Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Room Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Heavy Gas Conversion of the NASA Langley Transonic Dynamics Tunnel

The heavy gas test medium has recently been changed in the Transonic Dynamics Tunnel (TDT) at the NASA Langley Research Center. A NASA Construction of Facilities project has converted the TDT heavy gas from dichlorodifluoromethane (R12) to 1,1,1,2 tetrafluoroethane (R134a). The facility s heavy gas processing system was extensively modified to implement the conversion to R134a. Additional system modifications have improved operator interfaces, hardware reliability, and quality of the research data. The facility modifications included improvements to the heavy gas compressor and piping, the cryogenic heavy gas reclamation system, and the heavy gas control room. A series of wind tunnel characterization and calibration tests are underway. Results of the flow characterization tests show the TDT operating envelope in R134a to be very similar to the previous operating envelope in R12.

Corliss, James M.↗

Demonstration and Evaluation of the Human-Technology Integration Function Allocation Methodology

There is an imminent need for the existing nuclear power plants to reduce their operating and maintenance (O&M) costs to remain economically viable. Digital technology, including automation, provides a significant opportunity for the existing nuclear power plant fleet to transform the way in which work is accomplished, reducing O&M costs, and allowing the fleet to remain economically competitive. One notable opportunity to significantly reduce O&M costs pertains to modifications to the plant equipment and main control room (MCR). Existing instrumentation and control (I&C) technologies in the MCR are highly analog, costly to operate and maintain, and demand a high cognitive and physical workload from plant staff (i.e., operators). Digitalizing the MCR has a range of broad economic benefits, including improved plant performance and reduced manual work. Further, digital I&C systems can fundamentally change the way in which plant staff operate the plant; this is the concept of operation. Human-technology integration is important to ensure that impacts to the concept of operation are done in a way that account for capabilities of people and technology. Human-technology integration employs human factors engineering (HFE) methods and principles to maximize the benefits of digital technology, reducing human error, improving overall decision-making and usability. The U.S. Department of Energy Light Water Reactor Sustainability Program is applying human-technology integration research to ensure digital technologies are safe, reliable, and efficient. This paper documents the demonstration of the human-technology guidance developed by the Light Water Reactor Sustainability Program from a first-of-a-kind digital I&C upgrade, specifically addressing function analysis and allocation for a new digital I&C system that included changes in automation levels. The program’s specific approach is included in this work, following lessons learned. This document serves as a resource for industry to follow in applying human-technology integration and HFE to digital modifications, specific to function analysis and allocation. The lessons learned should be considered in the planning and execution of HFE activities that support such digital modifications.

99 GENERAL AND MISCELLANEOUS↗

Guidelines on ergonomic aspects of control rooms

The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.

Mitchell, C. M.↗

STS-50 TCDT Activities

Terminal Countdown and Demonstration Test (TCDT) activities are shown, such as the STS-50 crew (Commander Richards, Pilot Kenneth D. Bowersox, Payload Commander Bonnie J. Dunbar, Mission Specialists Ellen S. Baker and Carl J. Meade, and Payload Specialists Lawrence J. DeLucas and Eugene H. Trinh) emerging from T-38 aircraft and being introduced by Commander Richards. Emergency egress training is seen, as is the crew's departure from the Operations and Checkout (O&C) Building. Footage shows the launch pad and launch control room as the countdown nears the engine ignition simulation.

Source record↗

Multi-machine validation of plasma initiation modelling and prospects for future devices: Predicting plasma initiation using only hardware design and control room input data

This paper reports on the generic prediction capability of full electromagnetic plasma initiation modelling with DYON, which was carried out for the first time in fusion research by the joint modelling of the International Tokamak Physics Activity—Integrating Operation Scenario group. The following devices were included in the experiment database: VEST (spherical torus, copper coils, Stainless steel wall, R/a = 0.3 m/0.2 m, V v = 3.7 m 3 ), MAST-U (spherical torus, copper coils, C wall, R/a = 0.7 m/0.5 m, V v = 55 m 3 ), EAST (conventional tokamak, superconducting coils, metallic wall, R/a = 1.85 m/0.5 m, V v = 38 m 3 ), DIII-D (conventional tokamak, copper coils, C wall, R/a = 1.67 m/0.65 m, V v = 35 m 3 ), and KSTAR (conventional tokamak, superconducting coils, C wall, R/a = 1.8 m/0.5 m, V v = 55 m 3 ). Despite the different hardware features of the devices, the required operating spaces of the loop voltage induction and prefill gas pressure for inductive plasma initiation in each device were successfully reproduced by the predictive simulations with DYON using only the individual hardware design and the control room input data for each discharge. This successful validation across multiple machines demonstrates that the full electromagnetic DYON modelling can capture the essential physics of inductive plasma initiation. The simulation settings commonly employed for all modelling and the modifications necessary to account for the discrepancies between individual devices are reported. Predictions for ITER based on the multi-machine validation indicate that a wide range of prefill gas pressures exists for the Townsend breakdown and the plasma burn-through (0.01–1.5 mPa).

DYON↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Switched-Reluctance Electric Motor

An eight-pole radial magnetic bearing has been modified into a switched-reluctance electric motor capable of operating at a speed as high as 8,000 rpm at a temperature as high as 1,000 F (=540 C). The motor (see figure) is an experimental prototype of starter-motor/generator units that have been proposed to be incorporated into advanced gas turbine engines and that could operate without need for lubrication or active cooling. The unique features of this motor are its electromagnet coils and, to some extent, its control software. Heretofore, there has been no commercial-off-the-shelf wire capable of satisfying all of the requirements for fabrication of electromagnet coils capable of operation at temperatures up to 1,000 F (=540 C). The issues addressed in the development of these electromagnet coils included thermal expansion, oxidation, pliability to small bend radii, micro-fretting, dielectric breakdown, tensile strength, potting compound, thermal conduction, and packing factor. For a test, the motor was supported, along with a rotor of 18 lb (.8-kg) mass, 3-in. (.7.6-cm) diameter, 21-in. (.53-cm) length, on bearings packed with high-temperature grease. The motor was located at the mid span of the rotor and wrapped with heaters. The motor stator was instrumented with thermocouples. At the time of reporting the information for this article, the motor had undergone 14 thermal cycles between room temperature and 1,000 F (.540 C) and had accumulated operating time >27.5 hours at 1,000 F (=540 C). The motor-controller hardware includes a personal computer equipped with analog-to-digital input and digital-to-analog output cards. The controller software is a C-language code that implements a switched-reluctance motor-control principle: that is, it causes the coils to be energized in a sequence timed to generate a rotating magnetic flux that creates a torque on a scalloped rotor. The controller can operate in an open- or closed-loop mode. In addition, the software has been modified to enable the simultaneous operation of the prototype motor or another, similar apparatus as both a motor and a magnetic bearing. Combined bearing/motor operation has been demonstrated at room temperature but had not yet been demonstrated at high temperature at the time of reporting the information for this article.

Montague, Gerald↗

Voltage-controlled long-range propagation of indirect excitons in a van der Waals heterostructure

Indirect excitons (IXs), also known as interlayer excitons, can form the medium for excitonic devices whose operation is based on controlled propagation of excitons. Here, a proof of principle for excitonic devices was demonstrated in GaAs heterostructures where the operation of excitonic devices is limited to low temperatures. IXs in van der Waals transition-metal dichalcogenide (TMD) heterostructures are characterized by high binding energies making IXs robust at room temperature and offering an opportunity to create excitonic devices operating at high temperatures suitable for applications. However, a characteristic feature of TMD heterostructures is the presence of moiré superlattice potentials, which are predicted to cause modulations of IX energy reaching tens of meV. These in-plane energy landscapes can lead to IX localization, making IX propagation fundamentally different in TMD and GaAs heterostructures and making uncertain whether long-range IX propagation, sufficiently long to allow for creating elaborate excitonic devices and circuits, can be realized in TMD heterostructures. In this work, we realize long-range IX propagation with the 1/e IX luminescence decay distances reaching 13 microns in a MoSe 2 /WSe 2 heterostructure. We trace the IX luminescence along the IX propagation path. In the presented TMD materials, the long-range IX propagation occurs up to ~50 K. This is a step toward the room temperature operation, which can be realized in TMD heterostructures due to the high IX binding energy. We also realize control of the long-range IX propagation by voltage. The IX luminescence signal in the drain of an excitonic transistor is controlled within 40 times by gate voltage. The control of the IX propagation in the MoSe 2 /WSe 2 heterostructure is governed by new mechanisms, beyond the mechanism for controlling IX transport by an energy barrier to IX propagation (or a trap for IXs) created by the gate electrode, known since the studies of GaAs heterostructures. We discuss the origin of the voltage-controlled long-range IX propagation in the MoSe 2 /WSe 2 heterostructure, in particular, the electric-field control of the moiré potential.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Experimental system for the control of surgically induced infections, operating and maintenance instructions D203613-004

An experimental portable system used to control surgically induced infections is described. The system consists of a portable clean room comprised of a laminar flow filter system consistent with Federal standards; a helmet-shoulder pad assembly; a communication system; a helmet ventilation system; a transparent walled enclosure; and surgical gowns. Guidelines for the set up and operation of such equipment are given along with corrective steps to use in case of system malfunctions. Cleaning procedures, maintenance requirements, and disassembly and transfer particulars are included.

Tevebaugh, M. D.↗

Independent temperature and humidity control of a precooled desiccant air cooling system with proportional and fuzzy logic + proportional based controllers

Providing room comfort quickly by using less energy in cooling systems is important both in terms of efficiency and environment. In this study, independent temperature/humidity control strategies are designed for precooled desiccant based evaporative cooling system to provide room comfort quickly with less energy. Therefore, the speed controls of the system's actuators become important depending on the room, cooler and atmosphere conditions. The mathematical models are obtained to determine the relation between voltages of actuators and the variations in the room's temperature and humidity. After that, new control strategies are developed based on Proportional and Fuzzy+Proportional techniques and the control performance is increased by adding extra modes to the operation of the actuators. The effects of the control techniques on the cooling performance and energy consumption were investigated for different cases. It has been observed that the room temperature and relative humidity reach the set values in a short time for both techniques and are successfully kept at these values under the disturbances. By using Fuzzy+Proportional controller, the robustness of the cooler increases due to more precisely adjustment of controller's parameter depending the system conditions. Finally, both control strategies provide more than 20% energy savings compared to the traditional ON/OFF control.

42 ENGINEERING↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Advanced Subsonic Combustion Rig Developed

The Advanced Subsonic Combustion Rig (ASCR), a unique, state-of-the-art facility for conducting combustion research, is located at the NASA Lewis Research Center in Cleveland, Ohio. The ASCR, which was nearing completion at the close of 1995, will be capable of simulating the very high pressure and high temperature conditions that are expected to exist in future, advanced subsonic gas turbine (jet) engines. Future environmental regulations will require much cleaner burning (more environmentally friendly) aircraft engines. The ASCR is critical to the development of these cleaner engines. It will allow NASA and U.S. aircraft engine industry researchers to identify and test promising clean-burning gas turbine engine combustion concepts under the pressure and temperature conditions that are expected for those future engines. Combustion processes will be investigated for a variety of next-generation aircraft engine sizes, including engines for large, long-range aircraft (with typical trip lengths of about 3000 mi) and for regional aircraft (with typical trip lengths of about 400 mi). The ASCR design was conceived and initiated in 1993, and fabrication and construction of the rig, including the buildup of an advanced control room, took place throughout 1994 and 1995. In early 1996, the ASCR will be operational for obtaining research data. The ASCR is an intricate part of the NASA Advanced Subsonic Technology Propulsion Program, which is aimed at developing technologies critical to the next generation of gas turbine engines. This effort is in collaboration with the U.S. aircraft gas turbine engine industry. A goal of the Advanced Subsonic Technology Propulsion Program is to develop combustion concepts and technologies that will result in gas turbine engines that produce 50 percent less nitrous oxide (NO_x) pollutants than current engines do. This facility is unique in its capability to simulate advanced subsonic engine pressure, temperature, and air flow rate conditions. Specifically, it will provide operating temperatures up to 3000 F and pressures up to 60 atm. Under these conditions, researchers will obtain detailed combustion temperatures, pressures, and flow velocities as well as the chemical compositions of the combustion exhaust. Researchers also will be able to obtain data by using nonintrusive laser diagnostic techniques. The ASCR facility will be used to test fundamental combustion configurations (flametubes) for detailed study of combustion processes, to test sectors of gas turbine combustors to study the process in configurations more like those of aircraft engines, and in some cases to test full annular combustors.

Source record↗

Got Mercury?

Many lamps used in various spacecraft contain elemental mercury, which is efficiently absorbed through the lungs as a vapor. The liquid metal vaporizes slowly at room temperature, but may be completely vaporized when lamps are operating. Because current spacecraft environmental control systems are unable to remove mercury vapors, we considered short-term and long-term exposures. Using an existing study, we estimated mercury vapor releases from lamps that are not in operation during missions lasting less than or equal to 30 days; whereas we conservatively assumed complete vaporization from lamps that are operating or being used during missions lasing more than 30 days. Based on mercury toxicity, the Johnson Space Center's Toxicology Group recommends stringent safety controls and verifications for any hardware containing elemental mercury that could yield airborne mercury vapor concentrations greater than 0.1 mg/m3 in the total spacecraft atmosphere for exposures lasting less than or equal to 30 days, or concentrations greater than 0.01 mg/m3 for exposures lasting more than 30 days.

Meyers, Valerie↗

Quality concerns caused by quality control — deformation of silicon strip detector modules in thermal cycling tests

The ATLAS experiment at the Large Hadron Collider (LHC) is currently preparing to replace its present Inner Detector (ID) with the upgraded, all-silicon Inner Tracker (ITk) for its High-Luminosity upgrade (HL-LHC). The ITk will consist of a central pixel tracker and the outer strip tracker, consisting of about 19,000 strip detector modules. Each strip module is assembled from up to two sensors, and up to five flexes (depending on its geometry) in a series of gluing, wirebonding and quality control steps. During detector operation, modules will be cooled down to temperatures of about -35 °C (corresponding to the temperature of the support structures on which they will be mounted) after being initially assembled and stored at room temperature. In order to ensure compatibility with the detector's operating temperature range, modules are subjected to thermal cycling as part of their quality control process. Ten cycles between -35 °C and +40 °C are performed for each module, with full electrical characterisation tests at each high and low temperature point. As part of an investigation into the stress experienced by modules during cooling, it was observed that modules generally showed a change in module shape before and after thermal cycling. This paper presents a summary of the discovery and understanding of the observed changes, connecting them with excess module stress, as well as the resulting modifications to the module thermal cycling procedure.

47 OTHER INSTRUMENTATION↗

Master Console, SMC

The Master Console oversees the function of Computer Systems in Firing room 1 (FR1). Master Console Operators, MCOs' for short, are our customer. I was integrated into the System Monitoring and Control (SMC) software team that is under the guidance of David Slaiman, who is the product group lead. I have been brought up to speed with System Monitoring and Control. The initial time spent reading SMC software design description and understanding how it works. The current Firing Room 1 Console Display is a floor layout giving the MCO two essential pieces of information which are Health and Status. When an issue arises, the MCO has to look on the display to find which console is affected and then the MCO must use the Reference designator from the display to manually search for the Portal Workstation (PWS) installed in the console using the hardware map; which is a long process to lookup a PWS if an issue is present. My project is to make the FR1 Console Display easier for the MCO's to pinpoint PWS's without having to lookup additional resources in the process. My project also includes updating Firing Room 1 Console Display to include the F1R Non-Redundant Set. The display does not have good use of space and functionality. PWS numbers were not present in the previous design and are the critical component in efficient understanding and administration of the consoles. Part of the process includes getting feedback from the customer, instead of just emailing them with a question, we made a proposal with changes so they could respond and give us their input; which proved to be an effective method for engaging them. In order to do this I had to use the Display Editor (DE) tool developed by NASA, Paint.Net and Visio. The process I have been using has been Visio to alter the floor layout of Firing Room and take advantage of the white areas, and then I take the altered floor plan into Paint.Net. Once in Paint.Net I put the new floor plan as a background to the standard console display. Paint.Net also serves as a tool to create the new service state bars for the new background; finally I used the DE to assemble everything and setup the right CUI's for each PWS.

MCO↗

Packaging Technology for SiC High Temperature Circuits Operable up to 500 Degrees Centigrade

New high temperature low power 8-pin packages have been fabricated using commercial fabrication service. These packages are made of aluminum nitride and 96 percent alumina with Au metallization. The new design of these packages provides the chips inside with EM shielding. Wirebond geometry control has been achieved for precise mechanical tests. Au wirebond samples with 45 degree heel-angle have been tested using wireloop test module. The geometry control improves the consistency of measurement of the wireloop breaking point.Also reported on is a parametric study of the thermomechanical reliability of a Au thick-film based SiC die-attach assembly using nonlinear finite element analysis (FEA) was conducted to optimize the die-attach thermo-mechanical performance for operation at temperatures from room temperature to 500 degrees Centigrade. This parametric study centered on material selection, structure design and process control.

Chen, Lian-Yu↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗