Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Design, Implementation, and Verification of the Reliable Multicast Protocol

This document describes the Reliable Multicast Protocol (RMP) design, first implementation, and formal verification. RMP provides a totally ordered, reliable, atomic multicast service on top of an unreliable multicast datagram service. RMP is fully and symmetrically distributed so that no site bears an undue portion of the communications load. RMP provides a wide range of guarantees, from unreliable delivery to totally ordered delivery, to K-resilient, majority resilient, and totally resilient atomic delivery. These guarantees are selectable on a per message basis. RMP provides many communication options, including virtual synchrony, a publisher/subscriber model of message delivery, a client/server model of delivery, mutually exclusive handlers for messages, and mutually exclusive locks. It has been commonly believed that total ordering of messages can only be achieved at great performance expense. RMP discounts this. The first implementation of RMP has been shown to provide high throughput performance on Local Area Networks (LAN). For two or more destinations a single LAN, RMP provides higher throughput than any other protocol that does not use multicast or broadcast technology. The design, implementation, and verification activities of RMP have occurred concurrently. This has allowed the verification to maintain a high fidelity between design model, implementation model, and the verification model. The restrictions of implementation have influenced the design earlier than in normal sequential approaches. The protocol as a whole has matured smoother by the inclusion of several different perspectives into the product development.

Montgomery, Todd L.↗

Apollo experience report: Lunar module structural subsystem

In the Apollo Program, the lunar-orbit rendezvous mode was used for the lunar-landing mission. To accomplish the lunar landing, a lunar module spacecraft was built. A description of the design requirements for the structural subsystem and of the structural configuration and the method of design verification are given. A discussion is presented of several problems encountered and the corrective actions taken during the designing, manufacturing, and testing of the lunar module.

Weiss, S. P.↗

Space Shuttle Ascent Flight Design Process: Evolution and Lessons Learned

The Space Shuttle Ascent Flight Design team is responsible for defining a launch to orbit trajectory profile that satisfies all programmatic mission objectives and defines the ground and onboard reconfiguration requirements for this high-speed and demanding flight phase. This design, verification and reconfiguration process ensures that all applicable mission scenarios are enveloped within integrated vehicle and spacecraft certification constraints and criteria, and includes the design of the nominal ascent profile and trajectory profiles for both uphill and ground-to-ground aborts. The team also develops a wide array of associated training, avionics flight software verification, onboard crew and operations facility products. These key ground and onboard products provide the ultimate users and operators the necessary insight and situational awareness for trajectory dynamics, performance and event sequences, abort mode boundaries and moding, flight performance and impact predictions for launch vehicle stages for use in range safety, and flight software performance. These products also provide the necessary insight to or reconfiguration of communications and tracking systems, launch collision avoidance requirements, and day of launch crew targeting and onboard guidance, navigation and flight control updates that incorporate the final vehicle configuration and environment conditions for the mission. Over the course of the Space Shuttle Program, ascent trajectory design and mission planning has evolved in order to improve program flexibility and reduce cost, while maintaining outstanding data quality. Along the way, the team has implemented innovative solutions and technologies in order to overcome significant challenges. A number of these solutions may have applicability to future human spaceflight programs.

Picka, Bret A.↗

TSS subsatellite attitude dynamics and control laws verification programs

A dynamic model of the Tethered Satellite System (TSS) and of the relevant simulation program, developed in order to provide the dynamic analysis support for the design verification of the subsatellite attitude control, is presented. Special care was spent in the satellite attitude dynamic analysis and the model was specifically conceived to this aim. The way in which the simulation results can be utilized for the verification and testing of the attitude control is also presented.

Venditti, Floriano↗

Development of IR radiation simulator for spacecraft thermal testing

The aim was to simulate, in a ground test, the solar radiation environment to which the Ofeq satellite would be exposed in orbit. The solar simulator usually used is very expensive, as are its operation and maintenance, therefore an infrared (IR) simulator was used; its development involved the creation of uniform IR fluxes onto the irregular geometry of a spacecraft. The tests were carried out on a thermal model of the satellite and the model was verified in a solar simulator test at a European space center. Heat flux mapping software was developed to plan the positioning of the heating elements which generated the IR fluxes and a system was built for heat flux and temperature monitoring and control. A special heat flux sensor was developed to measure the energy absorbed by the satellite surfaces; its calibration had to be independent of wavelength, so that the measurements obtained at IR wavelengths would be equivalent to the actual solar radiation effects. The results of the verification experiment are presented; their conformity with predicted values indicates that the technique developed is a suitable tool for satellite design verification.

Shimrony, Yoram↗

Advanced Manufacturing Techniques Demonstrated for Fabricating Developmental Hardware

NASA Glenn Research Center's Engineering Development Division has been working in support of innovative gas turbine engine systems under development by Glenn's Combustion Branch. These one-of-a-kind components require operation under extreme conditions. High-temperature ceramics were chosen for fabrication was because of the hostile operating environment. During the designing process, it became apparent that traditional machining techniques would not be adequate to produce the small, intricate features for the conceptual design, which was to be produced by stacking over a dozen thin layers with many small features that would then be aligned and bonded together into a one-piece unit. Instead of using traditional machining, we produced computer models in Pro/ENGINEER (Parametric Technology Corporation (PTC), Needham, MA) to the specifications of the research engineer. The computer models were exported in stereolithography standard (STL) format and used to produce full-size rapid prototype polymer models. These semi-opaque plastic models were used for visualization and design verification. The computer models also were exported in International Graphics Exchange Specification (IGES) format and sent to Glenn's Thermal/Fluids Design & Analysis Branch and Applied Structural Mechanics Branch for profiling heat transfer and mechanical strength analysis.

Redding, Chip↗

Considerations in STS payload environmental verification

The current philosophy of the GSFS regarding environmental verification of Shuttle payloads is reviewed. In the structures area, increased emphasis will be placed on the use of analysis for design verification, with selective testing performed as necessary. Furthermore, as a result of recent cost optimization analysis, the multitier test program will presumably give way to a comprehensive test program at the major payload subassembly level after adequate workmanship at the component level has been verified. In the thermal vacuum area, thought is being given to modifying the approaches used for conventional spacecraft.

Keegan, W. B.↗

Umbilical Connect Techniques Improvement-Technology Study

The objective of this study was to develop concepts, specifications, designs, techniques, and procedures capable of significantly reducing the time required to connect and verify umbilicals for ground services to the space shuttle. The desired goal was to reduce the current time requirement of several shifts for the Saturn 5/Apollo to an elapsed time of less than one hour to connect and verify all of the space shuttle ground service umbilicals. The study was conducted in four phases: (1) literature and hardware examination, (2) concept development, (3) concept evaluation and tradeoff analysis, and (4) selected concept design. The final product of this study was a detail design of a rise-off disconnect panel prototype test specimen for a LO2/LH2 booster (or an external oxygen/hydrogen tank for an orbiter), a detail design of a swing-arm mounted preflight umbilical carrier prototype test specimen, and a part 1 specification for the umbilical connect and verification design for the vehicles as defined in the space shuttle program.

Valkema, Donald C.↗

Heterogeneous Integration Technologies for High-temperature, High-density, Low-profile Power Modules of Wide Bandgap Devices in Electric Drive Applications (Final Technical Report)

The goal of this project is to develop packaging technologies for making high-temperature, high-density, and low-profile wide-bandgap (WBG) power electronics modules for electric drives. These modules are aimed at enabling the DOE’s University Consortium to reach its 2025 inverter targets of ≥ 100 kW/L and ≤ 2.7 $/kW. The specific objectives are to: design and fabricate SiC half-bridge power modules with double-sided cooling and parasitic inductances < 5 nH, heat flux density > 400 W/cm 2 , and working junction temperature of 200 o C; design, fabricate, and deliver a gate driver with double-sided cooled modules for the construction of a 100 kW/L inverter at Oak Ridge National Lab; and design and prototype intelligent gate drivers with integrated current sensor and a low-profile DC-DC power supply with air-core transformer for testing power modules at 200 o C junction temperature. We followed an iterative technical approach of design, simulation, fabrication, and testing of various versions of modules, current sensors, and power supply. The state-of-the-art silicon carbide devices rated at 1.2 kV and 149 A were packaged by sintered-silver bonding on an aluminum nitride direct-bond-copper substrate for high thermal conductivity, high working temperature, and high joint reliability. Porous silver posts were used to interconnect the device’s source pads to the other direct-bond-copper substrate for low mechanical stresses, ease of manufacturing, and double-sided cooling. A current sensor based on package parasitic inductance was developed to measure switching current. A dynamic feedback scheme was developed to compensate the effect of parasitic resistance and temperature variation. A constant-current class-E dc-dc converter with air-core transformer was developed. Air-core transformer was used due to the unavailability of magnetic core at high temperatures. Gate driver and power supply were integrated with the double-side cooled, high temperature SiC power modules for testing the modules at 200 o C junction temperature. Double-pulse and continuous testing of the integrated technologies validated the design and fabrication of the three component technologies. Throughout the project, we overcame the challenge for design verification caused by low prototyping yield, which then helped train the graduate students, the future workforce, to learn the engineering know-how for low-cost manufacturing of reliable products. Below is a summary of the major accomplishments of this project: development of a prototyping process for fabricating double-side cooled (1200 V, 149 A) SiC phase-leg modules capable of working to 200 o C Tj; simulation and experimental verification of the improvement of thermo-mechanical reliability of the double-side cooled SiC phase-leg module by using rigid encapsulant; design and experimental validation of a current sensor based on package parasitic inductance and a compensation solution for eliminating the effect of parasitic resistance; design and experimental validation of a low-profile power supply with six-output air-core transformer for gate driver; functional demonstration of a SiC phase-leg module integrated with its gate driver, current sensor, and an air-core power supply at 200 o C Tj in a double-pulse switching test setup and Buck converter continuous test setup; successful completion of six PhD and two MS students who are or will work at Apple Inc., Tesla Inc., Wolfspeed Inc., Microchip Inc., Monolithic Power Systems Inc., and LG Magna Inc.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal design of the Galileo bus and Retro Propulsion Module

The Galileo spacecraft (S/C) consists of an Orbiter and Probe which have instruments to investigate the chemical composition and physical state of Jupiter's atmosphere, the Jovian satellites and the structure and physical dynamics of the Jovian magnetosphere. Galileo was at the Kennedy Space Center (KSC) preparing for a May 1986 launch at the time of the Challenger accident. The delay and an incraease in mission time has decreased the Radioisotope Thermoelectric Generator power output significantly. A change to the Inertial Upper Stage from the more powerful Centaur G-Prime has resulted in a trajectory that requires gravity assists once by Venus and twice by earth. The resulting peak solar intensity of this roundabout trajectory is more than twice the previous design value for the direct trajectory. Galileo was returned to the Jet Propulsion Laboratory (JPL) from KSC in February 1987 to begin the rework of the S/C thermal design. Verification of the thermal redesign was completed in the JPL 25' space simulator in August and November of 1988. This paper summarizes the thermal design and redesign of the Bus and Retro Propulsion Model.

Avila, A.↗

xEMU Wired Heart Rate Monitor

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on development and testing of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and detailed design of the xEMU Wired Heart Rate Monitor (WHRM). This paper outlines the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to WHRM are also provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

xEMU Integrated Communication System

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on development and testing of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and detailed design of the xEMU Integrated Communication System (ICS). This paper outlines the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the ICS are also provided, along with a forward strategy for final maturation into a flight-ready design.

Ian Meginnis↗

NASA Advanced Space Suit xEMU Development Report – Waist Brief Hip Assembly

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the history, development, and baseline detailed design of the xEMU Waist Brief Hip (WBH). This paper will outline the challenging technical requirements and solutions needed to overcome these challenges, and a status of the detailed design. Initial results of Design Verification Testing (DVT) as it relates specifically to WBH will also be provided, along with a forward strategy for final maturation into a flight-ready design.

xEMU↗

NASA Advanced Space Suit xEMU Development Report – Hard Upper Torso (HUT)

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU Hard Upper Torso (HUT) Assembly. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the HUT will also be provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

xEMU Shoulder Assembly

For the past several years, the Exploration Extravehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU Shoulder Assembly. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the shoulder will also be provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

Next generation VLSI tools

This paper focuses on what features would be useful in VLSI Computer Aided Design Tools and Systems to be used in the next five to ten years. Examples of current design tasks will be used to emphasize the areas where new or expanded VLSI CAD tools are needed. To provide a basis for projecting the future of VLSI tools, a brief history of the evolution of VLSI design software and hardware platforms is presented. The role of design methodology is considered with respect to the anticipated scale of future VLSI design projects. Future requirements of design verification and manufacturing testing are projected based on the challenge of surviving in a competitive market. Examples of VLSI tools reflect the author's involvement on VLSI design teams developing integrated circuits for disk memory and other computer peripherals for the last eight years.

Gibson, J.↗

NASA Advanced Space Suit xEMU Development Report – Components

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU helmet, extra-vehicular visor assembly (EVVA), hard upper torso (HUT), shoulders, liquid cooling and ventilation garment (LCVG), boots, waist brief hip (WBH), ancillary hardware, and environmental protection garment (EPG) . This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a current status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates specifically to these components will also be provided, along with a forward strategy for final maturation into a flight-ready design.

Shane McFarland↗

Deployable beam flight experiment (MAST)

Improvement of technology of space systems control is discussed. Future space systems such as large antennas or a space station may have dimensions on the order of 30 m to 200 m, yet their basic structures may be relatively lightweight and flexible, making ground tests for loads, controls analyses, and design verifications questionable if not impossible. Abandoning the extensive ground test and analysis verification program that led to the success of previous spacecraft is not a sensible option; making it meaningful using current technology will require inefficient, ultraconservative structure and control designs. New test methods are outlined.

Hanks, B. R.↗