Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Line outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A High-Performance Hybrid Computing Approach to Massive Contingency Analysis in the Power Grid

Operating the electrical power grid to prevent power black-outs is a complex task. An important aspect of this is contingency analysis, which involves understanding and mitigating potential failures in power grid elements such as transmission lines. When taking into account the potential for multiple simultaneous failures (known as the N-x contingency problem), contingency analysis becomes a massively computational task. In this paper we describe a novel hybrid computational approach to contingency analysis. This approach exploits the unique graph processing performance of the Cray XMT in conjunction with a conventional massively parallel compute cluster to identify likely simultaneous failures that could cause widespread cascading power failures that have massive economic and social impact on society. The approach has the potential to provide the first practical and scalable solution to the N-x contingency problem. When deployed in power grid operations, it will increase the grid operator’s ability to deal effectively with outages and failures with power grid components while preserving stable and safe operation of the grid. The paper describes the architecture of our solution and presents preliminary performance results that validate the efficacy of our approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Power Outage Forecasting

Electrical distribution networks are the final leg of the network that moves electric power from generating stations to end users. The vast majority of the circuits in these networks are above-ground and exposed to direct damage from strong winds, broken tree limbs, toppled trees, and flying debris. These systems are also susceptible to ice storms. The combined stress of the weight of ice (icing), the increased wind resistance of the conductors, and broken tree limbs can damage lines, poles, and support structures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OPERATIONAL TOPOLOGY ESTIMATION OF THREE PHASE UNBALANCED POWER DISTRIBUTION SYSTEMS WITH OUTAGES

Distribution grid, in general, is constructionally loopy but a radially operated network. Opening and closing of suitable tie-switches allows transition from one radial topology to another. Tie-switches ensure reliability and provide restoration paths when faults (outages) occur. The estimation of the system's current operational topology is a precursor to implementing any optimal control actions (during normal operation) or restorative actions (during outage condition). The existing literature in topology detection suffers with several limitations including: (1) computationally intensive nonlinear formulations that are not scalable for large distribution systems, (2) methods requiring exhaustive search for the correct topology by enumerating the complete topological search space, and (3) approaches requiring large volumes of time-series measurements and are not applicable for estimating continuously changing operational topology. Furthermore, the existing literature on distribution grid topology estimation cannot be extended to estimate the operational topology during outage conditions. For operational topology estimation during outages, our objective is to estimate both energized radial feeder and the outaged sections. Starting with a radial topology, these methods identify outaged feeder sections and hence, are inapplicable when the current radial operational topology is not known. In this work, we present a mathematical programming approach to estimate the operational topology of a three-phase unbalanced power distribution system under both outage and normal operating conditions. The aforementioned limitations of existing literature were countered by modeling the problem as a mixed-integer linear programming (MILP) problem which minimizes the errors in available measurements while satisfying the power flow and structural constraints of the system. Specically, a minimum weighted least absolute value estimator is proposed that uses the instantaneous line flow measurements, historical/ forecasted load data, and ping measurements from a limited set of smart meters and solves an MILP to identify the operational topology based on a linearized three-phase unbalanced power flow model. The proposed approach is tested on IEEE 123-bus feeder and 1069 bus multi-feeder test system and the numerical results prove the applicability of the proposed method to large three phase unbalanced grids with high errors in measurements. It is observed that the approach performs well even at high percentages of measurement errors.

GANDLURU NAGA, ANANDINI↗

Extreme Tele-Echocardiography: Methodology for Remote Guidance of In-Flight Echocardiography Aboard the International Space Station

Methods: In the year before launch of an ISS mission, potential astronaut echocardiographic operators participate in 5 sessions to train for echo acquisitions that occur roughly monthly during the mission, including one exercise echocardiogram. The focus of training is familiarity with the study protocol and remote guidance procedures. On-orbit, real-time guidance of in-flight acquisitions is provided by a sonographer in the Telescience Center of Mission Control. Physician investigators with remote access are able to relay comments on image quality to the sonographer. Live video feed is relayed from the ISS to the ground via the Tracking and Data Relay Satellite System with a 2- second transmission delay. The expert sonographer uses these images, along with twoway audio, to provide instructions and feedback. Images are stored in non-compressed DICOM format for asynchronous relay to the ground for subsequent off-line analysis. Results: Since June, 2009, a total of 27 resting echocardiograms and 5 exercise studies have been performed during flight. Average acquisition time has been 45 minutes, reflecting 26,000 km of ISS travel per study. Image quality has been adequate in all studies, and remote guidance has proven imperative for fine-tuning imaging and prioritizing views when communication outages limit the study duration. Typical resting studies have included 27 video loops and 30 still-frame images requiring 750 MB of storage. Conclusions: Despite limited crew training, remote guidance allows research-quality echocardiography to be performed by non-experts aboard the ISS. Analysis is underway and additional subjects are being recruited to define the impact of microgravity on cardiac structure and systolic and diastolic function.

Martin, David S.↗

Rapid Evaluation and Response to Impacts on Critical End-Use Loads Following Natural Hazard-Driven Power Outages: A Modular and Responsive Geospatial Technology

The disparate nature of data for electric power utilities complicates the emergency recovery and response process. The reduced efficiency of response to natural hazards and disasters can extend the time that electrical service is not available for critical end-use loads, and in extreme events, leave the public without power for extended periods. This article presents a methodology for the development of a semantic data model for power systems and the integration of electrical grid topology, population, and electric distribution line reliability indices into a unified, cloud-based, serverless framework that supports power system operations in response to extreme events. An iterative and pragmatic approach to working with large and disparate datasets of different formats and types resulted in improved application runtime and efficiency, which is important to consider in real time decision-making processes during hurricanes and similar catastrophic events. This technology was developed initially for Puerto Rico, following extreme hurricane and earthquake events in 2017 and 2020, but is applicable to utilities around the world. Given the highly abstract and modular design approach, this technology is equally applicable to any geographic region and similar natural hazard events. In addition to a review of the requirements, development, and deployment of this framework, technical aspects related to application performance and response time are highlighted.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extreme Tele-Echocardiography: Methodology for Remote Guidance of In-flight Echocardiography Aboard the International Space Station

Echocardiography is ideally suited for cardiovascular imaging in remote environments, but the expertise to perform it is often lacking. In 2001, an ATL HDI5000 was delivered to the International Space Station (ISS). The instrument is currently being used in a study to investigate the impact of long-term microgravity on cardiovascular function. The purpose of this report is to describe the methodology for remote guidance of echocardiography in space. Methods: In the year before launch of an ISS mission, potential astronaut echocardiographic operators participate in 5 sessions to train for echo acquisitions that occur roughly monthly during the mission, including one exercise echocardiogram. The focus of training is familiarity with the study protocol and remote guidance procedures. On-orbit, real-time guidance of in-flight acquisitions is provided by a sonographer in the Telescience Center of Mission Control. Physician investigators with remote access are able to relay comments on image optimization to the sonographer. Live video feed is relayed from the ISS to the ground via the Tracking and Data Relay Satellite System with a 2 second transmission delay. The expert sonographer uses these images along with two-way audio to provide instructions and feedback. Images are stored in non-compressed DICOM format for asynchronous relay to the ground for subsequent off-line analysis. Results: Since June, 2009, a total of 19 resting echocardiograms and 4 exercise studies have been performed in-flight. Average acquisition time has been 45 minutes, reflecting 26,000 km of ISS travel per study. Image quality has been adequate in all studies, but remote guidance has proven imperative for fine-tuning imaging and prioritizing views when communication outages limit the study duration. Typical resting studies have included 12 video loops and 21 still-frame images requiring 750 MB of storage. Conclusions: Despite limited crew training, remote guidance allows research-quality echocardiography to be performed by non-experts aboard the ISS. Analysis is underway and additional subjects are being recruited to define the impact of microgravity on cardiac structure and systolic and diastolic function.

Martin, David↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 10: Controllability and Observability Analysis (Deliverable D7))

It is common to have less than full observability for distribution systems, as the number of available measurements are not sufficient. Considering increasing penetration of distributed energy resources (DERs), it is imperative to understand and control distribution systems better. Developed for the transmission system, the original numerical observability analysis methods were based on the canonical DC Power Flow (DC-PF) model. However, the DC-PF model is ill-suited for the distribution system in which line resistance to reactance (R/X) ratios can be near unity. In this report, we apply the non-iterative Observability Test (OT) and Observable Island Identification Procedure (OIIP) in to the gain matrix from the distribution system state estimator. Because sensors are few in distribution systems, pseudo-measurements based on historical load profiles and zero-injection virtual measurements are often employed to ensure observability. However, both the observability and the accuracy of the state estimates are uncertain when historical data is limited/unavailable.

42 ENGINEERING↗

MaDEVIoT: Cyberattacks on EV Charging Can Disrupt Power Grid Operation

Extensive roll-out of electric vehicles (EVs) requires large-scale deployment of high-power EV Charging Stations (EVCSs). EVCSs are connected to the internet using Internetof- Things (IoT) such as smartphones, to improve the charging experience of users and increase their profitability. This paper studies the feasibility of demand-side cyberattacks launched on power grids via such internet-connected highpower EVCSs. The attack mechanism distorts power grid frequency and voltage, and has the potential to trigger systemwide outages. The case study, based on the power grid and EV deployment plans in Manhattan, New York, illustrates potential impacts of such attacks. The results show that such attacks will become feasible in Manhattan, New York in 2030, as EV adoption increases. Furthermore, the attacks in 2030 are feasible even compromising a single company’s EVCS server in Manhattan, New York. The attacks can cause line overloads and trip over-frequency protection relays, causing system-side blackout in the power grid in Manhattan, New York. The paper informs planning authorities and power grid operators involved with the roll-out of EV charging infrastructure about potential cyberthreats to power grids via manipulating internet-connected high-power EVCSs.

Acharya, Samrat S.↗

Distribution System Resilience Assessment Considering PV Vulnerabilities for Hurricane Events

Distribution networks are increasingly vulnerable to damage and outages from extreme weather events. The integration of solar photovoltaics (PVs) further complicates resilience analysis due to its weather-dependent nature. However, limited research has examined the impacts of weather on PVs under severe events like hurricanes. This paper proposes a probabilistic framework to assess distribution system resilience considering PV vulnerabilities during hurricanes. The framework incorporates (i) a spatiotemporal fragility model to evaluate failure probabilities for distribution lines and PVs, and (ii) resilience indices at both system and component levels. The approach offers valuable insights into the resilience of modern distribution grids under extreme weather conditions. Numerical results on the unbalanced IEEE 123-bus test system validate the effectiveness of the framework.

Vahedi, Soroush [University of Connecticut, Storrs↗

Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan (Final Report No. 2)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Microturbine Systems

In July 2000, the United Technologies Research Center (UTRC) was one of five recipients of a US Department of Energy contract under the Advanced Microturbine System (AMS) program managed by the Office of Distributed Energy (DE). The AMS program resulted from several government-industry workshops that recognized that microturbine systems could play an important role in improving customer choice and value for electrical power. That is, the group believed that electrical power could be delivered to customers more efficiently and reliably than the grid if an effective distributed energy strategy was followed. Further, the production of this distributed power would be accomplished with less undesirable pollutants of nitric oxides (NOx) unburned hydrocarbons (UHC), and carbon monoxide (CO). In 2000, the electrical grid delivered energy to US customers at a national average of approximately 32% efficiency. This value reflects a wide range of powerplants, but is dominated by older, coal burning stations that provide approximately 50% of US electrical power. The grid efficiency is also affected by transmission and distribution (T&D) line losses that can be significant during peak power usage. In some locations this loss is estimated to be 15%. Load pockets can also be so constrained that sufficient power cannot be transmitted without requiring the installation of new wires. New T&D can be very expensive and challenging as it is often required in populated regions that do not want above ground wires. While historically grid reliability has satisfied most customers, increasing electronic transactions and the computer-controlled processes of the 'digital economy' demand higher reliability. For them, power outages can be very costly because of transaction, work-in-progress, or perishable commodity losses. Powerplants that produce the grid electrical power emit significant levels of undesirable NOx, UHC, and CO pollutants. The level of emission is quoted as either a technology metric or a system-output metric. A common form for the technology metric is in the units of PPM {at} 15% O2. In this case the metric reflects the molar fraction of the pollutant in the powerplant exhaust when corrected to a standard exhaust condition as containing 15% (molar) oxygen, assuring that the PPM concentrations are not altered by subsequent air addition or dilution. Since fuel combustion consumes oxygen, the output oxygen reference is equivalent to a fuel input reference. Hence, this technology metric reflects the moles of pollutant per mole of fuel input, but not the useful output of the powerplant-i.e. the power. The system-output metric does embrace the useful output and is often termed an output-based metric. A common form for the output-based metric is in the units of lb/MWh. This is a system metric relating the pounds of pollutant to output energy (e.g., MWh) of the powerplant.

01 COAL, LIGNITE, AND PEAT↗

AP1000{sup R} nuclear power plant safety overview for spent fuel cooling

The AP1000{sup R} plant is an 1100-MWe class pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and costs. The AP1000 design uses passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems such as AC power, component cooling water, service water or HVAC. Furthermore, these passive features 'fail safe' during a non-LOCA event such that DC power and instrumentation are not required. The AP1000 also has simple, active, defense-in-depth systems to support normal plant operations. These active systems provide the first level of defense against more probable events and they provide investment protection, reduce the demands on the passive features and support the probabilistic risk assessment. The AP1000 passive safety approach allows the plant to achieve and maintain safe shutdown in case of an accident for 72 hours without operator action, meeting the expectations provided in the U.S. Utility Requirement Document and the European Utility Requirements for passive plants. Limited operator actions are required to maintain safe conditions in the spent fuel pool via passive means. In line with the AP1000 approach to safety described above, the AP1000 plant design features multiple, diverse lines of defense to ensure spent fuel cooling can be maintained for design-basis events and beyond design-basis accidents. During normal and abnormal conditions, defense-in-depth and other systems provide highly reliable spent fuel pool cooling. They rely on off-site AC power or the on-site standby diesel generators. For unlikely design basis events with an extended loss of AC power (i.e., station blackout) or loss of heat sink or both, spent fuel cooling can still be provided indefinitely: - Passive systems, requiring minimal or no operator actions, are sufficient for at least 72 hours under all possible pool heat load conditions. - After 3 days, several different means are provided to continue spent fuel cooling using installed plant equipment as well as off-site equipment with built-in connections. Even for beyond design basis accidents with postulated pool damage and multiple failures in the passive safety-related systems and in the defense-in-depth active systems, the AP1000 multiple spent fuel pool spray and fill systems provide additional lines of defense to prevent spent fuel damage. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Structure Learning and Statistical Estimation in Distribution Networks - Part I

Traditionally power distribution networks are either not observable or only partially observable. This complicates development and implementation of new smart grid technologies, such as those related to demand response, outage detection and management, and improved load-monitoring. In this two part paper, inspired by proliferation of the metering technology, we discuss estimation problems in structurally loopy but operationally radial distribution grids from measurements, e.g. voltage data, which are either already available or can be made available with a relatively minor investment. In Part I, the objective is to learn the operational layout of the grid. Part II of this paper presents algorithms that estimate load statistics or line parameters in addition to learning the grid structure. Further, Part II discusses the problem of structure estimation for systems with incomplete measurement sets. Our newly suggested algorithms apply to a wide range of realistic scenarios. The algorithms are also computationally efficient – polynomial in time– which is proven theoretically and illustrated computationally on a number of test cases. The technique developed can be applied to detect line failures in real time as well as to understand the scope of possible adversarial attacks on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Putting Safety in the Software

Software is a vital component of nearly every piece of modern technology. It is not a 'sub-system', able to be separated out from the system as a whole, but a 'co-system' that controls, manipulates, or interacts with the hardware and with the end user. Software has its fingers into all the pieces of the pie. If that 'pie', the system, can lead to injury, death, loss of major equipment, or impact your business bottom line, then software safety becomes vitally important. Learning to think about software from a safety perspective is the focus of this paper. We want you to think of software as part of the safety critical system, a major part. This requires 'system thinking' - being able to grasp the whole picture. Software's contribution to modern technology is both good and potentially bad. Software allows more complex and useful devices to be built. It can also contribute to plane crashes and power outages. We want you to see software in a whole new light, see it as a contributor to system hazards, and also as a possible fix or mitigation to some of those hazards.

Wetherholt, Martha S.↗

Structure Learning in Power Distribution Networks

Traditionally power distribution networks are either not observable or only partially observable. This complicates development and implementation of new smart grid technologies, such as these related to demand response, outage detection and management, and improved load-monitoring. Here, inspired by proliferation of the metering technology, we discuss statistical estimation problems in structurally loopy but operationally radial distribution grids consisting in learning operational layout of the network from measurements, e.g. voltage data, which are either already available or can be made available with a relatively minor investment. Our newly suggested algorithms apply to a wide range of realistic scenarios. The algorithms are also computationally efficient – polynomial in time – which is proven theoretically and illustrated computationally on a number of test cases. The technique developed can be applied to detect line failures in real time as well as to understand the scope of possible adversarial attacks on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dual-Doppler Feasibility Study

When two or more Doppler weather radar systems are monitoring the same region, the Doppler velocities can be combined to form a three-dimensional (3-D) wind vector field thus providing for a more intuitive analysis of the wind field. A real-time display of the 3-D winds can assist forecasters in predicting the onset of convection and severe weather. The data can also be used to initialize local numerical weather prediction models. Two operational Doppler Radar systems are in the vicinity of Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS); these systems are operated by the 45th Space Wing (45 SW) and the National Weather Service Melbourne, Fla. (NWS MLB). Dual-Doppler applications were considered by the 45 SW in choosing the site for the new radar. Accordingly, the 45th Weather Squadron (45 WS), NWS MLB and the National Aeronautics and Space Administration tasked the Applied Meteorology Unit (AMU) to investigate the feasibility of establishing dual-Doppler capability using the two existing systems. This study investigated technical, hardware, and software requirements necessary to enable the establishment of a dual-Doppler capability. Review of the available literature pertaining to the dual-Doppler technique and consultation with experts revealed that the physical locations and resulting beam crossing angles of the 45 SW and NWS MLB radars make them ideally suited for a dual-Doppler capability. The dual-Doppler equations were derived to facilitate complete understanding of dual-Doppler synthesis; to determine the technical information requirements; and to determine the components of wind velocity from the equation of continuity and radial velocity data collected by the two Doppler radars. Analysis confirmed the suitability of the existing systems to provide the desired capability. In addition, it is possible that both 45 SW radar data and Terminal Doppler Weather Radar data from Orlando International Airport could be used to alleviate any radar geometry issues at the NWS MLB radar, such as the "cone of silence" or beam blockage. In the event of a radar outage at one of the sites, the multi-radar algorithms would provide continuing coverage of the area through use of the data from the remaining operational radar sites. There are several options to collect, edit, synthesize and display dual-Doppler data sets. These options include commercial packages available for purchase and a variety of freeware packages available from the National Center for Atmospheric Research (NCAR) for processing raw radar data. However, evaluation of the freeware packages revealed that they do not have sufficient documentation and configuration control to be certified for 45 SW use. Additionally, a TI data line must be installed/leased from the NWS MLB office and CCAFS to enable the receipt of NWS MLB raw radar data to use in the dual-Doppler synthesis. Integration of the TI data line into the Eastern Range infrastructure that will meet the security requirements necessary for 45 SW use is time-consuming and costly. Overall evaluation indicates that establishment of the dual-Doppler capability using the existing operational radar systems is desirable and feasible with no technical concerns. Installation of such a system represents a significant enhancement to forecasting capabilities at the 45 WS and at NWS MLB. However, data security and cost considerations must be evaluated in light of current budgetary constraints. In any case, gaining the dual-Doppler capability will provide opportunities for better visualization of the wind field and better forecasting of the onset of convection and severe weather events to support space launch operations at KSC and CCAFS.

Huddleston, Lisa L.↗

An insurance perspective on U.S. electric grid disruption costs

Large yet infrequent disruptions of electrical power can impact tens of millions of people in a single event, triggering significant economic damages, portions of which are insured. Small and frequent events are also significant in the aggregate. This article explores the role that insurance claims data can play in better defining the broader economic impacts of grid disruptions in the U.S. context. We developed four case studies, using previously unpublished data for specific actual grid disruptions. The cases include the 1977 New York City blackout, the 2003 Northeast blackout, multi-year national annual lightning-related electrical damage and multi-year national line-disturbance events. Insured losses represent between 3 and 64 per cent of total loss costs across the case studies. Here, the household sector emerges as a larger locus of costs than indicated in previous studies, and short-lived events emerge as important sources of loss costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗