Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Statement of Doctor Noel Hinners, Associate Administrator for Space Sciences, National Aeronautics and Space Administration

Leadership in space exploration is an important part of the nation's prestige. There is a large science component in what are called applications and visa versa. Space science can provide the basis for some of the steps and bridges to possibilities envisioned for the year 2000 and forward. Both chemistry and physics are basis priorities in NASA missions and research activities. Current programs are concerned with developing the capability to put more weight in space, to provide for revisiting facilities such as the space telescope and provide for on-orbit repair or retrieval. Programs requiring the construction of facilities in space require higher levels of energy than those currently available. The prospective development of low-thrust propulsion in the 1980's will reduce transportation time. Data from Skylab and that to be obtained from Spacelab as well as investigations of solar-terrestrial interactions will benefit space tourists and inhabitants.

Hinners, N.↗

A requirements specification for a software design support system

Most existing software design systems (SDSS) support the use of only a single design methodology. A good SDSS should support a wide variety of design methods and languages including structured design, object-oriented design, and finite state machines. It might seem that a multiparadigm SDSS would be expensive in both time and money to construct. However, it is proposed that instead an extensible SDSS that directly implements only minimal database and graphical facilities be constructed. In particular, it should not directly implement tools to faciliate language definition and analysis. It is believed that such a system could be rapidly developed and put into limited production use, with the experience gained used to refine and evolve the systems over time.

Noonan, Robert E.↗

Assessment of small mechanical wastewater treatment plants: Relative life cycle environmental impacts of construction and operations

Many slow growing and shrinking rural communities struggle with aging or inadequate wastewater treatment plants (WWTPs), and face challenges in constructing and operating such facilities. Although existing literature has provided insight into the environmental sustainability of large facilities, including both the construction and operational phases, these studies have not examined small, rural facilities treating less than 7,000 m 3 /d (1.8 MGD) of wastewater in adequate depth and breadth. In this study, a detailed inventory of the construction and operational data for 16 case studies of small WWTPs was developed to elucidate their environmental life cycle impacts. Conventional LCA framework was followed. The results show that the environmental impacts of both the construction and operational phases are considerable. Operational impacts are highly related to energy usage. Improving energy efficiency of a plant may reduce the environmental impacts related to operations. Construction impacts can vary considerably between facilities. Process-related factors (e.g., concrete and reinforcing steel used in basins) are typically sized using the design flow; thus much of the variability in construction impacts among plants stems from the non-process related infrastructure. Multiple regression analysis was used as an exploratory tool to identify which non-process related plant aspects contribute to the variable environmental impact of small WWTPs. These factors include aluminum, cast iron, and the capacity utilization ratio (defined as the ratio of average flow to design flow). Furthermore, industry practitioners should consider these factors when aiming to reduce the environmental impacts of a small WWTP related to construction. Scenario sensitivity analyses found that the environmental impact of construction became smaller with longer design life, and the end-of-life consideration does not heavily influence the environmental sustainability of a WWTP.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Silicon Halide-alkali Metal Flames as a Source of Solar Grade Silicon

A program is presented which was aimed at determining the feasibility of using high temperature reactions of alkali metals and silicon halides to produce low cost solar-grade silicon. Experiments are being conducted to evaluate product separation and collection processes, measure heat release parameters for scaling purposes, and determine the effects of the reactants and/or products on materials of reactor construction. During the current reporting period, the results of heat release experiments were used to design and construct a new type of thick-wall graphite reactor to produce larger quantities of silicon. A reactor test facility was constructed. Material compatibility tests were performed for Na in contact with graphite and several coated graphites. All samples were rapidly degraded at T = 1200K, while samples retained structural strength at 1700K. Pyrolytic graphite coatings cracked and separated from substances in all cases.

Olson, D. B.↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Full Length Assembly Testing in PELICAN (Final Report)

In support of the development of the U.S. Department of Energy (DOE) Versatile Test Reactor (VTR), a thermal hydraulics test facility was constructed to generate experimental measurement of the pressure drop across a single full-scale assembly containing prototypic axial reflectors, fuel, and plena components. Constructed and operated at Argonne National Laboratory, the Pressure drop Experimental Loop for Investigations of Core Assemblies in Nuclear reactors (PELICAN) facility was designed to achieve hydraulic conditions identical to those anticipated for a full-scale fuel assembly located in the VTR core in the region with the highest flow rate. Using water as surrogate for liquid sodium, the flow loop was operated at elevated temperatures and pressures to match the thermophysical properties of liquid sodium and ensure matching Reynolds and Euler numbers. The measurement objectives for data generated from this test facility was driven primarily by the validation needs for code calculations and simulations of the reference VTR core. These objectives focused on the need to validate pressure drop results across the various segments of the fuel assembly as they relate directly to the pumping power and safety of the reactor. Presented in this report are experimental results and analytical comparisons based on testing of a full-length assembly in PELICAN. Housed within a hexagonal test section extending 3.4 m in length, the tested assembly features a prototypic lower reflector, grid plates, wire-wrapped rod bundle, upper reflector, and exit region. The rod bundle extends over 1.5 m in length and contains 217 individual wire-wrapped rods with dimensions that best reflect the reference VTR design. The as-tested bundle assembly was fabricated using 316 stainless steel 0.25-inch (6.35-mm) diameter rods wrapped with 0.04-inch (1.016-mm) diameter wire at a helical pitch of 10.51 inch (26.6 cm). Details of the method for in-house wire-wrapping, assembly, and installation are provided later in this report. Experimental measurements of pressure drop at 19 positions along the test assembly were recorded for a range of flow conditions, with special attention paid to key locations within the assembly, including component inlet and outlet, transition, and wire-wrapped rod bundle regions. Testing conditions were based on 110°C water with flow rates ranging from 50 to 450 GPM (3 to 27 kg/s) at the inlet of the test assembly generating Reynolds numbers and velocities up to ~8.0×10 4 and ~7.8 m/s, respectively, within the rod bundle region. Non-dimensional values for the friction factor were then calculated based on these experimental measurements and compared against those predicted by various analytical correlations available from open literature. Predictions by the upgraded Cheng and Todreas, Rehme, and Novendstern correlations fell within 4% to those values measured experimentally.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SSC OCIO, IT SUMMIT 2011

The Stennis Space Center (SSC) Records Retention Facility is a centralized location for all SSC records, Records Management staff, and the SSC History Office. The building is a storm resistant facility and provides a secure environment for records housing. The Records Retention Facility was constructed in accordance with The National Archives and Records Administration (NARA) requirements for records storage, making it the first NARA compliant facility in the agency. Stennis Space Center's Records Retention Facility became operational in May 2010. The SSC Records Retention Facility ensures that the required federal records are preserved, managed and accessible to all interested personnel. The facility provides 20,000 cubic feet of records storage capacity for the purpose of managing the centers consolidated records within a central, protected environment. Records housed in the facility are in the form of paper, optical, film and magnetic media. Located within the SSC Records Retention Facility, the Records Management Office provides comprehensive records management services in the form of: a) Storage and life-cycle management of inactive records of all media types; b) Digitizing/scanning of records and documents; c) Non-textual/digital electronic records media storage, migration and transfer; d) Records Remediation.

Cottrell, Dinna L.↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supersonic CO electric-discharge lasers

Laser modeling activity is described which involved addition of an option allowing N2 as a second diatomic gas. This option is now operational and a few test cases involving N2/CO mixtures were run. Results from these initial test cases are summarized. In the laboratory, a CW double-discharge test facility was constructed and tested. Features include: water-cooled removable electrodes, O-ring construction to facilitate cleaning and design modifications, increased discharge length, and addition of a post-discharge observation section. Preliminary tests with this facility using N2 yielded higher power loadings than obtained in the first-generation facility. Another test-section modification, recently made and as yet untested, will permit injection of secondary gases into the cathode boundary layer. The objective will be to vary and enhance the UV emission spectrum from the auxiliary discharge, thereby influencing the level of photoionization in the main discharge region.

Hason, R. K.↗

A radiant heating test facility for space shuttle orbiter thermal protection system certification

A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orbiter. This facility simulates surface thermal gradients, onorbit cold-soak temperatures down to 200 K, entry heating temperatures to 1710 K in an oxidizing environment, and the dynamic entry pressure environment. The capabilities of the facility and the development of new test equipment are presented.

Sherborne, W. D.↗

Replaceable blade turbine and stationary specimen corrosion testing facility

A facility was constructed to provide relatively low cost testing of hot section turbine blade and vane materials under hot corrosion conditions more akin to service environments. The facility consists of a small combustor whose pressurized gas flow can be directed to either a test section consisting of three small cascaded specimens or to a partial admittance single-stage axial flow turbine. The turbine rotor contains 28 replaceable turbine blades. The combustion gases resulting from the burning of Jet A-l fuel can be seeded with measured amounts of alkali salts. This facility is described here along with preliminary corrosion test results obtained during the final checkout of the facility.

Santoro, G. J.↗

SRMAFTE facility checkout model flow field analysis

The Solid Rocket Motor Air Flow Equipment (SRMAFTE) facility was constructed for the purpose of evaluating the internal propellant, insulation, and nozzle configurations of solid propellant rocket motor designs. This makes the characterization of the facility internal flow field very important in assuring that no facility induced flow field features exist which would corrupt the model related measurements. In order to verify the design and operation of the facility, a three-dimensional computational flow field analysis was performed on the facility checkout model setup. The checkout model measurement data, one-dimensional and three-dimensional estimates were compared, and the design and proper operation of the facility was verified. The proper operation of the metering nozzles, adapter chamber transition, model nozzle, and diffuser were verified. The one-dimensional and three-dimensional flow field estimates along with the available measurement data are compared.

Dill, Richard A.↗

Enhanced Design of Turbo-jet LPT by Separation Control Using Phased Plasma Actuators

This work deals with the documentation and control of flow separation that occurs over turbine blades in the low-pressure turbine stage at low Reynolds numbers that exist at high altitude cruise. We utilize a specially constructed linear cascade that is designed to study the flow field over a generic LPT cascade consisting of Pratt & Whitney 'Pak B' shaped blades. This facility was constructed under a previous one-year NASA Glenn RC initiative. The center blade in the cascade is instrumented to measure the surface pressure coefficient distribution. Optical access allows two-component LDV measurement for boundary layer profiles. Experimental conditions have been chosen to give a range of chord Reynolds numbers from 10 to 100K, and a range of free-stream turbulence levels from u'/U(sub infinity)= 0.08 to 3 percent. The surface pressure measurements were used to define a region of separation and reattachment that depend on the free-stream conditions. The location of separation was found to be relatively insensitive to the experimental conditions. However, reattachment location was very sensitive to the turbulence level and Reynolds number. Excellent agreement was found between the measured pressure distributions and predictions from Euler and RANS simulations. Two-component LDV measurements are presently underway to document the mean and fluctuating velocity components in the boundary layer over the center blade for the range of experimental conditions. The fabrication of the plasma actuator is underway. These are designed to produce either streamwise vortices, or a downstream-directed wall jet. A precursor experiment for the former approach was performed with an array of vortex generators placed just upstream of the separation line. These led to reattachment except for the lowest Reynolds number. Progress has also been made on the proposed concept for a laterally moving wake. This involved constructing a smaller wind tunnel and molding an array of symmetric airfoils to form an array. Following its development, it will be scaled up and used to introduce lateral moving wakes upstream up the Pak-B cascade.

Ashpis, David↗

Space artificial gravity facilities - An approach to their construction

In the course of adaptation to a space microgravity environment, humans experience cardiovascular deconditioning, loss of muscle mass, and loss of bone minerals. One possible solution to these space adaptation problems is to simulate earth's gravity using the centripetal acceleration created by a rotating system. The design and construction of rotating space structures pose many challenges. Before committing to the use of artificial gravity in future space missions, a man-rated Variable Gravity Research Facility (VGRF) should be developed in earth orbit as a gravitational research tool and testbed. This paper addresses the requirements and presents preliminary concepts for such a facility.

Wercinski, P. F.↗

High speed, low cost, LEO-thermal-cycling facility

The design and operations of a low cost, high rate thermal cycling facility designed for LEO conditions is described. Thermal cycling facilities were constructed with various design criteria. Some were designed to duplicate as closely as possible the conditions a cell or module would encounter while in orbit about the Earth. A typical facility to perform this type of cycling was a large vacuum system with liquid nitrogen cooled walls. The cells were heated by an AMO spectrum solar simulator, then a shutter was closed allowing the cells to give up their heat to the cold walls. This system was good at duplicating the orbital conditions but was slow and very costly to operate. Other systems used a gas atmosphere and heated the cells with radiant heat and cooled the cells by moving them into close proximity to a cold plate. The systems greatly increased the cycle times. Other systems moved the heating and cooling atmosphere into and out of the test areas and achieved reasonable cycle rates. All these systems, however, are expensive to operate.

Hart, R. E., Jr.↗

Description of a new full scale lightning simulation facility

A lightning test facility has been constructed in Utah, and the facility has initially been used to test and certify solid rocket motor (SRM) segment shipping containers. The simulator equipment consists of a 17-stage 1.7 MV Marx generator and three current generators. The performance of the Marx is enhanced by use of a distributed peaking capacitor to produce maximum dl/dt's in excess of 4 x 10 to the 11th Amps/sec into large test objects. The current generators consist of the following: (1) a 200 KA underdamped 500 kilojoule high current bank, (2) a critically damped intermediate current bank and (3) an over damped continuing current bank. Total charge transfer for these banks is 270 Coulombs with an action integral in excess of 8 x 10 to the 6th sq Amps-sec. Representative results for the simulator and SRM segment shipping containers are presented.

Papazian, Peter B.↗

Nuclear thermal propulsion test facility requirements and development strategy

The Nuclear Thermal Propulsion (NTP) subpanel of the Space Nuclear Propulsion Test Facilities Panel evaluated facility requirements and strategies for nuclear thermal propulsion systems development. High pressure, solid core concepts were considered as the baseline for the evaluation, with low pressure concepts an alternative. The work of the NTP subpanel revealed that a wealth of facilities already exists to support NTP development, and that only a few new facilities must be constructed. Some modifications to existing facilities will be required. Present funding emphasis should be on long-lead-time items for the major new ground test facility complex and on facilities supporting nuclear fuel development, hot hydrogen flow test facilities, and low power critical facilities.

Allen, George C.↗

Performance Evaluation of an Additively Manufactured ultra-High Operating Temperature SiC Solar-Thermal Air Receiver (HOTSSTAR) Test Module

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal and solar power systems. GE Aerospace Research in collaboration with Heliogen Inc and Sandia National Laboratories (SNL) is engaged in the development of ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. HOTSSTAR goal is to demonstrate SiC receiver with air exit temperatures up to 1100oC. We discuss fabrication and on-sun test results of a prototype 50kWth test module. The receiver architecture is based on a radial airflow design and consists of a series of radial SiC receiver sectors organized around central absorber. These components were fabricated using binder-jet printed SiC followed by melt-infiltration reaction bonding process. To enhance the thermo-mechanical reliability of SiC test articles in thermal gradient/ shock environment of the application, the components were laminated with GE’s MI SiC CMC. A dedicated test facility was constructed at SNL Solar Tower to evaluate the operational performance of HOTSSTAR module under solar fluxes >200 W/cm2. We report on our final 50kW test module fabrication, integration at the test facility at Sandia, and discuss on-sun test results. We compare the performance of HOTSSTAR module relative to our model predictions.

14 SOLAR ENERGY↗