Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Component Reliability in Photovoltaic Systems using Field Failure Statistics

Ongoing operations and maintenance (O&M) are needed to ensure photovoltaic (PV) systems continue to operate and meet production targets over the lifecycle of the system. Although average costs to operate and maintain PV systems have been decreasing over time, reported costs can vary significantly at the plant level. Estimating O&M costs accurately is important for informing financial planning and tracking activities, and subsequently lowering the levelized cost of electricity (LCOE) of PV systems. This report describes a methodology for improving O&M planning estimates by using empirically-derived failure statistics to capture component reliability in the field. The report also summarizes failure patterns observed for specific PV components and local environmental conditions observed in Sandia's PV Reliability, Operations & Maintenance (PVROM) database, a collection of field records across 800+ systems in the U.S. Where system-specific or fleet-specific data are lacking, PVROM-derived failure distribution values can be used to inform cost modeling and other reliability analyses to evaluate opportunities for performance improvements.

14 SOLAR ENERGY↗

Dark Matter Reconstruction in LBAI Experiments with Imperfect Data

Long-baseline atom interferometer (LBAI) experiments offer unprecedented sensitivity to ultralight scalar dark matter (DM) [1], however reconstruction of a putative DM signal with traditional frequency-domain analysis requires ``perfect data (i.e., regularly-sampled with no missing samples). In a real LBAI experiment, there will undoubtedly be imperfections in the data leading to downtime. This downtime can arise from operational considerations (e.g., maintenance), the operational environment (motion of people and animals [2] or elevators), and robustness of the experimental apparatus (e.g., bad atom launches). In this work, we investigate the impact of various downtime models on the overall DM sensitivity of such an experiment. We compare the sensitivity for each downtime model as determined by a ``compound FFT analysis to a baseline no-downtime case. We also show how much sensitivity can be regained by moving to a Lomb-Scargle frequency analysis, as in [2]. Furthermore, we demonstrate reconstruction of the DM wave s phase as well as its frequency. [1] D. Antypas, et al, ``New Horizons: Scalar and Vector Ultralight Dark Matter (2022). arXiv:2203.14915 [2] J. Carlton and C. McCabe, ``From RATs to riches: mitigating anthropogenic and synanthropic noise in atom interferometer searches for ultra-light dark matter (2023). arXiv:2308.101731

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

SDOM (Storage Deployment Optimization Model) [SWR-21-73]

SDOM is designed to accurately represent the operation of energy storage across different timescales, including long-duration and seasonal applications, and the spatiotemporal diversity and complementarity among VRE sources. SDOM uses an hourly temporal resolution, a fine spatial resolution for VRE sources, and a 1-year optimization window. SDOM assumes that all builds of VRE are accompanied by sufficient additional transmission capacity to allow full utilization of these additional resources. Nuclear, hydropower, and other renewable generation (e.g., biomass and geothermal energy sources) are fixed based on operational data (time series) for a given year; thus, SDOM minimizes total system cost using conventional generators as balancing units and using VRE and storage technologies to achieve a user-defined carbon-free or renewable energy target. The total system cost includes capital costs, fixed operation-and-maintenance (FO&M) costs, variable operation-and-maintenance (VO&M) costs, and fuel cost for power generation and storage technologies.

Guerra Fernandez, Omar Jose↗

Levelized Cost of Electricity (LCOE) Content Model for Design of High Deflection Foils for MHK Applications

The LCOE Content Model provides data submitters with an easy and consistent means of uploading data that can be used to calculate the levelized cost of energy for MHK devices. These data are important to DOE and will be used to develop data products that provide quantitative information to guide and support programmatic decisions. Data will also be used to evaluate MHK products and determine costs and can help data users compare the combination of capital costs and operations and maintenance over time. The ultimate goal is to use these data to perform research and tailor programs to best benefit the industry.

16 TIDAL AND WAVE POWER↗

Machine-Learning Enabled Evaluation of Probability of Piping Degradation In Secondary Systems of Nuclear Power Plants

The transition to condition-based, risk-informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. Furthermore, of the operations and maintenance costs in U.S. plants, approximately 80% are labor costs. To address the issue of rising operating costs and economic viability, technologies used to perform online monitoring of piping and other secondary system structural components in commercial nuclear power plants (NPPs) are under evaluation. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real time measurements, rather than at a pre-determined inspection interval thus reducing the maintenance cost. This paper describes distributed high-temperature stable fiber sensors fabricated in optical fibers through a roll-to-roll laser direct writing process using femtosecond lasers. Using phase-sensitive optical time domain reflectometry, distributed acoustic and vibration sensors can be developed and deployed to critical components and systems in NPPs to perform active measurements with spatial resolution down to 0.5-meter throughout the piping systems. Complex acoustic and vibration signatures harnessed by distributed sensors are registered and analyzed by artificial intelligence algorithms for degradation detection and flaw identification. Piping elbows with machined-in flaws were instrumented with fiber sensors. High-spatial-resolution data were used to develop and validate machine learning algorithms, including both linear and nonlinear regression, and classification. Additionally, classification and sensor analysis were also performed for data analysis. The paper concludes with recommendations and future work on applications of machine learning enabled high-resolution fiber sensors for piping degradation monitoring in current or future NPPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mobile Hot Cell Digital Twin: End-of-life Management of Disused High Activity Radioactive Sources – 23598

Sealed radioactive sources are utilized for a wide range of applications across nuclear facilities, universities, hospitals, and industry. When these sources reach the end of serviceable life, they become waste. As waste, this radioactive material then goes through a process of recapture and then transfer to long term storage. With the advancement of technology in conjunction with better accessibility of technology, industries are exploring the use of digital automation to enhance productivity, efficiency, and safety while minimizing operation and maintenance costs, health and environmental risks, and uncertainty in the project life cycles. One area for exploration is the use of a digital twin to help design a robust, versatile, and safe solution for recapturing spent sources. We believe this avenue can also provide further advantages in the operations aspect of end-of-life management of spent radioactive sources by reducing the deployment time, increasing operator safety, and reducing operation & maintenance cost. We present a novel digital twin framework for end-of-life management of disused high activity radioactive sources. We have designed and developed a framework that houses a digital twin for visualizing and monitoring the recapture process to inform the engineering and design of a new Mobile Hot Cell. Furthermore, we demonstrate the feasibility of the proposed framework by providing a prototypical implementation, supporting the Mobile Hot Cell and human-machine interface's virtual replication.

61 RADIATION PROTECTION AND DOSIMETRY↗

A survey on degradation modeling, prognosis, and prognostics-driven maintenance in wind energy systems

Wind energy generation proliferated over the past decades, introducing unique challenges and opportunities for failure prediction, operation and maintenance. Decision-makers are continuously looking into new methods to infer failure mechanisms and behaviors of wind turbine components to detect and intervene in the failures before they happen. Evidently, degradation modeling and prognosis become engaging topics for researchers and practitioners to prevent catastrophic failures. Prognostics-driven approaches predict the time of failure for the components (e.g., predicting remaining useful life), which provides significant insights for scheduling of operations and maintenance activities. Integrating these prognostics-driven insights into wind farm operations and maintenance presents a substantial challenge, demanding careful consideration of numerous factors such as accessibility, crew routing, and spare part logistics. This study provides state-of-the-art review for degradation modeling, prognosis, and prognostics-driven maintenance techniques for wind energy systems. The discussed techniques align with the United Nations' sustainable development goals, in particular Goal 7 (Affordable and Clean Energy), by enhancing effectiveness and sustainability of wind energy operations. This work also showcases open research questions related to degradation modeling, prognosis, and prognostics-driven maintenance.

Altinpulluk, Nur Banu↗

Optimizing an Integrated Renewable-Electrolysis System

Hydrogen is a versatile energy carrier that is used in a wide variety of chemical and industrial processes. Producing hydrogen using electrolysis can enable integration of multiple sectors including electricity, heating, and industrial sectors; however, the cost of producing hydrogen from electrolysis remains a challenge for encouraging greater adoption. With growing amounts of renewable generation on the California grid, there is downward pressure on wholesale electricity prices, particularly during the afternoon from photovoltaics (PV). These lower, or even potentially negative prices, challenge the business cases for new and existing PV plants. In addition, as the grid transitions to less flexible generation, there is greater need for system flexibility. To help improve the economics for both solar PV and hydrogen production using electrolyzers, we explore the benefit of combining PV and electrolysis systems. The optimal breakeven hydrogen production cost for six unique market participation configurations is calculated at six candidate locations where PV is already installed. The six market configurations include islanded, separated, retail, net energy metering (NEM), hybrid retail/wholesale and wholesale. Using the Revenue Operation and Device Optimization Model (RODeO) model, the optimal breakeven hydrogen price over the lifetime of the equipment is calculated. The cost includes production, storage, and compression in preparation for gaseous delivery trucks. Revenue streams include the sale of hydrogen, low carbon fuel standard (LCFS) credits, renewable electricity sold to the grid, and Renewable Energy Credits (REC). The costs included are the electricity costs, capital and fixed operation and maintenance cost (FOM) for the electrolyzer, PV, and storage and compression systems as well as taxes and financing costs. In addition, cost reductions are achieved through retail and wholesale rate optimization, by which electricity is purchased at the lowest price and sold, if possible, at the highest price. For all locations, the breakeven hydrogen production cost results show that, in the order of decreasing cost, the system configurations are islanded (highest), separated, NEM, retail, hybrid retail/wholesale, and wholesale (lowest). The resulting system design balances between the capital and maintenance cost components, the operation costs (i.e., electricity costs) and the additional market revenues. The integration of solar PV and electrolysis is shown to provide a mutually beneficial relationship. For PV, integration with electrolysis offers the potential to hedge against wholesale market price volatility, and integration with electrolysis may offer the potential to defer or avoid transmission investment to deliver power to the point-of-use and instead use it on-site. When compared with SMR without considering any renewable hydrogen premiums, this study finds that PV + Electrolysis systems with current costs are likely not competitive; however, with cost reductions for electrolysis equipment consistent with DOE projections, it was found that systems with wholesale market access would be competitive, largely on account of both low capital costs and low-cost electricity. The electrolysis units can provide greater flexibility than is required based on retail rate optimization, so there is an opportunity for a utility or CAISO to increase system flexibility with PV + Electrolysis systems in return for commensurate compensation. In this way, there are potentially several solutions that fall between the hybrid configuration and the wholesale configuration that could provide sufficient compensation for a PV + Electrolysis unit to compete with SMR while also providing greater flexibility to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 14 - Reliability of Wind Turbines

The global wind energy industry has grown at a fast pace during the past half-decade. Advancements from design and manufacturing to operation and maintenance have led to reduced capital and maintenance costs, which make wind power an indispensable source for a comprehensive solution to global electricity needs. Once wind turbines are installed, the opportunity to lower wind power costs is mainly through improved operation and maintenance practices. Modern wind turbines are equipped with tens or hundreds of measurement channels and are generating an abundance of data, with lot of efforts being put into data analysis by both the research community and the industry. One type of analysis is through the exploration of reliability engineering methods based on readily available data or maintenance records collected at typical wind power plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. The wind industry has adopted this discipline more broadly in recent years. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses the fundamentals of wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

database↗

Impacts of turbine and plant upsizing on the levelized cost of energy for offshore wind

Turbine and plant upsizing are major trends in offshore wind deployment, although the quantitative impact on project costs has not been well-characterized. The uncertain value of continued wind turbine and project growth limits the ability of the supply chain to prepare for future technology trends, leading to challenges in the realization of larger projects. This analysis explores the levelized cost of energy impacts of turbine ratings between 6 and 20 MW and plant capacities between 250 and 2,500 MW for fixed-bottom offshore wind using techno-economic cost models for foundation, electrical, installation, and operation and maintenance costs, along with annual energy production. We consider a nominal set of technology assumptions for all scenarios to isolate economies of size and scale without additional benefits from decreasing turbine capital costs, quantity discounts for larger projects, or optimized technology solutions. These results indicate that using a 20-MW wind turbine in a 2,500-MW power plant array can reduce the levelized cost of energy by over 23% relative to the global average turbine and plant size installed in 2019; primarily because of reductions in the balance-of-system and operation and maintenance costs. We also identify improved installation vessels, optimized export systems, and novel operation and maintenance strategies as additional cost reduction opportunities. These results suggest that upsizing represents a significant cost reduction opportunity for offshore wind energy and will continue to be a main factor in shaping the future of the sector.

17 WIND ENERGY↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗