Radioactive contamination from 1920-50's at an urban site of the New York City and interim remedial action - 15630
The former Wolff-Alport Chemical Company operated at the location in densely populated urban area in Queens, New York, between 1920 to about 1954. The company imported, stored on-site and processed monazite sand ores from the Belgium Congo. The extracted refined products enriched in rare-earth metals were sold on the commercial market. The process residues, rich in thorium and its progeny, were originally disposed of directly to the city sewer line and probably on-site also. The site's buildings are currently occupied by the auto shops, corner delicatessen store, light construction company, ice maker/distributor, and two residential apartments. Preliminary site investigations found multiple areas with elevated levels of direct gamma radiation with the maximum reported rates of 22 micro-sievert/hour (2.2 milli-rem/hour) at surface level and 40 micro-sievert/hour (4 milli-rem/hour) inside sewer manhole access. The thoron (Rn-220) gas air concentration in outdoor areas was reported reaching 13.5 kBq/m{sup 3} (366 pCi/L) and the radon (Rn-222) gas air concentrations was reported exceeding 148 Bq/ m{sup 3} (4 pCi/L) in some buildings. The dose assessments indicated that, under realistic scenarios, some members of the public were likely to receive the radiation exposure from this contamination in excess of the New York City and Nuclear Regulatory Commission general public radiation dose limit of 1 milli-sievert /yr (100 milli-rem/yr). The interim remedial action was planned and conducted by the U.S. Environmental Protection Agency (U.S. EPA) Region 2 in close cooperation with the New York City and New York State in 2012-13. The purpose of the action was to take necessary interim measures to reduce annual public dose below limit of 1 milli-sievert/yr (100 milli-rem/yr) and reduce radon gas concentration levels in impacted indoor spaces below U.S. EPA Action Level for residencies of 148 Bq/ m{sup 3} (4 pCi/L). In order to achieve these goals, the following actions were taken: detailed radiological and occupancy surveys; development of realistic exposure scenarios; dose assessments; installation of the fence and gates around the 'backyard' portion of the site; vegetation removal; development and detailed assessment of the radiation shielding options; application of the multilayer radiation shielding in some buildings, portions of the sidewalk and unpaved areas; mitigation of radon/thoron gas entry point; and installation of the radon mitigation system in one of the buildings. The preliminary post-action analyses indicated that the action goal would likely be achieved. The interim remedial action was conducted in a tight urban setting; it has significantly reduced public health risk from radiation without closure of businesses that continued operating within the site perimeter. (authors)