Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OVERBURDEN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Theoretical Formulation of an Ambient Stress State in Isotropic Elastic Media

Due to the weight of overburden and tectonic forces, the solid earth is subject to an ambient stress state. This stress state is quasi-static in that it is generally in a state of equilibrium. Typically, seismology assumes this ambient stress field has a negligible effect on wave propagation. However, two basic theories have been put forward to describe the effects of ambient stress on wave propagation. Dahlen and Tromp (2002) expound a theory based on perturbation analysis that largely supports the traditional seismological view that ambient stress is negligible for wave propagation. The second theory, espoused by Korneev and Glubokovskikh (2013) and supported by some experimental work, states that perturbation analysis is inappropriate since the elastic modulus is very sensitive to the ambient stress states. This brief report reformulates the equations given by Korneev and Glubokovskikh (2013) into a more compact form that makes it amenable to statement in terms of a pre-stress form of Hooke's Law. Furthermore, this report demonstrates the symmetries of the pre-stress modulus tensor and discusses the reciprocity relationship implied by the symmetry conditions.

58 GEOSCIENCES↗

Electric Shovel, 120 Tons Payload, Construction

The amount of steel used in the construction of one 120 short ton payload electric shovel, used to haul overburden and extract coal at a large surface mine. The shovel was assumed to be composed entirely of steel plate. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=FAED4248-03F6-4B60-97CE-0FAE81E305C4

42 ENGINEERING↗

Final Geometry and Dimensions of UCG Field Test Cavities

This report documents parameters of underground coal gasification (UCG) field tests, coal seam geometries, and final documented dimensions of gasified coal cavities. Most of the analysis focused on Hanna, Hoe Creek, and Rocky Mountain. Other field tests are included, although thorough documentation was not done. Data and images are taken from multiple sources including field test reports, conference proceedings, presentations, and discussions. Time was restricted so not all data was included or researched. With time restricting, the main parameters of focus include maximum cavity length, maximum cavity width, coal zone height, maximum coal cavity height, oxidant at the end of the test, and shoebox dimensions (box width, length, and height dimensions such that the volume is approximately equal to that of the gasified cavity estimated from field test diagrams). The next important set of parameters include module type, well spacing, volume of consumed coal, volume of collapsed overburden, maximum cavity height, and duration of the test. The information of this report is meant to reflect on the final coal cavity geometries after days of forward gasification. In some cases, intermediate phases were not analyzed, especially if they consumed the same coal seam as later test phases.

01 COAL, LIGNITE, AND PEAT↗

Report for Department of State (DoS) V-Fund Project "Tying Moment Tensor Solutions to Explosive Yield"

The goal of this study was to use U.S. nuclear explosions with known source parameters (yield, depth, shot point material and/or parameters) to determine moment-derived yield estimates. This work has been accomplished by performing full moment tensor solutions using regional network data from the LLNL network, and other regional broadband stations. As part of this study, we have calculated solutions for 130 U.S. nuclear explosions and 12 additional chemical explosions. We then take several approaches to using moment tensors to estimate yield, considering both the full and isotropic moment tensors, doing straight regression analysis on the whole dataset, then successively refining the calibration with additional information about material and overburden. We have also tried a completely new approach of using the seismic moment to help estimate the radiated seismic energy and tying this to yield through a seismic efficiency. Results appear to be promising, but more work might be required to make this more useful in an operational sense.

58 GEOSCIENCES↗

PSIP For HDF5 Pilot Project (Final Report)

Productivity and Sustainability Improvement Planning (PSIP) is a lightweight, incremental and iterative approach (much in the same spirit as Agile methodologies) for making routine software process improvements in software projects. It is designed to be easily applied in existing development workflows. Quoting from a November 2019 workshop paper describing PSIP. PSIP breaks from classic software process improvement approaches such as CMM(I), SPICE, ISO 9000 or Six Sigma, in that it trades comprehensive standards and certification-driven assessment for self-defined, internally driven goals. It does, however, carry forward such ideas as having staged models of improvement (like CMM(I)) in the form of progress tracking cards. Additionally, PSIP is more aligned with lean and agile methods; it adopts their emphasis on iterative improvement and continuous learning. At its core, PSIP is an instantiation of the Plan-Do-Check-Act management cycle (PDCA, also known as Plan-Do-Study-Adjust) which provides the foundation for much of the modern software process improvement literature. This situates PSIP within a constellation of bottom-up, inductive software process improvement methods. PSIP is designed around the notion that already overburdened teams can define and carry out a series of small, incremental steps of progression towards improvement goals without significant (there will be some, but the goal is to avoid significant) disruption to ongoing development activities. A key enabling tool in PSIP is the use of Progress Tracking Cards (PTCs) which define the steps of progression towards a given improvement goal. This is the theory of PSIP. The PSIP for HDF5 project was aimed at putting PSIP into practice with the purpose of evaluating its effectiveness in planning and facilitating quality and process improvements in a scientific software project as well as its associated artifacts. The HDF5 project was chosen as a use case to evaluate PSIP for several reasons. First, NNSA labs and LLNL in particular have a keen interest in how HDF5 quality impacts its uptake and sustainability as a community adopted and supported code. Next, HDF5 is a foundational library, a key substrate in the HPC/CSE software stack, and any improvements there realized through this contract will have benefits to many DOE applications depending on it. HDF5 also represents an older, legacy code with technical debts to pay down. These characteristics are similar to many NNSA and even some ECP code projects. But, because HDF5 is an I/O library, it represents a simpler use case within which to study PSIP than a full-fledged and significantly more complex PDE simulation code. We believe these attributes make HDF5 an ideal use case for evaluating PSIP.

97 MATHEMATICS AND COMPUTING↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical Simulations of Geologic Storage Reservoir Management to Support Risk Mitigation Evaluation

This report provides a detailed description of a set of numerical simulations that represent reservoir behavior over time in response to different operational decision scenarios for detection of potential leakage and reduction or avoidance of leakage impact at a hypothetical geological carbon storage (GCS) site. These simulations serve as the basis for a series of GCS leakage risk forecasts that are to be developed using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), and a demonstration of a simple decision support workflow for evaluation of mitigation strategies based on results of those system model forecasts. This risk assessment and decision support study is forthcoming. Four injection scenarios were considered: a constant rate carbon dioxide (CO 2 ) injection case (base case), a case with CO 2 injection rate adjustment, a case with early termination of injection operations, and a case with brine extraction. CO 2 injection operations were controlled to ensure that the pressure transient remains below the defined manageable reservoir fracture pressure, with consideration shown to hypothetical locations within the modeled spatial domain where the overburden was weaker and lower transient pressure increases were allowable. Additionally, a brine extraction alternative was considered as a reservoir management and risk mitigation option to reduce reservoir pressure, steer the plume away from any hypothetical geohazard such as fault as needed, and enhance storage capacity. Such operational actions contribute to risk management overtime. This study explores the potential utility of reservoir management for risk reduction at GCS sites. This study shows that the injection design may modify the time to CO 2 breakthrough at a legacy well; in particular, these results show that brine extraction can add value for mitigating risk both by delaying leakage and reducing pressure build-up. For the scenario considered, both pressure plots and pressure distributions demonstrate that pressure build-up was decreased by 3% with brine extraction. Additionally, extraction of brine afforded enhancement of CO 2 storage capacity by 5% compared to the base case. These findings suggest that brine extraction has substantial potential to steer the risk-related reservoir effects away from known geohazards (e.g., faults and legacy wells) by conducting pressure transient effects and CO 2 plume movement toward the production well. Injection rate adjustment scenarios considered in this study show potential value for managing both reservoir pressure transients and CO 2 plume behavior. Operational actions for reducing injection and/or early termination of injection (as compared to the base case), however, require careful design; tailoring both the extent and timing of injection rate adjustment over the injection and post-injection operational period must be thoroughly planned to balance maximizing storage and minimizing subsurface environmental risk. The study also gives preliminary consideration to the effectiveness that monitoring strategy may play in providing useful information to inform reservoir management decisions for risk reduction. Two types of monitoring were considered: 1) pressure build-up or pressure transient; and 2) potential leakage detection from a CO 2 mass or plume. Four hypothetical legacy wells, two plugged and two abandoned, were placed in the model domain. Monitoring along these wells was measured over time in individual stacked reservoir formations and shale formations to support risk mitigation decisions, especially operational decisions that assisted in risk reduction. These simulations will serve as the basis for a series of GCS leakage risk forecasts that are to be developed using NRAP’s Open-IAM, and demonstration of a simple decision support workflow for comparative assessment of mitigation alternatives based on results of those system model forecasts. This risk assessment and decision support study is forthcoming.

54 ENVIRONMENTAL SCIENCES↗

Cosmogenic Background Rejection at the ICARUS [Poster]

ICARUS is on the surface of Earth and is exposed to huge cosmic activity and is the focus for several physics analyses. In summary, the overburden is very effective in reducing the hadrons while fully eliminating the electromagnetic cosmic ray components. Exploiting the information from three sub detectors and benchmarking the method with data is in progress.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Big Hill Geomechanical Analysis Using M-D Viscoplastic Material Model

The integrity of wellbores at the interbed between the caprock and salt is a serious concern in the Big Hill site. For the remediation and life extension of wellbores, more accurate predictions from the global model are needed. The Big Hill global model is improved using the M-D viscoplastic contact surface model and the mesh containing the interbed layer with contact surfaces between the salt and caprock layers, and fault blocks in overburden and caprock layers. The model calibration has been performed based on the cavern volumetric closures obtained from the Caveman calculations. The results agree well from 1991 to the early 2000s. The difference starts to widen after that, it might be because of frequent fluid movement and raw water injection. Therefore, the predictions from this improved model could be used to examine the structural integrity of caverns in Big Hill salt dome.

42 ENGINEERING↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

DISTRIBUTION OF ION-EXCHANGEABLE RARE EARTH ELEMENTS AND CRITICAL MINERALS IN COAL-HOSTED CLAYS OF THE POWDER RIVER BASIN, WY

Increasing demand for a more robust domestic supply of rare earth elements (REE) and critical minerals (CM) has led to significant investigation into unconventional sources. Coal and coal byproducts from the Powder River Basin (PRB) of Wyoming are potential sources of REE but lack complete characterization of mineral hosts including ion-adsorption clays (IACs). IACs, which provide a substantial portion of the global REE supply, form when hydrated REE complexes are physiosorbed to negatively charged sites on clay surfaces. Typical IAC minerals include kaolinite, illite, and smectite. REE complexes are easily leached from IACs via ion exchange, making them economically attractive. However, research regarding the partitioning behaviors of strategic metals into PRB coal-hosted clays is limited. This project aims to quantify the modes of occurrence and distribution of REE and CM in clay minerals derived from PRB coals. Strategic metals investigated in this project have historic production or promising deposits within the PRB and/or high anticipated supply risk, and include: REE (lanthanides and Y), V, Ti, platinum group elements (PGE; Pt, Pd, Rh, Ru, Ir, Os), Al, Co, Ga, Zr, and W. Semi-quantitative compositional data from portable x-ray fluorescence spectroscopy (pXRF) on coal core from the PRB is consistent with the known correlation between REE and Al content, suggesting increased REE abundance will be found in clay-rich units. pXRF data also identifies elevated V, Ti, Co, and Zr correlated with Al. Preliminary x-ray diffraction (XRD) data indicates kaolinite, illite, and dickite are abundant minerals in overburden and clay-rich partings. Quantitative analysis via inductively coupled plasma mass spectrometry (ICP-MS) provides insights into REE and CM fractionation in coals as we compare trace metal occurrence to variations in mineralogy. Additionally, we apply scanning electron microscopy (SEM) and energy dispersive x-ray spectroscopy (EDS) data to correlate clay size and morphology to trace metal occurrence. Our findings supplement a broader effort to couple REE and CM extraction with existing domestic coal production and contribute to the fundamental understanding of adsorption processes that occur in low-temperature basin environments.

Stuart, Sophia↗

LA100 Equity Strategies. Chapter 2: Procedural Justice

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided and community-tailored strategies that aim to operationalize recognition and procedural justice. This chapter focuses on procedural justice, examining priorities identified during the community engagement portion of the LA100 Equity Strategies project. This process, and our approach to partnering with community-based organizations (CBOs) and the communities they serve, was developed from the baseline analysis in Chapter 1, which centers on recognition justice, examining past and current inequities in LA. Recognition, procedural, and distributional justice are the three tenets of energy justice around which the LA100 Equity Strategies project is organized. Procedural justice prioritizes fair, equitable, and inclusive participation in the decision-making process. This tenet's practical application entails who is invited and able to participate, whose voices are considered as decisions are made, the co-development of procedures to inform this deliberative process, and who has access to formal measures of regulation and accountability. Engaging with Angelenos to examine the causes of inequities and identify impact areas and priorities that center community experiences, values, and goals represents a first step in developing energy equity strategies for the Los Angeles Department of Water and Power (LADWP) to achieve distributional justice - the just and equitable distribution of energy benefits and burdens in LA's energy transition. Equity, as community members insisted, is about making - and following through with - a commitment to prioritize historically underserved and overburdened communities. Community engagement is a principal method for operationalizing this commitment, guiding our analytic approach and potential equity strategies. Using procedural justice as an analytical tool, this chapter presents the LA100 Equity Strategies approach to community engagement from 2021 to 2023 and the results of this process in relation to community-identified barriers and burdens impacting procedural justice outcomes. We analyze the procedural elements of reaching the equity goals Angelenos set to inform future LADWP decision-making and program development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Refueling Infrastructure Deployment in Low-Income and Non-Urban Communities

The U.S. National Blueprint for Transportation Decarbonization identifies the need to invest in infrastructure supporting low- and zero-emission vehicles, especially in low-income and overburdened communities, to eliminate nearly all greenhouse gas emissions from the transportation sector by 2050. The alternative fuel vehicle refueling property tax credit (26 U.S. Code § 30C) includes eligibility criteria intended to encourage investment in underserved communities based on the economic characteristics or urban character of the census tract in which the fueling infrastructure is installed. Eligible census tracts are those that qualify for the New Markets Tax Credit or that are not located within urban areas as defined by the U.S. Census Bureau. This study quantifies how many fueling-related amenities are currently located in census tracts that qualify and do not qualify for the 30C tax credit based on IRS Notice 2024-20. For existing electric vehicle charging stations, 51% of Level 2 and 60% of Direct Current Fast Charging public stations are located in eligible census tracts. 73% of natural gas, propane, and hydrogen fueling stations are in qualifying census tracts and 75% of biodiesel and renewable fuel stations are in qualifying census tracts. This compares with 73% of existing gas stations in eligible census tracts. For deploying the refueling infrastructure to satisfy future demand, this study shows that truck stops (94%), commercial truck stops (92%), and Federal Highway alternative fuel corridors (89%) are predominantly located in eligible locations. Additionally, significant percentages of the population (62%), light-duty vehicle registrations (64%), and medium- and heavy-duty vehicle registrations (68%) fall within eligible areas.

33 ADVANCED PROPULSION SYSTEMS↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Shallow Marine High-Resolution 3D Seismics for Above-Zone CO2 Monitoring: A Case Study in Offshore Japan

Shallow marine high-resolution 3D (HR3D) seismic utilizes a novel seismic acquisition technology for imaging fine geological features not revealed by conventional 3D surveys. HR3D technology has been previously used for shallow subsurface studies, however is rarely implemented for monitoring injected fluids, and has not previously been used to monitor an active CO2 storage project. In this study, we for the first time demonstrate the acquisition, processing and initial interpretation of a HR3D seismic survey in Tomakomai, offshore Japan, where a large-scale CO2 storage project is being undertaken. As a seismic monitoring tool, the HR3D survey images the geologic overburden (< 1000 ms), aiming to detect potential CO2 leakage pathways above the injection reservoir. The HR3D acquisition system comprises a 210 in3 GI air gun and 4 streamers that are 25 m in length with 10 m inline separation. Each streamer has 8 channels with a 3.125 m group interval, yielding a very small final bin size of 3 x 3 m. The short offset and low-fold coverage of the HR3D data creates new challenges in seismic data processing, which demands a different data processing workflow tailored to the HR3D acquisition. We present a data processing workflow involving multiple software processing packages, which tackled high-resolution related static issues and significantly reduced various noise elements. Dip-steering and structural filtering were employed on the stacked volume to further enhance the lateral coherence and to remove random noise and suppress acquisition footprints. The final volume shows flat and coherent above-zone stratigraphy, suggesting a good seal quality above the CO2 reservoir. The successful implementation of HR3D acquisition and the customized processing workflow verify the feasibility of HR3D seismics for the above- zone monitoring of offshore CO2 injection and storage projects.

Feng, Ye Erickson↗

SHALLOW MARINE HIGH-RESOLUTION 3D SEISMICS FOR ABOVE- ZONE CO2MONITORING: A CASE STUDY IN OFFSHORE JAPAN

Shallow marine high-resolution 3D (HR3D) seismic utilizes a novel seismic acquisition technology for imaging fine geological features not revealed by conventional 3D surveys. HR3D technology has been previously used for shallow subsurface studies, however is rarely implemented for monitoring injected fluids, and has not previously been used to monitor an active CO2 storage project. In this study, we for the first time demonstrate the acquisition, processing and initial interpretation of a HR3D seismic survey in Tomakomai, offshore Japan, where a large-scale CO2 storage project is being undertaken. As a seismic monitoring tool, the HR3D survey images the geologic overburden (< 1000 ms), aiming to detect potential CO2 leakage pathways above the injection reservoir. The HR3D acquisition system comprises a 210 in3 GI air gun and 4 streamers that are 25 m in length with 10 m inline separation. Each streamer has 8 channels with a 3.125 m group interval, yielding a very small final bin size of 3 x 3 m. The short offset and low-fold coverage of the HR3D data creates new challenges in seismic data processing, which demands a different data processing workflow tailored to the HR3D acquisition. We present a data processing workflow involving multiple software processing packages, which tackled high-resolution related static issues and significantly reduced various noise elements. Dip-steering and structural filtering were employed on the stacked volume to further enhance the lateral coherence and to remove random noise and suppress acquisition footprints. The final volume shows flat and coherent above-zone stratigraphy, suggesting a good seal quality above the CO2 reservoir. The successful implementation of HR3D acquisition and the customized processing workflow verify the feasibility of HR3D seismics for the above-zone monitoring of offshore CO2 injection and storage projects.

Feng, Ye E.↗

SolarAPP+ Enhancements and Commercialization (Final Technical Report)

With millions of distributed photovoltaic (PV) systems expected to be installed over the next five years, the permitting and inspection processes of authorities having jurisdiction (AHJs) may become overburdened, causing delays and increased costs for installed systems (Cruce et al. 2022). The central goal of this project was to automate and streamline permitting processes for distributed PV systems and complementary technologies, such as battery storage. Deploying automated permitting has been hypothesized to reduce permit review times, resulting in reduced costs and improved customer experience. This has the potential to expand the PV and PV-plus-storage market nationwide. The National Renewable Energy Laboratory (NREL) and its project partners, including UL Solutions, the Interstate Renewable Energy Council (IREC), the International Code Council (ICC), and more, developed the Solar Automated Permit Processing (SolarAPP+™) software platform to reduce permit review times. NREL and its partners also collaborated with the solar industry, the building safety community, and local governments to develop SolarAPP+.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DOE Zero Energy Ready Manufactured Housing: Subject Matter Expert Technical Assistance Summary

Manufactured homes offer American consumers an affordable option for decent single-family detached housing. For working-class American families in many U.S. markets, manufactured homes are the first step toward home ownership. They now make up 10% of all new homes constructed in the United States, with higher percentages in the south and in rural communities. To help encourage the production of homes that are more durable, healthy, efficient, and disaster resistant, the U.S. Department of Energy is bringing its building science research to the manufactured housing industry through DOE’s Zero Energy Ready Manufactured Home (ZER-MH) program, which provides technical assistance and voluntary guidelines to manufactured home builders. Homes built to these guidelines are better able to handle power outages and less likely to experience moisture issues, offering a better product option for American families. This higher quality is evidenced by energy modeling which shows homes manufactured to these voluntary guidelines will typically use half the energy of manufactured homes built to the current minimum requirements of the U.S. Department of Housing and Urban Development (HUD)’s Manufactured Housing and Construction Safety Standard (MHCSS). These homes can also reduce critical energy demand during the busiest hours of the day, typically late afternoon and early evening in the summer when air conditioning demand is highest and mornings in the winter when furnaces and heaters are heating up. Reducing electricity demand during these peak periods when electricity rates are at their highest reduces costs for American families while freeing up capacity on overburdened energy distribution networks. Builders participating in the DOE ZER-MH program are eligible for a tax incentive via the 45L tax credit, which helps to offset the costs of ZER-MH upgrades, enabling builders to offer these certified homes at no additional cost. Together these factors enable manufactured homes to offer home buyers a housing option that is both affordable to finance and affordable to operate, with lower monthly mortgage payments and lower monthly energy bills.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗