At least 145 records · Page 8

2013 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2012–October 31, 2013. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates • Groundwater monitoring data; (3) Status of compliance activities; (4) Noncompliance issues; and (5) Discussion of the facility’s environmental impacts. During the 2013 permit year, approximately 238 million gallons of wastewater was discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters are below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho National Laboratory's FY13 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2013 by Idaho National Laboratory (INL), a Department of Energy (DOE) sponsored entity, located in southeastern Idaho. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only the large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

99 GENERAL AND MISCELLANEOUS↗

Climate Change Vulnerability Assessment for Idaho National Laboratory

The University of Idaho (UI) was asked to participate in the development of a climate change vulnerability assessment for Idaho National Laboratory (INL). This report describes the outcome of that assessment. The climate change happening now, due in large part to human activities, is expected to continue in the future. UI and INL used a common framework for assessing vulnerability that considers exposure (future climate change), sensitivity (system or component responses to climate), impact (exposure combined with sensitivity), and adaptive capacity (capability of INL to modify operations to minimize climate change impacts) to assess vulnerability. Analyses of climate change (exposure) revealed that warming that is ongoing at INL will continue in the coming decades, with increased warming in later decades and under scenarios of greater greenhouse gas emissions. Projections of precipitation are more uncertain, with multi model means exhibiting somewhat wetter conditions and more wet days per year. Additional impacts relevant to INL include estimates of more burned area and increased evaporation and transpiration, leading to reduced soil moisture and plant growth.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

99 GENERAL AND MISCELLANEOUS↗

2014 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2013–October 31, 2014. The report contains the following information; Facility and system description; Permit required effluent monitoring data and loading rates; Permit required groundwater monitoring data; Status of compliance activities; Noncompliance issues; and Discussion of the facility’s environmental impacts. During the 2014 permit year, approximately 238 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters are below the Ground Water Quality Rule Secondary Constituent Standards in the downgradient monitoring wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho National Laboratory’s FY14 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2014 by Idaho National Laboratory (INL), a Department of Energy (DOE) sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 73,521 metric tons (MT) of CO2 equivalent (CO2e ) emissions during FY14. The following conclusions were made from looking at the results of the individual contributors to INL’s FY14 GHG inventory: • Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO2e emissions • Other sources with high emissions were stationary combustion (facility fuels), employee commuting, mobile combustion (fleet fuels), business air travel, and waste disposal (including fugitive emissions from the onsite landfill and contracted disposal) • Sources with low emissions were wastewater treatment (onsite and contracted), business ground travel (in personal and rental vehicles), and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only the large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory’s FY 2016 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2016 by Idaho National Laboratory (INL), a Department of Energy (DOE) sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13693 requires that federal agencies and institutions document reductions in GHG emissions. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 85,525 metric tons (MT) of CO 2 equivalent (CO 2 e ) emissions during FY 2016. The following conclusions were made from looking at the results of the individual contributors to INL’s FY 2016 GHG inventory: Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO 2 e emissions; Other sources with high emissions were employee commuting, mobile combustion (fleet fuels), stationary combustion (facility fuels), business air travel, and waste disposal (fugitive emissions from the onsite landfill); Sources with low emissions were wastewater treatment (onsite and contracted), business ground travel (in personal and rental vehicles), waste disposal (contracted disposal), and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only the Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

54 ENVIRONMENTAL SCIENCES↗

2017 Annual Reuse Report for the Idaho National Laboratory Site's Advanced Test Reactor Complex Cold Waste Ponds

This report describes conditions and information, as required by the state of Idaho, Department of Environmental Quality Reuse Permit I-161-02, for the Advanced Test Reactor Complex Cold Waste Ponds located at Idaho National Laboratory from November 1, 2016–October 31, 2017. The effective date of Reuse Permit I-161-02 is November 20, 2014 with an expiration date of November 19, 2019. A permit modification, I-161-02: Modification 1, became effective March 7, 2017. The modification incorporated clarification to the delivery of analytical reports and chain of custody forms. This report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Permit required groundwater monitoring data • Status of compliance activities • Issues • Discussion of the facility’s environmental impacts. During the 2017 permit year, 234.05 million gallons of wastewater were discharged to the Cold Waste Ponds which is below the maximum annual permit limit of 375 million gallons. Sulfate and total dissolved solids concentrations continue to remain highest in well USGS-065, which is the closest downgradient well to the Cold Waste Ponds. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations decrease rapidly as the distance downgradient from the Cold Waste Ponds increases. The concentrations of all permit-required parameters were below their respective groundwater quality standard levels (IDAPA 58.01.11) for all six groundwater monitoring wells. There was one noncompliance with the Reuse Permit during the 2017 permit year. Approximately 600 gallons of cooling water was discharged to ground surface outside of the designated application site. DEQ was notified of the noncompliance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Plan for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch

The Materials and Fuels Complex industrial waste system currently consists of the Industrial Waste Pond and Industrial Waste Ditch, associated piping, lift station, and flow meter. The Industrial Waste Pond and Industrial Waste Ditch, are land application sites permitted under Idaho Department of Environmental Quality Reuse Permit I-160-02, Modification 1. The Reuse Permit allows for 17 million gallons of industrial wastewater to be discharged to the land application sites. For Reuse Permit year 2017, approximately 7.569 million gallons were discharged to the land application sites, of which 1.649 million gallons were discharged to the Industrial Waste Ditch. A project (MFC West Campus Utility Corridor project) is proposed to begin in the summer of 2018. The project will install a new utility corridor along the west and north sides of the Materials and Fuels Complex. As part of the design, it is proposed to reroute the wastewater currently discharged to the Industrial Waste Ditch into an underground pipe that would connect into the existing Industrial Waste Pipeline. The Industrial Waste Ditch pipe would enter the existing Industrial Waste Pipeline upstream of the existing flow meter and sampling location. This would allow for the combined wastewater streams to be monitored for flow and sampled for parameters required by the Reuse Permit. In accordance with the Reuse Permit, this closure plan is being submitted to the Idaho Department of Environmental Quality for review and approval. Once the closure plan is approved, the Reuse Permit will be modified to remove the Industrial Waste Ditch from the permit. The closure plan includes: • Brief background of the Materials and Fuels Complex. • Reuse Permit history. • Site characteristics. • Description of the Industrial Wastewater System. • History of discharges to the Industrial Waste Ditch. • Summary of the Comprehensive Environmental Response, Compensation, and Liability Act characterization, evaluation, and remediation of the Industrial Waste Ditch. • Contaminant concentrations in the effluent discharged to the Industrial Waste Ditch. • Contaminant concentrations in cross gradient, downgradient, and background monitoring wells. Based on the Comprehensive Environmental Response, Compensation, and Liability Act characterization and remediation of the Industrial Waste Ditch, low volumes and contaminant concentrations in the effluent subsequently discharged to the Industrial Waste Ditch, and contaminant concentrations at or near background levels in the monitoring wells, it is recommended that the Industrial Waste Ditch should be closed without further characterization.

99 GENERAL AND MISCELLANEOUS↗

After Action Report: Idaho National Lab 2017 Exercise September 20, 2017

The purpose of this report is to document the results of the 2017 annual exercise conducted on September 20, 2017 at the Idaho National Laboratory (INL). This exercise was conducted in coordination with other INL contractors and applicable local jurisdictions, Department of Energy Idaho Operations Office (DOE ID), and DOE Headquarters (DOE HQ). The INL contractor, Battelle Energy Alliance, LLC (BEA) conducted the annual emergency exercise to demonstrate appropriate response measures to mitigate an event and protect the health and safety of personnel, the environment, and property. Offsite response organizations participated in the notification process to demonstrate appropriate response measures. This exercise evaluation serves as a management assessment of the performance for the INL Emergency Management (EM) Program.

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2017

Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2017 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2018. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

99 GENERAL AND MISCELLANEOUS↗

2017 BEA Self-Assessment Report for Idaho National Laboratory

This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2016, through September 30, 2017, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2017 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). After considering the information related to performance during the rating period, including feedback from the Office of Nuclear Energy (NE), Idaho Operations Office (ID), and other programmatic sponsors, BEA has self-assessed the Laboratory’s performance at a grade of A, an adjectival rating of “Excellent.” Table 1 documents BEA’s assessment of performance to the goals and individual performance Objectives. Table 2 documents completion of the Notable Outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2016 Self-Assessment Report.

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory's FY15 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2015 by Idaho National Laboratory (INL), a Department of Energy (DOE) sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13693 requires that federal agencies and institutions document reductions in GHG emissions. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 58,330 metric tons (MT) of CO 2 equivalent (CO 2 e ) emissions during FY15. The following conclusions were made from looking at the results of the individual contributors to INL’s FY15 GHG inventory: • Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO 2 e emissions • Other sources with high emissions were employee commuting, mobile combustion (fleet fuels), stationary combustion (facility fuels), business air travel, and waste disposal (including fugitive emissions from the onsite landfill and contracted disposal) • Sources with low emissions were wastewater treatment (onsite and contracted), business ground travel (in personal and rental vehicles), and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only the Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

99 GENERAL AND MISCELLANEOUS↗

Calcined Waste Storage at the Idaho Nuclear Technology and Engineering Center

This comprehensive report provides definitive information regarding the volume, mass, and composition (chemical and radioactivity) of the calcined waste stored at the Idaho Nuclear Technology and Engineering Center on the Idaho National Laboratory Site. The calcine composition data are required for current regulatory compliance and safe operation of the INTEC’s six Calcined Solids Storage Facilities (CSSFs), as well as future retrieval, treatment, and shipping the calcine to an off-Site facility (such as a geologic repository). This report also contains a description of the calcine storage bins that compose each of the CSSFs, emphasizing the features that may be of concern to future calcine retrieval. The CSSFs were designed by different architectural engineering firms and built at different times. Each CSSF has a unique design, reflecting varying design criteria and lessons learned from historical CSSF operation. The varying CSSF designs will affect future calcine retrieval processes and equipment. This revision (5) of the report presents refinements of the databases used to calculate the volume, mass, chemical content, and radioactivity of calcined waste produced and stored within the CSSFs. This revision corrects minor errors and inconsistencies noted in an extensive validation and verification effort of the prior version of the Microsoft Excel workbooks upon which the calcine composition described in this report is based. Historical calcine samples are insufficient in number and scope of analysis to fully characterize the entire inventory of calcine in the CSSFs. Sample data exist for all of the liquid wastes that were calcined. This report provides calcine composition data based on liquid waste sample analyses, the volume of liquid waste calcined, calciner operating data, and CSSF operating data using several large Microsoft Excel (Microsoft 2010) databases and spreadsheets. The Excel spreadsheets are collectively called the Historical Processing Model (HPM). The calcine composition determined by this method compares favorably with historical calcine sample data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Assessment for Use of DOE-Owned High-Assay Low-Enriched Uranium Stored at Idaho National Laboratory

The U.S. Department of Energy (DOE) proposes to make available about 10 Metric Tons (MT) of High-Assay Low-Enriched Uranium (HALEU ) feedstock produced through the electrometallurgical treatment (EMT) process, and other small quantities of HALEU stored at Idaho National Laboratory (INL) for research development & demonstration in support of the commercial nuclear industry and government agencies, including use in advanced reactors. HALEU is a term applied to uranium that is enriched in the uranium-235 (U-235) isotope to a value that is 5% to 20% of the total uranium. Private sector advanced nuclear reactor designs and advanced nuclear fuel designs call for use of HALEU, but currently no commercial facility manufactures HALEU. DOE proposes to expand the fuel fabrication capability at INL to produce HALEU fuel at INL from 10 MT of HALEU feedstock to meet near-term needs. The production requires expansion of the fuel fabrication capability, including the purchase of new equipment and use of facilities at INL’s Materials and Fuels Complex (MFC) and the Idaho Nuclear Technology and Engineering Center (INTEC). DOE has made no decision on the specific use of the fuel. The fuel could be used in advanced reactor design or for the purpose of research and development. DOE would work with other Federal agencies and commercial vendors to determine use of HALEU fuel. Use of this HALEU, including its potential use in a future nuclear reactor, will be analyzed in future National Environmental Policy Act (NEPA) documents by the appropriate agency. The EMT process in operation at the INL converts sodium-bonded spent nuclear fuel into waste forms suitable for disposal as high-level waste and a HALEU product that is unsuitable for diversion to nuclear weapons but could be either reused in fuel or disposed of as waste. The Final Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel, DOE/EIS-0306, DOE 2000) discussed the EMT process, but did not make a decision on the disposition or use of the HALEU product from the EMT process. This Environmental Assessment (EA) addresses the HALEU product as HALEU feedstock in production of HALEU fuel.

99 GENERAL AND MISCELLANEOUS↗

2018 Idaho National Laboratory Annual Report for Permit to Construct P-2015.0023

The U.S. Department of Energy (DOE) Idaho National Laboratory (INL) Site operates facilities with potential emissions criteria and hazardous air pollutants. This report documents the calendar year 2018 criteria and hazardous air pollutants emissions and has been prepared to comply with permit to construct (PTC) P-2015-0023, Condition 2.9 and Idaho Administrative Procedures Act (IDAPA) 58.01.01.178, Standard Contents of Permits Establishing a Facility Emissions Cap. IDAPA 58.01.01.178.04 requires that all permits establishing a FEC shall include sufficient reporting to assure compliance with the permit establishing the FEC. Total hazardous air pollutant (HAP) emissions for the year were 1.49 tons in aggregate and the maximum individual HAP was hydrochloric acid at 1.26 tons. Criteria pollutant emissions were 2.16 tons for sulfur dioxide, 35.6 tons for oxides of nitrogen, 11.6 tons of carbon monoxide, 3.51 tons of total particulate matter and 2.66 tons of VOCs.

99 GENERAL AND MISCELLANEOUS↗

Unreviewed Disposal Question Evaluation: Disposal of the Idaho Nuclear Technology and Engineering Center Mixed Low-Level Waste Requiring Macroencapsulation at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Idaho National Laboratory (INL), Idaho Nuclear Technology and Engineering Center (INTEC) Mixed Low-Level Waste (MLLW) requiring macroencapsulation (INEL166322NR1, Revision 0 [INL 2019]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the INTEC MLLW requiring macroencapsulation waste stream meets all the performance objectives contained in U.S. Department of Energy (DOE) Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P (DOE 2011). The INTEC MLLW requiring macroencapsulation waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗