At least 145 records · Page 8

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Potential and Opportunities

Pumped storage hydropower (PSH) is a flexible energy storage technology with the potential to improve grid reliability, resiliency, and stability in the electric grid of the future. NREL has developed a range of data and tools to help understand opportunities for new PSH deployment, including nationwide resource assessment data, a bottom-up component-level cost model, and a lifecycle greenhouse gas emissions calculator. These datasets can then be used to inform grid planning models, analysis, and decision making to understand the role PSH can play in the power sector.

cost↗

Monitoring and modeling hydrologic conditions in Ukraine for hydropower generation

Study region: The Dnieper and Dniester Rivers of Ukraine. Study focus: The ongoing conflict in Ukraine has caused disruptions to electricity generation, of which hydroelectric sources contribute approximately 9 % to the country’s needs. With the takeover of the Zaporizhzhia nuclear power plant by enemy forces, the loss of the Kakhovka hydroelectric dam, and the future impacts of the conflict on electricity generation unclear, it may be valuable for the Ukrainian government to better understand how it could leverage hydroelectric power sources in the near future. Unfortunately, measurements of river discharge throughout Ukraine ceased data collection in the late 1980’s to early 1990’s. To address this data gap, we developed a protocol that combined satellite-based time-series measurements of river width at seven locations throughout Ukraine from 2013 to 2023 with reanalysis data, climate-model predictions, and hydrologic models to both provide a means of monitoring a proxy for near-real-time discharge and also predict near-term (i.e., 2023–2030) hydrologic patterns for the region. New hydrological insights for the region: We ran new algorithms on 144 WorldView-2 and WorldView-3 satellite images to map rivers and extract width, one of which was validated against river gauge data located along the same river but in a neighboring country. Hydrologic models using two climate scenarios found minimal change in annual discharge at all sites, but magnitude and timing of peak discharge showed a moderate trend. The results suggest that hydropower is underutilized in Ukraine.

13 HYDRO ENERGY↗

Forty-year hydropower generation reanalysis for Conterminous United States

First published in 2022, the RectifHyd dataset provides hydrologically consistent estimates of monthly net generation for approximately 1,500 hydropower plants in the United States, addressing a gap in industrial surveys that have collected monthly generation data from only ~10% of plants post-2003. Here we present RectifHydPlus—an extended and enhanced dataset that improves on both the proxy information and temporal downscaling methodology adopted in RectifHyd. In addition to providing updated estimates of historical monthly generation for 590 plants with >10 MW nameplate capacity from 1980 through 2019, RectifHydPlus adds a hydrological control dataset that isolates the influence of historical water availability on generation. The new hydrological control dataset is suited to applications seeking to represent the capabilities of the contemporary fleet subject to historical interannual variability in climate. RectifHydPlus also includes a forty-year, daily-resolution, spill-adjusted water release time series for each dam, allowing users to aggregate generation estimates to the desired temporal resolution.

Hydroelectricity↗

HydroForecast Long-term: Improving hydropower’s resilience to climate change through accurate climate-scale

With hydrologic patterns and water availability across the globe shifting due to climate change, advancements in hydrologic prediction systems can help significantly reduce the uncertainties that utilities and water supply entities have in their decision making. Understanding and estimating hydrology at the climate scale is critical for managing water resources under changing climate scenarios. This project focuses on integrating state-of-the-art neural network modeling with downscaled climate projections to deliver the reliable water supply projections decades into the future to meet an urgent need from hydropower operators and water utilities. In this Phase 1 DOE SBIR proposal, we developed and validated a theory-guided neural network model, HydroForecast Long-term, for climate-scale hydrology and implemented the model within existing HydroForecast infrastructure. HydroForecast Long-term combines the most accurate streamflow modeling system with a flexible and scalable data architecture to generate water supply projections out to the year 2100. This report illustrates that we have achieved our four objectives: 1) create a prototype of HydroForecast Long-term, building the neural network prediction model, 2) build an automated data input pipeline that processes large amounts of data from the latest global temperature and precipitation climate models; 3) benchmark the accuracy of the hydrologic model over the recent two decades over a large set of diverse basins, and 4) create a set of output visuals and summary metrics informed by customer feedback that connect the data to critical decision points. This work empowers water users to make data-informed decisions supporting a resilient, renewable-powered grid and water system. The results advance the Department of Energy’s mission by addressing critical gaps in water supply planning under climate change.

13 HYDRO ENERGY↗

Addressing Critical Challenges of Coal Mines for Underground Pumped Storage Hydropower Using Numerical Calculations

Using existing coal mines to build underground pumped storage hydropower (UPSH) power plants could help reduce the costs associated with starting a new PSH operation. This innovative approach can leverage the existing infrastructure of coal mine facilities available in many regions of the United States. However, technical challenges associated with water quality, mineral chemistry and integrity of subsurface topologies have thus far prevented any of these facilities from going online. Rye Development is investigating the feasibility of UPSH at existing coal mine facilities. In this project, Rye Development received the technical assistance from Oak Ridge National Laboratory to investigate the impacts of minerals, metal particles, and chemical substances in water flow on hydraulic equipment and assess the overall structural integrity of hydraulic equipment in former coal mines.

13 HYDRO ENERGY↗

Effects of White Sturgeon (Acipenser transmontanus) Passage Through a Novel Hydropower Turbine and Implications for Long-Term Survival

Researchers from UC Davis and Natel Energy compared a novel "Restoration Hydropower Turbine" against a conventional turbine design to evaluate their physical and physiological effects on juvenile White Sturgeon. The study found that the new design achieved over 99% survival across all test speeds, whereas the conventional turbine caused significant mortality and injury due to blade strikes. Furthermore, long-term monitoring showed that fish passing through the new turbine experienced no meaningful or persistant negative impacts on their growth, behavior, or stress levels.

13 HYDRO ENERGY↗

Control Co-Design Framework for Joint Optimization of PID Governor and Hydraulic Dynamics for a Hydropower Plant

This paper presents a control co-design (CCD) framework tailored to the hydraulic and mechanical subsystems of hydropower systems, aimed at enhancing their dynamic performance and responsiveness to grid demands. Conventional sequential design approaches often fall short in capturing the coupled interactions between plant dynamics and control objectives. The proposed CCD methodology enables simultaneous optimization of key hydro plant parameters - such as governor settings, penstock characteristics, and valve control - with the control system architecture. Results indicate that both CCD and sequential design approaches achieve comparable transient and steady-state performance, with minor discrepancies arising from differences in their optimized parameters. However, CCD demonstrates a distinct advantage by tripling the water time constant (Tw) while maintaining similar dynamic performance to the sequential approach. This increase in Tw enables optimization of penstock dimensions, as it is directly influenced by penstock design, thereby contributing to overall cost optimization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical Potential for Hydropower Capacity at Non-powered Dams

In the last decade, retrofits of existing nonpowered dams (NPDs) have made up the largest share of capacity increases for US hydropower. Accurate estimates of potential capacity and generation at NPDs help identify sites that may be worth investing in detailed feasibility analyses and design exploration. This dataset consists of NPDs in the conterminous US with at least 100kW of theoretical potential based on earlier resource assessments. Historical daily streamflow (modeled or from USGS gauge records), hydraulic head (based on historical observations or primary purpose and dam height) are the main inputs for HydroGenerate which determines design flow and turbine efficiencies and then calculates nominal capacity, daily generation, and capacity factor. These outputs are summarized on a monthly basis (i.e., generation (MWh) and capacity factor averaged for each month from January to December) and overall (i.e., nominal capacity, average annual generation (MWh), and average annual capacity factor). A total of 4.1 GW capacity is estimated across all 2,564 NPDs included in the dataset.

13 HYDRO ENERGY↗

Technical Potential for Hydropower Capacity at Non-powered Dams

In the last decade, retrofits of existing nonpowered dams (NPDs) have made up the largest share of capacity increases for US hydropower. Accurate estimates of potential capacity and generation at NPDs help identify sites that may be worth investing in detailed feasibility analyses and design exploration. This dataset contains estimates of technical potential capacity and generation at 2,616 NPDs in the conterminous US. This is based on a subset of dams that were found by earlier resource assessments to have at least 100kW of theoretical potential. Historical daily streamflow (modeled or from USGS gauge records) and hydraulic head (based on historical observations or primary purpose and dam height) are the main inputs to the HydroGenerate model, which determines design flow, turbine efficiencies, and assumed friction losses and then calculates nominal capacity, daily generation, and capacity factor. These estimates represent the conditions over the historical period of 1980-2015, and are summarized on a monthly basis (i.e., averaged for each month of the year) and overall (i.e., nominal capacity, average annual generation (MWh), and average annual capacity factor). A total of nearly 4 GW capacity is estimated across all 2,616 NPDs included in the dataset.

Hansen, Carly [Oak Ridge National Laboratory (ORNL↗

US Hydropower & Environmental Mitigations: A 1998-2023 inventory of mitigation measures inside licensing documents

Federal Energy Regulatory Commission (FERC) license documents mandate environmental mitigation requirements to reduce potential environmental damage caused by non-federal hydropower facilities. This StoryMap showcases a dataset that leveraged Natural Language Processing (NLP) to inventory environmental mitigations from 465 FERC licenses that were issued from 1998-2023 (Ruggles et al, 2025). Users can explore trends in mitigation requirements over time and space with interactive maps and are presented with a demonstration use case.

Ruggles, Thomas A. [Oak Ridge National Laboratory ↗

The 2024 National Hydropower Map

A visualization of the geospatial distribution and characteristics of operational hydropower plants in the United States in 2024.

13 HYDRO ENERGY↗

The 2026 National Hydropower Map

A visualization of the geospatial distribution and characteristics of operational hydropower plants in the United States in 2026

Schmidt, Erik [Oak Ridge National Laboratory (ORNL↗

TGW Hydrology, River Routing, and Hydropower Simulation Datasets

he current dataset contains data upload links to the following hydrologic (water balance), river routing (water management), and hydropower simulation data over CONUS: Climate Forcing: TGW (https://tgw-data.msdlive.org/) Simulation Scenario: Historical, Mid-Century, End-Century Simulation Period: 1980-2024, 2020-2059, 2060-2099 Simulation Models: VIC (Variable Infiltration Capacity), mosartwmpy (Model for Scale Adaptive River Transport-Water Management in Python), and PNNL B1Hydro Output Format: NetCDF and CSV

Tidwell, Vincent C [Pacific Northwest National Lab↗