Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Dosimetry and cancer risk estimations for different radiation protection solutions at decommissioning a contaminated nuclear power plant site

Contaminated sediments originating from dredging activities in a nuclear power plant site were placed in a pond, which has to be taken into consideration during the future decommissioning process. The sediments have to be handled to free release the site. The radionuclides Co-60 and Cs-137 were identified and the activity concentrations (Bq/kg) were quantified in the range of 10–6000 and 5–50 Bq kg -1 , respectively. The absorbed dose rate to individuals of various ages and sex present at the site of the dry pond area was estimated. The radiological impact in terms of lifetime attributable risk (LAR) and effective dose were calculated. For a 30-year-old male exposed during one year without any action regarding the sediments in the dried out pond, the LAR was predicted to be 0.0027, which recalculated to effective dose corresponds to 7.6 mSv year -1 . The calculations show that countermeasures will be needed for the contaminated site.

61 RADIATION PROTECTION AND DOSIMETRY↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of a plug-and-play anti-noise module for fault diagnosis of rotating machines in nuclear power plants

The health of rotating machines is crucial to the stable operation and safety of nuclear power plants. However, research on machine learning-based fault diagnosis of rotating machines in the nuclear industry is still in its infancy. The signal noise generated in the plant may negatively affect the effectiveness of the analysis. In this paper, a plug-and-play anti-noise machine learning module is proposed to fill the knowledge and capability gap. The modules are loaded into a convolutional neural network called deep residual network (ResNet) to obtain a new model with noise reduction capability. The basic idea is that the module is able to identify noise features and include them in the subsequent analysis, effectively filtering noise at the feature level of the network. Nine variants of the new model are compared with the original ResNet as well as four classical machine learning models to test the effectiveness of the module and to examine the impact of the module's loading modes on the performance of the new model. Finally, this research helps facilitate the application of machine learning in the plant noise environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation of the Performance and Explainability Tradeoffs for Machine-Learning Models for Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Predictive maintenance (PdM) has shown great potential for achieving substantial cost savings and enhancing the economic competitiveness of nuclear power plants (NPPs) in today's energy market. Among the different modeling approaches that exist, machine learning (ML) tools in particular have a demonstrated ability to handle high dimensional and multivariate data and to extract hidden relationships within data in industrial environments. While ML methods show great potential, their lack of explainability---especially for black-box models---is a major hurdle to their adoption. Moreover, considering the supposed trade-off between explainability and performance challenges, careful consideration must be made as to which of these quality aspects takes precedence in light of multiple modeling options, resource availability, and domain characteristics. The present work evaluates the performance of six ML models, each with a different degree of explainability, in classifying the conditions of circulating water pumps (CWPs) by utilizing sensor data from nuclear power plants. To determine the drivers behind the trade-offs presented by this array of models, this work also tests different combinations of CWP units as the training and testing data, degrees of data imbalance, and objective functions for hyperparameter tuning. It was found that black-box models tend to afford superior performance in cases where there are far more instances of one type of labeled data than of any other type. It is recommended that a guided procedure be followed for designing and delivering an ML system that is sufficiently explainable to all involved stakeholders.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Multicriterion benefit evaluation methodology for safety enhancements in nuclear power plants and application for FLEX strategies

Here we propose a multicriterion benefit evaluation (MCBE) methodology for evaluating costs and benefits of implementing safety enhancements in nuclear power plants. The MCBE methodology establishes a comprehensive evaluation scope using multiple evaluation criteria (including public risk, occupational risk, plant revenue, and plant cost) and multiple contexts (including plant normal operations, incidents, and accidents). The MCBE methodology formulates a benefit or cost element as the product of a monetary consequence and its occurrence-likelihood change. The MCBE methodology also incorporates a decision maker’ preferences toward occurrence likelihood and monetary consequence into cost and benefit estimations through a modified usage of cumulative prospect theory. This paper applies the MCBE methodology to the implementation of diverse and flexible coping strategy (FLEX) in a generic nuclear power plant as an illustrative example. The FLEX benefits are evaluated through three types of influence paths: plant safety enhancement, risk-informed activities, and potential additional credit of FLEX in supporting plant operation and maintenance-efficiency improvement. The benefit-to-cost ratio (BCR) of FLEX implementation is calculated. Sensitivity analyses are conducted to examine the impacts of modeling assumptions and input parameter values on the BCR.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Nuclear Power Plant Colocation with Data Centers

This presentation is an overview of the nuclear siting and licensing process, including specific considerations and challenges for nuclear power plant colocation with data centers.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Digital-Twin-Enabling Technologies for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable optimized scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derates while simultaneously improving operational capacity. Digital twins (DTs) are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. DTs for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. A DT’s goal is to provide additional insights by combining and interpreting various sources of information for preventative maintenance scheduling optimization or early fault detection. DTs for condition monitoring are projected to be valuable for meeting requirements under 10 CFR 50.55a, “Codes and Standards,” and 10 CFR 50.65, “Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants”. However, DT technologies are still under significant development, and the process for developing a DT for condition monitoring has not been formalized. Therefore, in this work, we present an initial framework for developing a DT, discuss and review the various challenges and considerations for DT deployment, and identify the opportunities that a DT can improve. The presented framework is intended to help developers formulate a strategy when approaching DT development for condition monitoring. In conclusion, a DT use case for a reactor coolant pump is presented to demonstrate the proposed framework.

advanced sensor instrumentation↗

Energy Arbitrage: Comparison of Options for use with LWR Nuclear Power Plants

Arbitrage is the opportunistic buying and selling of a commodity during local pricing valleys and peaks respectively to maximize economic value. This report evaluates options for energy arbitrage integrated with existing light water reactor (LWR) nuclear power plants (NPPs) where nuclear energy could be stored in a variety of forms and later recovered to generate electrical power during periods when grid electricity demand and pricing are high. The forms of energy storage examined in this report include the potential value of batteries, hydrogen, and thermal energy storage for coupling with nuclear power. Various large demand response options are also analyzed, including the production of liquid nitrogen via air separation and liquefaction, liquefaction of hydrogen, compressed hydrogen, and the cryogenic capture of CO2. Demand response refers to dispatchable loads that can cycle up or down depending on-grid electricity demand to aid in balancing the grid. Large demand response options could dispatch to aid nuclear power stations in avoiding power turndowns by providing an alternate disposition for electrical energy by producing marketable products (e.g., liquid nitrogen, hydrogen, or captured CO2). Static conditions were chosen and analyzed in this report for each option. Dynamic operation or optimization of energy arbitrage or demand response are out of scope for this report. The analysis is based on storage systems with discharge capacities of 500 MW for which various durations of storage and costs of charging (electricity cost) are examined. While the value of thermal energy to an industrial user for flexible plant operations has been previously proven as a business case, this report evaluates costs of hydrogen energy storage and leading thermal energy storage options, and large demand response loads that could be integrated with LWRs in comparison to utility-scale battery storage for use of off-peak nuclear energy. Compilation of this information will be used by the Idaho National Laboratory (INL) RAVEN/HERON systems integration and economics tool to evaluate thermal energy dispatch to industrial users. Relative ranking of energy storage options was done using a levelized cost of storage (LCOS) metric which calculates a rough breakeven cost for the system, taking into account the capital and operating costs as well as the revenue from arbitrage. Table ES1 below shows the LCOS for each of the energy storage options considered. First, in the table, lithium iron (Fe) phosphate batteries are listed as the base case for comparison against the other options. Next is hydrogen storage where most of the hydrogen analyses assumed the hydrogen to be produced using solid oxide electrolytic cell (SOEC) high temperature steam electrolysis (HTSE). The others used existing models of polymer electrolyte membrane (PEM) low temperature electrolysis to produce hydrogen. HTSE performance parameters and costs were taken from existing INL models. Various means were assumed to convert the hydrogen to electricity, including PEM fuel cells (FCs) and a gas turbine mixed in a 30 vol% mixture with natural gas. Physical storage (pressure vessels) and geological storage (natural underground features) were used to store the hydrogen as noted. Geological storage is more economical, but the locations are limited because of the requirement for pre-existing geological formations that will support storage. Thermal energy storage (TES) options were also analyzed including electro-thermal energy storage (ETES) and four different liquid sensible heat TES storage media as noted (Hitec, Hitec XL, Therminol-66, and Dowtherm A). The ETES process considered was modified using existing public documentation on an Echogen process and uses a separate supercritical CO2 charge and discharge cycle with sand as the heat storage media.

25 ENERGY STORAGE↗

Fitness-for-Service Analysis of Reactor Components under Flexible Load-Following Operating Conditions

Conventional power-generation plants, including nuclear plants, have been traditionally designed to provide a steady baseload energy capacity, optimizing output efficiency while minimizing variable costs. However, the growing adoption of large-scale renewable energy-generation systems, which rely on intermittent sources such as solar and wind, has introduced more variability into the energy supply in interconnected electricity grids. As a result, the next generation of power plants needs to operate in what is known as the load-following mode, requiring flexible adjustments in electricity production to align with the energy demand on the grid. This transition from the steady baseload operation to load-following operating conditions can significantly increase the number of times various plant components are exposed to transient stresses. This increased thermo-mechanical cycling can lead to accelerated material degradation, thereby elevating the risk of premature failure of a component. It becomes imperative to conduct a comprehensive analysis of fatigue, creep-fatigue, and stress corrosion cracking life, to assess the resilience of the various engineering components under these flexible load-following operating conditions. This study aims to develop a comprehensive numerical model of a light-water reactor pressure vessel (RPV) to investigate its degradation under various operating scenarios. This coupled thermo-mechanical finite element analysis evaluated the stress response of the RPV caused by considering fluctuations in thermal and mechanical loads caused by the varying pressure and temperature occurring during the load-following operation. Critical locations on the RPV are subsequently identified based on the stress response. The stress intensity factors for the postulated flaws at those locations are then calculated, followed by an evaluation of the reactor's life in accordance with the ASME Boiler and Pressure Vessel Code Section XI. This comprehensive life assessment covers a number of transients expected during the flexible load-following operation, providing invaluable insights into the RPV's structural integrity. Moreover, the development methodology can be adapted to other reactor components, as well as components of conventional power stations that are affected by varying operating conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-Kernel Support Vector Machine based Predictive Maintenance of Circulating Water Pumps in Nuclear Power Plants

Multi-Kernel Support Vector Machine (MK-SVM) is a machine learning classification algorithm that can assist in the development of predictive maintenance strategies for nuclear power plant systems. Predictive maintenance can alleviate maintenance costs and enhance reliability of plant systems. In this work, MK-SVM is utilized for determining the health of the circulating water system (CWS) in a nuclear power plant.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NiCrMoNb age hardenable alloy for creep-resistant high temperature applications, and methods of making

Nickel alloys, methods of making nickel alloys, articles including the nickel alloys, uses of the alloys, and methods of treating nickel alloys are described. The inventive heat resistant structural materials are suitable for applications requiring high yield stress at room temperature and good creep strength at high temperatures, such as in gas turbines, steam turbines, fossil energy boilers, aero engines, power generation systems using fluids such as supercritical carbon dioxide (e.g., advanced ultra-supercritical power plants), concentrated solar power plants, nuclear power plants, molten salt reactors: turbine blades, casings, valves, heat exchangers and recuperators.

Detrois, Martin↗

NiCrMoNb age hardenable alloy for creep-resistant high temperature applications, and methods of making

Nickel alloys, methods of making nickel alloys, articles including the nickel alloys, uses of the alloys, and methods of treating nickel alloys are described. The inventive heat resistant structural materials are suitable for applications requiring high yield stress at room temperature and good creep strength at high temperatures, such as in gas turbines, steam turbines, fossil energy boilers, aero engines, power generation systems using fluids such as supercritical carbon dioxide (e.g., advanced ultra-supercritical power plants), concentrated solar power plants, nuclear power plants, molten salt reactors: turbine blades, casings, valves, heat exchangers and recuperators.

Detrois, Martin↗

Development of a Scalable Risk-informed Predictive Maintenance Cloud-based Strategy at Nuclear Power Plants

The fact that light-water reactor operation and maintenance costs are prohibitively expensive and contribute to the premature decommissioning of nuclear power plants is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology, as its low cost, computing and storage adaptability, and ability to host applications across numerous virtual infrastructures potentially make it a cost-effective alternative to onsite storage and diagnostics. In this paper, a technological assessment is carried out on a provisional cloud deployment architecture for a nuclear power plant predictive monitoring system. This cloud-based monitoring system would enable maintenance and diagnostic analysts and other authorized plant users to remotely monitor equipment functionality, thus enabling early fault detection and effective predictive maintenance practices. To provide data processing and storage, sensor device networking, and database management, the Microsoft Azure cloud platform is utilized as part of the proposed cloud architecture; however, this analysis could be extended to other cloud computing service providers as well. The focus of this paper is on application of cloud resources for enabling predictive maintenance, identification of technological hurdles associated with moving to a cloud-computing-based architecture, and potential benefits from moving to a centralized cloud system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

This report presents results of research performed by Idaho National Laboratory (INL) for the Nuclear Regulatory Commission (NRC) to identify and develop strategies for testing nuclear power plant (NPP) flood barriers. This research project began with a literature review that documented the results of previous NRC-funded research, work performed by other government agencies, reports generated by industry organizations, NRC licensee submittals, information from testing facilities, and information from commercial firms engaged in NPP decommissioning. This literature review was then used to develop a simplified flood protection categorization scheme and related glossaries. Using this categorization scheme and glossaries, a survey of currently used flood barriers was conducted, focusing on both permanent and temporary flood barriers. External flood barriers such as levees and berms were outside the scope of this survey. This research project also assessed the current state of NPP decommissioning for potential flood barrier harvesting opportunities, surveyed capabilities of domestic and international flood testing facilities, and explored technical challenges to harvesting and testing of flood barriers. Other factors that should be considered in developing flood barrier testing strategies were also explored and are documented in this report (e.g., selection of flood barriers for testing, codes and standards for flood barrier testing, potential alternatives to harvesting such as in-situ testing, testing performance criteria, and testing parameters).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗