NaCl, and concentrations of Nd and the complexing agent dipicolinic acid (DPA), a component of spores, were monitored along with optical densities and spore numbers. Overall, results support neodymium bioassociation that is dependent upon biomass, with more apparent adsorption occurring at higher spore concentrations. However, probable spore lysis in 2 and 4 M NaCl solutions and possible germination at 0.15 M NaCl appear to drive the release of DPA and subsequent return of Nd to solution. The implications of this work for the WIPP will depend on actual biomass levels and the ionic strength of the repository brines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to Transportation Analysis for the Waste Isolation Pilot Plant

The goal of this transportation analysis (TA) is to update the 2008 TA in order to evaluate the impacts associated with the transportation of transuranic (TRU) waste from waste generator sites to the Waste Isolation Pilot Plant (WIPP) facility and from waste generator sites to the Idaho National Laboratory (INL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical Modeling Using OLI Systems Mixed Solvent Electrolyte Model in Support of the Waste Isolation Pilot Plant

Aqueous electrolyte thermodynamic models were developed for synthetic Salado (GWB) and Castile (ERDA-6) brines to inform the experimental design and to facilitate laboratory data interpretation in geochemical studies supporting disposal in the Waste Isolation Pilot Plant (WIPP). The thermodynamic models, which include the relevant vapor-liquid-solid equilibria for the oxidation-reduction conditions of interest, enable computation of system parameters such as activity-based pH, E h [vs. standard hydrogen electrode (SHE)], ionic strength, total dissolved solids, and solution density; the chemical speciation of all phases; saturation tendencies for thermodynamically feasible solids; and changes in brine chemistry because of the addition of H 2 (g), argon, MgO, Fe(0), and other waste form components. The impacts of oxidation-reduction potential (ORP) and pH on aqueous speciation and dominant solid phases were also assessed with the aid of real-solution Pourbaix diagrams for key elements of interest. In addition to the OLI modeling results, limited measurement data for pH and ORP standards are provided, analyzed, and discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Proposed Disturbed Rock Zone Conceptual Model Modifications to the Waste Isolation Pilot Plant Performance Assessment

The United States Department of Energy (DOE) and Sandia National Laboratories (SNL) have recently proposed a set of updates that integrate data from recent site characterization studies to two conceptual models for the Waste Isolation Pilot Plant's Performance Assessment (WIPP PA) program. This paper discusses the changes to the Disturbed Rock Zone (DRZ) model, which describes the macroscopic manifestation of grain-scale microcracks and larger macro-cracks that are created by induced stresses in the salt surrounding excavations. The DRZ, as modeled in WIPP PA, is an important component of the repository system because its properties affect the quantity of available brine and its ability to enter the waste areas as well as the connectivity of panels after closure. The DOE and SNL have proposed decreasing the region that represents the DRZ in WIPP PA. Additionally, it has been proposed to make the permeability of DRZ a time-dependent quantity to reflect the long-term behavior. In this paper, the implementation of the proposed DRZ model changes is outlined, and the impact of the DRZ modifications on the long-term performance of the WIPP is discussed. The DRZ modifications generally reduced the amount of brine that entered into the repository, as well as reduced the pressure in the repository, except for scenarios in which a pressurized brine pocket was encountered. Overall, the saturation and pressure changes affected the frequency and magnitude of the direct brine and spalling volumes. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WASTE ISOLATION PILOT PLANT (WIPP): THE NATIONS' SOLUTION TO NUCLEAR WASTE STORAGE AND DISPOSAL ISSUES

In the southeastern portion of my home state of New Mexico lies the Chihuahauan desert, where a transuranic (TRU), underground disposal site known as the Waste Isolation Pilot Plant (WIPP) occupies 16 square miles. Full operation status began in March 1999, the year I graduated from Los Alamos High School, in Los Alamos, NM, the birthplace of the atomic bomb and one of the nation’s main TRU waste generator sites. During the time of its development and until recently, I did not have a full grasp on the role Los Alamos was playing in regards to WIPP. WIPP is used to store and dispose of TRU waste that has been generated since the 1940s because of nuclear weapons research and testing operations that have occurred in Los Alamos, NM and at other sites throughout the United States (U.S.). TRU waste consists of items that are contaminated with artificial, man-made radioactive elements that have atomic numbers greater than uranium, or are trans-uranic, on the periodic table of elements and it has longevity characteristics that may be hazardous to human health and the environment. Therefore, WIPP has underground rooms that have been carved out of 2,000 square foot thick salt formations approximately 2,150 feet underground so that the TRU waste can be isolated and disposed of. WIPP has operated safely and successfully until this year, when two unrelated events occurred in February 2014. With these events, the safety precautions and measures that have been operating at WIPP for the last 15 years are being revised and improved to ensure that other such events do not occur again.

07 ISOTOPE AND RADIATION SOURCES↗

Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (Rev. 6.4)

The purpose of this document is to summarize the waste acceptance criteria (WAC), applicable to the transportation, storage, and disposal of contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE), primary directive for ensuring that CH and RH TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (Rev. 6.2)

The purpose of this document is to summarize the waste acceptance criteria (WAC), applicable to the transportation, storage, and disposal of contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE), primary directive for ensuring that CH and RH TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (Rev. 6.5)

The purpose of this document is to summarize the waste acceptance criteria (WAC), applicable to the transportation, storage, and disposal of contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE’s), primary directive for ensuring that CH and RH TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing solid-surface plasma facing components for pilot plants and reactors with replenishable wall claddings and continuous surface conditioning. Part B: required research in present tokamaks

Abstract The companion part A paper (Stangeby et al 2022) reports a number of independent estimates indicating that high-duty-cycle DT tokamaks starting with pilot plants will likely experience rates of net erosion and deposition of solid PFC, plasma facing component, material in the range of 10 3 to 10 4 kg yr −1 , regardless of the material used. The subsequent redeposition of such large quantities of material has the potential for major interference with tokamak operation. Similar levels and issues will be involved if ∼continuous low-Z powder dropping is used for surface conditioning of DT tokamaks, independent of the material used for the PFC armor. In Stangeby et al (2022) (part A) it is proposed that for high-duty-cycle DT tokamaks, non-metallic low-Z refractory materials such as ceramics (graphite, SiC, etc) used as in situ replenishable, relatively thin—of order mm—claddings on a substrate which is resistant to neutron damage could provide a potential solution for protecting the main walls, while reducing the risk of degrading the confined plasma. Assessment of whether such an approach is viable will require information, much of which is not available today. Section 6 of part A identifies a partial list of major physics questions that will need to be answered in order to make an informed assessment. This part B report describes R&D needed to be done in present tokamaks in order to answer many of these questions. Most of the required R&D is to establish better understanding of low-Z slag generation and to identify means to safely manage it. Powder droppers provide a unique opportunity to carry out controlled studies on the management of low-Z slag in current tokamaks, independent of whether their protection tiles use low-Z or high-Z material.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Effect of Congress' Mandate to Create Greater Efficiencies in the Characterization of Transuranic Waste through the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit

Effective December 1, 2003, the U.S. Congress directed the Department of Energy (DOE) to file a permit modification request with the New Mexico Environment Department (NMED) to amend the Hazardous Waste Facility Permit (hereinafter 'the Permit') at the Waste Isolation Pilot Plant (WIPP). This legislation, Section 311 of the 2004 Energy and Water Development Appropriations Act, was designed to increase efficiencies in Transuranic (TRU) waste characterization processes by focusing on only those activities necessary to characterize waste streams, while continuing to protect human health and the environment. Congressionally prescribed changes would impact DOE generator site waste characterization programs and waste disposal operations at WIPP. With this legislative impetus, in early 2004 the DOE and Washington TRU Solutions (WTS), co-permittee under the Permit, submitted a permit modification request to the NMED pursuant to Section 311. After a lengthy process, including extensive public and other stakeholder input, the NMED granted the Permittees' request in October 2006, as part of a modification authorizing disposal of Remote-Handled (RH) TRU waste at WIPP. In conclusion: Implementation of the Permit under the revised Section 311 provisions is still in its early stages. Data are limited, as noted above. In view of these limited data and fluctuations in waste feed due to varying factors, at the current time it is difficult to determine with accuracy the impacts of Section 311 on the costs of characterizing TRU waste. It is safe to say, however, that the there have been many positive impacts flowing from Section 311. The generator sites now have more flexibility in characterizing waste. Also, RH TRU waste is now being disposed at WIPP - which was not possible before the 2006 Permit modification. As previously noted, the RH modification was approved at the same time as the Section 311 modification. Had the Section 311 changes not been implemented, RH TRU waste may not have been successfully permitted for disposal at WIPP. Changes made pursuant to Section 311 helped to facilitate approval of the proposed RH TRU modifications. For example, the three scenarios for use in AK Sufficiency Determination Requests, described herein, are essential to securing approval of some RH TRU waste streams for eventual disposal at WIPP. Thus, even if characterization rates do not increase significantly, options for disposal of RH TRU waste, which may not have been possible without Section 311, are now available and the TRU waste disposal mission is being accomplished as mandated by Congress in the LWA. Also, with the Section 311 modification, the Permittees commenced room-based VOC monitoring in the WIPP repository, which is also a positive impact of Section 311. Permit changes pursuant to Section 311 were a good beginning, but much more is need to encourage more efficient methodologies in waste characterization activities for TRU mixed waste destined for WIPP. Although the Permittees now have more flexibility in characterizing waste for disposal at WIPP, the processes are still lengthy, cumbersome, and paper-intensive. As the generator sites continue to characterize waste under Section 311, more data will likely be compiled and evaluated to assess the longer term cost and technical impacts of Section 311. Also, further refinements in TRU waste characterization requirements through Permit modifications are likely in future years to eliminate, improve, and clarify remaining unnecessary and redundant Permit provisions. Continuous improvements to the TRU waste characterization program are bound to occur, resulting in even greater efficiencies in the characterization and ultimate disposal of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗