Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Nuclear Fuel Cycle Technologies: Current Challenges and Future Plans - 12558

The mission of the Office of Nuclear Energy's Fuel Cycle Technologies office (FCT program) is to provide options for possible future changes in national nuclear energy programs. While the recent draft report of the Blue Ribbon Commission on America's Nuclear Future stressed the need for organization changes, interim waste storage and the establishment of a permanent repository for nuclear waste management, it also recognized the potential value of alternate fuel cycles and recommended continued research and development in that area. With constrained budgets and great expectations, the current challenges are significant. The FCT program now performs R and D covering the entire fuel cycle. This broad R and D scope is a result of the assignment of new research and development (R and D) responsibilities to the Office of Nuclear Energy (NE), as well as reorganization within NE. This scope includes uranium extraction from seawater and uranium enrichment R and D, used nuclear fuel recycling technology, advanced fuel development, and a fresh look at a range of disposal geologies. Additionally, the FCT program performs the necessary systems analysis and screening of fuel cycle alternatives that will identify the most promising approaches and areas of technology gaps. Finally, the FCT program is responsible for a focused effort to consider features of fuel cycle technology in a way that promotes nonproliferation and security, such as Safeguards and Security by Design, and advanced monitoring and predictive modeling capabilities. This paper and presentation will provide an overview of the FCT program R and D scope and discuss plans to analyze fuel cycle options and support identified R and D priorities into the future. The FCT program is making progress in implanting a science based, engineering driven research and development program that is evaluating options for a sustainable fuel cycle in the U.S. Responding to the BRC recommendations, any resulting legislative changes, and meeting the needs of the commercial nuclear industry (including developing and evaluating fuel concepts that may enhance accident tolerance in light water reactors while possibly improving fuel performance) are program priorities. Continuing to build partnerships and collaborations with industry, universities, international organizations, and other DOE programs are essential to addressing the challenges facing the FCT program. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Dutch nuclear fuel cycle scenarios on radionuclide inventory intended for disposal - 15201

One of the main subjects of Dutch five-year research program into geological disposal of radioactive waste, OPERA, is the post-closure radiological safety assessment. Reliable estimates of the radionuclide inventory and matrix composition are an important input for the safety assessment. The amounts and categories of waste foreseen to be disposed in 2130 the Netherlands have been compiled by the Dutch waste management organisation COVRA. Additionally, NRG has made a characterisation of the waste (radionuclides and matrix). This reference inventory is based on the Dutch base nuclear energy scenario of operating the Dutch single reactor, the Borssele NPP, until its presently scheduled shut-down in 2033. However, changes in the presently adopted nuclear fuel cycle strategy in the Netherlands may impact both the quantities of generated radioactive waste and its composition, and therefore the source term of the radiological safety assessment. To get a grip on this uncertainty a set of alternative future fuel cycle scenarios in the Netherlands, which are in compliance with scenarios formulated in the Dutch vision documents, has been considered and evaluated. The scenarios have been analysed with the computer code DANESS, 'Dynamic Analysis of Nuclear Energy System Strategies'. The result of the DANESS analyses concerns the amount and type of the radioactive waste to be finally disposed in a deep geological repository. This also includes the inventories of the individual radionuclides that are relevant for the post-closure safety assessment to be performed in a subsequent stage of the OPERA program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories: An Asset Management Journey - 19438

In this paper, Canadian Nuclear Laboratories (CNL) outlines key tools, strategies and lessons learned from development of their Asset Management Program. Canadian Nuclear Laboratories is a 60-year old site in the midst of a C$1.2B redevelopment that includes construction of six new facilities and demolition of over 120 buildings and structures. The presentation outlines CNL's progress in creating an efficient and effective asset management program that leverages and optimizes current good practices while creating a consistent, disciplined and information-based approach for the maintenance and management of assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Building on Radioactivity and Nuclear Energy for the French CEA Cadarache Research Center - 13492

The CEA Cadarache research center is one of the 10 research centers of the French Alternative Energies and Atomic Energy Commission (CEA). Distributed throughout various research platforms, it focuses on nuclear fission, nuclear fusion, new energy technologies (hydrogen, solar, biomass) and fundamental research in the field of vegetal biology. It is the most important technological research and development centers for energy in Europe. Considering the sensitive nature of nuclear activities, the questions surrounding the issue of radioactive waste, the nuclear energy and the social, economic and environmental concerns for present and future generations, the French Government asked nuclear actors to open communication and to give all the information asked by the Local Information Commission (CLI) and the public [1]. In this context, the CEA Cadarache has decided to better show and explain its expertise and experience in the area of nuclear energy and nuclear power plant design, and to make it available to stakeholders and to the public. CEA Cadarache receives each year more than 9000 visitors. To complete technical visits of the research facilities and laboratories, a scientific cultural center has been built in 2011 to inform the public on CEA Cadarache research activities and to facilitate the acceptance of nuclear energy in a way suited to the level of knowledge of the visitors. A modern interactive exhibition of 150 m{sup 2} allows visitors to find out more about energy, CEA Cadarache research programs, radioactive waste management and radiological impact on the research center activities. It also offers an auditorium for group discussions and for school groups to discover science through enjoyment. This communication center has received several thousand visitors since its opening on October 2011; the initial results of this experience are now available. It's possible to explain the design of this exhibition, to give some statistics on the number of the visitors, their characteristics and their perception after their center visits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Analysis of Advanced Reactor Spent Nuclear Fuel Storage, Transportation, and Disposal

Due to increased interest in advanced reactor deployment and their associated potential new fuel cycles, the U.S. Department of Energy (DOE) Spent Fuel and Waste Science and Technology (SFWST) program has begun to evaluate the possible implications of long term management and final disposition of the spent nuclear fuel (SNF) generated. Safely managing and dispositioning this SNF, along with any other associated radioactive waste, is the primary focus of this initial preliminary assessment. This paper summarizes efforts to evaluate the characteristics and packaging options for three types of advanced reactor SNF forms: (1) tristructural isotropic (TRISO), (2) metallic, and (3) irradiated fuel salt presented in the report titled “Storage, Transportation, and Disposal of Advanced Reactor Spent Nuclear Fuel and High-Level Waste”. TRISO and metallic SNF and their associated waste streams were emphasized because of the near-term anticipated demonstrations of X-energy’s Xe-100 and TerraPower and GE Hitachi’s Natrium advanced reactors. Preliminary information on spent fuel salts discharged from molten-salt reactors (MSRs) was also examined to provide a baseline for future efforts. All calculations and assumptions were based on publicly available information. This paper identifies several different reactors that produce either TRISO or metallic SNF as well as a few of the reactor and fuel characteristics used for the assessments. Based on these characteristics, calculations were performed to determine the applicability of packaging SNF into existing canister designs. The evaluations included geometric (e.g., dimension, volume) and mass/weight considerations, known operational approaches and loading procedures, physical and chemical considerations/conditions for storage environments, and as-loaded radiation, thermal, and criticality analyses to identify constraints on storage, transportation, and disposal. Gaps in publicly available data pertaining to reactor operation and/or fuel composition provide increased uncertainty in some evaluations. Additionally, uncertainty in packaging and SNF management operations provide additional uncertainty. However, preliminary conclusions can still be assessed through this work and are presented in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prospects and Challenges in the Management of Non-Retrievable Radioactive Waste in the Russian Federation - 17212

In 2011, the Federal Law 'On the Management of Radioactive Waste' was enacted in the Russian Federation setting a framework for the Unified State System for Radioactive Waste Management and establishing a mandatory requirement for safe radioactive waste (RW) disposal. Particular category of 'non-retrievable RW' was defined given the amount of RW generated by that time, the issues associated with relevant sites, as well as the experience gained during the implementation of nuclear legacy programs. It was specified that in situ disposal is the preferred management option for this category of waste rather than RW retrieval and re-disposal due to relevant radiation and financial aspects. In 2011 - 2015, a set of high-priority tasks on taking the inventory of accumulated RW was accomplished. This work also provided for demonstrating the feasibility and making key decisions on the final stages on their lifecycle and relevant end-state strategies. Facilities holding non-retrievable RW were divided into two categories: - subject to transition into near-surface storage facilities by constructing additional safety barriers; - subject to controlled long-term storage followed by remediation. Efforts on a number of surface liquid RW storage water reservoirs falling under the first category launched back in the 20. century were completed. The new federal program provides for a set of follow-up efforts to be completed at 12 facilities. As it comes to the second category, the main task was to develop a set of safety management options, as well as some computational methods to demonstrate the feasibility of the selected end-state strategies. The most considerable efforts were made at the Techa Cascade of water reservoirs being the largest liquid radioactive waste (LRW) storage facility in the world that holds over 360 million m{sup 3} of waste with uncertain legal status, the lack of relevant computational models to predict its state. The paper summarizes the data on defining the end states of non-retrievable RW, completed and scheduled efforts on implementing relevant long-term safety strategies. The paper focuses on subsurface repositories and near-surface LRW storage reservoirs considered as common types of facilities holding non-retrievable RW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Report 2016

This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSER summarizes data and compliance status for calendar year 2016 at the Nevada National Security Site (NNSS) and its two Nevada-based support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. In addition to the NNSA itself, the six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for its multiple missions. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, the Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Report 2014

This Nevada Nuclear Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NNSA/NFO Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.This NNSSER summarizes data and compliance status for calendar year 2014 at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) and its two support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). Through a Memorandum of Agreement, NNSA/NFO is responsible for the oversight of these ER projects, and the Sandia Field Office of NNSA (NNSA/SFO) has oversight of all other TTR and NTTR activities. NNSA/SFO produces the TTR annual environmental report, which is available at http://www.sandia.gov/news/publications/environmental/index.html.Major Site Programs and Facilities NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. The six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for weapons experimentation and nuclear test readiness. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site (known as the T-1 Site), Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).

54 ENVIRONMENTAL SCIENCES↗

Addressing the Legacy Waste Challenge - IAEA Activities in Support of Member States - 16304

The International Atomic Energy Agency (IAEA) promotes the safe and peaceful uses of nuclear energy including the safe management of radioactive waste. Although safe and effective radioactive waste processing technologies and practices are well established and widespread, the issue of legacy waste remains a challenge for many IAEA member states. The primary source of the world-wide legacy waste inventory has its origins in past nuclear weapons programs and associated research and development activities. Other sources include historical waste in old storage and disposal facilities that were either never intended to be a permanent end-state or are no longer considered adequate from a safety perspective. Additionally, many IAEA member states with less advanced nuclear energy programs, often have small inventories of legacy radioactive waste arising from medical, research and industrial activities but lack the processing capabilities to put these wastes into a safe form for storage and disposal. These wastes have the potential to create a safety and environmental hazard and pose a radioactive waste management challenge for many reasons including lack of characterization data and process knowledge, waste package degradation, or the presence of hazardous or mixed waste components. The Waste Technology Section (WTS) within the Department of Nuclear Energy at the IAEA has an extensive program of activities to support the safe retrieval, processing, storage and disposal of radioactive waste including legacy waste. These include publications, co-ordinated research projects, technical co-operation activities, and information exchange forums including workshops, technical meetings and virtual networks. This paper will present an overview of recent IAEA activities and accomplishments aimed as assisting member states with addressing their legacy waste inventories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RADIOACTIVE WASTE MANAGEMENT IN THE CHERNOBYL EXCLUSION ZONE - 25 YEARS SINCE THE CHERNOBYL NUCLEAR POWER PLANT ACCIDENT

Radioactive waste management is an important component of the Chernobyl Nuclear Power Plant accident mitigation and remediation activities of the so-called Chernobyl Exclusion Zone. This article describes the localization and characteristics of the radioactive waste present in the Chernobyl Exclusion Zone and summarizes the pathways and strategy for handling the radioactive waste related problems in Ukraine and the Chernobyl Exclusion Zone, and in particular, the pathways and strategies stipulated by the National Radioactive Waste Management Program. The brief overview of the radioactive waste issues in the ChEZ presented in this article demonstrates that management of radioactive waste resulting from a beyond-designbasis accident at a nuclear power plant becomes the most challenging and the costliest effort during the mitigation and remediation activities. The costs of these activities are so high that the provision of radioactive waste final disposal facilities compliant with existing radiation safety requirements becomes an intolerable burden for the current generation of a single country, Ukraine. The nuclear accident at the Fukushima-1 NPP strongly indicates that accidents at nuclear sites may occur in any, even in a most technologically advanced country, and the Chernobyl experience shows that the scope of the radioactive waste management activities associated with the mitigation of such accidents may exceed the capabilities of a single country. Development of a special international program for broad international cooperation in accident related radioactive waste management activities is required to handle these issues. It would also be reasonable to consider establishment of a dedicated international fund for mitigation of accidents at nuclear sites, specifically, for handling radioactive waste problems in the ChEZ. The experience of handling Chernobyl radioactive waste management issues, including large volumes of radioactive soils and complex structures of fuel containing materials can be fairly useful for the entire world's nuclear community and can help make nuclear energy safer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive and Non-Destructive Characterization of various LLW/ILW at NRG - 19078

The Nuclear Research and consultancy Group is located at Petten, the Netherlands, and operates the High Flux Reactor (HFR). The HFR is used for isotope production for medical purposes and material research. During its exploitation several types of radioactive waste are produced, which partly have accumulated at the reactor site. In addition, NRG operated the Low Flux Reactor (LFR), a small 30 kWmax Argonaut type reactor which was used for research and education purposes. Over the past decade several projects on waste management and decommissioning were carried out requiring various approaches, including the radiochemical characterisation of the different emerging waste streams as required by the Dutch regulator. This paper focuses on the practices and technical aspects of the destructive and non-destructive characterization of various types of low- and intermediate-level waste arising from a number of nuclear activities performed at the premises of NRG, i.e. the Dutch legacy waste management program, the treatment of ion exchange resins, and the decommission of the Low-Flux Reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From the Cesium Pond Soil Shipping Campaign at Whiteshell Laboratories - 18206

Whiteshell Laboratories (WL), located in Manitoba, Canada is the first major decommissioning project of a nuclear research establishment in Canada. With the focus now active remediation to return the site to green state, the majority of legacy radioactive waste and waste generated from decommissioning and demolition of nuclear facilities must be transported off site to Chalk River Laboratories (CRL), located in Ontario, Canada. No large radioactive waste shipment campaigns have been undertaken by WL until now. A newly established Waste Management Program specifically designed to support the WL Closure Project has executed its first major shipping campaign of radioactive material, making approximately one hundred shipments and reducing WL's total volume of low-level radioactive waste to transport by seven percent. The shipped waste was approximately 1800 m{sup 3} (2600 metric tons) of known Cs-137 contaminated soil material generated from the excavation of an Experimental Cesium Pond Project designed to study the distribution of dose received by organisms living at the mud-water interface from Cs-137 contamination. This paper outlines the cost benefit analysis undertaken to determine the most cost effective method for transporting the radioactively contaminated soil to CRL, storage challenges experienced by both WL and CRL, the selection of the most appropriate waste package, training of shippers, and the continual optimization of increasing the number of generated waste packages and the number of waste packages shipped and accepted at CRL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗