Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

An efficient temporal logic for robotic task planning

Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.

Becker, Jeffrey M.↗

Space applications of artificial intelligence; Proceedings of the Annual Goddard Conference, Greenbelt, MD, May 16, 17, 1989

Theoretical and implementation aspects of AI systems for space applications are discussed in reviews and reports. Sections are devoted to planning and scheduling, fault isolation and diagnosis, data management, modeling and simulation, and development tools and methods. Particular attention is given to a situated reasoning architecture for space repair and replace tasks, parallel plan execution with self-processing networks, the electrical diagnostics expert system for Spacelab life-sciences experiments, diagnostic tolerance for missing sensor data, the integration of perception and reasoning in fast neural modules, a connectionist model for dynamic control, and applications of fuzzy sets to the development of rule-based expert systems.

Rash, James L.↗

Architecture For Intelligent Control Of Robotic Tasks

Proposed architecture for control of such robotic devices as artificial hands calls for data-abstracting hierarchies of processing, controlling, and sensing equipment that plans, executes, and corrects movements of devices at acceptably high rates. Combines features developed in research on artificial intelligence and control theory. Characterized by casual connections between layers of hierarchy, approximately equal complexities of layers, and directed focus of attention.

Fiorini, Paolo↗

Challenges in building intelligent systems for space mission operations

The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.

Hartman, Wayne↗

Studies in knowledge-based diagnosis of failures in robotic assembly

The telerobot diagnostic system (TDS) is a knowledge-based system that is being developed for identification and diagnosis of failures in the space robotic domain. The system is able to isolate the symptoms of the failure, generate failure hypotheses based on these symptoms, and test their validity at various levels by interpreting or simulating the effects of the hypotheses on results of plan execution. The implementation of the TDS is outlined. The classification of failures and the types of system models used by the TDS are discussed. A detailed example of the TDS approach to failure diagnosis is provided.

Lam, Raymond K.↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Do it yourself remote sensing: Generating an inexpensive, high tech, real science lake mapping project for the classroom

The utilization of modest equipment and software revealed bottom contours and water column conditions of a dynamic water body. Classroom discussions of field techniques and equipment capabilities followed by exercises with the data sets in cause-and-effect analysis all contributed to participatory education in the process of science. This project is presented as a case study of the value of engaging secondary and collegiate level students in planning, executing and appraising a real world investigation which they can directly relate to. A 1 km wide bay, experiencing marsh inflow, along an 8 km long lake situated 120 km north of Ottawa, Canada, on the glaciated Canadian Precambrian Shield was mapped in midsummer for submerged topography, bottom composition, temperature profile, turbudity, dissolved oxygen and biota distribution. Low level aerial photographs scanned into image processing software are permitting spatial classification of bottom variations in biology and geology. Instrumentation consisted of a portable sport fishing SONAR depth finder, an electronic lead line multiprobe with photocell, thermistor and dissolved oxygen sensors, a selective depth water sampler, portable pH meter, an underwater camera mounted on a home-made platform with a bottom-contact trigger and a disposable underwater camera for shallow survey work. Sampling transects were referenced using a Brunton hand transit triangulating several shore markers.

Metzger, Stephen M.↗

Task-level control for autonomous robots

Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

Simmons, Reid↗

International Space Station ECLSS Operations Status - Increment OA

This paper describes Environmental Control and Life Support Systems (ECLSS) operations to date for preflight planning, international partner coordination and mission plan execution of the International Space Station (ISS). The focus is on the activities involved with the STS-88(2A) Space Shuttle Endeavor flight, the first delivery of the US segment of the ISS, which consists of the Pressurized Mating Adapter (PMA)/and Node 1 elements, and the delivery of the first Russian segment of the ISS, the FGB, a US-financed and Russian- built module.

Lamczyk, Philip C.↗

Generalizing Backtrack-Free Search: A Framework for Search-Free Constraint Satisfaction

Tractable classes of constraint satisfaction problems are of great importance in artificial intelligence. Identifying and taking advantage of such classes can significantly speed up constraint problem solving. In addition, tractable classes are utilized in applications where strict worst-case performance guarantees are required, such as constraint-based plan execution. In this work, we present a formal framework for search-free (backtrack-free) constraint satisfaction. The framework is based on general procedures, rather than specific propagation techniques, and thus generalizes existing techniques in this area. We also relate search-free problem solving to the notion of decision sets and use the result to provide a constructive criterion that is sufficient to guarantee search-free problem solving.

Jonsson, Ari K.↗

Processing Spacecraft Data Without Confusion

Producing multiple versions of the same data product for the same time frame with the same remotely sensed inputs can be a recipe for disaster. Yet, amidst the commotion of satellite launch and early operations (LEO), such data processing is needed. After LEO, the situation gets worse. Processing newly arriving data ("forward processing") is augmented with reprocessing and algorithm development, comparison, evaluation, and testing -- often happening all at the same time. The problem can be analyzed in three main parts -- maintaining multiple versions of algorithms and data so that end-product users are not overwhelmed,allocating computer resources efficiently, and simplifying production operations so that va st amounts of data can be processed with minimal staff and fewer errors. OMIDAPS provides a framework for execution of algorithms that transform lower level data acquired by OMI on NASA's Aura satellite into higher level science data products. In contrast to traditional science data processing systems, we address all parts of the problem with an innovative approach allowing multiple data processing to run within a single physical system. The data products, imports, exports, and execution planning are all segregated into distinct "ArchiveSets." This paper describes reasons for multiple concurrent productions on a typical satellite data processing project using OMI as an example. It describes the virtual data processing system concept and its advantages over separate physical processing strings. It explores the specific implementation of the virtual systems within OMIDAPS and discusses some of the implications of our approach and describes how virtual processing is used to accomplish the overall mission of OMI data processing.

Tilmes, Curt↗

Deformation and Damage Studies for Advanced Structural Materials

Advancements made in understanding deformation and damage of advanced structural materials have enabled the development of new technologies including the attainment of a nationally significant NASA Level 1 Milestone and the provision of expertise to the Shuttle Return to Flight effort. During this collaborative agreement multiple theoretical and experimental research programs, facilitating safe durable high temperature structures using advanced materials, have been conceived, planned, executed. Over 26 publications, independent assessments of structures and materials in hostile environments, were published within this agreement. This attainment has been recognized by 2002 Space Flight Awareness Team Award, 2004 NASA Group Achievement Award and 2003 and 2004 OAI Service Awards. Accomplishments in the individual research efforts are described as follows.

Source record↗

Model Checking Abstract PLEXIL Programs with SMART

We describe a method to automatically generate discrete-state models of abstract Plan Execution Interchange Language (PLEXIL) programs that can be analyzed using model checking tools. Starting from a high-level description of a PLEXIL program or a family of programs with common characteristics, the generator lays the framework that models the principles of program execution. The concrete parts of the program are not automatically generated, but require the modeler to introduce them by hand. As a case study, we generate models to verify properties of the PLEXIL macro constructs that are introduced as shorthand notation. After an exhaustive analysis, we conclude that the macro definitions obey the intended semantics and behave as expected, but contingently on a few specific requirements on the timing semantics of micro-steps in the concrete executive implementation.

Siminiceanu, Radu I.↗

International Space Station Execution Replanning Process: Trends and Implications

International Space Station is a joint venture. Because of this, ISS execution planning- planning within the week for the ISS requires coordination across multiple partner, and the associated processes and tools to allow this coordination to occur. These processes and tools are currently defined and are extensively used. This paper summarizes these processes, and documents the current data trends associated with these processes and tools, with a focus on the metrics provided from the ISS Planning Product Change Request (PPCR) tool. As NASA's Vision for Space Exploration and general Human spaceflight trends are implemented, the probability of joint venture long duration programs such as ISS, with varying levels of intergovernmental and/or corporate partnership, will increase. Therefore, the results of this PPCR analysis serve as current Lessons learned for the ISS and for further similar ventures.

McCormick, Robet J.↗

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

NASA's Spaceflight Visual Impairment and Intracranial Hypertension Research Plan: An accelerated Research Collaboration

To date six long duration astronauts have experienced in flight visual changes and post flight signs of optic disc edema, globe flattening, choroidal folds, hyperoptic shifts and or raised intracranial pressure. In some cases the changes were transient while in others they are persistent with varying degrees of visual impairment. Given that all astronauts exposed to microgravity experience a cephalad fluid shift, and that both symptomatic and asymptomatic patients have exhibited optic nerve sheath edema on MRI, there is a high probability that all astronauts develop in-flight idiopathic intracranial hypertension to some degree. Those who are susceptible, have an increased likelihood of developing treatment resistant papilledema resulting in visual impairment and possible long-term vision loss. Such an acquired disability would have a profound mission impact and would be detrimental to the long term health of the astronaut. The visual impairment and increased intracranial pressure phenomenon appears to have multiple contributing factors. Consequently, the working "physiological fault bush" with elevated intracranial pressure at its center, is divided into ocular effects, and CNS and other effects. Some of these variables have been documented and or measured through operational data gathering, while others are unknown, undocumented and or hypothetical. Both the complexity of the problem and the urgency to find a solution require that a unique, non-traditional research model be employed such as the Accelerated Research Collaboration(TM) (ARC) model that has been pioneered by the Myelin Repair Foundation. In the ARC model a single entity facilitates and manages all aspects of the basic, translational, and clinical research, providing expert oversight for both scientific and managerial efforts. The result is a comprehensive research plan executed by a multidisciplinary team and the elimination of stove-piped research. The ARC model emphasizes efficient and effective communication between management and investigators; and real-time sharing of scientific discoveries in an effort to solve complex problems.

Otto, Christian↗

Aerodynamic Characterization of a Modern Launch Vehicle

A modern launch vehicle is by necessity an extremely integrated design. The accurate characterization of its aerodynamic characteristics is essential to determine design loads, to design flight control laws, and to establish performance. The NASA Ares Aerodynamics Panel has been responsible for technical planning, execution, and vetting of the aerodynamic characterization of the Ares I vehicle. An aerodynamics team supporting the Panel consists of wind tunnel engineers, computational engineers, database engineers, and other analysts that address topics such as uncertainty quantification. The team resides at three NASA centers: Langley Research Center, Marshall Space Flight Center, and Ames Research Center. The Panel has developed strategies to synergistically combine both the wind tunnel efforts and the computational efforts with the goal of validating the computations. Selected examples highlight key flow physics and, where possible, the fidelity of the comparisons between wind tunnel results and the computations. Lessons learned summarize what has been gleaned during the project and can be useful for other vehicle development projects.

Hall, Robert M.↗

Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans

The Solar Dynamics Observatory (SDO) was designed to understand the Sun and the Sun s influence on Earth. SDO was launched on February 11, 2010 carrying three scientific instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). Both AIA and HMI are sensitive to high frequency pointing perturbations and have sub-arcsecond level line-of-sight (LOS) jitter requirements. Extensive modeling and analysis efforts were directed in estimating the amount of jitter disturbing the science instruments. To verify the disturbance models and to validate the jitter performance prior to launch, many jitter-critical components and subassemblies were tested either by the mechanism vendors or at the NASA Goddard Space Flight Center (GSFC). Although detailed analysis and assembly level tests were performed to obtain good jitter predictions, there were still several sources of uncertainties in the system. The structural finite element model did not have all the modes correlated to test data at high frequencies (greater than 50 Hz). The performance of the instrument stabilization system was not known exactly but was expected to be close to the analytical model. A true disturbance-to-LOS observatory level test was not available due to the tight schedule of the flight spacecraft, the cost in time and manpower, difficulties in creating gravity negation systems, and risks of damaging flight hardware. To protect the observatory jitter performance against model uncertainties, the SDO jitter team devised several on-orbit jitter reduction plans in addition to reserve margins on analysis results. Since some of these plans severely restricted the capabilities of several spacecraft components (e.g. wheels and High Gain Antennas), the SDO team performed on-orbit jitter tests to determine which jitter reduction plans, if any, were necessary to satisfy science LOS jitter requirements. The SDO on-orbit jitter tests were designed to satisfy the following four objectives: 1. Determine the acceptable reaction wheel operational speed range during Science Mode. 2. Determine HGA algorithm jitter parameters (number of stagger steps and enable/disable no-steprequests). 3. Determine acceptable EVE instrument filter wheels spin rates. 4. Determine if AIA instrument filter wheels excite the first AIA telescope structural mode. This paper provides detailed information on the SDO wheel jitter test plan, shows on-orbit jitter measurements and how ground predictions compare to those measurements, and describes the final jitter mitigation plan executed on SDO.

Liu, Kuo-Chia (Alice)↗