Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

2016-2020 Strategic Plan and Implementing Framework

The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

Strategic, Plan, Framework, Vision, Clean Energy, ↗

Implementation of Recommendations from the One System Comparative Evaluation of the Hanford Tank Farms and Waste Treatment Plant Safety Bases

A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25 recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

JPL Contamination Control Engineering

JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

Molecular Contamination Spectral Effects (MCSE) Ch↗

Design requirements for SRB production control system. Volume 4: Implementation

The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

Source record↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site, together with quantitative information on material mineralogy, chemistry, and physical properties (rock textures; soil grain size and shape distributions; degree and nature of soil induration; soil magnetic properties). The calibration targets provide radiometric and mineralogical control surfaces. The magnets allow observations of magnetic phases. Patch plates are imaged to determine adhesive and abrasive properties of soils. Coordinated mission planning is crucial for optimizing the measurement synergy among the packages included on the lander. This planning has already begun through generation of multi-sol detailed operations activities. One focus has been to develop a scenario to use the arm to dig a soil trench to a depth of tens of centimeters. The activity will be monitored through use of Pancam and RAC to ensure nominal operations and to acquire data to determine subsurface physical properties (e.g., angle of repose of trench walls). Pancam and Mini-TES observations would also provide constraints on mineralogy and texture for the walls and bottom of the trench during excavation. If desired, soils excavated at depth could be deposited on the surface and Mossbauer and APXS measurements could be acquired for these materials. Soil samples from various depths would be delivered to MECA for characterization of aqueous geochemistry and physical properties of soil grains, particularly size, shape, and hardness. These physical properties would be determined by optical and atomic force microscopy. When completed, detailed information of soil properties as a function of depth would be obtained. These various data sets would constrain our understanding of whether or not there are systematic variations in soil characteristics as a function of depth. These variations might be related, for example, to evaporative moisture losses and formation of salt deposits, thereby indicating water transport processes occurred fairly recently. Many other value-added measurement scenarios are being developed. For example, characterizing the nature and dynamics of dust deposition will be done using MIP/DART to provide deposition rates, Pancam and RAC imaging of lander and rover surfaces to extrapolate these measurements to other areas, and a variety of measurements to determine if the bulk loose soil has the same characteristics as dust that accumulates during the mission. Bedrock geology of the site is primarily an APEX-focus setting, mineralogy, and texture, and APXS data to be we interest will be to determine the extent to which rock hydrothermal processes, given that APEX is the precursor 4 and 2005 rover missions. Additional information is contained in the original.

Arvidson, R.↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.↗

Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect to the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.

60 APPLIED LIFE SCIENCES↗

Review of Tools for Identifying, Planning, and Implementing Habitat Restoration for Pacific Salmon and Steelhead

Abstract A key challenge in watershed restoration is identifying the appropriate assessments, data, and analyses needed to identify disrupted natural processes, lost and degraded habitats, and limiting factors to ultimately identify and design successful restoration projects. This has proven particularly challenging for large restoration programs focused on recovery of threatened and endangered salmon and trout where numerous tools, models, and other assessments have been developed to assist with habitat restoration at the watershed, reach, and project scale. Unfortunately, it is often unclear which step in the restoration process these various assessment tools will actually address. To assist with identifying the appropriate assessment tool (e.g., model, data collection, analysis, and survey), we reviewed major categories of watershed restoration assessment tools to determine their goals, inputs, outputs, and their utility in helping plan, prioritize, and implement restoration actions. The major categories of assessment tools reviewed were: (1) life cycle and fish–habitat models, (2) watershed assessment methods and techniques, (3) reach assessments, (4) prioritization tools, and (5) common monitoring methods to identify, prioritize, and plan river and watershed restoration projects. We specifically indicated whether these assessment tools directly or indirectly assisted with the key steps in the restoration process that are required to develop successful restoration plans and projects. These steps involve assessing watershed conditions, identifying limiting habitats and life stages, identifying problems and restoration actions, selecting restoration techniques, prioritizing restoration actions, or designing actual restoration projects. It is important to recognize that no single assessment tool will address all the steps in the restoration process. Selecting appropriate assessment tools requires a clear understanding of the goals of the restoration program and which step in the restoration process will be addressed by a particular tool. We provide recommendations for how restoration practitioners and managers can use our review to help select the appropriate assessment tools needed for their watershed.

Roni, Philip↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗