Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Ares V: Enabling Unprecedented Payloads for Space in the 21st Century

Numerous technical and programmatic studies since the U.S. space program began in the 1960s has emphasized the need for a heavy lift capability for exploration beyond low Earth orbit (LEO). The Saturn V once embodied that capability until it was retired. Now the Ares V cargo launch vehicle (CaLV) promises to restore and improve on that capability, providing unprecedented opportunities for human and robotic exploration, science, national security and commercial uses. This paper provides an overview of the capabilities of Ares V, both as an opportunity for payloads of increased mass and/or volume, and as a means of reducing risk in the payload design process. The Ares V is part of NASA s Constellation Program, which also includes the Ares I crew launch vehicle (CLV), Orion crew exploration vehicle (CEV), and Altair lunar lander. This architecture is designed to carry out the national space policy goals of completing the International Space Station (ISS), retiring the Space Shuttle fleet, and expanding human exploration beyond LEO. The Ares V is designed to loft upper stages and/or cargo, such as the Altair lander, into LEO. The Ares I is designed to put Orion into LEO with a crew of up to four for rendezvous with the ISS or with the Ares V Earth departure stage for journeys to the Moon. While retaining the goals of heritage hardware and commonality, the Ares V configuration continues to be refined through a series of internal trades. The current reference configuration was recommended by the Ares Projects and approved by the Constellation Program during the Lunar Capabilities Concept Review (LCCR) June 2008. The reference configuration defines the Ares V as 381 feet (116m) tall with a gross lift-off mass (GLOM) of 8.1 million pounds (3,704.5 mT). Its first stage will generate 11 million pounds of sea-level liftoff thrust. It will be capable of launching 413,800 pounds (187.7 mT) to LEO, 138,500 pounds (63 mT) direct to the Moon or 156,700 pounds (71.1 mT) in its dual-launch architecture role with Ares I. It could also launch 123,100 pounds (55.8 mT) to Sun-Earth L2. Assessment of astronomy payload requirements since Spring 2008 has indicated that Ares V has the potential to support a range of payloads and missions. Some of these missions were impossible in the absence of Ares V s capabilities. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. A 2008 study by a National Research Council (NRC) panel, as well as analyses presented by astronomers and planetary scientists at two weekend conferences in 2008, support the position that Ares V has benefit to a broad range of planetary and astronomy missions. This early dialogue with Ares V engineers is permitting the greatest opportunity for payload/transportation/mission synergy and with the least financial impact to Ares V development. In addition, independent analyses suggest that Ares V has the opportunity to enable more cost-effective mission design. 1

Creech, Steve↗

Entry, Descent, and Landing technological barriers and crewed MARSvehicle performance analysis

Mars has been explored historically only by robotic crafts, but a crewed mission encompasses several new engineering challenges – high ballistic coefficient entry, hypersonic decelerators, guided entry for reaching intended destinations within acceptable margins for error in the landing ellipse, and payload mass are all critical factors for evaluation. A comprehensive EDL parametric analysis has been conducted in support of a high mass landing architecture by evaluating three types of vehicles −70° Sphere Cone, Ellipsled and SpaceX hybrid architecture called Red Dragon as potential candidate options for crewed entry vehicles. Aerocapture at the Martian orbit of about 400 km and subsequent Entry-from-orbit scenarios were investigated at velocities of 6.75 km/s and 4 km/s respectively. A study on aerocapture corridor over a range of entry velocities (6–9 km/s) suggests that a hypersonic L/D of 0.3 is sufficient for a Martian aerocapture. Parametric studies conducted by varying aeroshell diameters from 10 m to 15 m for several entry masses up to 150 mt are summarized and results reveal that vehicles with entry masses in the range of about 40–80 mt are capable of delivering cargo with a mass on the order of 5–20 mt. For vehicles with an entry mass of 20 mt to 80 mt, probabilistic Monte Carlo analysis of 5000 cases for each vehicle were run to determine the final landing ellipse and to quantify the statistical uncertainties associated with the trajectory and attitude conditions during atmospheric entry. Strategies and current technological challenges for a human rated Entry, Descent, and Landing to the Martian surface are presented in this study.

Prabhakar Subrahmanyam↗

Case Study for Lunar ISRU Systems Utilizing Polar Water

In-Situ Resource Utilization (ISRU) is key to long term presence at any extraterrestrial destination. Current NASA direction is to achieve a sustainable presence on the lunar surface by 2028. Mission plans currently target the lunar South Pole to leverage the extended periods of solar illumination and allows for potential access to water ice in the permanently shadowed areas around the poles. With water, it is possible to produce both fuel and oxidizer to fully refuel a vehicle. In order to address ISRU infusion into mission planning, a study of an end-to-end ISRU propellant production system was initiated to assess ISRU architectures and obtain mass and power estimates for each. The results of these case studies will be presented. For this study, The ISRU system architecture involved two sites; the mine site in a shadowed crater where water ice is excavated and extracted from the regolith and the propellant production site at an illuminated ridge where the water is processed into liquefied O2 and H2 propellants. Fixed hardware would be emplaced at each site, with two alternating water tankers to transport water between them. Notional lunar sites were identified for this architecture for baseline environmental parameters. Technology solutions for each subsystem were selected based on those with the highest fidelity models or those that have empirical laboratory data to anchor to. While power needs were identified for each location, a power solution was not prescribed, therefore the masses presented do not include surface power systems. The baseline case in this study assumed that 10 mT of oxygen, along with enough hydrogen to support a propulsion mixture ratio of 6, must be produced in 225 days. Therefore 15 mT of water would need to be collected and processed. The baseline solution resulted in a system mass of5 mT and a total required power of 68kW. The majority of the mass was split between the ridge site system and the two water tankers (2.6 mTand 1.8mTrespectively). The majority of the required power was with three subsystems at approximately 20 kW each: hydrogen liquefaction, electrolysis, and the water extractor subsystem. Trades for four key variables are also presented, namely production rate, water concentration, dry overburden depth, and number of water transport trips. This can be compared to a system that targets oxygen from the minerals in the surface regolith material. A carbothermal reduction reactor system was used for this comparison. The use of direct solar thermal energy to process the regolith and the ease of access of the resource resulted in significantly lower values for the oxygen case: approximately 2.7 mT and 11.8 kW. However, the mass trade would favor the water case over successive missions where the hydrogen up-mass of 2 mT per mission will accrue against the oxygen system.1Aerospace Research Engineer, Chemical and Thermal Propulsion Systems Branch, Senior Member.2Mechanical Engineer, Propulsion and Power Division/Energy Conversion Systems, 2101 Nasa Pkwy/Mailcode EP3 Houston, TX 77058, AIAA member.

Lunar↗

The strength of the sun's polar fields

The magnetic field strength within the polar caps of the sun is an important parameter for both the solar activity cycle and for our understanding of the interplanetary magnetic field. Measurements of the line-of-sight component of the magnetic field generally yield 0.1 to 0.2 mT near times of sunspot minimum. This paper reports measurements of the polar fields made at the Stanford Solar Observatory using the Fe I line at 525.02 nm. It is found that the average flux density poleward of 55 deg latitude is about 0.6 mT peaking to more than 1 mT at the pole and decreasing to 0.2 mT at the polar cap boundary. The total open flux through either polar cap thus becomes about 3 x 10 to the 14th Wb. It is also shown that observed magnetic field strengths vary as the line-of-sight component of nearly radial fields.

Svalgaard, L.↗

The versatility of a truss mounted mobile transporter for in-space construction

The Mobile Transporter (MT) evolution from early erectable structures assembly activities is detailed. The MT operational features which are required to support astronauts performing on-orbit structure construction or spacecraft assembly functions are presented and discussed. Use of the MT to perform a variety of assembly functions is presented. Estimated EVA assembly times for a precision segmented reflector approximately 20 m in diameter are presented. The EVA/MT technique under study for construction of the reflector (and the entire spacecraft) is illustrated. Finally, the current status of development activities and test results involving the MT and Space Station structural assembly are presented.

Bush, Harold G.↗

The versatility of a truss mounted mobile transporter for in-space construction

The Mobile Transporter (MT) evolution from early erectable structures assembly activities is detailed. The MT operational features which are required to support astronauts performing on-orbit structure construction or spacecraft assembly functions are presented and discussed. Use of the MT to perform a variety of assembly functions is presented. Estimated EVA assembly times for a precision segmented reflector approximately 20 m in diameter are presented. The EVA/MT technique under study for construction of the reflector (and the entire spacecraft) is illustrated. Finally, the current status of development activities and test results involving the MT and Space Station structural assembly are presented.

Bush, Harold G.↗

Design and performance of mobile terminal for North American MSAT network

The mobile terminal (MT), which can be selected for various applications, i.e. land mobile, transportable, fixed site, and maritime use, has been developed. Medium gain and high gain antennas are available. The MT can support circuit switched voice and data service. Additionally, cellular roaming service, net radio, and Group 3 facsimile services are optionally provided. A Mitsubishi handheld portable phone can be used as a stand-alone portable cellular-only phone or it can provide MSAT voice service when connected to MT. The MT which operates in L-band (1.5 GHz/1.6 GHz) satisfies equivalent isotropically radiated power (EIRP) of 12.5 dBW minimum and G/T of -16 dB/K minimum for medium gain system and -12 dB/K for high gain system. The excellent performance of transmit phase noise and bit error rate is achieved by using new technologies.

Fuji, Tsuyoshi↗

The post-pinatubo evolution of stratospheric aerosol surface area density as inferred from SAGE 2

Following the eruption of Mount Pinatubo in June of 1991, the aerosol mass loading of the stratosphere increased from -1 Mt to approximately 30 Mt. This change in aerosol loading was responsible for numerous radiative and chemical changes observed within the stratosphere. As a result, the ability to quantify aerosol properties on a global basis during this period is important. Aerosol surface area density is a critical parameter in governing the rates of heterogeneous reactions, such as ClONO2 plus H2O yields HNO3 plus HOCl, which influence the stratospheric abundance of ozone. Following the eruption of Mt. Pinatubo, measurements by the Stratospheric Aerosol and Gas Experiment (SAGE 2) indicated that the stratospheric aerosol surface area density increased by as much as a factor of 100. Using SAGE 2 multi-wavelength aerosol extinction data, aerosol surface area density as well as mass are derived for the period following the eruption of Mt. Pinatubo through the present.

Poole, L. R.↗

Electrodynamic Thrust Performance for Space Solar Satellite Applications

The use of spinning tethers to transfer payloads from low earth orbit (LEO) to geosynchronous earth orbit (GEO) has previously been considered for payload masses up to 4000 kg (4 MT). The construction of the solar power station requires a transfer of 22,568 MT per year from LEO to GEO. This is envisioned to be carried out in payload units of 20 MT or 40 MT, which implies a frequency of 1188 or 594 flights per year, respectively. We could say from the outset that the use of spinning tethers for such large payloads at such high launch frequencies does not appear promising. This is inherent in the principles of spinning tether transfer, which we will briefly sketch below. Somewhat different scenarios are possible, but the basic physics remains the same. We consider only a single stage from LEO to GTO tether system, since the complexity involved in phasing the launches, docking, and spinups for a two-stage system for so many payloads rules out a two-stage system, in our opinion. The payload must first be launched to LEO, where it docks with the tether launch platform and is connected to the tether. The tether (tens of kilometers long) is then deployed with the payload upward. In order to give the payload the velocity necessary to launch it into a geosynchronous transfer orbit (GTO), i.e., to impart the required Av, the tethered system must be spun up about the center of mass of the tether-platform-payload system. The two end masses (platform and payload) are driven to rotate about the center of mass of the tethered system. Both the final rotational velocity and the phasing of the tether spin have to be controlled so that payload is in the vertically up position at the perigee of the LEO and with the velocity required to achieve the GTO when it is released at that point. Upon release, the payload then goes into GTO, where it again requires an acceleration to reach GEO (circularization of the orbit). The platform goes into a lower orbit, from which it must be raised in order to be at the proper LEO for docking with another payload. For this scheme to make sense at all, the platform must be envisioned as having a solar powered electrical thrust system to regain LEO and to spin up the tethered system. Similarly, solar powered electrical propulsion would be used to circularize the orbit to GEO.

Estes, Robert D.↗

STS-110 Flight Day 8 Highlights

On Flight Day 8 of the STS-110 mission, the combined members of the Atlantis STS-110 crew and the International Space Station (ISS) Expedition 4 crew, Commanders Michael J. Bloomfield and Yury I. Onufrienko, respectively, answer questions posed to them by press members on the ground. Topics covered include: challenges of long term space habitation, adequacy of training for the on-orbit construction of the space station, details on the Mobile Transporter (MT) railcar system. Footage of the MT directly precedes and follows the extended question and answer portion of the video. The MT is seen from a variety of angles, as it slowly moves from Workstation 4 to Workstation 5 in order to test its ability to grapple to a fixed point along the track. The MT will eventually be used as a base for the robot arm in order to perform maintenance and assembly tasks on the ISS.

Source record↗

Effects of Volcanic Eruptions on Stratospheric Ozone Recovery

The effects of the stratospheric sulfate aerosol layer associated with the Mt. Pinatubo volcano and future volcanic eruptions on the recovery of the ozone layer is studied with an interactive two-dimensional photochemical model. The time varying chlorine loading and the stratospheric cooling due to increasing carbon dioxide have been taken into account. The computed ozone and temperature changes associated with the Mt. Pinatubo eruption in 1991 agree well with observations. Long model runs out to the year 2050 have been carried out, in which volcanoes having the characteristics of the Mount Pinatubo volcano were erupted in the model at 10-year intervals starting in the year 2010. Compared to a non-volcanic run using background aerosol loading, transient reductions of globally averaged column ozone of 2-3 percent were computed as a result of each of these eruptions, with the ozone recovering to that computed for the non-volcanic case in about 5 years after the eruption. Computed springtime Arctic column ozone losses of from 10 to 18 percent also recovered to the non-volcanic case within 5 years. These results suggest that the long-term recovery of ozone would not be strongly affected by infrequent volcanic eruptions with a sulfur loading approximating Mt. Pinatubo. Sensitivity studies in which the Arctic lower stratosphere was forced to be 4 K and 10 K colder resulted in transient ozone losses of which also recovered to the non-volcanic case in 5 years. A case in which a volcano five times Mt. Pinatubo was erupted in the year 2010 led to maximum springtime column ozone losses of 45 percent which took 10 years to recover to the background case. Finally, in order to simulate a situation in which frequent smaller volcanic eruptions result in increasing the background sulfate loading, a simulation was made in which the background aerosol was increased by 10 percent per year. This resulted in a delay of the recovery of column ozone to 1980 values of more than 10 years.

Rosenfield, Joan E.↗

Characterization of iron, manganese, and copper synthetic hydroxyapatites by electron paramagnetic resonance spectroscopy

The incorporation of micronutrients (e.g., Fe, Mn, Cu) into synthetic hydroxyapatite (SHA) is proposed for slow release of these nutrients to crops in NASA's Advanced Life Support (ALS) program for long-duration space missions. Separate Fe3+ (Fe-SHA), Mn2+ (Mn-SHA), and Cu2+ (Cu-SHA) containing SHA materials were synthesized by a precipitation method. Electron paramagnetic resonance (EPR) spectroscopy was used to determine the location of Fe3+, Mn2+, and Cu2+ ions in the SHA structure and to identify other Fe(3+)-, Mn(2+)-, and Cu(2+)-containing phases that formed during precipitation. The EPR parameters for Fe3+ (g=4.20 and 8.93) and for Mn2+ (g=2.01, A=9.4 mT, D=39.0 mT and E=10.5 mT) indicated that Fe3+ and Mn2+ possessed rhombic ion crystal fields within the SHA structure. The Cu2+ EPR parameters (g(z)=2.488, A(z)=5.2 mT) indicated that Cu2+ was coordinated to more than six oxygens. The rhombic environments of Fe3+ and Mn2+ along with the unique Cu2+ environment suggested that these metals substituted for the 7 or 9 coordinate Ca2+ in SHA. The EPR analyses also detected poorly crystalline metal oxyhydroxides or metal-phosphates associated with SHA. The Fe-, Mn-, and Cu-SHA materials are potential slow release sources of Fe, Mn, and Cu for ALS and terrestrial cropping systems.

NASA Center JSC↗

Power Systems Evaluated for Solar Electric Propulsion Vehicles

Solar electric propulsion (SEP) mission architectures are applicable to a wide range NASA missions including the robotic exploration of the outer planets in the next decade and the human exploration of Mars within the next 2 decades. SEP enables architectures that are very mass efficient with reasonable power levels (1-MW class) aerobrake and cryogenic upper-stage transportation technologies are utilized. In this architecture, the efficient SEP stage transfers the payload from low Earth orbit (LEO) High Energy Elliptical Parking Orbit (HEEPO) within a period of 6 to 12 months. highthrust, cryogenic upper stage and payload then separate from the SEP vehicle for injection to the planetary target, allowing for fast heliocentric trip times. This mission architecture offers a potential reduction in mass to LEO in comparison to alternative all-chemical nuclear propulsion schemes. Mass reductions may allow launch vehicle downsizing enable missions that would have been grounded because of cost constraints. The preceding figure illustrates a conceptual SEP stage design for a human Mars mission. Researchers at the NASA Glenn Research Center at Lewis Field designed conceptual SEP vehicle, conceived the mission architecture to use this vehicle, and analyzed the vehicle s performance. This SEP stage has a dry mass of 35 metric tons (MT), 40 MT of xenon propellant, and a photovoltaic array that spans 110 m, providing power to a cluster of eight 100-kW Hall thrusters. The stage can transfer an 80-MT payload and upper stage to the desired HEEPO. Preliminary packaging studies show this space-station-class SEP vehicle meets the proposed "Magnum" launch vehicle and volume requirements with considerable margin. An SEP vehicle for outer planetary missions, such as the Europa Mapper Mission, would be dramatically smaller than human Mars mission SEP stage. In this mission architecture, the SEP power system with the payload to provide spacecraft power throughout the mission. Several photovoltaic array design concepts were considered for the SEP vehicle power system for the human mission to Mars. These include a space station derivative, a SCARLET (Solar Concentrator Arrays with Refractive Linear Element Technology) derivative, and a hybrid inflatable-deployable thin polymer membrane array with thin-film solar cells (as shown in the concept illustration). This concept is based on a design developed for the Next Generation Space Telescope Sun shield. The array is divided into 16 independent electrical sections with 500-V, negative-grounded solar cell strings. The power system employs a channelized, 500-Vdc power management and distribution (PMAD) architecture with lithium ion batteries for energy storage for vehicle and payload secondary loads (the high-power Hall thrusters do not operate in eclipse periods). The 500-V PMAD voltage permits "direct-drive" thruster operation, greatly reducing the power processing unit size, complexity, and power loss. Similar power system architecture, designs, and technology are assumed for the Europa Mapper Mission SEP vehicle. The primary exceptions are that the photovoltaic array is assumed to consist of two rectangular wings and that the power system rating is 15 kW in Earth orbit and 200 W at Europa. To size the SEP vehicle power system, a dedicated Fortran code was developed to predict detailed power system performance, mass, and thermal control requirements. This code also modeled all the relevant Earth orbit environments; that is, the particulate radiation, plasma, meteoroids and debris, ultraviolet radiation, contamination, and thermal conditions. Analysis results for the Human Mars Mission SEP vehicle show a power system mass of 9-MT and photovoltaic array area of 5800-square meters for the thin-membrane design concept with CuInS2 thin-film cells. Power processing unit input power for a thin-membrane array design with three-junction, amorphous SiGe solar cells is shown in the graph. Power falls off rapidly inhe first weeks of the mission because of light-induced (Staebler-Wronksi) solar cell losses. During the next 200 days, power decreases steadily as the SEP stage spirals through the proton belts and sustains the bulk of the mission radiation damage. Once the vehicle apogee is above approximately four Earth radii, little additional degradation is incurred. From 400 to 800 days, a 1100-km "parking" orbit is maintained to await the next payload transfer opportunity. This orbit is below the main proton belt, and thus, little radiation dose is accumulated during this time period. During the second LEO-to-HEEPO transfer, power degrades somewhat further, but power requirements are still met. In comparison, the Europa Mapper SEP vehicle power system had a mass of 150 kg and a thin membrane array area of 100 square meters.

Kerslake, Thomas W.↗

Settled Cryogenic Propellant Transfer

Cryogenic propellant transfer can significantly benefit NASA s space exploration initiative. LMSSC parametric studies indicate that "Topping off" the Earth Departure Stage (EDS) in LEO with approx.20 mT of additional propellant using cryogenic propellant transfer increases the lunar delivered payload by 5 mT. Filling the EDS to capacity in LEO with 78 mT of propellants increases the delivered payload by 20 mT. Cryogenic propellant transfer is directly extensible to Mars exploration in that it provides propellant for the Mars Earth Departure stage and in-situ propellant utilization at Mars. To enable the significant performance increase provided by cryogenic propellant transfer, the reliability and robustness of the transfer process must be guaranteed. By utilizing low vehicle acceleration during the cryogenic transfer the operation is significantly simplified and enables the maximum use of existing, reliable, mature upper stage cryogenic-fluid-management (CFM) techniques. Due to settling, large-scale propellant transfer becomes an engineering effort, and not the technology development endeavor required with zero-gravity propellant transfer. The following key CFM technologies are all currently implemented by settling on both the Centaur and Delta IV upper stages: propellant acquisition, hardware chilldown, pressure control, and mass gauging. The key remaining technology, autonomous rendezvous and docking, is already in use by the Russians, and must be perfected for NASA whether the use of propellant transfer is utilized or not.

Kutter, Bernard F.↗

Gale Crater - Why are We There and What do We Hope to Learn?

The Mars Science Laboratory Rover Curiosity is commencing a two-year investigation of Gale crater and Mt. Sharp, the craters prominent central mound. Gale is a 155 km, late Noachian/early Hesperian impact crater located near the dichotomy boundary separating the southern highlands from the northern plains. The central mound is composed of layered sedimentary rock, with upper and lower mound units separated by a prominent erosional unconformity. The lower mound is of particular interest, as it contains secondary minerals indicative of a striking shift from water-rich to water-poor conditions on early Mars. A key unknown in the history of Gale is the relationship between the sedimentary units in the mound and sedimentary sequences in the surrounding region. We employed orbital remote sensing data to determine if areas within a 1,000 km radius of Gale match the characteristics of sedimentary units in Mt. Sharp. Regions of interest were defined based on: the mound s inferred age, altitude range, and THEMIS nighttime brightness (a proxy for thermal inertia). Using orbital CTX, MOC and HiRISE images we examined all areas within our regions of interest for analogous geomorphic units in the same altitude ranges as the corresponding units in Mt. Sharp. The results are consistent with the hypothesis that sedimentary units in both the upper and lower sections of the Gale mound are related to nearby regional units located along the dichotomy boundary. This relationship supports an inferred geologic history that includes several episodes of widespread sedimentary deposition and erosion in the martian mid-latitudes. In this model Mt. Sharp is the remnant of regional sedimentary deposits that partially or completely filled the crater, became lithified, and were subsequently deeply eroded. Key questions that will be addressed by Curiosity include the compositions of the sediments, the modes of deposition, the mechanisms of lithification, and the nature of the erosion.

Allen, Carlton C.↗

Mars Sample Return Using Commercial Capabilities: Mission Architecture Overview

Mars Sample Return (MSR) is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. This paper presents an overview of a feasibility study for an MSR mission. The objective of the study was to determine whether emerging commercial capabilities can be used to reduce the number of mission systems and launches required to return the samples, with the goal of reducing mission cost. We report the feasibility of a complete and closed MSR mission design using the following scenario that covers three synodic launch opportunities, beginning with the 2022 opportunity: A Falcon Heavy injects a SpaceX Red Dragon capsule and trunk onto a Trans Mars Injection (TMI) trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV), and hardware to transfer a sample collected in a previously landed rover mission to the ERV. The Red Dragon descends to land on the surface of Mars using Super Sonic Retro Propulsion (SSRP). After previously collected samples are transferred to the ERV, the single-stage MAV launches the ERV from the surface of Mars. The MAV uses a storable liquid bi-propellant propulsion system to deliver the ERV to a Mars phasing orbit. After a brief phasing period, the ERV, which also uses a storable bi-propellant system, performs a Trans Earth Injection (TEI) burn. Upon arrival at Earth, the ERV performs Earth and lunar swing-bys and is placed into a lunar trailing circular orbit - an Earth orbit, at lunar distance. A later mission, using Dragon and launched by a Falcon Heavy, performs a rendezvous with the ERV in the lunar trailing orbit, retrieves the sample container and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of pristine martian materials into the Earth's biosphere. The analysis methods employed standard and specialized aerospace engineering tools. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships (MERs). The architecture was iterated until overall mission convergence was achieved on at least one path. Subsystems analyzed in this study include support structures, power system, nose fairing, thermal insulation, actuation devices, MAV exhaust venting, and GN&C. Best practice application of loads, mass growth contingencies, and resource margins were used. For Falcon Heavy capabilities and Dragon subsystems we utilized publically available data from SpaceX, published analyses from other sources, as well as our own engineering and aerodynamic estimates. Earth Launch mass is under 11 mt, which is within the estimated capability of a Falcon Heavy, with margin. Total entry masses between 7 and 10 mt were considered with closure occurring between 9 and 10 mt. Propellant mass fractions for each major phase of the EDL - Entry, Terminal Descent, and Hazard Avoidance - have been derived. An assessment of the effect of the entry conditions on the thermal protection system (TPS), currently in use for Dragon missions, shows no significant stressors. A useful payload mass of 2.0 mt is provided and includes mass growth allowances for the MAV, the ERV, and mission unique equipment. We also report options for the MAV and ERV, including propulsion systems, crewed versus robotic retrieval mission, as well as direct Earth entry. International planetary protection policies as well as verifiable means of compliance will have a large impact on any MSR mission design. We identify areas within our architecture where such impacts occur. We also describe preliminary compliance measures that will be the subject of future work. This work shows that emerging commercial capabilities as well as new methodologies can be used to efficiently support an important planetary science objective. The work also has applications for human exploration missions that use propulsive EDL techniques

Red Dragon↗

Mars Sample Return Using Commercial Capabilities: Mission Architecture Overview

Mars Sample Return (MSR) is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. This paper presents an overview of a feasibility study for a MSR mission. The objective of the study was to determine whether emerging commercial capabilities can be used to reduce the number of mission systems and launches required to return the samples, with the goal of reducing mission cost. The major element required for the MSR mission are described and include an integration of the emerging commercial capabilities with small spacecraft design techniques; new utilizations of traditional aerospace technologies; and recent technological developments. We report the feasibility of a complete and closed MSR mission design using the following scenario that covers three synodic launch opportunities, beginning with the 2022 opportunity: A Falcon Heavy injects a SpaceX Red Dragon capsule and trunk onto a Trans Mars Injection (TMI) trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV); an Earth Return Vehicle (ERV); and hardware to transfer a sample collected in a previously landed rover mission to the ERV. The Red Dragon descends to land on the surface of Mars using Supersonic Retro Propulsion (SRP). After previously collected samples are transferred to the ERV, the single-stage MAV launches the ERV from the surface of Mars to a Mars phasing orbit. The MAV uses a storable liquid, pump fed bi-propellant propulsion system. After a brief phasing period, the ERV, which also uses a storable bi-propellant system, performs a Trans Earth Injection (TEI) burn. Once near Earth the ERV performs Earth and lunar swing-bys and is placed into a Lunar Trailing Orbit (LTO0 - an Earth orbit, at lunar distance. A later mission, using a Dragon and launched by a Falcon Heavy, performs a rendezvous with the ERV in the lunar trailing orbit, retrieves the sample container and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft, makes a controlled Earth re-entry preventing any unintended release of pristine Martian materials into the Earth's biosphere. Other capsule type vehicles and associated launchers may be applicable. The analysis methods employed standard and specialized aerospace engineering tools. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships (MERs). The architecture was iterated until overall mission convergence was achieved on at least one path. Subsystems analyzed in this study include support structures, power system, nose fairing, thermal insulation, actuation devices, MAV exhaust venting, and GN&C. Best practice application of loads, mass growth contingencies, and resource margins were used. For Falcon Heavy capabilities and Dragon subsystems we utilized publically available data from SpaceX; published analyses from other sources; as well as our own engineering and aerodynamic estimates. Earth Launch mass is under 11 mt, which is within the estimated capability of a Falcon Heavy, with margin. Total entry masses between 7 and 10 mt were considered with closure occurring between 9 and 10 mt. Propellant mass fractions for each major phase of the EDL - Entry, Terminal Descent, and Hazard Avoidance - have been derived. An assessment of the entry conditions on the thermal protection system (TPS), currently in use for Dragon missions, has been made. And shows no significant stressors. A useful mass of 2.0 mt is provided and includes mass growth allowances for the MAV, the ERV, and mission unique equipment. We also report on alternate propellant options for the MAV and options for the ERV, including propulsion systems; crewed versus robotic retrieval mission; as well as direct Earth entry. International Planetary Protection Policies as well as verifiable means of compliance will have a large impact on any MSR mission design. We identify areas within our architecture where such impacts occur. This work shows that emerging commercial capabilities can be used to effectively integrated into a mission to achieve an important planetary science objective.

Mars Sample Return↗

New Mastcam Multispectral Rock Classes in Sulfate-Bearing Strata, Gale Crater, Mars

Orbital data of Gale Crater, Mars has identified a transition in the stratigraphy of Mt. Sharp indicating an environmental change from a wetter one that accommodated clay mineral formation to a drier environment that led to the precipitation of sulfates. Mt. Sharp is not the only location on Mars for which this transition has been observed which suggests a global environmental change around the Noachian-Hesperian transition. Also visible from orbit is a dark-toned marker band that lies within the sulfate-bearing strata hypothesized to be a volcanic ash deposit. The Mars Science Laboratory (MSL) Curiosity rover is currently exploring this region of Mt. Sharp. In-situ analyses by the rover show changes in morphology and chemistry between the sulfate-bearing layers below and above the marker band and the marker band itself. The MSL instrument payload includes the Mast Camera (Mastcam), which collects multispectral images to provide context for other instruments and broad mineralogic interpretations. In addition to mafic Fe-bearing minerals, Mastcam is sensitive to oxides and some hydrated minerals, important indicators of alteration. In our previous work, we compiled a database of Mastcam spectra through Curiosity’s exploration of Vera Rubin ridge (sols 0-2302), from which 9 spectral classes of rocks were identified (Fig. 1D). Each class has diagnostic spectral features that reflect a common mineralogic interpretation. More recently, as Curiosity traversed through the clay-rich region, Glen Torridon (GT), there was some variation in the rock spectral classes potentially due to nontronite and other phyllosilicates, but not enough to warrant new spectral classes (Fig. 1B). We hypothesize that new classes will appear in accordance with sulfate-bearing strata and the marker band, specifically appearing as a ‘downturn’ in the last two wavelength filters that is inherent, but not unique, to polyhydrated Mg-sulfates. Here, we expand upon our analysis of Mastcam multispectral observations through Curiosity’s second encounter with the marker band (up to sol 3672), comparing the spectral diversity within the sulfate-bearing unit and the marker band to the spectral classes encountered previously in the traverse. These analyses will provide a basis for comparison and aid in selecting targets for in-situ investigations as Curiosity continues its ascent of Mt. Sharp.

A M Eng↗