Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Evaluating Methods of Software Bill of Materials Generation to Enhance Nuclear Power Plant Cybersecurity

Instrumentation and control (I&C) systems in nuclear power plants (NPPs) are potential targets of cyberattacks and can prove deleterious for the safety of the NPPs. A Software Bill of Materials (SBOM) provides a detailed list of the various components and their dependencies in software, which helps in vulnerability and risk assessment for cyber hygiene and situational awareness. For an NPP, the process of generating an accurate SBOM report can be complex due to the legacy systems and firmware binaries involved. While most current SBOM tools are focused more on modern internet technology software, this research provides insights and guidelines for an NPP to generate an accurate and efficient SBOM. Here, the paper proposes a new methodology to help NPPs categorize software and use appropriate tools to generate SBOMs for their digital I&C systems.

SBOM↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and Recommendations for Cyber Risk Assessment in Nuclear Power Plants

Digital instrumentation and control (I&C) systems are being deployed in nuclear power plants (NPPs) for both existing and advanced reactor designs. As I&C systems become more digitized to allow features like near autonomous control and remote operation, they introduce greater cyber risk to NPPs. Cyberattacks targeting industrial control systems (ICSs) are growing in both qualities and capabilities, which indicates that cybersecurity needs to be an integral part of risk assessment in the industry. Although there are some risk assessment methods in traditional information technology (IT) cybersecurity, the differences between IT and ICS cybersecurity make it infeasible to apply these risk assessment methods directly to ICSs. Some research has focused on risk assessment methods for ICSs, but few studies focus on applications to NPPs. Ideal risk frameworks for the nuclear industry are dynamic and account for system dependencies; this survey review focuses on such risk assessment methods both in and outside the nuclear field. In this article, the major challenges in cybersecurity risk assessment research are pointed out, and further research suggestions and considerations for cyber risk assessment in I&C systems are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an In-Situ Method for Cable Condition Monitoring in Nuclear Power Plants (SBIR Phase IIB Final Report)

This is the final report of a Small Business Innovation Research (SBIR) project that Analysis and Measurement Services Corporation (AMS) has conducted for the U.S. Department of Energy (DOE) over a seven-and-a-half year period (February 2013 through April 2020 with the awards of Phase I, Phase II and Phase IIB projects). The goal of the project was to design, develop, validate, and demonstrate a technique for in-situ testing of cable insulation polymers that will identify, locate, and provide the degree of aging for cables commonly used in nuclear power plants. During the Phase I project, AMS established that the frequency domain reflectometry (FDR) technique can successfully identify and measure cable insulation degradation that can be trended with aging. In Phase II, AMS performed extensive cable aging studies to correlate FDR measurements with other laboratory condition monitoring techniques and developed aging condition categories to quantify the severity of insulation degradation. In Phase IIB, the project expanded the research to include a wider variety of cable polymers that are used in the commercial nuclear power industry. This work also involved developing acceptance criteria to objectively assess age-related cable degradation while sharing the results of this research with industry, academia, and national laboratories to advance the state of the art in cable aging management technologies. The products developed under this research project provide the nuclear industry with an effective condition monitoring tool to support safe and long-term plant operation. Throughout the project, collaborations and support were received from a variety of industry organizations and individuals including DOE National Laboratories as well as nuclear plant utilities and several other industry experts and cable manufacturers. Contributions from these organizations included the donation of new cables, naturally aged cables, and research collaboration. The validation and commercialization of the products of this project were achieved through opportunities to test and demonstrate the technologies’ capabilities on-site at nuclear power generation and research facilities as well as in the laboratory alongside industry peers and cable testing service companies. The research resulted in a technology that can be used to identify, locate, and quantify age-related degradation in several types of cable polymers. This included developing software and hardware as well as the methodology for using the FDR technique to assess age-related degradation of installed cables. The technology developed under this project can provide nuclear plant management, engineers, and technicians with an in-situ electrical test method to determine if in-service cables need to be replaced, monitored on a periodic basis, or show no evidence of significant age-related degradation that may require action. Near the end of this Phase IIB project, the FDR product was sold to a nuclear power utility in South Korea. This sale of a dedicated aging assessment tool is the beginning of a comprehensive contract with the expectation of twelve (12) units sold to that country. Additionally, the FDR technology has been sold to several industry organizations including a nuclear research institute and the Diablo Canyon nuclear power plant. This technology is also being leased by other nuclear industry service companies for incorporation into aging management programs. The cable testing technology that was developed under this project was also integrated into a comprehensive cable aging assessment service that is being offered to the nuclear industry at the request of U.S. nuclear utilities and is currently part of onsite testing services provided by AMS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AI for Interpreting Nuclear Power Plant Documents for Power Uprates

To reduce the cost and time needed for regulatory compliance, nuclear power plants (NPPs) can utilize artificial intelligence (AI) to assist in interpreting complex and voluminous documents that typically span thousands of pages. Usually, the process of interpreting a plant’s technical specifications (TSs) and associated documents is labor intensive. This study aims to understand what processes state-of-the-art large language models (LLMs) can automate and to identify the pitfalls associated with using LLMs to reduce human labor costs and time. This research uses a recent AI technology called retrieval augmented generation (RAG), which retrieves pages of information from TSs and associated documents to assist with NPP power uprates (cleared to produce more power). LLMs are integral to RAG because they create human-like responses based on the retrieved information, aiding in the interpretation and application processes. A baseline case demonstrates how LLMs can operate successfully for a power uprate application. Then five use cases show five types of potential failures: (1) RAG retrieving the incorrect information, (2) RAG misinterpreting the retrieved information, (3) RAG relying on knowledge not contained in the retrieved information, (4) RAG hallucinating, and (5) RAG refusing to answer. The results of the five use cases suggest that automating the human interpretation of TSs and associated documents with AI should be approached with caution. A subject-matter expert reviewed the AI outputs from the five use cases and concluded that an LLM can produce technical information that is needed to produce power uprate applications in certain instances.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Technical Basis for Advanced Artificial Intelligence and Machine Learning Adoption in Nuclear Power Plants

The research and development reported here is part of the Technology Enabled Risk-Informed Maintenance Strategy project sponsored by the U.S. Department of Energy’s Light Water Reactor Sustainability program. The primary objective of the research presented in this report is to produce a technical basis for developing explainable and trustable artificial intelligence (AI) and machine learning (ML) technologies. The technical basis will lay the foundation for addressing the technical and regulatory adoption challenges of AI/ML technologies across plant assets and the nuclear industry at scale and to achieve seamless cost-effective automation without compromising plant safety and reliability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Topical Analyses Related to Co-located Industrial Facilities at Nuclear Power Plants

This report investigates topics of interest with regard to Nuclear Power Plants (NPPs) utilizing flexible plant operations and generation (FPOG). Previous reports have identified the risk associated with co-located hydrogen generation facilities. This report evaluates special topics with regard to co-location of both hydrogen and syngas production facilities. A literature review was conducted to evaluate overpressure mitigation techniques that may be available to the NPP to reduce the consequence of an overpressure event. Also, the overpressure consequence of a catastrophic hydrogen storage tank failure event was analyzed. A comparison of the similarities and differences between the methodology utilized in HyRAM+ and Regulatory Guide 1.91 (R.G. 1.91) was performed for overpressure analysis. Also, the trinitrotoluene (TNT) equivalency methodology was utilized to evaluate an overpressure event at a Syngas production facility.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dosimetry and cancer risk estimations for different radiation protection solutions at decommissioning a contaminated nuclear power plant site

Contaminated sediments originating from dredging activities in a nuclear power plant site were placed in a pond, which has to be taken into consideration during the future decommissioning process. The sediments have to be handled to free release the site. The radionuclides Co-60 and Cs-137 were identified and the activity concentrations (Bq/kg) were quantified in the range of 10–6000 and 5–50 Bq kg -1 , respectively. The absorbed dose rate to individuals of various ages and sex present at the site of the dry pond area was estimated. The radiological impact in terms of lifetime attributable risk (LAR) and effective dose were calculated. For a 30-year-old male exposed during one year without any action regarding the sediments in the dried out pond, the LAR was predicted to be 0.0027, which recalculated to effective dose corresponds to 7.6 mSv year -1 . The calculations show that countermeasures will be needed for the contaminated site.

61 RADIATION PROTECTION AND DOSIMETRY↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of a plug-and-play anti-noise module for fault diagnosis of rotating machines in nuclear power plants

The health of rotating machines is crucial to the stable operation and safety of nuclear power plants. However, research on machine learning-based fault diagnosis of rotating machines in the nuclear industry is still in its infancy. The signal noise generated in the plant may negatively affect the effectiveness of the analysis. In this paper, a plug-and-play anti-noise machine learning module is proposed to fill the knowledge and capability gap. The modules are loaded into a convolutional neural network called deep residual network (ResNet) to obtain a new model with noise reduction capability. The basic idea is that the module is able to identify noise features and include them in the subsequent analysis, effectively filtering noise at the feature level of the network. Nine variants of the new model are compared with the original ResNet as well as four classical machine learning models to test the effectiveness of the module and to examine the impact of the module's loading modes on the performance of the new model. Finally, this research helps facilitate the application of machine learning in the plant noise environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation of the Performance and Explainability Tradeoffs for Machine-Learning Models for Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Predictive maintenance (PdM) has shown great potential for achieving substantial cost savings and enhancing the economic competitiveness of nuclear power plants (NPPs) in today's energy market. Among the different modeling approaches that exist, machine learning (ML) tools in particular have a demonstrated ability to handle high dimensional and multivariate data and to extract hidden relationships within data in industrial environments. While ML methods show great potential, their lack of explainability---especially for black-box models---is a major hurdle to their adoption. Moreover, considering the supposed trade-off between explainability and performance challenges, careful consideration must be made as to which of these quality aspects takes precedence in light of multiple modeling options, resource availability, and domain characteristics. The present work evaluates the performance of six ML models, each with a different degree of explainability, in classifying the conditions of circulating water pumps (CWPs) by utilizing sensor data from nuclear power plants. To determine the drivers behind the trade-offs presented by this array of models, this work also tests different combinations of CWP units as the training and testing data, degrees of data imbalance, and objective functions for hyperparameter tuning. It was found that black-box models tend to afford superior performance in cases where there are far more instances of one type of labeled data than of any other type. It is recommended that a guided procedure be followed for designing and delivering an ML system that is sufficiently explainable to all involved stakeholders.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Multicriterion benefit evaluation methodology for safety enhancements in nuclear power plants and application for FLEX strategies

Here we propose a multicriterion benefit evaluation (MCBE) methodology for evaluating costs and benefits of implementing safety enhancements in nuclear power plants. The MCBE methodology establishes a comprehensive evaluation scope using multiple evaluation criteria (including public risk, occupational risk, plant revenue, and plant cost) and multiple contexts (including plant normal operations, incidents, and accidents). The MCBE methodology formulates a benefit or cost element as the product of a monetary consequence and its occurrence-likelihood change. The MCBE methodology also incorporates a decision maker’ preferences toward occurrence likelihood and monetary consequence into cost and benefit estimations through a modified usage of cumulative prospect theory. This paper applies the MCBE methodology to the implementation of diverse and flexible coping strategy (FLEX) in a generic nuclear power plant as an illustrative example. The FLEX benefits are evaluated through three types of influence paths: plant safety enhancement, risk-informed activities, and potential additional credit of FLEX in supporting plant operation and maintenance-efficiency improvement. The benefit-to-cost ratio (BCR) of FLEX implementation is calculated. Sensitivity analyses are conducted to examine the impacts of modeling assumptions and input parameter values on the BCR.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Nuclear Power Plant Colocation with Data Centers

This presentation is an overview of the nuclear siting and licensing process, including specific considerations and challenges for nuclear power plant colocation with data centers.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Digital-Twin-Enabling Technologies for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable optimized scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derates while simultaneously improving operational capacity. Digital twins (DTs) are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. DTs for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. A DT’s goal is to provide additional insights by combining and interpreting various sources of information for preventative maintenance scheduling optimization or early fault detection. DTs for condition monitoring are projected to be valuable for meeting requirements under 10 CFR 50.55a, “Codes and Standards,” and 10 CFR 50.65, “Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants”. However, DT technologies are still under significant development, and the process for developing a DT for condition monitoring has not been formalized. Therefore, in this work, we present an initial framework for developing a DT, discuss and review the various challenges and considerations for DT deployment, and identify the opportunities that a DT can improve. The presented framework is intended to help developers formulate a strategy when approaching DT development for condition monitoring. In conclusion, a DT use case for a reactor coolant pump is presented to demonstrate the proposed framework.

advanced sensor instrumentation↗