Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Entry descent”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Entry, Descent, and Landing Technology Concept Trade Study for Increasing Payload Mass to the Surface of Mars

A trade study was conducted that compared various entry, descent, and landing technologies and concepts for placing an 1,800 kg payload on the surface of Mars. The purpose of this trade study was to provide data, and make recommendations, that could be used in making decisions regarding which new technologies and concepts should be pursued. Five concepts were investigated, each using a different combination of new technologies: 1) a Baseline concept using the least new technologies, 2) Aerocapture and Entry from Orbit, 3) Inflatable Aeroshell, 4) Mid L/D Aeroshell-A (high ballistic coefficient), and 5) Mid L/D Aeroshell-B (low ballistic coefficient). All concepts were optimized to minimize entry mass subject to a common set of key requirements. These key requirements were: A) landing a payload mass of 1,800 kg, B) landing at an altitude 2.5 km above the MOLA areoid, C) landing with a descent rate of 2.5 m/s, and D) using a single launch vehicle available within the NASA Expendable Launch Vehicle Contract without resorting to in-space assembly. Additional constraints were implemented, some common to all concepts and others specific to the new technologies used. Among the findings of this study are the following observations. Concepts using blunt-body aeroshells (1, 2, and 3 above) had entry masses between 4,028 kg and 4,123 kg. Concepts using mid L/D aeroshells (4 and 5 above) were significantly heavier with entry masses of 5,292 kg (concept 4) and 4,812 kg (concept 5). This increased weight was mainly due to the aeroshell. Based on a comparison of the concepts it was recommended that: 1) re-qualified and/or improved TPS materials be developed, 2) large subsonic parachutes be qualified. Aerocapture was identified as a promising concept, but system issues beyond the scope of this study need to be investigated. Inflatable aeroshells were identified as a promising new technology, but they require additional technology maturation work. For the class of missions investigated in this trade study, mid L/D aeroshells were not competitive on an entry mass basis as compared to blunt-body aeroshells.

Cruz, Juan R.↗

Entry, Descent, and Landing Operations Analysis for the Mars Phoenix Lander

The Mars Phoenix lander was launched August 4, 2007 and remained in cruise for ten months before landing in the northern plains of Mars in May 2008. The one-month Entry, Descent, and Landing (EDL) operations phase prior to entry consisted of daily analyses, meetings, and decisions necessary to determine if trajectory correction maneuvers and environmental parameter updates to the spacecraft were required. An overview of the Phoenix EDL trajectory simulation and analysis that was performed during the EDL approach and operations phase is described in detail. The evolution of the Monte Carlo statistics and footprint ellipse during the final approach phase is also provided. The EDL operations effort accurately delivered the Phoenix lander to the desired landing region on May 25, 2008.

Prince, Jill L.↗

Managing Complexity in the MSL/Curiosity Entry, Descent, and Landing Flight Software and Avionics Verification and Validation Campaign

The complexity of the Mars Science Laboratory (MSL) mission presented the Entry, Descent, and Landing systems engineering team with many challenges in its Verification and Validation (V&V) campaign. This paper describes some of the logistical hurdles related to managing a complex set of requirements, test venues, test objectives, and analysis products in the implementation of a specific portion of the overall V&V program to test the interaction of flight software with the MSL avionics suite. Application-specific solutions to these problems are presented herein, which can be generalized to other space missions and to similar formidable systems engineering problems.

Stehura, Aaron↗

A High-Heritage Blunt-Body Entry, Descent, and Landing Concept for Human Mars Exploration

Human-scale landers require the delivery of much heavier payloads to the surface of Mars than is possible with entry, descent, and landing (EDL) approaches used to date. A conceptual design was developed for a 10 m diameter crewed Mars lander with an entry mass of approx.75 t that could deliver approx.28 t of useful landed mass (ULM) to a zero Mars areoid, or lower, elevation. The EDL design centers upon use of a high ballistic coefficient blunt-body entry vehicle and throttled supersonic retro-propulsion (SRP). The design concept includes a 26 t Mars Ascent Vehicle (MAV) that could support a crew of 2 for approx.24 days, a crew of 3 for approx.16 days, or a crew of 4 for approx.12 days. The MAV concept is for a fully-fueled single-stage vehicle that utilizes a single pump-fed 250 kN engine using Mono-Methyl Hydrazine (MMH) and Mixed Oxides of Nitrogen (MON-25) propellants that would deliver the crew to a low Mars orbit (LMO) at the end of the surface mission. The MAV concept could potentially provide abort-to-orbit capability during much of the EDL profile in response to fault conditions and could accommodate return to orbit for cases where the MAV had no access to other Mars surface infrastructure. The design concept for the descent stage utilizes six 250 kN MMH/MON-25 engines that would have very high commonality with the MAV engine. Analysis indicates that the MAV would require approx.20 t of propellant (including residuals) and the descent stage would require approx.21 t of propellant. The addition of a 12 m diameter supersonic inflatable aerodynamic decelerator (SIAD), based on a proven flight design, was studied as an optional method to improve the ULM fraction, reducing the required descent propellant by approx.4 t.

Mars lander↗

A High-Heritage Blunt-Body Entry, Descent, and Landing Concept for Human Mars Exploration

Human-scale landers require the delivery of much heavier payloads to the surface of Mars than is possible with entry, descent, and landing (EDL) approaches used to date. A conceptual design was developed for a 10 m diameter crewed Mars lander with an entry mass of approx. 75 t that could deliver approx. 28 t of useful landed mass (ULM) to a zero Mars areoid, or lower, elevation. The EDL design centers upon use of a high ballistic coefficient blunt-body entry vehicle and throttled supersonic retro-propulsion (SRP). The design concept includes a 26 t Mars Ascent Vehicle (MAV) that could support a crew of 2 for approx. 24 days, a crew of 3 for approx.16 days, or a crew of 4 for approx.12 days. The MAV concept is for a fully-fueled single-stage vehicle that utilizes a single pump-fed 250 kN engine using Mono-Methyl Hydrazine (MMH) and Mixed Oxides of Nitrogen (MON-25) propellants that would deliver the crew to a low Mars orbit (LMO) at the end of the surface mission. The MAV concept could potentially provide abort-to-orbit capability during much of the EDL profile in response to fault conditions and could accommodate return to orbit for cases where the MAV had no access to other Mars surface infrastructure. The design concept for the descent stage utilizes six 250 kN MMH/MON-25 engines that would have very high commonality with the MAV engine. Analysis indicates that the MAV would require approx. 20 t of propellant (including residuals) and the descent stage would require approx. 21 t of propellant. The addition of a 12 m diameter supersonic inflatable aerodynamic decelerator (SIAD), based on a proven flight design, was studied as an optional method to improve the ULM fraction, reducing the required descent propellant by approx.4 t.

Mars lander↗

Post-flight Analysis of Atmospheric Properties from Mars 2020 Entry, Descent, and Landing

The Mars 2020 spacecraft landed the Perseverance rover and Ingenuity helicopter successfully in Jezero crater on Feb. 18, 2021. The entry, descent, and landing (EDL) sequence of the spacecraft largely leveraged the previous Mars Science Laboratory (MSL) mission. The atmospheric modeling approach for Mars 2020 was also borrowed from MSL, and consisted of utilizing two mesoscale atmospheric models of the landing site during the Martian season of landing, and using that data to create a statistical model of the pressure, density, temperature, and winds that Mars 2020 could have expected to encounter. Additionally, Mars 2020 contained an optical sensor - Landing Vision System (LVS) - that relied on taking pictures of the terrain, and was sensitive to the dust opacity of the atmosphere. This paper will briefly describe the pre-flight atmospheric models used for Mars 2020, but will focus on post-flight assessment of these models by comparing them to near-landing day orbiter sounder data and onboard atmospheric measurements. Suggestions for potential model changes will be also discussed.

Soumyo Dutta↗

Post-flight Analysis of Atmospheric Properties from Mars 2020 Entry, Descent, and Landing

The Mars 2020 spacecraft landed the Perseverance rover and Ingenuity helicopter successfully in Jezero crater on Feb. 18, 2021. The entry, descent, and landing (EDL) sequence of the spacecraft largely leveraged the previous Mars Science Laboratory (MSL) mission. The atmospheric modeling approach for Mars 2020 was also borrowed from MSL, and consisted of utilizing two mesoscale atmospheric models of the landing site during the Martian season of landing, and using that data to create a statistical model of the pressure, density, temperature, and winds that Mars 2020 could have expected to encounter. Additionally, Mars 2020 contained an optical sensor - Landing Vision System (LVS) - that relied on taking pictures of the terrain, and was sensitive to the dust opacity of the atmosphere. This paper will briefly describe the pre-flight atmospheric models used for Mars 2020, but will focus on post-flight assessment of these models by comparing them to near-landing day orbiter sounder data and onboard atmospheric measurements. Suggestions for potential model changes will be also discussed.

Soumyo Dutta↗

Post-flight Analysis of Atmospheric Properties from Mars 2020 Entry, Descent, and Landing

The Mars 2020 spacecraft landed the Perseverance rover and Ingenuity helicopter successfully in Jezero crater on Feb. 18, 2021. The entry, descent, and landing (EDL) sequence of the spacecraft largely leveraged the previous 2012 Mars Science Laboratory (MSL) mission. The atmospheric modeling approach for Mars 2020 was also borrowed from MSL. It consisted of two mesoscale atmospheric models of the target site during the Martian season of landing, and a statistical model of the pressure, density, temperature, and winds based on the mesoscale model data. This paper briefly describes the pre-flight atmospheric models used for Mars 2020, but focuses on the post-flight assessment of these models and comparison to near-landing day orbiter sounder and other onboard atmospheric measurements. Observations from post-flight analysis showed that density was under-predicted in the upper atmosphere, but within the altitudes covered by the mesoscale models, the pre-flight modeling matched post-flight results, including for quantities like wind velocities. Potential improvements to address the upper atmosphere and other deficiencies of the Mars 2020 pre-flight model are also discussed.

Villar, Gregorio↗

Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis: Appendices - Volume 2

The NASA Engineering and Safety Center (NESC) was requested to establish the Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis assessment, which involved development of an enhanced simulation architecture using the Program to Optimize Simulated Trajectories II (POST2) simulation tool. The assessment was requested to enhance the capability of the Agency to provide rapid evaluation of EDL characteristics in systems analysis studies, preliminary design, mission development and execution, and time-critical assessments. Many of the new simulation framework capabilities were developed to support the Agency EDL Systems Analysis (EDL-SA) team, that is conducting studies of the technologies and architectures that are required to enable higher mass robotic and human mission to Mars. The appendices to the original report are contained in this document.

Murri, Daniel G.↗

Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis, Phase 2 Results

The NASA Engineering and Safety Center (NESC) was requested to establish the Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis assessment, which involved development of an enhanced simulation architecture using the Program to Optimize Simulated Trajectories II simulation tool. The assessment was requested to enhance the capability of the Agency to provide rapid evaluation of EDL characteristics in systems analysis studies, preliminary design, mission development and execution, and time-critical assessments. Many of the new simulation framework capabilities were developed to support the Agency EDL-Systems Analysis (SA) team that is conducting studies of the technologies and architectures that are required to enable human and higher mass robotic missions to Mars. The findings, observations, and recommendations from the NESC are provided in this report.

Murri, Daniel G.↗

Entry, Descent, and Landing Aerothermodynamics: NASA Langley Experimental Capabilities and Contributions

A review is presented of recent research, development, testing and evaluation activities related to entry, descent and landing that have been conducted at the NASA Langley Research Center. An overview of the test facilities, model development and fabrication capabilities, and instrumentation and measurement techniques employed in this work is provided. Contributions to hypersonic/supersonic flight and planetary exploration programs are detailed, as are fundamental research and development activities.

Hollis, Brian R.↗

Analysis of Mars 2020 Perseverance Entry, Descent, and Landing Attitude Initialization Performance

The Mars 2020 Perseverance rover successfully landed at Jezero Crater on February 18, 2021. To perform this feat, the entry, descent, and landing navigation filter must be initialized with an estimate of the spacecraft state, which includes attitude from the cruise attitude control subsystem. Accuracy of this initial attitude estimate has an impact on important metrics such as touchdown velocity. This paper presents a post-landing reconstruction of the attitude initialization error budget, showing that the requirement of 0.15 deg ($3\sigma$, per axis) was met. Each error source is described and analyzed, including flight telemetry where possible. Analysis of the error budget shows that it is driven by systematic sun sensor errors, star-scanner-to-sun-sensor alignment stability, and inertial-measurement-unit-to-sun-sensor alignment stability. Finally, a contingency plan to initialize the navigation filter in the event of a star scanner failure is presented. While this plan was not needed in flight, results indicate that the attitude initialization requirement could have still been met in this off-nominal scenario.

Lo, Kevin D.↗

A Rigid Mid-Lift-to-Drag Ratio Approach to Human Mars Entry, Descent, and Landing

Current NASA Human Mars architectures require delivery of approximately 20 metric tons of cargo to the surface in a single landing. A proposed vehicle type for performing the entry, descent, and landing at Mars associated with this architecture is a rigid, enclosed, elongated lifting body shape that provides a higher lift-to-drag ratio (L/D) than a typical entry capsule, but lower than a typical winged entry vehicle (such as the Space Shuttle Orbiter). A rigid Mid-L/D shape has advantages for large mass Mars EDL, including loads management, range capability during entry, and human spaceflight heritage. Previous large mass Mars studies have focused more on symmetric and/or circular cross-section Mid-L/D shapes such as the ellipsled. More recent work has shown performance advantages for non-circular cross section shapes. This paper will describe efforts to design a rigid Mid-L/D entry vehicle for Mars which shows mass and performance improvements over previous Mid-L/D studies. The proposed concept, work to date and evolution, forward path, and suggested future strategy are described.

Cerimele, Christopher J.↗

The Mars Exploration Rovers Entry Descent and Landing and the Use of Aerodynamic Decelerators

The Mars Exploration Rovers (MER) project, the next United States mission to the surface of Mars, uses aerodynamic decelerators in during its entry, descent and landing (EDL) phase. These two identical missions (MER-A and MER-B), which deliver NASA s largest mobile science suite to date to the surface of Mars, employ hypersonic entry with an ablative energy dissipating aeroshell, a supersonic/subsonic disk-gap-band parachute and an airbag landing system within EDL. This paper gives an overview of the MER EDL system and speaks to some of the challenges faced by the various aerodynamic decelerators.

Steltzner, Adam↗

Multidisciplinary Tool for Systems Analysis of Planetary Entry, Descent, and Landing

Systems analysis of a planetary entry (SAPE), descent, and landing (EDL) is a multidisciplinary activity in nature. SAPE improves the performance of the systems analysis team by automating and streamlining the process, and this improvement can reduce the errors that stem from manual data transfer among discipline experts. SAPE is a multidisciplinary tool for systems analysis of planetary EDL for Venus, Earth, Mars, Jupiter, Saturn, Uranus, Neptune, and Titan. It performs EDL systems analysis for any planet, operates cross-platform (i.e., Windows, Mac, and Linux operating systems), uses existing software components and open-source software to avoid software licensing issues, performs low-fidelity systems analysis in one hour on a computer that is comparable to an average laptop, and keeps discipline experts in the analysis loop. SAPE uses Python, a platform-independent, open-source language, for integration and for the user interface. Development has relied heavily on the object-oriented programming capabilities that are available in Python. Modules are provided to interface with commercial and government off-the-shelf software components (e.g., thermal protection systems and finite-element analysis). SAPE currently includes the following analysis modules: geometry, trajectory, aerodynamics, aerothermal, thermal protection system, and interface for structural sizing.

Samareh, Jamshid A.↗

Mars 2020 Entry, Descent, and Landing as Observed by Radio Science Techniques at UHF and X-band Frequencies

On February 18, 2021, NASA’s Mars 2020 Rover “Perseverance” conducted the Entry, Descent, and Landing (EDL) sequence to land safely on the surface of Mars at Jezero Crater. Due to the criticality of the EDL sequence, redundant telecommunications strategies were utilized to observe the event. The rover transmitted an X-band (8.4 GHz) signal encoded with Multiple Frequency Shift Keying tones direct-to-Earth and a UHF (401.5 MHz) signal with 8 kbps encoded telemetry to orbiters, which relayed the signal back to Earth at X-band. NASA’s Deep Space Network complexes at Goldstone, California and Madrid, Spain received the direct-to-Earth X-band signal. Two of the largest steerable radio telescopes in the world, the 100-meter Green Bank Telescope in West Virginia and the Effelsberg 100-meter Radio Telescope in Germany also received the UHF carrier signal on Earth. During the EDL event, full spectrum recordings of the UHF and X-band signals were captured at these observatories using open-loop receivers. Real-time and post-processing signal analysis to determine power level, received frequency, and Doppler shift allowed determination of the spacecraft’s health and safety state during critical sequences, including event detection such as atmospheric entry, plasma blackouts, and parachute deployment. Simultaneous observations of the UHF and X-band radio links allow for redundancy in the event of a fault and greatly improve confidence in Doppler event detection.

Gladden, Roy↗

Entry, Descent, and Landing Communications for the Mars 2020 Lander Mission

The Mars 2020 mission was launched on July 30, 2020 and successfully landed in Jezero Crater on February 18, 2021. The challenging Entry, Descent, and Landing (EDL) sequence was observed by ground stations on Earth and by orbiters at Mars. This paper discusses the design of the launch and arrival period to ensure maximum Earth visibility, the details of phasing the orbiting assets, and the development of the entry relay targets needed to ensure robust spacecraft telecommunications during EDL.

Abilleira, Fernando↗

Mars 2020 Entry, Descent, and Landing Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. In addition to performing the critical function of landing the rover on the Martian surface, the EDL timeline behavior must co-exist in a non-partitioned software and system environment with other high-level functions that accomplish the goals for the rest of the mission. Due to the criticality of EDL, the potential for loss of mission, and a need for complete system autonomy, the standard for how the EDL Timeline interacts with other functions in the system is highly constrained. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗