Lessons learned from the commissioning of the THTR 300 - 18575

Although the commissioning of the THTR 300, the only large pebble bed High Temperature Gas-Cooled Reactor (HTGR) power plant, occurred more than 30 years ago, many lessons could be learned that would directly benefit the design, construction and startup of future pebble bed HTGRs. This report includes a review of the THTR 300 design and an overview of the commissioning program utilized to bring the plant from initial criticality to full power. Selected plant test results are compared to predicted plant behavior from 40% to 100% plant load. Lessons learned from the commissioning of the THTR are also included. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Commissioning of the CMS Forward Pixel Detector

The Compact Muon Solenoid (CMS) experiment is scheduled for physics data taking in summer 2009 after the commissioning of high energy proton-proton collisions at Large Hadron Collider (LHC). At the core of the CMS all-silicon tracker is the silicon pixel detector, comprising three barrel layers and two pixel disks in the forward and backward regions, accounting for a total of 66 million channels. The pixel detector will provide high-resolution, 3D tracking points, essential for pattern recognition and precise vertexing, while being embedded in a hostile radiation environment. The end disks of the pixel detector, known as the Forward Pixel detector, has been assembled and tested at Fermilab, USA. It has 18 million pixel cells with dimension 100 x 150 {micro}m{sup 2}. The complete forward pixel detector was shipped to CERN in December 2007, where it underwent extensive system tests for commissioning prior to the installation. The pixel system was put in its final place inside the CMS following the installation and bake out of the LHC beam pipe in July 2008. It has been integrated with other sub-detectors in the readout since September 2008 and participated in the cosmic data taking. This report covers the strategy and results from commissioning of CMS forward pixel detector at CERN.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Portfolio Analysis with General Commission

The well-known problem of finding explicit formulas for the expected return and risk of portfolios with general commission is completely solved. It is assumed that the commission depends on the asset and the asset position, and on whether the given position is opened or closed. For portfolios with only the budget constraint and initial commission, we prove that the function of expected portfolio return and portfolio variance function are bounded.

54 ENVIRONMENTAL SCIENCES↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

First on-line commissioning experiments at the St. Benedict facility

Nuclear beta decays provide an excellent probe of fundamental symmetries due to their mediation by the weak interaction. In particular, precise measurements of these decays provide constraints on the unitarity of the Cabbibo-Kobayashi-Maskawa (CKM) quark-mixing matrix. While superallowed pure Fermi decays currently set the most precise limits, the alternative suite of superallowed mixed mirror decays has been ill-studied. These nuclei can provide an important consistency check of calculation and measurement methods employed for the pure Fermi decays, more critically needed now in the wake of a 2.4σ deviation from unitarity of the CKM matrix. In order to remedy the gap in data for mirror decays, the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) facility is being commissioned at the University of Notre Dame’s Nuclear Science Laboratory (NSL). In this paper, we present first results of the commissioning of the St. Benedict facility on-line at the TwinSol radioactive beam facility. The results of initial commissioning experiments involving the St. Benedict gas catcher, RF carpet, RFQ ion guide and RFQ cooler-buncher will be presented.

beta decay↗

Commissioning of a replacement subatmospheric cold box for Jefferson Lab’s Central Helium Liquefier

Jefferson Lab’s Cryogenics Department has designed, fabricated, installed, and commissioned a new subatmospheric cold box to replace one of the two existing units within our Central Helium Liquefier (CHL). The replacement cold box, dubbed SC1R, pumps saturated helium vapor at 0.0385 atm from Jefferson Lab’s continuous electron beam accelerator facility (CEBAF) cryomodules to maintain an operating temperature of nominally 2.1 K. This is accomplished using a five-stage cryogenic centrifugal compressor (cold compressor) system and a brazed aluminum plate-fin heat exchanger operating between 2.1 K and 4.5 K. In this paper we will describe our experience commissioning the SC1R cold box. We will discuss pump-down of the system to 2.1 K and steady-state operation at the cold compressor design flow rates of 170, 200, and 250 g/s. Performance of the heat exchanger and cold compressors has been mapped across a range of flow rates and optimized for CEBAF operations. This commissioning data will be used to monitor future performance and adapt to changing load requirements.

Mastracci, B.↗

Commissioning of the large-scale lead tungstate scintillating calorimeter

Here, we report on the installation and initial commissioning of a large-scale lead tungstate (PbWO4) scintillating crystal calorimeter developed for high-rate photon detection and precise energy measurement. The calorimeter comprises 1596 high-granularity, high-resolution scintillating crystals optimized for electromagnetic-shower detection over a wide energy range. Scintillation light from each crystal is read out by Hamamatsu R4125 photomultiplier tubes equipped with a custom voltage divider and front-end amplifier to ensure stable gain at high rates. All calorimeter modules were fabricated and characterized using a light-emitting diode–based optical test system prior to installation to verify uniformity and photodetector performance. After installation, the electromagnetic calorimeter was fully integrated into the experiment data acquisition and energy-based trigger systems. The optical response of the modules was equalized using the light-monitoring system, cosmic-ray muons, and photons from Compton-scattering events. Commissioning results demonstrate a reliably calibrated optical response and stable detector performance during the first run. These results validate the calorimeter design and commissioning methodology for large-scale scintillator-based photonic instrumentation.

Analog to digital converters↗

Commissioning of output factors for uniform scanning proton beams

Purpose: Current commercial treatment planning systems are not able to accurately predict output factors and calculate monitor units for proton fields. Patient-specific field output factors are thus determined by either measurements or empirical modeling based on commissioning data. The objective of this study is to commission output factors for uniform scanning beams utilized at the ProCure proton therapy centers. Methods: Using water phantoms and a plane parallel ionization chamber, the authors first measured output factors with a fixed 10 cm diameter aperture as a function of proton range and modulation width for clinically available proton beams with ranges between 4 and 31.5 cm and modulation widths between 2 and 15 cm. The authors then measured the output factor as a function of collimated field size at various calibration depths for proton beams of various ranges and modulation widths. The authors further examined the dependence of the output factor on the scanning area (i.e., uncollimated proton field), snout position, and phantom material. An empirical model was developed to calculate the output factor for patient-specific fields and the model-predicted output factors were compared to measurements. Results: The output factor increased with proton range and field size, and decreased with modulation width. The scanning area and snout position have a small but non-negligible effect on the output factors. The predicted output factors based on the empirical modeling agreed within 2% of measurements for all prostate treatment fields and within 3% for 98.5% of all treatment fields. Conclusions: Comprehensive measurements at a large subset of available beam conditions are needed to commission output factors for proton therapy beams. The empirical modeling agrees well with the measured output factor data. This investigation indicates that it is possible to accurately predict output factors and thus eliminate or reduce time-consuming patient-specific output measurements for proton treatments.

07 ISOTOPE AND RADIATION SOURCES↗

SU-E-T-438: Commissioning of An In-Vivo Quality Assurance Method Using the Electronic Portal Imaging Device

Purpose: Patient specific pre-treatment quality assurance (QA) using arrays of detectors or film have been the standard approach to assure the correct treatment is delivered to the patient. This QA approach is expensive, labor intensive and does not guarantee or document that all remaining fractions were treated properly. The purpose of this abstract is to commission and evaluate the performance of a commercially available in-vivo QA software using the electronic portal imaging device (EPID) to record the daily treatments. Methods: The platform EPIgray V2.0.2 (Dosisoft), which machine model compares ratios of TMR with EPID signal to predict dose was commissioned for an Artiste (Siemens Oncology Care Systems) and a Truebeam (Varian medical systems) linear accelerator following the given instructions. The systems were then tested on three different phantoms (homogeneous stack of solid water, anthropomorphic head and pelvis) and on a library of patient cases. Simple and complex fields were delivered at different exposures and for different gantry angles. The effects of the table attenuation and the EPID sagging were evaluated. Gamma analysis of the measured dose was compared to the predicted dose for complex clinical IMRT cases. Results: Commissioning of the EPIgray system for two photon energies took 8 hours. The difference between the dose planned and the dose measured with EPIgray was better than 3% for all phantom scenarios tested. Preliminary results on patients demonstrate an accuracy of 5% is achievable in high dose regions for both 3DCRT and IMRT. Large discrepancies (>5%) were observed due to metallic structures or air cavities and in low dose areas. Flat panel sagging was visible and accounted for in the EPIgray model. Conclusion: The accuracy achieved by EPIgray is sufficient to document the safe delivery of complex IMRT treatments. Future work will evaluate EPIgray for VMAT and high dose rate deliveries. This work is supported by Dosisoft, Cachan, France.

60 APPLIED LIFE SCIENCES↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Commissioning and Operation of FAST Electron Linac at Fermilab

We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The pho-toinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commission-ing such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation.

43 PARTICLE ACCELERATORS↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m$^3$ membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

43 PARTICLE ACCELERATORS↗

Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on America’s Nuclear Future

To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NWTC Dynamometer and Controllable Grid Interface Commissioning and Testing of General Electric Wind Turbine Drivetrain: Cooperative Research and Development Final Report, CRADA Number CRD 14-551

This CRADA (1) facilitates commissioning of the new NWTC 5MW dynamometer facility while testing a General Electric (Participant) 2.75MW wind turbine drivetrain under loaded conditions, (2) facilitates commissioning of the new NWTC the Controllable Grid Interface (CGI) as part of testing the GE 2.75MW drivetrain, (3) facilitates further wind turbine drivetrain testing utilizing the commissioned dynamometer and CGI test facilities.

17 WIND ENERGY↗

Commissioning Plan for the Cameca NanoSIMS 50L

In late March of 2017 a Cameca® NanoSIMS 50L was delivered to the Nuclear Security Advanced Technologies (NSAT) group at ORNL. This instrument occupies the cutting edge of Secondary Ion Mass Spectrometry (SIMS) technology, and will ultimately solidify the NSAT group’s position at the forefront of the nuclear security research and development community. This document describes the processes whereby the ORNL NanoSIMS 50L will be commissioned, culminating in the group’s ability to demonstrate both depth of proficiency and breadth of capability to sponsors and the broader community. Before describing the specific metrics and benchmarks defining the commissioning process, this document delves into the body of literature specific to SIMS analysis in support of nuclear forensics research. This in-depth literature review sets the stage for an explanation of how the NanoSIMS 50L platform will help address existing research questions and define new ones. Lastly, the document describes the measurements and projects that will take place as part of the instrument’s commissioning phase.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NSLS-II SR Commissioning Report

The NSLS-II storage ring (SR) phase I commissioning has been successfully completed in May 12, 2014. In accordance to the project milestone, 25 mA average current was achieved in the storage ring with PETRA III 500 MHz 7-cell PETRA-III RF cavity but w/o ID’s and Landau cavities. In about 5 weeks we delivered a 3 GeV beam to the ring injection straight section, made the 1st turn around the ring, achieved hundreds of turns optimizing injection, stored beam having sextupoles and RF turned ON. Injection efficiency was achieved 95%, close orbit rms value is ~100 um, tune and chromaticity were measured and adjusted as desired, and beam lifetime was a few hours depending on the stored beam current. This report consists of a summary, a chronological part, the injector system performance in Ch3, SR commissioning experience in Ch4 and the outlook of remaining work in Ch5. The SR commissioning experience includes the software experience, hardware (timing, diagnostics, RF, vacuum, PS) operation experience, the strategy for initial injection beam to the stored beam, measurement of the linear optics and control to the desired value, nonlinear beam dynamics study, beam instability study, the subsystem reliability and fault study at different scenarios.

36 MATERIALS SCIENCE↗

Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version)

The purpose of the commissioning process for this project is to provide SNL assurance that equipment/systems have been provided as required, installed in the prescribed manner and operate in compliance with SNL project requirements, basis of design, contract documentation, and operational needs. In addition, commissioning provides SNL assurance that any special safety engineered features to prevent or control the accidental release of hazardous energy operate appropriately. Commissioning is intended to enhance the quality of system startup, operation and aid in the orderly and timely transfer of fully functioning systems.

42 ENGINEERING↗