Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCIAL PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Financial Analysis of the 2018 Glen Canyon Dam Bug Flow Experiment

This report examines the financial implications of the macroinvertebrate production flows (MPF) experiment conducted at the Glen Canyon Dam (GCD) from May 1, through August 31, 2018. It is the first report examining the financial implications of a MPF experiment since the 2016 Record of Decision (ROD) was adopted in December 2016 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime. Experimental releases may have either a positive or a negative impact on the financial value of energy production. For these experimental releases, financial costs of approximately $165,000 were incurred because this experiment maintained flat releases on the weekends and holidays. This study identifies the main factors that contribute to MPF costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics MPF operations during the period of the experiment when it complies with the 2016 ROD operating criteria, and (2) a counterfactual Without Experiments scenario that is identical to the baseline except it assumes that the MPF experiment did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power sale prices in the modeling process. In addition to estimating the financial impact of MPFs, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Rethinking the Role of Financial Transmission Rights in Wind-Rich Electricity Markets in the Central U.S.

Transmission congestion can cause a divergence between wholesale power prices at the individual pricing nodes where power is generated and the more-liquid trading hubs where that power is often delivered and sold. This nodal price difference is commonly referred to as the “locational basis” (or just “basis”). Because the basis varies over time, it can—if not hedged—unpredictably affect a wind plant’s revenue and/or value, which increases investor risk and potentially slows deployment. We find wind plants typically face a larger and more-negative basis than do thermal generators, and hence are more-negatively impacted by congestion. Moreover, while most thermal generators can effectively hedge basis risk by purchasing conventional fixed-volume financial transmission rights (FTRs), these fixed-volume FTRs do not effectively hedge basis risk for variable wind generation. More-effective hedging mechanisms may be required to support those generators most-impacted by congestion, and to promote continued investment in variable generation resources in congested markets.

17 WIND ENERGY↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using Power Purchase Agreements for Solar Deployment at Universities

More than 60 universities have used solar power purchase agreements (PPAs) to deploy more than 100 megawatts of solar PV on campuses around the country. This webinar is intended for university financial planners and other stakeholders who are assessing the financial aspects of deploying solar. The speakers will provide an overview of how universities are using PPAs and key PPA components. In addition, they will discuss the process of using PPAs, why PPAs make sense for campus solar deployment, and the benefits and challenges for universities. Tools and other resources will be shared to help universities interested in using PPAs for campus solar deployment.

14 SOLAR ENERGY↗

Comparative Policy Study for Green Buildings in U.S. and China

Prominent barriers facing the U.S. green building industry include the fact that government bodies that supervise health, fire safety, land, and other public operations are slow to revise codes to accommodate green building (regulatory barrier). In China, the lack of a green building professional accreditation process similar to the Leadership in Energy and Environmental Design (LEED) AP process limits the green building workforce capacity development (informational barrier). The main policies highlighted in this report to tackle these barriers are 1) comprehensive codes and labeling plan (informational, institutional), 2) government-led targets and demonstrations (risk), 3) education and awareness programs (informational), 4) fiscal policy that supports green building investment (financial), and 5) integrated design promotion (institutional, financial).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An open source GIS tool to quantify the visual impact of wind turbines and photovoltaic panels

Although there are clear economic and environmental incentives for producing energy from solar and wind power, there can be local opposition to their installation due to their impact upon the landscape. To date, no international guidelines exist to guide quantitative visual impact assessment of these facilities, making the planning process somewhat subjective. In this paper we demonstrate the development of a method and an Open Source GIS tool to quantitatively assess the visual impact of these facilities using line-of-site techniques. The methods here build upon previous studies by (i) more accurately representing the shape of energy producing facilities, (ii) taking into account the distortion of the perceived shape and size of facilities caused by the location of the observer, (iii) calculating the possible obscuring of facilities caused by terrain morphology and (iv) allowing the combination of various facilities to more accurately represent the landscape. The tool has been applied to real and synthetic case studies and compared to recently published results from other models, and demonstrates an improvement in accuracy of the calculated visual impact of facilities. The tool is named r.wind.sun and is freely available from GRASS GIS AddOns. - Highlights: • We develop a tool to quantify wind turbine and photovoltaic panel visual impact. • The tool is freely available to download and edit as a module of GRASS GIS. • The tool takes into account visual distortion of the shape and size of objects. • The accuracy of calculation of visual impact is improved over previous methods.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Improving The Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

Piland, William M.↗

Financial Analysis of Incentive Mechanisms to Promote Energy Efficiency: Case Study of a Prototypical Southwest Utility

Many state regulatory commissions and policymakers want utilities to aggressively pursue energy efficiency as a strategy to mitigate demand and energy growth, diversify the resource mix, and provide an alternative to building new, costly generation. However, as the National Action Plan for Energy Efficiency (NAPEE 2007) points out, many utilities continue to shy away from aggressively expanding their energy efficiency efforts when their shareholder's fundamental financial interests are placed at risk by doing so. Thus, there is increased interest in developing effective ratemaking and policy approaches that address utility disincentives to pursue energy efficiency or lack of incentives for more aggressive energy efficiency efforts. New regulatory initiatives to promote increased utility energy efficiency efforts also affect the interests of consumers. Ratepayers and their advocates are concerned with issues of fairness, impacts on rates, and total consumer costs. From the perspective of energy efficiency advocates, the quid pro quo for utility shareholder incentives is the obligation to acquire all, or nearly all, achievable cost-effective energy efficiency. A key issue for state regulators and policymakers is how to maximize the cost-effective energy efficiency savings attained while achieving an equitable sharing of benefits, costs and risks among the various stakeholders. In this study, we modeled a prototypical vertically-integrated electric investor-owned utility in the southwestern US that is considering implementing several energy efficiency portfolios. We analyze the impact of these energy efficiency portfolios on utility shareholders and ratepayers as well as the incremental effect on each party when lost fixed cost recovery and/or utility shareholder incentive mechanisms are implemented. A primary goal of our quantitative modeling is to provide regulators and policymakers with an analytic framework and tools that assess the financial impacts of alternative incentive approaches on utility shareholders and customers if energy efficiency is implemented under various utility operating, cost, and supply conditions.We used and adapted a spreadsheet-based financial model (the Benefits Calculator) which was developed originally as a tool to support the National Action Plan for Energy Efficiency (NAPEE). The major steps in our analysis are displayed graphically in Figure ES- 1. Two main inputs are required: (1) characterization of the utility which includes its initial financial and physical market position, a forecast of the utility?s future sales, peak demand, and resource strategy to meet projected growth; and (2) characterization of the Demand-Side Resource (DSR) portfolio ? projected electricity and demand savings, costs and economic lifetime of a portfolio of energy efficiency (and/or demand response) programs that the utility is planning or considering implementing during the analysis period. The Benefits Calculator also estimates total resource costs and benefits of the DSR portfolio using a forecast of avoided capacity and energy costs. The Benefits Calculator then uses inputs provided in the Utility Characterization to produce a ?business-as usual? base case as well as alternative scenarios that include energy efficiency resources, including the corresponding utility financial budgets required in each case. If a decoupling and/or a shareholder incentive mechanism are instituted, the Benefits Calculator model readjusts the utility?s revenue requirement and retail rates accordingly. Finally, for each scenario, the Benefits Calculator produces several metrics that provides insights on how energy efficiency resources, decoupling and/or a shareholder incentive mechanism impacts utility shareholders (e.g. overall earnings, return on equity), ratepayers (e.g., average customer bills and rates) and society (e.g. net resource benefits).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Impacts, Health and Safety Impacts, and Financial Costs of the Front End of the Nuclear Fuel Cycle

FEFC processes, unlike many of the proposed fuel cycles and technologies under consideration, involve mature operational processes presently in use at a number of facilities worldwide. This report identifies significant impacts resulting from these current FEFC processes and activities. Impacts considered to be significant are those that may be helpful in differentiating between fuel cycle performance and for which the FEFC impact is not negligible relative to those from the remainder of the full fuel cycle. This report: • Defines ‘representative’ processes that typify impacts associated with each step of the FEFC, • Establishes a framework and architecture for rolling up impacts into normalized measures that can be scaled to quantify their contribution to the total impacts associated with various fuel cycles, and • Develops and documents the bases for estimates of the impacts and costs associated with each of the representative FEFC processes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consolidated decommissioning guidance: Financial assurance, recordkeeping, and timeliness. Volume 3

The U.S. Nuclear Regulatory Commission (NRC) consolidated and updated numerous decommissioning guidance documents into this three volume NUREG. Specifically, the three volumes address the following topics: (1) "Decommissioning Process for Materials Licensees"; (2) "Characterization, Survey, and Determination of Radiological Criteria"; and (3) "Financial Assurance, Recordkeeping, and Timeliness." This three-volume NUREG series replaces NUREG-1727 ("NMSS Decommissioning Standard Review Plan," issued September 2000) and NUREG/BR-0241 ("NMSS Handbook for Decommissioning Fuel Cycle and Materials Licensees," issued March 1997). This NUREG series is intended for use by NRC staff, licensees, and others. Volume 3 of this NUREG series provides guidance on the technical aspects of compliance with requirements for timeliness in decommissioning of materials facilities, the requirements for financial assurance for decommissioning, and the recordkeeping requirements related to eventual decommissioning. Licensees should use this guidance in preparing decommissioning plans, license termination plans, final status surveys, and other technical decommissioning reports for submittal to the NRC. The NRC staff will use this guidance in reviewing these documents and related license amendment requests. Volume 3 is intended to apply only to the decommissioning of materials facilities licensed under Title 10 of the Code of Federal Regulations (10 CFR) Parts 30, 40, 70, and 72.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Security Technology Incubation Project Continuation Plan

This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

99 GENERAL AND MISCELLANEOUS↗

Comparative Analysis of Natural Gas Cogeneration Incentives on Electricity Production in Latin America

An analysis to assess the influence of country-dependent variables and incentives on the feasibility of natural gas cogeneration projects in Latin America is presented in this work. The analysis is performed using a hypothetical industrial plant, where the cogeneration solution consists in the recovery of waste heat from the power generation for steam production. The feasibility is evaluated by calculating the Return of Investment (ROI) and the Internal Rate of Return (IRR) of the project. Eight Latin American countries are studied considering their specific natural gas markets, regulation, and macroeconomic variables. Two scenarios, electricity production for self-consumption and electricity production with power surplus sale, are independently analyzed considering the effects of available incentives. In the countries where the project is feasible, the application of incentives leads to a significant reduction in the ROI and, consequently, to an increment in the IRR. The effect of the interest rate and environmental impact were also analyzed. In general terms, along the region, the regulation for cogeneration is incipient while incentives are very standard and similar respect to lowering of import, Value-Added Tax (VAT), and income taxes, which seems to be designed purely to promote capital investment. Following the results from this study, it is of paramount importance to create new policy instruments in the future to advance the regulatory framework for cogeneration in Latin America.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

In new conservation era, what's best motivator to promote negawatts?

With rising fuel prices, rapidly escalating infrastructure costs and concerns about climate change, nearly everyone agrees that energy conservation should take priority before any supply-side options. But the debate about what is the best means to that end has not been settled. Approaches tried by several states are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Upside is missing from assessments of nuclear costs

This potential upside is rooted in the justification (both theoretical and real) for the provision of loan guarantees by the government: direct future tax revenue from the entities receiving the guarantees will be increased by an amount sufficient to offset the cost of any losses from the provision of the guarantees. In addition, there are a slew of indirect gains accruing for the government.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FERC rate incentives for transmission infrastructure development

With enactment of the Energy Policy Act of 2005, Congress delivered a mandate to the Federal Energy Regulatory Commission to establish regulations that would provide for incentive-based rate treatments for investments that would improvement the nation's electric transmission system. That has required FERC to move from merely approving cost-based rates for transmission services to enacting new regulations that would make it more attractive to invest in transmission infrastructure without offending the ''just and reasonable'' rate standard. (author)

24 POWER TRANSMISSION AND DISTRIBUTION↗