Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GW method”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

133 records · Page 8

Characterisations of the HinOTORI telescope with a three-color imager at Ali Observatory in Western Tibet

HinOTORI is a new telescope supported by an international collaboration project between China and Japan. It is a 50 centimeter telescope equipped with simultaneous three-color imagers (u',R C , and I C bands). It is located at Ali Observatory at an altitude of 5100m. Thanks to the high altitude and extreme dryness, Ali site is one of the most suitable sites for optical astrometry. HinOTORI telescope aims at detecting optical transients such as the counterparts of gravitational wave (GW) sources, supernovae, gamma-ray bursts (GRB) and so on. This paper describes the site information, design of simultaneous three-color optical layout, system instruments and whole control system. We also report some telescope characterisations for three bands (u'/R C /I C ) respectively, such as Hartmann constant (0.49"/0.56"/0.60"), best focus position (3.922/3.920/3.903 mm), PSF FWHM size (3.755/3.328/3.167pixels), total transmittance and limiting magnitude (15.69/17.57/17.05mag, 10 σ 30 seconds exposure time). With different airmass observation data, the atmospheric extinction coefficients of three bands (0.366/0.061/0.026) were also derived.

47 OTHER INSTRUMENTATION↗

Modeling the impact of extreme summer drought on conventional and renewable generation capacity: Methods and a case study on the Eastern U.S. power system

Across recent years, there has been a growing prevalence of extreme weather events throughout the United States, posing significant challenges to the reliable and resilient operation of power systems. Specifically, summer droughts threaten to severely reduce available generation capacity to meet regional electricity demand, potentially leading to power outages. This underscores the importance of accurate resource adequacy (RA) assessment to ensure the reliable operation of the nation’s energy infrastructure. Accurately evaluating the usable capacity of regional generation fleets is a challenging undertaking due to the intricate interactions between power systems and hydro-climatic systems. Here, this paper proposes a systematic and analytical framework to evaluate the impacts of extreme summer drought events on the available capacity of various generating technologies, incorporating both meteorological and hydrologic factors. The framework provides detailed plant-level capacity derating models for hydroelectric, thermoelectric, and renewable power plants, facilitating evaluations with high temporal and spatial resolution. The application of the proposed impact assessment framework to the 2025 generation fleet of the real-world power system within the PJM and SERC regions of the United States yields insightful results. By analyzing the daily usable capacity of 6,055 at-risk generators across the study region, it shows that the summer capacity deration is most significant for hydroelectric and once-through thermal power plants, followed by recirculating thermal power plants and combustion turbines. In the event of the recurrence of the 2007 southeastern summer drought event in the near future, the generation fleet could experience a substantial reduction in available capacity, estimated at approximately 8.5 GW, compared to typical summer conditions. The sensitivity analysis reveals that the usable capacity of the generation fleet would suffer an even more significant decrease under conditions of increasingly severe summer droughts. The proposed approach and the findings of this study provide valuable methodologies and insights, empowering stakeholders to bolster the resilience of power systems against the potentially devastating effects of future extreme drought events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CdTe Core: Final Technical Report (FTR)

CdTe is presently the cost-leading thin-film PV technology, directly competing with Si at scale, even when domestically manufactured. While an impressive technology, its efficiency remains much below the detailed balance limit with the largest cause due to its low photovoltage and fill factor. To realize gains, the carrier concentration, minority carrier lifetime, and interface recombination all need to be improved simultaneously over historic levels. Using a new defect chemistry (group V doping instead of copper) has been identified as a viable route using single crystal systems. This project focused on implementing this new defect chemistry in scalable, polycrystalline thin-film photovoltaic CdTe devices with tasks focusing improvements to the front interface, absorber, and rear interface as well as capability development & stakeholder engagement. The goal of the project was to establish a strategy using devices, test structures, detailed characterization, and modeling to quantify the sources of losses in state-of-the-art CdTe photovoltaic devices. Using this strategy and advanced synthesis, losses at the front interface, absorber, and rear interface were worked on in parallel. The final objective was to significantly improve the voltage deficit in CdTe devices to enable improvements in photovoltage and efficiency that can be implemented by industry in the near-term. Over the course of the project, the team developed new characterization techniques, analysis, and modeling which were then applied to state-of-the-art materials generated internally and collaboratively. In particular to enable rapid progress, NREL worked closely with First Solar where NREL grew complete devices as well as ones that interleaved process steps where First Solar had completed different steps such as absorber growth or absorber growth and activation using their baseline methods. Using detailed characterization and analysis including photoemission, photoluminescence, and scanning probe techniques enabled understanding of the loss pathways and area for improvements in our own and First Solar s materials. Ultimately, this contributed to the first series of new world record CdTe efficiencies since 2016, culminating in a 23.1% certified cell that was P-doped along with As-doped cells of similar performance. Internally, NREL improved the statistical variation in baseline As-doped devices and improved average photovoltage by over 100 mV. This was done through an improvement in absorber quality, changed front interface, and improved back contact. In addition to materially improving the fabrication processes at NREL, characterization, analysis, and modeling were developed and disseminated. NREL also played a pivotal role in community building over the course of this project working closely with the Cadmium Telluride Accelerator Consortium. NREL worked in a series of collaborations with academic and industry partners, leveraging knowledge and innovations from this project, as well as helped organize a series of workshops to ensure rapid progress in the field. Working closely with the academic community has led to a dissemination of knowledge; working with First Solar as increased US competitiveness First Solar expanded domestic production to ~10 GW and opened new facilities.

14 SOLAR ENERGY↗

Availability and Performance Loss Factors for U.S. PV Fleet Systems

In the PV Fleet Performance Data Initiative, we partner with photovoltaic (PV) fleet owners to collect time-series PV production data and publish aggregated, anonymized results. This report is an update of our previous publications, specifically a FY 2021 performance index publication and a FY 2022 fleet degradation analysis. In this analysis, we have increased our data participants and system totals by around 10% to 8.5 GW and 24,000 separate inverter data channels. Four major analysis topics are considered in this report: Performance Index (PI) trends, PV system availability, soiling losses, and PV system degradation. Performance Index and inverter availability are assessed on a larger set of data from our FY 2021 report: 1,128 systems compared with 200 systems from before. The increased number of systems is due to an improved data quality methodology, as well as introducing new systems to the analysis. Overall results are similar to previously published values - overall inverter availability is low in the first six months of system performance before reaching steady-state by the end of the first year. Excluding this six-month startup period, system-level aggregated data shows a median (P50) system availability of 0.99 and a lower 10th percentile (P90) value of 0.95 (Figure ES-1). A dependence on system size is also demonstrated, with worse inverter availability results for larger PV systems. Causes of this effect are under investigation, but may be impacted by inverter size, which also show lower availability for larger inverter sizes. This report also investigates PI, correcting for degradation, soiling, snow, and availability. Following these corrections, the median system PI over its entire lifetime is 0.95. PI values reported here are approximately 3% lower than what we presented in our previous FY 2021 report. Soiling loss is assessed in a comprehensive way for the first time in this report. Results are presented using the COmbined Degradation and Soiling (CODS) method, as implemented in RdTools (v3.0.0a4). Soiling values are presented for 255 systems, which indicated irradiance-weighted soiling loss greater than 1%. The values have been published in an updated NREL soiling map at nrel.gov/pv/soiling.html. Finally, we investigated system degradation using three different data analysis techniques: conventional RdTools (year-on-year (YOY)), CODS, and Performance Loss Rate (PLR) analysis. Overall degradation results are consistent with our previous publications. Rerunning conventional RdTools on our updated fleet shows that some data partners have systematically fallen below the median system degradation rate (change over time) of -0.75 %/year. A comparison with PLR analysis, which looks at change in annual PI over time, shows that median system degradation is consistent with -0.5% to -0.75% per year change. However, at the P90 value, system degradation is substantially faster. These two results are consistent and indicate that resulting degradation statistics depend to a great degree on the population of PV systems making up the analysis cohort and whether soiling impacts the systems. The use of CODS for degradation analysis provides a different method for degradation assessment, which explicitly excludes the impact of recoverable soiling on degradation analysis. Excluding soiling effects yields an annual system degradation around -0.5% per year on average. This indicates that a portion of system performance loss may be attributed to periodic soiling that is not fully recovered. This report provides PV system owners/operators with background and methods to analyze PV system performance, give guidance for expected cohort performance, and performance loss values for use in pro-forma financial models, which guide new-build system design and bankability reports.

14 SOLAR ENERGY↗

Baseline Cost Model for Hydropower: Documentation (2025)

Hydropower currently contributes about 80 GW of conventional and 23 GW of pumped storage capacity to the United States (US) power grid. Previous studies have estimated a considerable amount of remaining US hydropower resources, including non-powered dams (NPD) (Hadjerioua et al., 2012), new stream-reach developments (NSD) (Kao et al., 2014), pumped storage hydropower (PSH) and canal/conduit (Kao et al., 2022). The combined theoretical capacity potential of these various hydropower resources is comparable to the existing US hydropower capacity. There is a continuing interest in developing this hydropower potential, particularly to help meet the increasing demand for electricity. However, available data (Sasthav and Oladosu, 2022) show that the rate of new hydropower development has slowed considerably over time despite the interest of industry stakeholders. This is partly due to the competition from other energy resources and from the highly dispersed nature of remaining hydropower resources, which lead to high information requirements for evaluating the feasibility of potential projects. Cost information provides the most succinct summary of the feasibility of a potential hydropower project required by stakeholders, including developers, investors, policymakers, consumer groups, etc., considering investment options. The best estimates of hydropower costs can be obtained through detailed engineering design and cost assessments of individual projects. However, this approach has high data and resource (time, funds, cross-disciplinary expertise) requirements that render it inapplicable for rapid cost estimation with limited data. Although innovative approaches can overcome some of these impediments (see Oladosu and Ma, 2024 for such an application to potential NPD projects), the development of such approaches still requires significant amounts of resources and are not generally applicable to all hydropower project types. Therefore, statistical and parametric methods using simpler cost specifications remain of significant utility to hydropower stakeholders and are, at the least, complementary to more detailed approaches, particularly when evaluating many potential projects.

13 HYDRO ENERGY↗

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency

The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three 'principal requirements': (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b ), fueling efficiency (η f ), processing time of plasma exhaust in the inner fuel cycle (t p ), reactor availability factor (AF), reserve time (tr) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d ). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ~11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBR R ). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b , possible if AF > 30% and 1% ≤ η f f b ≤ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a 'reserve' tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ~0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Numerical relativity simulations of the neutron star merger GW190425: microphysics and mass ratio effects

ABSTRACT GW190425 was the second gravitational wave (GW) signal compatible with a binary neutron star (BNS) merger detected by the Advanced LIGO and Advanced Virgo detectors. Since no electromagnetic counterpart was identified, whether the associated kilonova was too dim or the localization area too broad is still an open question. We simulate 28 BNS mergers with the chirp mass of GW190425 and mass ratio 1 ≤ q ≤ 1.67, using numerical-relativity simulations with finite-temperature, composition dependent equations of state (EOS) and neutrino radiation. The energy emitted in GWs is $\lesssim 0.083\mathrm{\, M_\odot }c^2$ with peak luminosity of 1.1–$2.4\times ~10^{58}/(1+q)^2\, {\rm {erg \, s^{-1}}}$. Dynamical ejecta and disc mass range between 5 × 10−6–10−3 and 10−5–$0.1 \mathrm{\, M_\odot }$, respectively. Asymmetric mergers, especially with stiff EOSs, unbind more matter and form heavier discs compared to equal mass binaries. The angular momentum of the disc is 8–$10\mathrm{\, M_\odot }~GM_{\rm {disc}}/c$ over three orders of magnitude in Mdisc. While the nucleosynthesis shows no peculiarity, the simulated kilonovae are relatively dim compared with GW170817. For distances compatible with GW190425, AB magnitudes are always dimmer than ∼20 mag for the B, r, and K bands, with brighter kilonovae associated to more asymmetric binaries and stiffer EOSs. We suggest that, even assuming a good coverage of GW190425’s sky location, the kilonova could hardly have been detected by present wide-field surveys and no firm constraints on the binary parameters or EOS can be argued from the lack of the detection.

79 ASTRONOMY AND ASTROPHYSICS↗