Jackson Park Hospital Green Building Medical Center

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago's recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work. The new green building houses the hospital's Family Medicine Residency Program and Specialty Medical Offices. The residency program has been vital in attracting new, young physicians to this medically underserved area. The new outpatient center will also help to allure needed medical providers to the community. The facility also has areas designated to women's health and community education. The Community Education Conference Room will provide learning opportunities to area residents. Emphasis will be placed on conserving resources and protecting our environment, as well as providing information on healthcare access and preventive medicine. The new Medical Office Building was constructed with numerous energy saving features. The exterior cladding of the building is an innovative, locally-manufactured precast concrete panel system with integral insulation that achieves an R-value in excess of building code requirements. The roof is a 'green roof' covered by native plantings, lessening the impact solar heat gain on the building, and reducing air conditioning requirements. The windows are low-E, tinted, and insulated to reduce cooling requirements in summer and heating requirements in winter. The main entrance has an air lock to prevent unconditioned air from entering the building and impacting interior air temperatures. Since much of the traffic in and out of the office building comes from the adjacent Jackson Park Hospital, a pedestrian bridge connects the two buildings, further decreasing the amount of unconditioned air that enters the office building. The HVAC system has an Energy Efficiency Rating 29% greater than required. No CFC based refrigerants were used in the HVAC system, thus reducing the emission of compounds that contribute to ozone depletion and global warming. In addition, interior light fixtures employ the latest energy-efficient lamp and ballast technology. Interior lighting throughout the building is operated by sensors that will automatically turn off lights inside a room when the room is unoccupied. The electrical traction elevators use less energy than typical elevators, and they are made of 95% recycled material. Further, locally manufactured products were used throughout, minimizing the amount of energy required to construct this building. The primary objective was to construct a 30,000 square foot medical office building on the Jackson Park Hospital campus that would comply with newly adopted City of Chicago green building codes focusing on protecting the environment and conserving energy and resources. The energy saving systems demonstrate a state of the-art whole-building approach to energy efficient design and construction. The energy efficiency and green aspects of the building contribute to the community by emphasizing the environmental and economic benefits of conserving resources. The building highlights the integration of Chicago's new green building codes into a poor, inner city neighborhood project and it is designed to attract medical providers and physicians to a medically underserved area.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial Building Technology Demonstration (Final Scientific/Technical Report)

The background for this project was a unique and innovative concept that had been proposed and demonstrated by enVerid Systems, reducing the energy consumption in HVAC systems in commercial and public buildings by up to 50% at peak loads. The concept involves selective scrubbing of gas contaminants from indoor air as a practical substitute for outside air ventilation, the latter being the conventional practice today. This scrubbing enables recycling of most of the indoor air and significantly decreasing the amount of outside air, resulting in a reduced HVAC load and commensurate energy savings for the facility. Key to our approach is low cost scrubbing of all gas contaminants from indoor air using novel, efficient and regenerable sorbent materials. The total solution, labeled HLR (HVAC Load Reduction) is implemented by means of compact modules that can be retrofitted onto virtually any building, and utilizes novel sorbents that have been developed and brought to scale production by enVerid. Although the technology had been deployed and demonstrated, the US commercial building and HVAC markets, famously conservative with respect to innovation and new technologies, had yet to embrace the idea or the product. The overarching goal of the project was to help overcome market hesitancy and enable widespread adoption, by creating a critical mass of success stories across different regions and building types, all under oversight and verification of the DOE and NREL, to ensure credibility and accuracy. The project, overall, was a resounding success. Several installations were deployed and tested comprehensively for the impact on both energy consumption and indoor air quality, and results were not only excellent, but quantitatively in line with expectations. A total number of eight (8) installations were attempted, with 2 aborted due to building issues. Of the six successful installations, however, complete M&V was performed by NREL on 2 (Miami and NYC) and partial analysis on a third site (ArcBest), and these three, along with their results, were therefore presented from a financial and reporting standpoint. Although the number of case studies fell short of the original target of 10, we nevertheless had excellent demonstrations in vastly different climate zones: Southeast, Northeast and Midwest, and in very different building types. This included a modern high-rise office building in New York City and a University Campus health center in Miami, and a mid-rise high-density office in Arkansas. The cooling load reduction was shown to be significant, averaging 37% during the final cooling season in the Miami site. In the NYC site, the cooling energy savings were generally less, at around 12%, as expected. While this is a lower number for average/total savings, two comments are important to note: (i) the outside airflow (OA) reduction was not consistent during the data collection period, at least in part understating the attainable savings through incorrect measurement of the “high energy” reference state; and (ii) the peak impact in NYC is almost certainly as high as Miami, with critical ramifications for peak load reduction and equipment downsizing ability. Importantly, the measured energy savings in all locations were related to the outdoor climate conditions and the actual achievable reduction in outside air, very much in line with models and calculations; this leaves us with increased confidence in our understanding of the interaction between the technology and the building, and our ability to project the impact of this innovation in the future, through broad adoption. Simply put: the energy savings and load reduction impact of the HLR solution has been confirmed quantitatively. The results also confirmed the air quality objective. This may be even more significant, in that air quality is more complex and harder to measure and quantify, and the performance of the HLR as an air scrubber is the linchpin of the entire solution. In all sites, indoor air quality met or exceeded the required parameters, in terms of achieving the target (low) levels of indoor pollutants. Furthermore, the concentrations of outdoor sourced pollutants were markedly lower, as expected, mostly due to the reduction in outside air intake although in part also due to the scrubbing. The success was not immediate nor easy, and early challenges with the systems, especially (but not only) around controls and communication, caused delays in commissioning and undermined some of our M&V schedules. The good news is no fundamental issues were encountered and the number of such glitches was declining quickly by the end of the project. Other challenges had to do with coordinating the control of the building OA dampers, which the HLR needs to have in order to deliver the load reduction, but which the facility manager controls regularly and independently. This is not necessarily a problem for normal HLR operation but interferes with accurate M&V, where switching OA settings back and forth on a precise timetable is essential for clean data. The project provided valuable experience in retrofitting buildings that had been originally designed to operate with less recirculation and more outside air, and some key learnings related to the cyclical regeneration of the sorbents in the operational environment of the building. Some of these learnings gave already been incorporated into ongoing improvements in the design of the HLR module as well as the software that is used to control its operation. The cost and time of retrofit installations is much better understood; so is the test and balance procedure of the building that determines the available range of outside air reduction, which in turn determines the amount of load reduced. We had also implemented at least one annual cycle of sorbent cartridge replacement in the field, after which we tested the used sorbent to assess the rate of degradation of sorbent potency – an important factor affecting the long-term economics of HLR deployments. A notable shortfall of the project, other than the fact that the number of sites was below target, was that we had not (yet) completed testing to measure and verify (M&V) the winter energy savings. This is primarily due to late start on the NYC sites (Miami does not portend any heating savings associated with reduced outside air), combined with the issues of OA damper control. It is by no means suggested that such savings cannot be captured, only that the M&V with respect to winter in NYC has been incomplete. The value of this project and its interest to the general public are hard to overstate. The case studies created from Miami and especially from NYC have, without a doubt, opened up the interest of the broad HVAC industry to HLR in the past year. Major manufacturer reps have signed up to represent and promote the product, and dozens of top tier engineering consultants have introduced HLR as a base of design in upcoming construction and renovation projects – precisely the overarching goal of this project. These would not have happened without the highly visible installation in NYC and its ultimately satisfied customer. Furthermore, the DOE itself issued a report in late 2017 analyzing hundreds of candidate technologies for reducing energy consumption in HVAC; remarkably, the budding HLR solution ranked among the top 3(!); no doubt, its status as a viable and significant contender on this list is informed by the success of these demonstrations. And furthermore, in the wake of these demos, several major energy utilities, led by ConEdison in NYC, have endorsed the HLR solution and now routinely provide substantial cash rebates for customers choosing to incorporate the HLR in their buildings and reap the benefit of the reduced peak load as well as reduced cumulative energy demand. Last but not least, in January of 2019, as this report was being written, the HLR module won the AHR Expo Innovation Award for Green Buildings and, remarkably, the prestigious and only Product of the Year 2019, being selected by an independent professional panel of judges from AHR and ASHRAE. Given the confirmation of the enormous energy saving potential of HLR in widescale deployment, as well as ancillary but significant benefits in terms of equipment downsizing and indoor air quality, the benefit of this effort to the public speaks for itself. Accelerating adoption of HLR, without dependence on subsidies and driven by the private sector, is well under way. There is still much work to be done in terms of educating the HVAC and construction ecosystems and improving the product’s robustness and simplicity, to further facilitate the adoption of this technology and the capture of its potential value. But the American public will greatly benefit both directly and indirectly in the immediate future and beyond.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WHISPER: Wireless Home Identification and Sensing Platform for Energy Reduction

Many regions of the world benefit from heating, ventilating, and air-conditioning (HVAC) systems to provide productive, comfortable, and healthy indoor environments, which are enabled by automatic building controls. Due to climate change, population growth, and industrialization, HVAC use is globally on the rise. Unfortunately, these systems often operate in a continuous fashion without regard to actual human presence, leading to unnecessary energy consumption. As a result, the heating, ventilation, and cooling of unoccupied building spaces makes a substantial contribution to the harmful environmental impacts associated with carbon-based electric power generation, which is important to remedy. For our modern electric power system, transitioning to low-carbon renewable energy is facilitated by integration with distributed energy resources. Automatic engagement between the grid and consumers will be necessary to enable a clean yet stable electric grid, when integrating these variable and uncertain renewable energy sources. We present the WHISPER (Wireless Home Identification and Sensing Platform for Energy Reduction) system to address the energy and power demand triggered by human presence in homes. The presented system includes a maintenance-free and privacy-preserving human occupancy detection system wherein a local wireless network of battery-free environmental, acoustic energy, and image sensors are deployed to monitor homes, record empirical data for a range of monitored modalities, and transmit it to a base station. Several machine learning algorithms are implemented at the base station to infer human presence based on the received data, harnessing a hierarchical sensor fusion algorithm. Results from the prototype system demonstrate an accuracy in human presence detection in excess of 95%; ongoing commercialization efforts suggest approximately 99% accuracy. Using machine learning, WHISPER enables various applications based on its binary occupancy prediction, allowing situation-specific controls targeted at both personalized smart home and electric grid modernization opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Voltron Compatible Whole Building Root-Fault Detection and Diagnosis

Buildings consume more than 40% of primary energy in the U.S. Malfunctioning sensors, components, and control systems, as well as degrading components in Heating, Ventilating and Air-conditioning (HVAC) and lighting systems are main reasons for energy waste and unsatisfactory indoor environment. Field studies have shown that an energy saving of 5-30% of total building energy consumption and improved indoor air quality can be achieved by simply applying automated fault detection and diagnosis (AFDD), followed by corrections even if these are not done in real time. Extensive research has been made on the development of component level AFDD tools in the past two decades. However, in recent years, the development of method for a whole building level AFDD has received much attention. Here, a whole building fault refers to a fault happening in one subsystem but impact on more than one subsystems, or has a significant impact on building performances, such as building’s energy consumption. Existing component level AFDD tools could fail to detect or give false alarm for faults that trigger abnormalities in multiple subsystems. Isolating such whole building faults, which have impacts on multiple subsystems, is also challenging by simply using component based AFDD solutions. On the other hand, it might be more cost-effective for medium- or small-sized commercial buildings that have subsystems (e.g. primary cooling subsystem, air loop subsystem, heating subsystem, lighting subsystem, etc.) to install one whole building level AFDD tool, rather than many component level AFDD tools, to focus on significant faults. The focus of this project is firstly to provide training opportunities in building AFDD research area for undergraduate students and to develop a workforce pipeline in building sciences. The objective of the proposed research activities is to develop cost-effective and scalable AFDD solutions for whole building level faults. The developed AFDD solution is VOLTTRONTM compatible to further increase its plug-n-play capacity and the market penetration. VOLTTRONTM is an open-source innovative distributed control and sensing software platform developed by the Pacific Northwest National Laboratory. A VOLTTRONTM compatible AFDD tool brings the benefits such as low-cost deployment, and better building to grid integration, etc. The performance of the developed whole building AFDD tools is evaluated using data collected from a mixed-use medium-sized university campus building. Another significant goal of this project is to engage undergraduate students in research activities and expose them to building control and AFDD fields. A demonstration building – Nesbitt Hall at Drexel University is identified for this study. This demonstration building has a typical HVAC system configuration, which includes a water-cooled chiller system, three variable air volume (VAV) air handling unit (AHU) systems, and a hydronic heating system. Faults, that are expected to have a whole building level impact, are artificially implemented in this demonstration building for three different seasons. Building data have been collected in this project, which include fault free building automation system (BAS) data and BAS data that contain system behaviors caused by artificially implemented and naturally occurred faults. These collected data are used to evaluate the developed whole building AFDD tools. A data-driven method, which includes a weather and schedule-based pattern matching (WPM) method and Feature based Principal Component Analysis (FPCA) method, is developed for whole building level fault detection. Parameter sensitivity tests, including snapshot window size, data sample searching pool size, etc., are implemented to evaluate the impacts of various WPM-FPCA parameters. A data-driven and expert knowledge/rule-based method using Bayesian Network (BN) and WPM is developed for whole building level fault diagnosis. The developed WPM-BN method, which includes a two-layer BN structure model and BN parameters, are either learned from baseline data or developed from expert knowledge. The developed whole building AFDD tools are evaluated using BAS data collected from the demonstration building. Using the evaluation data set, the WPM-FPCA fault detection method is evaluated under two different Principle Component (PC) retention rates, i.e., 0.65 retention rate and 0.95 retention rate. It is observed that when using 0.65 PC retention rate, the WPM-FPCA fault detection method achieves a 79% fault detection rate (this rate reaches to 85% when including the six make-up fault test cases discussed in the next bullet), while when using 0.95 PC retention rate, the WPM-FPCA fault detection method achieves 100% fault detection rate (this rate remains to be 100% when including the six make-up fault test cases). Under both PC retention rates, the WPM-FPCA fault detection method demonstrates 0% false alarm rates. Using the evaluation data set, the developed WPM-BN fault diagnosis method has successfully diagnosed thirteen (13) faults out of the fourteen (14) fault test cases. The one mis-diagnosed case exhibits fewer fault symptoms in different subsystems, when compared with other fault test cases. Overall speaking, the developed whole building AFDD solutions demonstrate satisfactory fault detection/diagnosis accuracy with very low false alarm rate. Lastly, a survey and market study has been performed to understand the existing AFDD market, including its gaps and needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model Predictive Control of HVAC Systems: Implementation and Testing at the University of California, Merced

A Model Predictive Control algorithm was developed for the UC Merced campus chilled water plant. Model predictive control (MPC) is an advanced control technology that has proven successful in the chemical process industry and other industries. The main goal of the research was to demonstrate the practical and commercial viability of MPC for optimization of building energy systems. The control algorithms were developed and implemented in MATLAB, allowing for rapid development, performance, and robustness assessment. The UC Merced chilled water plant includes three water-cooled chillers and a two million gallon chilled water storage tank. The tank is charged during the night to minimize on-peak electricity consumption and take advantage of the lower ambient wet bulb temperature. The control algorithms determined the optimal chilled water plant operation including chilled water supply (CHWS) temperature set-point, condenser water supply (CWS) temperature set-point and the charging start and stop times to minimize a cost function that includes energy consumption and peak electrical demand over a 3-day prediction horizon. A detailed model of the chilled water plant and simplified models of the buildings served by the plant were developed using the equation-based modeling language Modelica. Steady state models of the chillers, cooling towers and pumps were developed, based on manufacturers performance data, and calibrated using measured data collected and archived by the control system. A detailed dynamic model of the chilled water storage tank was also developed and calibrated. Simple, semi-empirical models were developed to predict the temperature and flow rate of the chilled water returning to the plant from the buildings. These models were then combined and simplified for use in a model predictive control algorithm that determines the optimal chiller start and stop times and set-points for the condenser water temperature and the chilled water supply temperature. The report describes the development and testing of the algorithm and evaluates the resulting performance, concluding with a discussion of next steps in further research. The experimental results show a small improvement in COP over the baseline policy but it is difficult to draw any strong conclusions about the energy savings potential for MPC with this system only four days of suitable experimental data were obtained once correct operation of the MPC system had been achieved. These data show an improvement in COP of 3.1% {+-} 2.2% relative to a baseline established immediately prior to the period when the MPC was run in its final form. This baseline includes control policy improvements that the plant operators learned by observing the earlier implementations of MPC, including increasing the temperature of the water supplied to the chiller condensers from the cooling towers. The process of data collection and model development, necessary for any MPC project, resulted in the team uncovering various problems with the chilled water system. Although it is difficult to quantify the energy savings resulting from these problems being remedied, they were likely on the same order as the energy savings from the MPC itself. Although the types of problems uncovered and the level of energy savings may differ significantly from other projects, some of the benefits of detecting and diagnosing problems are expected from the use of MPC for any chilled water plant. The degree of chiller loading was found to be a key factor for efficiency. It is more efficient to operate the chillers at or near full load. In order to maximize the chiller load, one would maximize the temperature difference across chillers and the chilled water flow rate through the chillers. Thus, the CHWS set-point and the chilled water flow-rate can be used to limit the chiller loading to prevent chiller surging. Since the flow rate has an upper bound and the CHWS set point has a lower bound, the chiller loading is constrained and often determined by the chilled water return temperature (CHWR). The CHWR temperature is primarily comprised of warm water from the top of the TES tank. The CHWR temperature falls substantially as the thermocline approaches the top of the tank, which reduces the chiller loading. As a result, it has been determined that overcharging the TES tank can be detrimental to the chilled water plant efficiency. The resulting MPC policy differs from the current practice of fully charging the TES tank. A heuristic rule could possible avoid this problem without using predictive control. Similarly, the COP improvements from the change in CWS set-point were largely captured by a static set-point change by the operators. Further research is required to determine how much of the MPC savings could be garnered through simplified rules (based on the MPC study), with and without prediction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Living House Final Technical Report

The Solar Living House is a high-performance solar-powered dwelling designed by a team of faculty and students from the University of Florida, in collaboration with Santa Fe College, the National University of Singapore, and Alachua Habitat for Humanity. The project was designed in accordance with the Solar Decathlon 2015, a research, design, education, and outreach program developed by the U.S. Department of Energy (DOE). The Solar Living House is fundamentally a house for living, centered on people and the activities of daily life while quietly introducing advanced design, construction, and engineering technologies. The 993 square-foot two-bedroom one-bath home was designed to embrace and frame an exterior courtyard space. This courtyard acts as an extension of the interior living spaces, maximizing the spatial potentials of a modest building footprint and introducing natural light into the primary living spaces of the house. Research Outcomes: The Solar Living House advances work on high-performance buildings through three principal technological innovations: wet/dry modular construction, a building automation system, and solar dehumidification systems. Wet / Dry Modular Construction: The house is designed as a series of five modules, including one that is designated as the “wet core.” The wet core consolidates the mechanical systems and bathroom into a single module to reduce plumbing runs, efficiency losses, and on-site construction time. The other four modules are designed to eliminate interior load bearing walls to allow for maximum flexibility in the reconfiguring of the space over time. The modules are designed to meet the structural challenges of both Florida’s hurricanes and California’s earthquakes. Building Automation System: The house is equipped with an integrated building automation system, allowing the houses environmental systems, lights, security systems, and smoke detectors to be programmed, monitored, and controlled through any mobile or computing device. These systems allow for more precise calibrations of temperature/humidity/lighting to correspond with user needs and preferences, minimizing energy losses with economical night- or day-time setbacks. Solar Dehumidification System: The most significant technological innovation in the Solar Living House is the solar thermal dehumidification system. This system generates hot water through two rooftop-mounted evacuated tube solar thermal collectors. The hot water is used to continually dry a regenerative solid desiccant material, typically white silica gel. The solid desiccant is used to adsorb moisture and humidity from the air without additional mechanical cooling. This strategy allows humidity to be modulated independently of air temperature, providing greater thermal comfort and reducing the opportunity for the growth of mold spores within the house while also reducing the overall energy consumption of the HVAC system. Economic Feasibility: The team set aggressive goals for affordability, targeting a construction cost of $138,710. An independent professional cost estimator determined the overall project costs, as designed, would be $333,799, or $336.15 per square foot of finished floor area. This is more than 2.4 times the target construction cost. By comparison, the average construction cost for a home in the United States in 2015 was $289,415, or $103.29 per square foot of finished floor area. Following work on the Solar Living House, team leaders incorporated many of its objectives into a net-zero energy home on a site in Gainesville, Florida. This site-built home avoided many of the constraints and complications of modular construction necessitated by the Solar Decathlon, allowing it to be built for a much more modest budget. This two-bedroom two bath 1,800 square foot home was constructed for $135.39 per square foot, including active photovoltaic solar systems, careful attention to continuous air barriers, increased insulation levels, and permanent site constructions. This project suggest that high-performance buildings can be realized for more modest budgets. Public Benefits: Work on the Solar Living House and Solar Decathlon 2015 offered our student team unparalleled learning opportunities. Because of the duration of the project, a number of students participated at different points in their education, from first year undergraduates all the way through to advanced graduate students. The opportunity for collaboration with students and faculty from the National University of Singapore was also extraordinary, allowing for a sharing of technical knowledge and cultural exchange. The wider public has benefited from this work as its findings have been shared through public presentations and publications. It serves as a useful stepping stone along the path towards affordable, high-performance buildings.

14 SOLAR ENERGY↗

Creating the Environment for Exploration Habitats

The Crew and Thermal Systems Division’s (CTSD) 20 Foot Chamber has undergone significant modifications to support NASA’s future human exploration missions to the Moon, Mars, and beyond. Existing chamber systems such as Vacuum/Repress, Heating Ventilation and Air Conditioning (HVAC), and Fire Suppression System (FSS), were upgraded, while new systems such as Air Revitalization and Gas Distribution were added. In addition, the chamber was outfitted with crew quarters, hygiene areas, storage, and workspaces. Teams across the Johnson Space Center (JSC) worked together to overcome the logistical and operational challenges of the planned test parameters. The ultimate goal was to create an analog testbed in which a maximum of 8 human test subjects could safely live and work for at least 11 days in the same conditions (reduced pressures, Oxygen concentrations, etc.) as those expected inside a base spacecraft. This would allow researchers to study the effects of such environments on humans and to validate proposed Prebreathe Protocols to enable the safe performance of surface extravehicular activities (EVAs). Over the last eighteen months, the CTSD Systems Test Branch has performed six tests of varying lengths and atmospheres for both NASA and commercial partners. To date, researchers now have collected data on 48 test subjects in the course of 42 days and over 130 simulated EVAs. This paper will discuss the history of the 20 Foot Chamber, its long road to becoming an analog testbed for human exploration, and the capabilities that make it a unique, world class facility for NASA and commercial human exploration missions. It will provide an overview of past and future testing, and the lessons learned along the way.

Cristina Aurora Anchondo↗

Creating the Environment for Exploration Habitats

The Crew and Thermal Systems Division’s (CTSD) 20 Foot Chamber has undergone significant modifications to support NASA’s future human exploration missions to the Moon, Mars, and beyond. Existing chamber systems such as Vacuum/Repress, Heating Ventilation and Air Conditioning (HVAC), and Fire Suppression System (FSS), were upgraded, while new systems such as Air Revitalization and Gas Distribution were added. In addition, the chamber was outfitted with crew quarters, hygiene areas, storage, and workspaces. Teams across the Johnson Space Center (JSC) worked together to overcome the logistical and operational challenges of the planned test parameters. The ultimate goal was to create an analog testbed in which a maximum of 8 human test subjects could safely live and work for at least 11 days in the same conditions (reduced pressures, Oxygen concentrations, etc.) as those expected inside a base spacecraft. This would allow researchers to study the effects of such environments on humans and to validate proposed Prebreathe Protocols to enable the safe performance of surface extravehicular activities (EVAs). Over the last eighteen months, the CTSD Systems Test Branch has performed six tests of varying lengths and atmospheres for both NASA and commercial partners. To date, researchers now have collected data on 48 test subjects in the course of 42 days and over 130 simulated EVAs. This paper will discuss the history of the 20 Foot Chamber, its long road to becoming an analog testbed for human exploration, and the capabilities that make it a unique, world class facility for NASA and commercial human exploration missions. It will provide an overview of past and future testing, and the lessons learned along the way.

Cristina A Anchondo↗

Creating the Test Environment for Exploration Habitats

The Crew and Thermal Systems Division’s (CTSD) 20 Foot Chamber has undergone significant modifications to support NASA’s future human exploration missions to the Moon, Mars, and beyond. Existing chamber systems such as Vacuum/Repress, Heating Ventilation and Air Conditioning (HVAC), and Fire Suppression System (FSS), were upgraded, while new systems such as Air Revitalization and Gas Distribution were added. In addition, the chamber was outfitted with crew quarters, hygiene areas, storage, and workspaces. Teams across the Johnson Space Center (JSC) worked together to overcome the logistical and operational challenges of the planned test parameters. The ultimate goal was to create an analog testbed in which a maximum of eight human test subjects could safely live and work for at least 11 days in the same conditions (e.g., reduced pressures, oxygen concentrations, and so on) as those expected inside a base spacecraft. This would allow researchers to study the effects of such environments on humans and to validate proposed Prebreathe Protocols to enable the safe performance of surface extravehicular activities (EVAs). Over the last 18 months, the CTSD Systems Test Branch has performed six tests of varying lengths and atmospheres for both NASA and commercial partners. To date, researchers now have collected data on 48 test subjects in the course of 42 days and over 130 simulated EVAs. This paper will discuss the history of the 20 Foot Chamber, its long road to becoming an analog testbed for human exploration, and the capabilities that make it a unique, world class facility for NASA and commercial human exploration missions. It will provide an overview of past and future testing and the lessons learned along the way.

Cristina A Anchondo↗

Creating the Test Environment for Exploration Habitats

The Crew and Thermal Systems Division’s (CTSD) 20 Foot Chamber has undergone significant modifications to support NASA’s future human exploration missions to the Moon, Mars, and beyond. Existing chamber systems such as Vacuum/Repress, Heating Ventilation and Air Conditioning (HVAC), and Fire Suppression System (FSS), were upgraded, while new systems such as Air Revitalization and Gas Distribution were added. In addition, the chamber was outfitted with crew quarters, hygiene areas, storage, and workspaces. Teams across the Johnson Space Center (JSC) worked together to overcome the logistical and operational challenges of the planned test parameters. The ultimate goal was to create an analog testbed in which a maximum of eight human test subjects could safely live and work for at least 11 days in the same conditions (e.g., reduced pressures, oxygen concentrations, and so on) as those expected inside a base spacecraft. This would allow researchers to study the effects of such environments on humans and to validate proposed Prebreathe Protocols to enable the safe performance of surface extravehicular activities (EVAs). Over the last 18 months, the CTSD Systems Test Branch has performed six tests of varying lengths and atmospheres for both NASA and commercial partners. To date, researchers now have collected data on 48 test subjects in the course of 42 days and over 130 simulated EVAs. This paper will discuss the history of the 20 Foot Chamber, its long road to becoming an analog testbed for human exploration, and the capabilities that make it a unique, world class facility for NASA and commercial human exploration missions. It will provide an overview of past and future testing and the lessons learned along the way.

Chris Briggs↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes Habitat for Humanity The Woods

The Washington State University (WSU) Energy Program's Building America (BA) team conducted a case study of a high-performance affordable housing community: The Woods (Figure 1). This BA effort is part of a larger-scale study of 30 homes funded from 2013-2016 by Tacoma Public Utilities (TPU) and the Bonneville Power Administration. The Woods is a Habitat for Humanity (HFH) community of homes certified by ENERGY STAR Homes Northwest (ESHNW); the community is in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report and includes significant billing analysis and cost-effectiveness research from a collaborative and ongoing DHP research effort for TPU and the Bonneville Power Administration. This final BA report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing. The research goal of the U.S. Department of Energy's BA research team Building America Partnership for Improved Residential Construction was to compare a ductless heat pump (DHP) hybrid system (DHP in common area/electric resistance [ER] in bedrooms) to an all-electric zonal ER system in high-performance single-family affordable housing. This effort included assessing the costs and benefits of a DHP/ER hybrid system located in the main living area to offset the primary heating demand of zonal ER heaters in the bedroom zones and comparing these findings to data from of new affordable single-family housing in Washington State. This report includes: (1) Measured indoor and outdoor temperatures and relative humidity (RH) in the homes. (2) Field testing results of heating, ventilating, and air-conditioning equipment; ventilation system airflows; building envelope tightness; lighting, appliance, and other input data required for preliminary Building Energy Optimization (BEopt) modeling; and ENERGY STAR field verification (3) BEopt modeling results compared to measured energy use. (4) A comparison of the space heat energy consumption of a DHP/ER hybrid heating system and a traditional zonal ER heating system installed in the same home. This comparison is made by implementing a series of weekly "flip-flop tests" (referred to here as "switchback" tests per TPU) to compare space heating, temperature, and RH in zonal ER heating mode with a DHP/ER mode as discussed in the Building America Test Plan (Lubliner 2010a). (5) Cost data from HFH and other sources related to building efficiency measures focusing on the DHP/ER hybrid heating system. (6) An evaluation of the thermal performance and cost benefit of DHP/ER hybrid heating systems in these high-performance homes employing life cycle cost analysis for energy code policy and monthly cash flow analysis of HFH homeowners. (7) Post-monitoring occupant survey results. The report also provides the following stakeholder findings and recommendations: (1) DHP single-head systems at The Woods are cost-effective to new homebuyers of these high-performance all-electric homes. (2) Stakeholder education is needed on design, inspection, and commissioning; documentation is needed for heat recovery ventilation (HRV) and from ENERGY STAR builders, verifiers, and inspectors to help ensure that the houses meet the goal of "build tight, ventilate right." (3) A code gap in inspection and enforcement was identified that should be addressed by: (3a) Improving the fire marshal's approach to sprinkler attic piping freeze protection; (3b) Improving the maintenance of ceiling insulation continuity; and (3c) Educating the local building inspector on attic insulation inspection concerns that allow for maximizing design improveme...

affordable housing↗