Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Entry Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Radioactive contamination from 1920-50's at an urban site of the New York City and interim remedial action - 15630

The former Wolff-Alport Chemical Company operated at the location in densely populated urban area in Queens, New York, between 1920 to about 1954. The company imported, stored on-site and processed monazite sand ores from the Belgium Congo. The extracted refined products enriched in rare-earth metals were sold on the commercial market. The process residues, rich in thorium and its progeny, were originally disposed of directly to the city sewer line and probably on-site also. The site's buildings are currently occupied by the auto shops, corner delicatessen store, light construction company, ice maker/distributor, and two residential apartments. Preliminary site investigations found multiple areas with elevated levels of direct gamma radiation with the maximum reported rates of 22 micro-sievert/hour (2.2 milli-rem/hour) at surface level and 40 micro-sievert/hour (4 milli-rem/hour) inside sewer manhole access. The thoron (Rn-220) gas air concentration in outdoor areas was reported reaching 13.5 kBq/m{sup 3} (366 pCi/L) and the radon (Rn-222) gas air concentrations was reported exceeding 148 Bq/ m{sup 3} (4 pCi/L) in some buildings. The dose assessments indicated that, under realistic scenarios, some members of the public were likely to receive the radiation exposure from this contamination in excess of the New York City and Nuclear Regulatory Commission general public radiation dose limit of 1 milli-sievert /yr (100 milli-rem/yr). The interim remedial action was planned and conducted by the U.S. Environmental Protection Agency (U.S. EPA) Region 2 in close cooperation with the New York City and New York State in 2012-13. The purpose of the action was to take necessary interim measures to reduce annual public dose below limit of 1 milli-sievert/yr (100 milli-rem/yr) and reduce radon gas concentration levels in impacted indoor spaces below U.S. EPA Action Level for residencies of 148 Bq/ m{sup 3} (4 pCi/L). In order to achieve these goals, the following actions were taken: detailed radiological and occupancy surveys; development of realistic exposure scenarios; dose assessments; installation of the fence and gates around the 'backyard' portion of the site; vegetation removal; development and detailed assessment of the radiation shielding options; application of the multilayer radiation shielding in some buildings, portions of the sidewalk and unpaved areas; mitigation of radon/thoron gas entry point; and installation of the radon mitigation system in one of the buildings. The preliminary post-action analyses indicated that the action goal would likely be achieved. The interim remedial action was conducted in a tight urban setting; it has significantly reduced public health risk from radiation without closure of businesses that continued operating within the site perimeter. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Video Camera Improvements to Support Hanford Tank Farms - 17141

Hanford Tank Farms consist of 177 underground storage tanks that contain 56 million gallons of radioactive waste. The current mission is to safely manage this waste in preparation to feed the Waste Treatment Plant. Fulfilling this mission includes inspecting each tank regularly to ensure tank integrity and support ongoing operations such as transferring waste from older single-shell tanks to the newer double-shell tanks. Video cameras derived from commercially available equipment have provided the ability to remotely see inside the tanks, reducing some of the challenges of fulfilling this mission. However, there are many challenges and limitations with the currently used video systems. Among some of the challenges are limited tank interior entry points for camera deployment, high radiation dose rates, limited equipment longevity in the environmental conditions, need for high resolution image quality, low light conditions, and in-tank obstructions. Washington River Protection Solutions (WRPS) has identified and tested new video systems that will effectively manage these challenges and increase capability, efficiency, and improve safety. The new camera systems are planned for deployment to support the next Single Shell Tank Retrieval Project in the A/AX tank Farm complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗

MCNP5 Criticality Validation and Bias for Intermediate Enriched Uranium Systems

The purpose of this analysis is to validate the Monte Carlo N-Particle 5 (MCNP5) code Version 1.40 (LA-UR-03-1987, 2005) and its cross-section database for k-code calculations of intermediate enriched uranium systems on INTEL ® processor based PC's running any version of the WINDOWS operating system. Configurations with intermediate enriched uranium were modeled with the moderator range of 39≤HlFissile≤1438. See Table 2-1 for brief descriptions of selected cases and Table 3-1 for the range of applicability for this validation. A total of 167 input cases were evaluated including bare and reflected systems in a single body or arrays. The 167 cases were taken directly from the previous (Version 4C [Lan 2005]) validation database. Section 2.0 list data used to calculate k-effective (k eff ) for the 167 experimental criticality benchmark cases using the MCNP5 code v1.40 and its cross-section database. Appendix B lists the MCNP cross-section database entries validated for use in evaluating the intermediate enriched uranium systems for criticality safety. The dimensions and atom densities for the intermediate enriched uranium experiments were taken from NEA/NSC/DOC(95)03, September 2005, which will be referred to as the benchmark handbook throughout the report. For these input values, the experimental benchmark k eff is approximately 1.0. The MCNP validation computer runs ran to an accuracy of approximately ±0.001. For the cases where the reported benchmark k eff was not equal to 1.0000 the MCNP calculational results were normalized. The difference between the MCNP validation computer runs and the experimentally measured k eff is the MCNP5 v1.40 bias. The USLSTATS code (ORNL 1998) was utilized to perform the statistical analysis and generate an acceptable maximum k eff limit for calculations of the intermediate enriched uranium type systems.

42 ENGINEERING↗

FPGA Design Practices for I&C in Nuclear Power Plants

Safe FPGA design practices can be classified into three major groups covering board-level and FPGA logic-level design practices, FPGA design entry methods, and FPGA design methodology. This paper is presenting the most common hardware and software design practices that are acceptable in safety-critical FPGA systems. It also proposes an FPGA-specific design life cycle including design entry, FPGA synthesis, place and route, and validation and verification.

Bobrek, Miljko↗

Solar Ready Vets Curriculum Design

The 5-week SRV program includes four sets of program learning goals aligned around (1) the NABCEP Entry Level body of knowledge; (2) gaining hands-on experience with solar system site analysis, design, installation, commissioning, operation, maintenance and financial considerations; (3) Safety issues unique to solar + OSHA 30; (4) Transition planning and individual support of entry into the solar industry. These goals, and the learning objectives associate with each, are pursued in parallel during the course.

14 SOLAR ENERGY↗

Scripting in Radiation Therapy: An Automatic 3D Beam-Naming System

Scripts can be executed within the radiation treatment planning software framework to reduce human error, increase treatment planning efficiency, reduce confusion, and promote consistency within an institution or even among institutions. Scripting is versatile, and one application is an automatic 3D beam-naming system that describes the position of the beam relative to the patient in 3D space. The naming system meets the need for nomenclature that is conducive for clear and accurate communication of beam entry relative to patient anatomy. In radiation oncology in particular, where miscommunication can cause significant harm to patients, a system that minimizes error is essential. Frequent sharing of radiation treatment information occurs not only among members within a department but also between different treatment centers. Descriptions of treatment beams are perhaps the most commonly shared information about a patient's course of treatment in radiation oncology. Automating the naming system by the use of a script reduces the potential for human error, improves efficiency, enforces consistency, and would allow an institution to convert to a new naming system with greater ease. This script has been implemented in the Department of Radiation Oncology at the University of Washington Medical Center since December 2009. It is currently part of the dosimetry protocol and is accessible by medical dosimetrists, radiation oncologists, and medical physicists. This paper highlights the advantages of using an automatic 3D beam-naming script to flawlessly and quickly identify treatment beams with unique names. Scripting in radiation treatment planning software has many uses and great potential for improving clinical care.

61 RADIATION PROTECTION AND DOSIMETRY↗

Opening Up Transactive Systems: Introducing TESS and Specification in a Field Deployment

Transactive energy systems (TS) use automated device bidding to access (residential) demand flexibility and coordinate supply and demand on the distribution system level through market processes. In this work, we present TESS, a modularized platform for the implementation of TS, which enables the deployment of adjusted market mechanisms, economic bidding, and the potential entry of third parties. TESS thereby opens up current integrated closed-system TS, allows for the better adaptation of TS to power systems with high shares of renewable energies, and lays the foundations for a smart grid with a variety of stakeholders. Furthermore, despite positive experiences in various pilot projects, one hurdle in introducing TS is their integration with existing tariff structures and (legal) requirements. In this paper, we therefore describe TESS as we have modified it for a field implementation within the service territory of Holy Cross Energy in Colorado. Importantly, our specification addresses challenges of implementing TS in existing electric retail systems, for instance, the design of bidding strategies when a (non-transactive) tariff system is already in place. We conclude with a general discussion of the challenges associated with “brownfield” implementation of TS, such as incentive problems of baseline approaches or long-term efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Large Detector Laboratory for the Development and Testing of Radiation Detection Systems

Thousands of radiation detection systems have been deployed over the last decade to domestic and international locations, primarily at ports of entry or departure. An essential ingredient in supporting sensor deployment is the capability to develop and test emerging systems and replicate the behavior of deployed systems. Pacific Northwest National Laboratory recently designed and constructed a laboratory for developing and testing these large-scale radiation detection systems. The Large Detector Laboratory is capable of housing up to 30 fully integrated radiation portal monitoring systems and allows for complex testing scenarios that include background suppression, equipment shielding, and source cross talk between systems. The laboratory design also allows implementation of applications ranging from pedestrian screening to baggage or package inspection to vehicle and cargo inspection to standoff detection. This manuscript describes the unique attributes of this laboratory that includes reproducing operational conditions faced by integrated systems, realistic source configurations and measurements across multiple systems.

laboratory↗

Underground coal operators install several new longwall mining systems

Several new names appear in the annual US Longwall Census, but the population remains the same: 52 although the number of longwall mines dropped from 40 to 47. CONSOL Energy remains the leader with 12 faces. Robert E. Murray owns 8 longwall mines followed by Arch Coal with 5 and Foundation Coal with 3. West Virginia has 13 longwalls followed by 9 in Pennsylvania, 7 in Utah and 6 in Alabama. The article describes CONSOL Energy's operations. A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries, depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Open Power System Datasets and Open Simulation Engines: A Survey Toward Machine Learning Applications

A major factor behind the success of machine learning (ML) models in multiple domains is the availability and accessibility of large, labeled, and well-organized datasets for training and benchmarking. In comparison, power grid datasets face three major challenges: (i) real-world data is often restricted by regulatory constraints, privacy reasons, or security concerns, making it difficult to obtain and work with; (ii) synthetic datasets, which are created to address these limitations, often have incomplete information and are released using specialized tools, making them inaccessible to the broader community; and, (iii) input-output datasets are difficult to generate through simulation for non-experts because open-source simulators are not known outside the power system community. This survey addresses these challenges by serving as an entry point to publicly available datasets and simulators for researchers venturing in this area. We review the current landscape of open-source power network data, machine models, consumer demand profiles, renewable generation data, and inverter models. We also examine open-source power system simulators, which are crucial for generating high-quality, high-fidelity power grid datasets. We aim to provide a foundation for overcoming data scarcity and advance towards a structured web of datasets and simulators to support the development of ML for power systems.

42 ENGINEERING↗

Two inhibitory systems and CKIs regulate cell cycle exit of mammalian cardiomyocytes after birth

Mammalian cardiomyocytes actively proliferate during embryonic stages, following which they exit their cell cycle after birth, and the exit is maintained. Previously, we showed that two inhibitory systems (the G1-phase inhibitory system: repression of cyclin D1 expression; the M-phase inhibitory system: inhibition of CDK1 activation) maintain the cell cycle exit of mouse adult cardiomyocytes. We also showed that two CDK inhibitors (CKIs), p21{sup Cip1} and p27{sup Kip1}, regulate the cell cycle exit in a portion of postnatal cardiomyocytes. It remains unknown whether the two inhibitory systems are involved in the cell cycle exit of postnatal cardiomyocytes and whether p21{sup Cip1} and p27{sup Kip1} also inhibit entry to M-phase. Here, we showed that more than 40% of cardiomyocytes entered an additional cell cycle by induction of cyclin D1 expression at postnatal stages, but M-phase entry was inhibited in the majority of cardiomyocytes. Marked cell cycle progression and endoreplication were observed in cardiomyocytes of p21{sup Cip1} knockout mice at 4 weeks of age. In addition, tri- and tetranucleated cardiomyocytes increased significantly in p21{sup Cip1} knockout mice. These data showed that the G1-phase inhibitory system and two CKIs (p21{sup Cip1} and p27{sup Kip1}) inhibit entry to an additional cell cycle in postnatal cardiomyocytes, and that the M-phase inhibitory system and p21{sup Cip1} inhibit M-phase entry of cardiomyocytes which have entered the additional cell cycle. - Highlights: • Many postnatal cardiomyocytes entered an additional cell cycle by cyclin D1 induction. • The majority of cardiomyocytes could not enter M-phase after cyclin D1 induction. • Cell cycle progressed markedly in p21{sup Cip1} knockout mice after postnatal day 14. • Tri- and tetranucleated cardiomyocytes increased in p21{sup Cip1} knockout mice.

60 APPLIED LIFE SCIENCES↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Inclusion of Scatter in HADES: Final Report

Covert nuclear attack is one of the foremost threats facing the United States and is a primary focus of the War on Terror. The Domestic Nuclear Detection Office (DNDO), within the Department of Homeland Security (DHS), is chartered to develop, and improve domestic systems to detect and interdict smuggling for the illicit use of a nuclear explosive device, fissile material or radiologica1 material. The CAARS (Cargo Advanced Automated Radiography System) program is a major part of the DHS effort to enhance US security by harnessing cutting-edge technologies to detect radiological and nuclear threats at points of entry to the United States. DNDO has selected vendors to develop complete radiographic systems. It is crucial that the initial design and testing concepts for the systems be validated and compared prior to the substantial efforts to build and deploy prototypes and subsequent large-scale production. An important aspect of these systems is the scatter which interferes with imaging. Monte Carlo codes, such as MCNP (X-5 Monte Carlo Team, 2005 Revision) allow scatter to be calculatied, but these calculations are very time consuming. It would be useful to have a fast scatter estimation algorithm in a fast ray tracing code. We have been extending the HADES ray-tracing radiographic simulation code to model vendor systems in a flexible and quick fashion and to use this tool to study a variety of questions involving system performance and the comparative value of surrogates. To enable this work, HADES has been linked to the BRL-CAD library (BRL-CAD Open Source Project, 2010), in order to enable the inclusion of complex CAD geometries in simulations, scanner geometries have been implemented in HADES, and the novel detector responses have been included in HADES. A major extension of HADES which has been required by this effort is the inclusion of scatter in these radiographic simulations. Ray tracing codes generally do not easily allow the inclusion of scatter, because these codes define a source and a grid of detector pixels and only compute the attenuation along rays between these points. Scatter is an extremely complex set of processes which can involve rays which change directions many times between the source and detector. Scatter from outside the field of view of the imaging system, as well as within the field of view, can have an important role in image formation. In this report, we will describe how we implemented a treatment of scatter in HADES. We begin with a discussion of how we define scatter in Section 2, followed by a description of how single Compton scatter is now included in HADES in Section 3. In Section 4 we report a set of verification tests against MCNP and tests of how the technique scales with image size, number of scatters allowed and number of processors used in the calculations. In Section 5, we describe how we plan to extend this approach to other forms of scatter and conclude in Section 6. It should be emphasized that the purpose of this report is to show that a form of scatter has been implemented in HADES and has been verified against MCNP. Validation, the process of comparing simulation and experiment, is a future task.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Comparison of CO 2 trapping in highly heterogeneous reservoirs with Brooks-Corey and van Genuchten type capillary pressure curves

Geological heterogeneities affect the dynamics of carbon dioxide (CO 2 ) plumes in subsurface environments in important ways. Previously, we showed how the dynamics of CO 2 plumes are influenced by the multiscaled sedimentary architecture in deep brine fluvial-type reservoirs. The results confirm that representing small-scale features and the corresponding heterogeneity in saturation functions, along with hysteresis in saturation functions, are all critical to understanding capillary trapping processes. Here, we show that when heterogeneity and hysteresis are represented, the two conventional approaches for defining saturation functions, Brooks-Corey and van Genuchten, represent fundamentally different physical systems. The Brooks-Corey approach represents heterogeneity in entry pressures, and leads to trapping by capillary pinning. The van Genuchten approach represents a network of pores transporting the nonwetting fluid, across rock types, with negligible capillary entry pressure, and leads to capillary retardation. We conclude these differences significantly affect the large-scale characteristics of CO 2 plumes (i.e., their mass, shape, and position).

58 GEOSCIENCES↗

Benford’s law and continuous dependent random variables

Many mathematical, man-made and natural systems exhibit a leading-digit bias, where a first digit (base 10) of 1 occurs not 11% of the time, as one would expect if all digits were equally likely, but rather 30%. This phenomenon is known as Benford’s Law. Analyzing which datasets adhere to Benford’s Law and how quickly Benford behavior sets in are the two most important problems in the field. Most previous work studied systems of independent random variables, and relied on the independence in their analyses. Inspired by natural processes such as particle decay, we study the dependent random variables that emerge from models of decomposition of conserved quantities. We prove that in many instances the distribution of lengths of the resulting pieces converges to Benford behavior as the number of divisions grow, and give several conjectures for other fragmentation processes. The main difficulty is that the resulting random variables are dependent. We handle this by using tools from Fourier analysis and irrationality exponents to obtain quantified convergence rates as well as introducing and developing techniques to measure and control the dependencies. The construction of these tools is one of the major motivations of this work, as our approach can be applied to many other dependent systems. As an example, we show that the n! entries in the determinant expansions of n×n matrices with entries independently drawn from nice random variables converges to Benford’s Law.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

An affordable platform for automated synthesis and electrochemical characterization

In recent years, self-driving laboratories (SDLs) have emerged as a powerful tool to expedite various areas of chemical research. For optimal functionality, these laboratories must be adaptable, readily modifying configurations to meet researchers' specific needs. Despite these advances, much of chemistry still depends on proprietary equipment from specialized vendors, which can be restrictive and difficult to customize for diverse lab setups. Moreover, ensuring reproducibility requires full disclosure of equipment details. In this work, we introduce an automated system featuring a cost-effective, self-designed potentiostat and a straightforward synthesis platform. We provide complete transparency by disclosing the electronic schematics of the potentiostat and the software used in the system. Our aim is to reduce the barriers to entry for SDLs and promote the principles of open science.

Pablo-García, Sergio↗

LBNF/DUNE Liquid Argon Roadmap

The Deep Underground Neutrino Experiment (DUNE) is an international flagship venture to unlock the mysteries of neutrinos. Hosted at the Sanford Underground Research Facility (SURF) and supported by the Long-Baseline Neutrino Facility (LBNF), DUNE relies on nearly 75,000 tonnes of ultrapure liquid argon (LAr) housed in state-of-the-art cryostats. Transporting such vast quantities of LAr to its destination a mile underground in Lead, SD, is a logistical and engineering challenge. The process begins with securing large quantities of liquid argon from suppliers located far from the site, with major sources situated near Houston, TX and Chicago, IL. The receiving facility, located atop a mountain with steep, often snow-covered access roads, provides limited maneuverability for trucks and can only handle two deliveries simultaneously. The facility serves as an entry point for argon to the greater LBNF cryogenic system. It is furnished with truck unloading stations, limited buffer storage of some 280 tonnes capacity, and vaporizers. The last are crucial for converting liquid argon into gas for transfer down the Ross Shaft, eliminating the need for cryogens in the vertical pipeline. These constraints, along with other operational factors, cap the delivery rate at 70 tonnes per day. Once underground, the argon is purified and recondensed before filling the cryostats. This roadmap outlines the integrated supply chain and cryogenic systems that enable the delivery of LAr to support DUNE’s groundbreaking physics research.

Maciazka, Matt [Fermilab]↗