Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Schedule-Organizer Computer Program

Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

Collazo, Fernando F.↗

Optimal Scheduling of a Multi-User, Multi-Tasking Automatic Robotic Telescope

An algorithm is introduced to generate the optimal schedule of observations for a multi-user, multi-tasking automatic robotic telescope. The schedule is optimal m that it will take the highest possible quality data, perform the largest number of tasks, and fairly serve multiple users in terms of data quality, allocated telescope time, and observation priorities. In addition, the algorithm addresses problems due to overloading and underloading the telescope. The algorithm, which employs dynamic-programming-based decision theory, is analytically proven to produce the optimal schedule using set theory. Simulations conducted using actual astronomical data are presented which show significant improvement over existing scheduling techniques. Once completed the new scheduling algorithm will be tested on the Tennessee State University/Harvard-Smithsonian Center for Astrophysics 32-inch automatic Photoelectric Telescope at Fairborn Observatory, Arizona.

Tantaris, R. N.↗

Generating traffic-based building occupancy schedules in Chattanooga, Tennessee from a grid of traffic sensors

Building occupancy significantly impacts energy use, timing for demand impacts, and is a significant source of uncertainty in building energy models. There are relatively few sources that define building occupancy schedules and number of occupants per building or space type. More importantly, these sources define traditional schedules that are likely not to reflect the true occupancy of a given building. We construct traffic-based occupancy schedules which are more responsive to changes in mobility patterns, and which can realistically estimate occupant arrivals, departures, and counts in individual buildings.

Berres, Andy↗

Scheduling the NASA Deep Space Network with Deep Reinforcement Learning

With three complexes spread evenly across the Earth, NASA’s Deep Space Network (DSN) is the primary means of communications as well as a significant scientific instrument for dozens of active missions around the world. A rapidly rising number of spacecraft and increasingly complex scientific instruments with higher bandwidth requirements have resulted in demand that exceeds the network’s capacity across its 12 antennae. The existing DSN scheduling process operates on a rolling weekly basis and is time-consuming; for a given week, generation of the final baseline schedule of spacecraft tracking passes takes roughly 5 months from the initial requirements submission deadline, with several weeks of peer-to-peer negotiations in between. This paper proposes a deep reinforcement learning (RL) approach to generate candidate DSN schedules from mission requests and spacecraft ephemeris data with demonstrated capability to address real-world operational constraints. A deep RL agent is developed that takes mission requests for a given week as input, and interacts with a DSN scheduling environment to allocate tracks such that its reward signal is maximized. A comparison is made between an agent trained using Proximal Policy Optimization and its random, untrained counterpart. The results represent a proof-of-concept that, given a well-shaped reward signal, a deep RL agent can learn the complex heuristics used by experts to schedule the DSN. A trained agent can potentially be used to generate candidate schedules to bootstrap the scheduling process and thus reduce the turnaround cycle for DSN scheduling.

Wilson, Brian↗

Space power system scheduling using an expert system

A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.

Bahrami, K. A.↗

Automated Scheduling Via Artificial Intelligence

Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

Biefeld, Eric W.↗

PS: A nonprocedural language with data types and modules

The Problem Specification (PS) nonprocedural language is a very high level language for algorithm specification. PS is suitable for nonprogrammers, who can specify a problem using mathematically-oriented equations; for expert programmers, who can prototype different versions of a software system for evaluation; and for those who wish to use specifications for portions (if not all) of a program. PS has data types and modules similar to Modula-2. The compiler generates C code. PS is first shown by example, and then efficiency issues in scheduling and code generation are discussed.

Gokhale, M. B.↗

NASDA knowledge-based network planning system

One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

Yamaya, K.↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IMMM-SFA/tempset

Generates new temperature set point schedules from base schedules. The software provides a systematic, automatic method to generate temperature setpoint schedules from a base schedule and a small set of modeling parameters. The software will be open-sourced, and can easily be accessed by energy modelers.

Vernon, Chris↗

Intelligent perturbation algorithms for space scheduling optimization

The optimization of space operations is examined in the light of optimization heuristics for computer algorithms and iterative search techniques. Specific attention is given to the search concepts known collectively as intelligent perturbation algorithms (IPAs) and their application to crew/resource allocation problems. IPAs iteratively examine successive schedules which become progressively more efficient, and the characteristics of good perturbation operators are listed. IPAs can be applied to aerospace systems to efficiently utilize crews, payloads, and resources in the context of systems such as Space-Station scheduling. A program is presented called the MFIVE Space Station Scheduling Worksheet which generates task assignments and resource usage structures. The IPAs can be used to develop flexible manifesting and scheduling for the Industrial Space Facility.

Kurtzman, Clifford R.↗

Assessing Tactical Scheduling Options for Time-Based Surface Metering

This paper presents a parametric analysis of the most recent tactical scheduler design for NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, committed to demonstrating time-based surface metering at Charlotte Douglas International Airport (CLT). The tactical scheduler design is implemented in a fast-time simulation model of CLT using NASA’s Surface Operations Simulator and Scheduler. The tactical scheduler is supported by three basic functions: trajectory prediction, runway scheduling, and advisory generation. A key parameter of the advisory generation function is the taxi time delay buffer used when calculating target gate pushback times from runway schedule. Multiple simulations that varied the amount of taxi time delay buffer were analyzed to determine the effect on tactical scheduler performance. The results show an improvement in tactical scheduler performance when the buffer is made sufficiently large to release departures from their gates early enough to maintain scheduler predicted runway throughput.

Zelinski, Shannon↗

The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

Price dynamics in wholesale electricity markets are driven by supply and demand. In markets with hydroelectric dams, the timing and amount of hydropower offered can influence prices in similar ways to wind and solar power. Unlike variable renewable energy, however, the supply of hydropower in wholesale markets is a function of both water availability and operational decisions at dams. Dam operators maximize revenues in wholesale markets by aligning generation with the periods of highest expected prices, and these scheduling decisions may in turn influence prices. Here, we examine the relative importance of two types of information in predicting forward electricity prices: a) water availability at dams, in the form of short-to-medium-range hydrological forecasts; and b) hourly scheduling decisions at dams. Using softly coupled hydrologic, hydropower scheduling, and power systems models spanning the U.S. Western Interconnection, we quantify the importance of hydrologic forecast accuracy in correctly predicting wholesale electricity prices and compare this with the influence of dam operators’ own hourly scheduling decisions on realized market prices. We find that aligning hydropower generation schedules with the periods of high forecasted prices causes larger, inadvertent price forecast errors than imperfect hydrologic forecasts. This suggests that knowledge of how water is managed by dam operators within the week is more important than weekly inflow forecast errors when predicting forward electricity prices. Our findings have implications for optimal hydropower scheduling by region. Specifically, accounting for price effects is critical in markets dominated by hydropower capacity.

Electricity markets↗

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre↗

A scheduling and diagnostic system for scientific satellite GEOTAIL using expert system

The Intelligent Satellite Control Software (ISACS) for the geoMagnetic tail observation satellite named GEOTAIL (launched in July 1992) has been successfully developed. ISACS has made it possible by applying Artificial Intelligence (AI) technology including an expert system to autonomously generate a tracking schedule, which originally used to be conducted manually. Using ISACS, a satellite operator can generate a maximum four day period of stored command stream autonomously and can easily confirm its safety. The ISACS system has another function -- to diagnose satellite troubles and to suggest necessary remedies. The workload of satellite operators has drastically been reduced since ISACS has been introduced into the operations of GEOTAIL.

Nakatani, I↗

Generation and Exploitation of Aggregation Abstractions for Scheduling and Resource Allocation

Our research is investigating abstraction of computational theories for scheduling and resource allocation. These theories are represented in a variant of first order predicate calculus, parameterized multisorted logic, that facilitates specification of large problems. A particular problem is conceptually stated as a set of ground sentences that are consistent with a quantified theory. We are mainly investigating the automated generation of aggregation abstractions and approximations in which detailed resource allocation constraints are replaced by constraints between aggregate demand and capacity. We are also investigating the interaction of aggregation abstractions with the more thoroughly investigated abstractions of weakening operator preconditions. The purpose of the theories for aggregated demand/capacity is threefold: first, to answer queries about aggregate properties, such as gross feasibility; second, to reduce computational costs by using the solution of aggregate problems to guide the solution of detailed problems; and third, to facilitate reformulating theories to approximate problems for which there are efficient problem solving methods. We also describe novel methods for exploiting aggregation abstractions.

Linden, Theodore A.↗

Building Load Control Using Distributionally Robust Chance-Constrained Programs with Right-Hand Side Uncertainty and the Risk-Adjustable Variants

Aggregation of heating, ventilation, and air conditioning (HVAC) loads can provide reserves to absorb volatile renewable energy, especially solar photo-voltaic (PV) generation. In this paper, we decide HVAC control schedules under uncertain PV generation, using a distributionally robust chance-constrained (DRCC) building load control model under two typical ambiguity sets: the moment-based and Wasserstein ambiguity sets. We derive mixed integer linear programming (MILP) reformulations for DRCC problems under both sets. Especially, for the Wasserstein ambiguity set, we use the right-hand side (RHS) uncertainty to derive a more compact MILP reformulation than the commonly known MILP reformulations with big-M constants. All the results also apply to general individual chance constraints with RHS uncertainty. Furthermore, we propose an adjustable chance-constrained variant to achieve tradeoff between the operational risk and costs. We derive MILP reformulations under the Wasserstein ambiguity set and second-order conic programming (SOCP) reformulations under the moment-based set. Using real-world data, we conduct computational studies to demonstrate the efficiency of the solution approaches and the effectiveness of the solutions. Summary of Contribution: The problem studied in this paper is motivated by a building load control problem that uses the aggregation of heating, ventilation, and air conditioning (HVAC) loads as flexible reserves to absorb uncertain solar photovoltaic (PV) generation. The problem is formulated as distributionally robust chance-constrained (DRCC) programs with right-hand side (RHS) uncertainty. In addition, we propose a risk-adjustable variant of the DRCC programs, where the risk level, instead of being predetermined, is treated as a decision variable. The paper aims to provide tractable reformulations and solution algorithms for both the (general) DRCC and the (general) adjustable DRCC models with RHS uncertainty.

97 MATHEMATICS AND COMPUTING↗