Economic impact of yield and composition variation in bioenergy crops: Populus trichocarpa
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Commercial nuclear power plants typically use nuclear fuel that is enriched to less than five weight percent in the isotope 235 U. However, recently several vendors have proposed new nuclear power plant designs that would use fuel with 235 U enrichments between five weight percent and 19.75 weight percent. Nuclear fuel with this level of 235 U enrichment is known as “high assay low-enriched uranium.” Once it has been irradiated in a nuclear reactor and becomes used (or spent) nuclear fuel, it will be stored, transported, and disposed of. However, irradiated high assay low-enriched uranium differs from typical irradiated nuclear fuel in several ways, and these differences may have economic effects on its storage, transport, and disposal, compared to typical irradiated nuclear fuel. This report describes those differences and qualitatively discusses their potential economic effects on storage, transport, and disposal.
Commercial nuclear power plants typically use nuclear fuel that is enriched up to five weight percent in the isotope 235 U. However, recently several vendors have proposed new nuclear power plant designs that would use fuel with 235 U enrichments between five weight percent and 19.75 weight percent. Nuclear fuel with this level of 235 U enrichment is known as “high assay low-enriched uranium.” Once it has been irradiated in a nuclear reactor and becomes used (or spent) nuclear fuel, it will be stored, transported, and disposed of. However, irradiated high assay low-enriched uranium fuel differs from typical irradiated nuclear fuel in several ways, and these differences may have economic effects on its storage, transport, and disposal, compared to typical irradiated nuclear fuel. A previous report described these differences qualitatively (Price et al., 2024); this report builds on the previous report and provides quantitative estimates of the potential economic effects on storage, transport, and disposal of high assay low-enriched uranium spent fuel.
The U.S. nuclear industry currently employs nearly 475,000 people in full-time jobs (direct and secondary). 100,000 of these are direct, career-length and skilled. According to the U.S. Bureau of Labor Statistics and the Nuclear Energy Institute, the nuclear electric power generation sector directly employs between 50,000 and 60,000 workers. Nuclear vendors and manufacturers add another 60,000 positions. Compensation is also high and in 2021, nuclear power reactor operators received a median annual pay of over $100,000. While operators are not required by Nuclear Regulatory Commission regulations to have a college degree, the average nuclear engineer with a bachelor’s degree earned over $120,000. The defining characteristics of a nuclear power plant make it an economic hub because of the broad range of work roles required during construction and normal operation. This ranges from jobs in the skilled trades like electricians and pipefitters, to scientists and engineers whose backgrounds are in multiple disciplines.
Wild pigs (Sus scrofa) cause damage to agricultural crops in their native range as well as in the portions of the globe where they have been introduced. In the US, states with the highest introduced wild pig populations are Alabama, Arkansas, California, Florida, Georgia, Louisiana, Mississippi, Missouri, North Carolina, South Carolina, and Texas. The present study summarizes the first survey-based effort to value the full extent of wild pig damage to producers of six crops in these eleven US states. The survey was distributed by the USDA National Agricultural Statistical Service in the summer of 2022 to a sample of 11,495 producers of corn (Zea mays), soybeans (Glycine max), wheat (Triticum spp.), rice (Oryza sativa), peanuts (Arachis hypogaea), and sorghum (Sorghum bicolor) in these 11 states. Our findings suggest that the economic burden of wild pigs on producers of these crops is substantial and not limited to the direct and most identifiable categories of crop damage (i.e., production value lost due to depredation, trampling and rooting). We estimate that the annual cost to producers of these six crops in the surveyed states in 2021 was almost USD 700 million.
Highlights System-wide sensitivity of bulk-format and round bale logistics responded to different degrees of expense inputs. Biomass size-reduction expenses for bulk-format were consistently less than round-bale chopping. Stack/reclaim operations with high-density-capacity equipment for bulk-format were the highest expenses. Clean-sheet design of stacker/reclaimer and self-compacting bulk trailer may significantly reduce expenses. Abstract . Deterministic cost analyses were conducted for a harvest, storage, preprocessing, and supply system providing 371,870 dry Mg (dMg) year-1 of milled switchgrass (SG) to a biorefinery from 21,929 ha of production fields within 72 km of the biorefinery. Varied input costs of diesel fuel, labor, and interest rate were input into a highly detailed cost analysis for bulk-format and baseline round bale logistics. These operational input factors, potentially reflecting an evolving economic climate or paradigm shift, were examined to provide insight into the cost to deliver preprocessed biomass feedstock for centralized commercial-scale conversions. Total annual costs per dry unit of SG were determined for all combinations of diesel fuel prices of $0.53 L-1, $0.92 L-1, and $1.32 L-1; total labor costs of $20.00 h-1, $28.85 h-1, and $40.00 h-1 singly and uniformly applied across all labor inputs; and three representative interest rates of 6%, 8%, and 12%. Increases in total cost most depended on increases in diesel fuel cost, followed by labor rate, and finally interest rate. Increases in fuel costs from $0.53 L-1 to $1.32 L-1 yielded a total cost increase of about $11.56 dMg-1 and $13.36 dMg-1 for bulk-format and round bale logistics, respectively, for all combinations of labor and interest rates. The overall increase in labor rate ($20.00 h-1 to $40.85 h-1) resulted in increased total costs of about $10.32 dMg-1 for bulk-format logistics and $9.94 dMg-1 for round bale logistics for all fuel and interest rates. The overall increase in interest rate (6% to 12%) resulted in increased total costs of about $6.72 dMg-1 for bulk-format logistics and $4.21 dMg-1 for round bale logistics for all fuel and labor rates. Increases in total costs for combined increases in fuel cost, labor rate, and interest rate were $28.60 dMg-1 and $27.48 dMg-1, yielding maximum total costs of $87.87 dMg-1 and $86.53 dMg-1 for bulk-format and round bale logistics, respectively. Costs were determined for existing equipment systems, including novel use of waste compaction and ejector semi-trailers. The highest potential for cost reductions may require clean-sheet equipment designs specifically tailored for SG, such as forage harvesters that direct-cut standing SG, mobilized stacker-reclaimer technology to not inhibit stack-area footprint, self-compacting ejector trailer technology, and bale grinding technology incorporating controlled mass feeding and shear failure elements. Keywords: Bales, Bioenergy, Bulk-format, Densification, Field chop, Logistics, Transportation
This study examines the impact of stochastic harvest field time on profit maximizing potential of corn cob/stover collection in North Dakota. Three harvest options are analyzed using mathematical programming models. Our findings show that under the first corn grain only harvest option, farmers are able to complete harvesting corn grain and achieve maximum net income in a fairly short amount of time with existing combine technology. However, under the second simultaneous corn grain and cob (one-pass) harvest option, farmers generate lower net income compared to the net income of the first option. This is due to the slowdown in combine harvest capacity as a consequence of harvesting corn cobs. Under the third option of separate corn grain and stover (two-pass) harvest option, time allocation is the main challenge and our evidence shows that with limited harvest field time available, farmers find it optimal to allocate most of their time harvesting grain and then proceed to harvest and bale stover if time permits at the end of harvest season. The overall findings suggest is that it would be more economically efficient to allow a firm that is specialized in collecting biomass feedstock to participate in cob/stover harvest business.
Gas sparging is the most commonly used method for delivering CO2 to algal cultures in Open Raceway Ponds (ORPs). While this method is well-tested and effective, these systems experience large amounts of outgassing to the surrounding atmosphere and often achieve carbon utilization efficiencies (CUE) lower than 30%. With such large losses, system are overdesigned to provide CO2 gas in extreme excess, resulting in increased capital and operational expenses. This research is focused on the development, testing, and implementation of a hydrogel membrane seeded with the enzyme carbonic anhydrase and designed to convert gaseous CO2 into aqueous bicarbonate and deliver this inorganic carbon (iC) directly to the algae pond. Despite increased capital expenses for the module, bicarbonate storage tank, and added pumps and infrastructure, preliminary results suggest that the membrane module has the potential to reduce the minimum biomass selling price by 35% by significantly reducing the operational expenditure for CO2.
Explore the source record for details and available documents.
Not Available
Not Available
Not Available
Not Available
Not Available
Not Available
Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.
This dataset includes the outputs of the JOBS EVSE module for VGI. These impacts include state, census division region, and national metrics including gross jobs, wages, and GDP of the manufacturing, installation, and operations of interconnects per geographic unit.