Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Dewatering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Formate-assisted pyrolysis

The present invention provides, among other thing, methods for creating significantly deoxygenated bio-oils form biomass including the steps of providing a feedstock, associating the feedstock with an alkali formate to form a treated feedstock, dewatering the treated feedstock, heating the dewatered treated feedstock to form a vapor product, and condensing the vapor product to form a pyrolysis oil, wherein the pyrolysis oil contains less than 30% oxygen by weight.

09 BIOMASS FUELS↗

Evaluation of an enhanced gravity-based fine-coal circuit for high-sulfur coal

One of the main objectives of this study was to evaluate a fine-coal cleaning circuit using an enhanced gravity separator specifically for a high sulfur coal application. The evaluation not only included testing of individual unit operations used for fine-coal classification, cleaning and dewatering, but also included testing of the complete circuit simultaneously. At a scale of nearly 2 t/h, two alternative circuits were evaluated to clean a minus 0.6-mm coal stream utilizing a 150-mm-diameter classifying cyclone, a linear screen having a projected surface area of 0.5 m{sup 2}, an enhanced gravity separator having a bowl diameter of 250 mm and a screen-bowl centrifuge having a bowl diameter of 500 mm. The cleaning and dewatering components of both circuits were the same; however, one circuit used a classifying cyclone whereas the other used a linear screen as the classification device. An industrial size coal spiral was used to clean the 2- x 0.6-mm coal size fraction for each circuit to estimate the performance of a complete fine-coal circuit cleaning a minus 2-mm particle size coal stream. The 'linear screen + enhanced gravity separator + screen-bowl circuit' provided superior sulfur and ash-cleaning performance to the alternative circuit that used a classifying cyclone in place of the linear screen. Based on these test data, it was estimated that the use of the recommended circuit to treat 50 t/h of minus 2-mm size coal having feed ash and sulfur contents of 33.9% and 3.28%, respectively, may produce nearly 28.3 t/h of clean coal with product ash and sulfur contents of 9.15% and 1.61 %, respectively.

01 COAL, LIGNITE, AND PEAT↗

Screen bowl centrifuge: a high-efficiency particle size separator

Over the years, screen bowl centrifuges have been widely used for dewatering fine coal in coal preparation plants in the United States and elsewhere. It is generally recognized in the engineering and scientific communities that screen bowl centrifuges provide some degree of particle size separation while dewatering fine coal in a common application. However, the extent of differential partitioning of coarse and fine particles achievable by a screen bowl centrifuge has not been systematically studied in the past. The present investigation was aimed at conducting a parametric study using a statistically designed experimental program to better understand and optimize the size classification performance of a screen bowl centrifuge. A continuously operating screen bowl centrifuge having a bowl diameter of 0.5 m was used for this study at the Illinois Coal Development Park. Three key operating parameters, i.e., feed flow rate, feed solid content and pool depth, were varied to conduct a total of 17 experiments using a three-level factorial test matrix. Some of the best size separation performances achieved in this study may be described as having an imperfection value of 0.13 at an effective separation size (d(50c)) of 38 mu m and an imperfection value of 0.27 at an effective separation size (d(50c)) of 2.8 mu m. Due to an effective separation of ultrafine high ash materials, the ash content of the screen bowl feed was reduced from 22.3% to a minimum of 8.84% with a combustible recovery of 84.1% and an ash rejection of 71.6%. A higher combustible recovery of 92.1% was achieved at a product ash content of 12.5% with a d(50c) of 2.8 mu m and imperfection of 0.27.

01 COAL, LIGNITE, AND PEAT↗

Operating and maintenance guidelines for screenbowl centrifuges

Plant dewatering circuits equipped with screenbowl centrifuges need to be well designed, properly operated, and adequately maintained to maximize the dewatering performance. The most important 'feed variables' are particle size, dry solids feed rate and slurry flow rate. The most important 'machine variables' include pool depth, rotational speed and gearbox ratio. The article discusses the effect of these parameters and offers some maintenance guidelines. The article was adapted from a paper presented at CoalPrep 2008. 6 refs., 2 figs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Test on Polymer Waste Form - 12137

Polymer solidification was attempted to produce stable waste form for the boric acid concentrates and the dewatered spent resins. The polymer mixture was directly injected into the mold or drum which was packed with the boric acid concentrates and the dewatered spent resins, respectively. The waste form was produced by entirely curing the polymer mixture. A series of performance tests was conducted including compressive strength test, water immersion test, leach test, thermal stability test, irradiation stability test and biodegradation stability test for the polymer waste forms. From the results of the performance tests for the polymer waste forms, it is believed that the polymer waste form is very stable and can satisfy the acceptance criteria for permanent disposal. At present, performance tests with full scale polymer waste forms are being carried out in order to obtain qualification certificate by the regulatory institute in Korea. Polymer waste forms were prepared with the surrogate of boric acid concentrates and the surrogate of spent ion exchange resins respectively. Waste forms were also made in lab scale and in full scale. Lab. scale waste forms were directly subjected to a series of the performance tests. In the case of full scale waste form, the test specimens for the performance test were taken from a part of waste form by coring. A series of performance tests was conducted including compressive strength test, thermal stability test, irradiation stability test and biodegradation stability test, water immersion test, leach test, and free standing water for the polymer waste forms. In addition, a fire resistance test was performed on the waste forms by the requirement of the regulatory institute in Korea. Every polymer waste forms containing the boric acid concentrates and the spent ion exchange resins had exhibited excellent structural integrity of more than 27.58 MPa (4,000 psi) of compressive strength. On thermal stability testing, biodegradation testing and water immersion testing, no degradation was observed in the waste forms. Also, by measuring the compressive strength after these tests, it was confirmed that the structural integrity was still retained. A leach test was performed by using non radioactive cobalt, cesium and strontium. The leaching of cobalt, cesium and strontium from the polymer waste forms was very low. Also, the polymer waste forms were found to possess adequate fire resistance. From the results of the performance tests, it is believed that the polymer waste form is very stable and can satisfy the acceptance criteria for permanent disposal. At present, Performance tests with full scale polymer waste forms are on-going in order to obtain qualification certificate by the regulatory institute in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Terrace Geochemistry at the Shiprock, New Mexico, Disposal Site - 17232

The objective of this investigation was to identify and differentiate potential non-mill-related water inputs to a shallow terrace groundwater system through the use of aqueous chemical and isotopic tracers at a former uranium- and vanadium-ore processing facility. Terrace groundwater in the vicinity of the Shiprock, New Mexico, site is hypothesized to be largely anthropogenic because natural rates of recharge in the terrace are likely insufficient to sustain a continuous water table in the terrace alluvial system, as observed in several analogue terrace locations east of the site and in response to post-mill dewatering efforts across the site. The terrace is composed of alluvial sand and gravel and weathered and unweathered Mancos Shale. Terrace groundwater exists and flows in the alluvium and to a much less extent in the Mancos Shale. Historical data established that in both the terrace and flood plain below the terrace, mill-derived uranium and sulfate is found primarily in the alluvium and the upper portion of the weathered Mancos Shale. Groundwater extraction is being conducted in the vicinity of former mill operations and in washes and seeps to de-water the formation and remove contamination, thus eliminating these exposure pathways and minimizing movement to the flood plain. However, past and present contribution of non-mill anthropogenic water sources may be hindering the dewatering effort, resulting in reduced remedy effectiveness. Groundwater source signatures can be determined based on chemical and isotopic ratios and are used to help identify and delineate both mill and non-mill water contributions. Aqueous chemical and isotopic tracers, such as {sup 234}U/{sup 238}U activity ratios and uranium concentrations, δ{sup 34}S{sub sulfate} and sulfate concentrations, tritium concentrations, and δ{sup 2}H{sub water} and δ{sup 18}O{sub water} are being used in this Phase I study. The aqueous chemical and isotopic analysis has identified areas on the terrace where groundwater is derived from mill-related activities and areas where the groundwater is associated with non-mill activities. A separate field effort of Phase II work will follow, including investigating additional locations for these isotopes and examination of δ{sup 18}O{sub sulfate}, δ{sup 34}S{sub sulfate}, and chloro-fluorocarbon signatures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of multiple groundwater contaminant plumes extending beyond property boundaries at the young - Rainey STAR Center (Science, Technology, and Research Center) - 15623

The US DOE Pinellas Plant-now known as the Young - Rainey STAR Center, located in Largo, Florida-manufactured components for nuclear weapons from 1956 to 1995. During decades of operations, chlorinated solvents were released from a drum storage area and from underground piping at multiple points adjacent to and beneath a 4.5-hectare (11-acre) building. Two groundwater contaminant plumes associated with contaminant sources beneath the building have been identified, delineated, and are being monitored. During a focused delineation campaign in 2008 to better define the plume boundaries prior to municipal construction projects in the area, the plumes were determined to extend beyond the site boundaries, beneath the adjacent roadway easements, and beneath four adjacent privately owned properties. US DOE has performed a number of activities in response to the discovery of the offsite contaminant plumes, including performing a high-resolution delineation of contaminant plumes; coordinating with local municipalities to complete two linear construction projects requiring dewatering in the vicinity of the plumes; performing risk assessment, risk management, risk communication, and community relations tasks associated with the project; coordinating with state regulators to identify a risk-based corrective action regulatory approach; and coordinating with impacted property owners to develop and implement institutional controls. During the replacement of a 1.2-meter (48-inch) municipal potable water line directly over the contaminant plume area, US DOE (1) constructed infrastructure to receive and treat dewatering effluent at a rate of 20 gallons per minute around the clock for 6 weeks, and (2) conducted breathing-zone air monitoring during excavation of a 3.0-meter (10-foot) deep trench. This degree of diligence was necessary to ensure and document that no site workers were exposed to chlorinated solvent vapors during the construction process, and that a large volume of potentially contaminated groundwater was properly treated and dispositioned. US DOE also took aggressive actions to pro-actively address claims regarding loss of property value on two properties associated with the groundwater contamination, which resulted in a teaming arrangement with each party for future management of the ongoing corrective actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned - New Resin Processing System Selection, Procurement, Delivery, Set-up, Training, and Operation - 16615

Energy Northwest's first resin dewatering and drying system was purchased in 1989. Although the system functions acceptably, parts are no longer available and containers are no longer off-the shelf items, which require special manufacturing, thus higher cost, as compared to those used by many plants today. The decision was made to procure a new resin processing system (Self-Engaging Rapid Dewatering System, or SERDS). This paper provides lessons learned regarding each aspect of pre-planning, to procurement, acceptance testing, procedure development, and operation, including challenges as well as successes, which could help others in their decision making when contemplating procurement of a similar system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Method for leaching rare earth elements and critical minerals from organically associated materials

A method for extracting rare earth elements and critical minerals including adding an acid to a mixture comprising organically bound rare earth elements. The mixture is maintained at a pH of 0.25 to 4 for a period of time, resulting in a liquor and a leached mixture. The liquor is removed from the leached mixture to form a dewatered cake. The dewatered cake is washed to form a washing liquid. The washing liquid is recycled to create a second slurry comprising organically bound rare earth elements.

Theaker, Nolan↗

Analysis of Extracted Ingredients from Dairy Byproduct Using Dimethyl Ether

Whey permeate is a byproduct created in large quantities from the dairy industry with limited applications due to transportation and stability. Whey permeate is primarily comprised of water, carbohydrates, and minerals with minimal contribution of proteins. Various biomasses in food processing have utilized liquid dimethyl ether (DME) as a form of extraction for high-value ingredients and dewatering. DME is a growing interest in wastewater and biomass treatment due to it being a green solvent, ability to dissolve organic solvents, and miscibility with water. The current study is to determine if DME can effectively dewater whey permeate as well as recover components that can be further used in the food industry as a value-added ingredient. Analysis of the liquid extract and solid extract was evaluated with inductively coupled plasma-mass spectrometry (ICP-MS) and solid extracts were further characterized with the application of a scanning electron microscope (SEM).

09 - BIOMASS FUELS↗

Shifts in hydropower operation to balance wind and solar will modify effects on aquatic biota

To avoid negative consequences to freshwater biota from climate change, society must complete the transition from fossil to renewable electricity sources. However, temporal patterns in hydropower generation (and flow releases that affect aquatic biota) may change with increased wind and solar penetration. We used power cost modeling to characterize current and future within-day and seasonal patterns in hydropower generation across the Eastern Interconnection in a wet and a dry year. Compared to the baseline, future hydropower generation across the grid decreased during the day and increased before dawn and after dusk. At a project level, such a pattern would suggest 'double peaking' operation (up- and down-ramping before dawn and after dusk, with lower releases midday). Variation in generation was higher in wet years than dry years, foreshadowing possible flow constraints on hydropower flexibility. At the grid scale, projected ramping rates were higher in all seasons. A review of the ecological literature suggests that these changes would shift the timing of invertebrate drift and elevate the risk of nest scouring during up-ramping and the risk of stranding or dewatering during down ramping. Thermal conditions may be moderated by increased ramping. Strategies for adapting to future shifts in the renewable portfolio range from re-regulation in reservoir cascades to providing flow refuge (structures and vegetation) below individual projects. Coordinated basin-scale operation can distribute peaking operation to maintain grid support while restricting local ramping at critical ecological times. In addition, research to design hybrid renewable systems that add battery storage is needed to understand how we can mitigate future risks to aquatic communities while promoting the use of renewable energy. This study, which is among the first to examine ecological side-effects of the shift to renewable energy in freshwater ecosystems, lays out a path toward understanding and navigating changes to flow regimes under the energy transition.

54 ENVIRONMENTAL SCIENCES↗

Developments in algal processing

Macroalgae and microalgae, including cyanobacteria, are primarily photosynthetic organisms grown for the production of renewable biomass for foods, feedstocks, and high-value specialty chemicals. While there are differences in cultivating and harvesting macro- and microalgae due to scale, many of the same downstream techniques can be used for processing algal biomass. This chapter will outline various developments in processing technologies used for the treatment of algal biomass with discussion of scalability, cost, time, and efficacy. Topics will cover methods for harvesting and dewatering algae, drying algal biomass, biomass disruption, and nutrient recovery, including case studies with lessons learned. Here, the final section presents biomass applications and product considerations. While there is no universally-adopted approach for processing algal biomass, these studies provide the foundation for making informed decisions, considering the unique properties of the algae and the integrity of the desired end products.

09 BIOMASS FUELS↗

Cross-Flow Filtration of Multiple Algal Strains and Mixed Populations Using Embedded Membranes

The objective of this research is to analytically assess cross-flow membrane filtration (CFF) technology as an algal harvesting approach that will debottleneck the water recovery/nutrient recovery/recycling processes. Specifically, the focus of this investigation will be INL-developed, ceramic-embedded, erosion-resistant membrane technology, comprising stainless steel micro- and ultra-filters with controlled pore sizes to reduce membrane fouling and enhance filtration permeation properties. Parameters such as shear/face velocity and transmembrane pressure will be varied to assess impact on filtration efficiency. Detrimental effects such as cell lysis must also be considered. The project is an opportunity to analytically investigate the level of shear (cross-flow face velocity level) needed to accomplish dewatering by filtration in an economic manner while gaining insight into membrane fouling mechanisms. Furthermore, testing of the membranes with different starting concentrations of algae, as well as with a variety of membranes and filtration conditions, will allow us to establish the boundary conditions where membrane technologies are appropriate for application in an overall algal harvesting strategy.

09 BIOMASS FUELS↗

Results of the GCMS Effluent Gas Analysis for the Brine Processing Test

The effluent gas for the Paragon Ionomer Water Processor (IWP), UMPQUA Ultrasonic Brine Dewatering System (UBDS), and the NASA Brine Evaporation Bag (BEB) were analyzed using Headspace GCMS Analysis in the recent AES FY14 Brine Processing Test. The results from the analysis describe the number and general chemical species of the chemicals produced. Comparisons were also made between the different chromatograms for each system, and an explanation of the differences in the results is reported.

GCMS↗

Centrifugal dryers keep pace with the market

New plant design and upgrades create a shift in dewatering strategies. The article describes recent developments. Three major manufacturers supply centrifugal dryers - TEMA, Centrifugal & Mechanical Industries (CMI) and Ludowici. CMI introduced a line of vertical centrifugal dryers. TEMA improved the techniques by developing a horizontal vibratory centrifuge (HVC) which simplified maintenance. 3 figs., 1 photo.

01 COAL, LIGNITE, AND PEAT↗