Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ON-LINE PROGRAMMING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

131 records · Page 8

AGR-1 Irradiation Test Final As-Run Report

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 x 10 25 n/m 2 (E >0.18 MeV). We’ll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10 -7 with only one capsule significantly exceeding this value. A maximum R/B of around 2 x 10 -7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Salt Sampling FY21 Technical Report

The goal of the salt sampling program at Argonne is to develop and deploy automated molten salt sampling approaches to enable high-precision in-process salt sample analysis to improve the timeliness of sampling-based accountancy measurements. Tools currently under development in support of this goal include (1) a modular vacuum sampler with an accompanying sample handling method for coupling vacuum sampling with high-precision at-line sample analysis, (2) a pneumatic sample generator that enables high-throughput sample analysis to improve the precision of existing analytical techniques, and (3) a windowless flow cell to enable on-line optical analysis of molten salt in a sampling loop. Compared to point sampling approaches (i.e., dip probes), vacuum sampling systems and on-line sampling loops facilitate access to a larger cross-section of a process fluid. This is known to improve the characterization of the process fluid by producing more representative samples and by enabling the analysis of a larger cross section of the fluid. A vacuum sampling approach for molten salts eliminates the risk of dross contamination of samples and avoids the use of moving parts in the salt. In FY21, two methods for integrating a vacuum sampler with a pneumatic sample generator were tested. These included direct fluidic coupling and coupling using a solid salt transfer mechanism. Solid salt transfer was ultimately selected over fluidic coupling, primarily to enable the transport of samples over longer distances to support automated at-line integration with high-precision techniques (such as microcalorimetry) that cannot withstand the extreme conditions near an electrorefining process. To facilitate rapid solid salt coupling, new mechanisms were developed for rapidly charging and discharging salt sample tubes at the vacuum sampler and pneumatic sample generator, respectively. While the charging mechanism will be deployed in FY22, the tube transfer method and discharge mechanism were tested in FY21. These were deployed at one of Argonne’s engineering-scale electrorefiners to implement at-line high-throughput pneumatic micro-sample generation capabilities. The method was used to generate precise uranium- and lanthanide-bearing electrorefiner micro-samples with the specific dimensions requested by researchers at Los Alamos National Laboratory for use in testing their novel microcalorimeter x-ray techniques. The solid salt transfer mechanism proved not only to be an effective means of integrating the precision sample generator with vacuum sampling, but also improved the performance of the sampler generator. Because the modular sampling approach described here eliminates the need for new high-radiation sample handling capabilities, salt-wetted seals, salt-wetted moving parts, and heated transfer lines outside the electrorefiner, it will address most of the remaining technical challenges for the at-line deployment of high-precision analytical techniques. This will enable significant reductions in the time delay for sampling-based accountancy measurements by eliminating the need for manual off-line sample processing and analysis. On-line optical analysis of molten salt in a sampling loop would provide complementary information to at-line and in-situ techniques. In FY21, an open-aperture molten salt gravity flow cell with windowless optical access to flowing salt was successfully demonstrated. Future work should include the refinement and performance testing of the on-line and at-line sampling tools, integration of additional analysis techniques, stakeholder outreach and collaboration, evaluation of the integrated methods, and analyses to determine how the various tools might fit into an integrated safeguards monitoring system of unattended near real time monitoring tools.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Salt Vessel-Sample Generator Interface

The goal of the salt sampling program at Argonne is to develop and deploy automated molten salt sampling approaches for interfacing relevant unit operations with salt analysis to improve the timeliness and accuracy of sampling-based accountancy measurements. One technology under development is a vacuum sampler loop module. In this system, molten salt is drawn from a process vessel through a heated sampling line and into a charge vessel. Next, one or more samples are split from the volume in the charge vessel and the remaining salt is returned to the process. The vacuum sampler loop module is being developed to interface with other sample processing and analysis modules to enable rapid at-line sample characterization. The main purpose of the vacuum sampling loop module is to enable the collection of samples that are more representative of the bulk salt by replacing traditional point samplers (i.e., dip probes) with a sampling approach that captures a larger cross section of salt. Additionally, the vacuum sampling approach eliminates the risk of dross contamination of samples and avoids the use of moving parts in the salt. Two methods of interfacing the vacuum sampling loop with a precision pneumatic sample generator were investigated in FY21. This report covers the testing of fluidic coupling between the two modules. Two iterations of the fluidically coupled modules were tested. The first iteration system coupled the two modules using a freeze valve to seal the vacuum sampler during filling and to control flow into the pneumatic sample generator. While this integrated system functioned as intended, some changes were implemented to make the system more robust and better suited to remote deployment. Specifically, the system was made to be more modular and active control of the vacuum filling operation was replaced with a passive control mechanism. For passive filling, the salt charge vessel was vented to a small gas tank that was at negative pressure, causing salt to be drawn into the vessel until the force of the fluid head was in equilibrium with the gas pressure. The passive control system performed well and will be used in future iterations. Another change in the second system was a newly configured pneumatic sample generator in which sample ejection occurred through a hole in the reservoir’s stainless-steel side wall instead of through a non-wetted sapphire orifice on the bottom. This alternate configuration may be better suited for near-process deployment because it enables on-line orifice maintenance and an orifice bypass drain back to the process. A third change in the second iteration system was the transition to a two-chamber charge vessel which split off a fraction of the sampled salt as a liquid aliquot. The goal was to create a buffer mechanism that would allow reproducible aliquoting of samples, independently of variability in the charge vessel fill height. While the two-chamber design was functional, the sample size reproducibility was below target values. To improve reproducibility and overcome many of the impediments to remote deployment of the vacuum sampling loop module, separate work was conducted to replace the two-chamber liquid aliquoting mechanism with aliquoting into single-use sample tubes. Solid salt transfer in the sample tubes will replace fluidic coupling for integrating the vacuum sampler with downstream modules. Because the proposed operations can all be executed with simple overhead actuation mechanisms or other existing hot-cell technology, there will be no need for large investments in novel hot cell sample handling technologies using this alternate approach. As such, near-term deployment of the vacuum sampling technology will be achievable. This new approach for automated coupling of sample tubes with down-stream modules is covered in a separate FY21 report, and a remotely operated version of the vacuum sampler loop module with the tube aliquoting feature is planned for FY22.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

GUINEVERE experiment: Kinetic analysis of some reactivity measurement methods by deterministic and Monte Carlo codes

The GUINEVERE experiment (Generation of Uninterrupted Intense Neutrons at the lead Venus Reactor) is an experimental program in support of the ADS technology presently carried out at SCK-CEN in Mol (Belgium). In the experiment a modified lay-out of the original thermal VENUS critical facility is coupled to an accelerator, built by the French body CNRS in Grenoble, working in both continuous and pulsed mode and delivering 14 MeV neutrons by bombardment of deuterons on a tritium-target. The modified lay-out of the facility consists of a fast subcritical core made of 30% U-235 enriched metallic Uranium in a lead matrix. Several off-line and on-line reactivity measurement techniques will be investigated during the experimental campaign. This report is focused on the simulation by deterministic (ERANOS French code) and Monte Carlo (MCNPX US code) calculations of three reactivity measurement techniques, Slope ({alpha}-fitting), Area-ratio and Source-jerk, applied to a GUINEVERE subcritical configuration (namely SC1). The inferred reactivity, in dollar units, by the Area-ratio method shows an overall agreement between the two deterministic and Monte Carlo computational approaches, whereas the MCNPX Source-jerk results are affected by large uncertainties and allow only partial conclusions about the comparison. Finally, no particular spatial dependence of the results is observed in the case of the GUINEVERE SC1 subcritical configuration. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗