Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Potential Large Decadal Missions Enabled by Nasas Space Launch System

Large space telescope missions have always been limited by their launch vehicle's mass and volume capacities. The Hubble Space Telescope (HST) was specifically designed to fit inside the Space Shuttle and the James Webb Space Telescope (JWST) is specifically designed to fit inside an Ariane 5. Astrophysicists desire even larger space telescopes. NASA's "Enduring Quests Daring Visions" report calls for an 8- to 16-m Large UV-Optical-IR (LUVOIR) Surveyor mission to enable ultra-high-contrast spectroscopy and coronagraphy. AURA's "From Cosmic Birth to Living Earth" report calls for a 12-m class High-Definition Space Telescope to pursue transformational scientific discoveries. NASA's "Planning for the 2020 Decadal Survey" calls for a Habitable Exoplanet Imaging (HabEx) and a LUVOIR as well as Far-IR and an X-Ray Surveyor missions. Packaging larger space telescopes into existing launch vehicles is a significant engineering complexity challenge that drives cost and risk. NASA's planned Space Launch System (SLS), with its 8 or 10-m diameter fairings and ability to deliver 35 to 45-mt of payload to Sun-Earth-Lagrange-2, mitigates this challenge by fundamentally changing the design paradigm for large space telescopes. This paper reviews the mass and volume capacities of the planned SLS, discusses potential implications of these capacities for designing large space telescope missions, and gives three specific mission concept implementation examples: a 4-m monolithic off-axis telescope, an 8-m monolithic on-axis telescope and a 12-m segmented on-axis telescope.

Technology↗

Advancing Understanding of Geothermal Representation in the Power Sector to Accelerate Deployment

Driven mostly by decarbonization goals, geothermal interest in the US power sector has grown considerably, gradually evolving from being considered a niche technology, to being recognized as a viable source of clean, baseload, grid-balancing power, and renewable electric power generation. Furthermore, recent technical advances that could greatly accelerate deployment in the near future, and US federal incentives for low-carbon generation technologies, including geothermal, can enable opportunities for integrating geothermal into utilities resource planning portfolios. However, in general, utilities do not have in-house expertise to evaluate geothermal technologies and its potential role in helping decarbonize the grid as well as help them achieve their individual decarbonization goals. To date, geothermal is rarely included in Capacity Expansion Models (CEM) which utilities use in their planning activities and resource/technologies prioritization. To this end, EPRI and NREL are working together in a DOE-GTO funded research project to improve geothermal understanding (opportunities, value, risks) among the power industry to help accelerate geothermal deployment. In the present paper we describe the approach and preliminary findings of this work, focused on two topics: 1) Expand the degree of understanding on the value, opportunity, and risk of geothermal technologies among utilities and related companies/groups, specifically around geothermal for power generation. 2) Improve representation of geothermal power technologies in capacity expansion models (CEM).

capacity expansion models↗

Powered By: Transmission Planning

Presented as part of the NREL Grid Planning and Analysis Center's (GPAC) "Powered By" Series, this iteration focuses not on a specific tool but instead on a domain of expertise/capability being built out at NREL: transmission planning. Various sets of tools are integrated together in this presentation to present a combination of transmission focus areas, case studies, tools and future directions of transmission research.

capacity expansion↗

Technical Assistance for the Makah Tribe, Washington

The Energy Technology Innovation Partnership Project (ETIPP) worked with the Makah Tribe on strategic energy planning, including scoping future energy needs of relocated facilities, understanding the potential for new energy generation options to support current and future energy demand, and supporting communication and capacity-building goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA secondary payload plans, policies and requirements

A review is presented of the secondary or piggyback flight opportunities that are presently available along with an overview of NASA's secondary payload plans, policies and requirements. When there is excess capacity on either the Space Shuttle or an expendable launch vehicle (ELV), a logical step is to carry a secondary payload to provide a relatively low-cost launch for small satellites. NASA has already flown more than a dozen piggyback payloads on the Delta rocket. The Small Expendable Deployment system experiment is currently planned as the first of small space experiments launched as a piggyback on an ELV. Some details are provided on various secondary payload flight opportunities aboard the Space Shuttle including the Get-Away Special Canister Program, the complex autonomous payload, the Hitchhiker Program, and the middeck lockers concept. Also described are several secondary payload possibilities utilizing ELVs.

Poniatowski, Karen S.↗

Capacity contributions of Southern Oregon offshore wind to the Pacific Northwest and California

Variable renewable energy generation poses unique capacity challenges, which increasingly depend on weather events at varying timescales. Facilitated by transmission planning, geographic and technological diversity of the generation fleet may provide a mitigation to capacity shortfalls. In this work, offshore wind (OSW) energy is sited in the areas off the West Coast between Coos Bay, Oregon, and Crescent City, California. Three generation and transmission scenarios are modeled within the Western Interconnection: (i) 3.4 gigawatts (GW) of installed OSW capacity connected to Southern Oregon through a High Voltage Alternating Current (HVAC) Radial Topology in 2030; (ii) 12.9 GW of installed OSW capacity connected to Washington, Oregon, and California through a High Voltage Direct Current (HVDC) Radial Topology post-2030, and (iii) the same 12.9 GW connected to the same locations through a Multi-terminal DC (MTDC) Backbone Topology post-2030. Zonal dispatch simulations assuming coincident wind, solar, and hydropower production and loads over 18 meteorological years, accounting for temperature-dependent equipment derating and forced outages, serve as inputs to the Associated System Capacity Contribution (ASCC) methodology. The capacity credit is 33%, 25% and 34% for the 2030 HVAC Radial Topology, 2030+ HVDC Radial Topology, and 2030+ MTDC Backbone Topology, respectively. Transmission design is shown to mitigate the typical erosion of marginal capacity contribution as more OSW is developed, underscoring the opportunity for grid modernization while decarbonizing the generation mix.

17 WIND ENERGY↗

Eagle-Picher SPV development

The topics covered are presented in viewgraph form and include the following: Eagle-Picher heritage - single pressure vessel (SPV) technology; SPV units in process at Eagle-Pitcher; design features; basic battery design features; cell development considerations; SPV boiler plate cell; cell development activity; SPV cell capacity test - charge and discharge; and current plans.

Brill, Jack↗

Project Prometheus

Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

Johnson, Steve↗

Optimization of X-ray Absorbers for TES Microcalorimeters

We have investigated the thermal, electrical, and structural properties of Bi and BiCu films that are being developed as X-ray absorbers for transition-edge sensor (TES) microcalorimeter arrays for imaging X-ray spectroscopy. Bi could be an ideal material for an X-ray absorber due to its high X-ray stopping power and low heat capacity, but it has a low thermal conductivity, which can result in position dependence of the pulses in the absorber. In order to improve the thermal conductivity, we added Cu layers in between the Bi layers. We measured electrical and thermal conductivities of the films around 0.1 K(sub 1) the operating temperature of the TES calorimeter, to examine the films and to determine the optimal thickness of the Cu layer. From the electrical conductivity measurements, we found that the Cu is more resistive on the Bi than on a Si substrate. Together with an SEM picture of the Bi surface, we concluded that the rough surface of the Bi film makes the Cu layer resistive when the Cu layer is not thick enough t o fill in the roughness. From the thermal conductivity measurements, we determined the thermal diffusion constant to be 2 x l0(exp 3) micrometers squared per microsecond in a film that consists of 2.25 micrometers of Bi and 0.1 micrometers of Cu. We measured the position dependence in the film and found that its thermal diffusion constant is too low to get good energy resolution, because of the resistive Cu layer and/or possibly a very high heat capacity of our Bi films. We show plans to improve the thermal diffusion constant in our BiCu absorbers.

Iyomoto, Naoko↗

Parallel runway requirement analysis study. Volume 1: The analysis

The correlation of increased flight delays with the level of aviation activity is well recognized. A main contributor to these flight delays has been the capacity of airports. Though new airport and runway construction would significantly increase airport capacity, few programs of this type are currently underway, let alone planned, because of the high cost associated with such endeavors. Therefore, it is necessary to achieve the most efficient and cost effective use of existing fixed airport resources through better planning and control of traffic flows. In fact, during the past few years the FAA has initiated such an airport capacity program designed to provide additional capacity at existing airports. Some of the improvements that that program has generated thus far have been based on new Air Traffic Control procedures, terminal automation, additional Instrument Landing Systems, improved controller display aids, and improved utilization of multiple runways/Instrument Meteorological Conditions (IMC) approach procedures. A useful element to understanding potential operational capacity enhancements at high demand airports has been the development and use of an analysis tool called The PLAND_BLUNDER (PLB) Simulation Model. The objective for building this simulation was to develop a parametric model that could be used for analysis in determining the minimum safety level of parallel runway operations for various parameters representing the airplane, navigation, surveillance, and ATC system performance. This simulation is useful as: a quick and economical evaluation of existing environments that are experiencing IMC delays, an efficient way to study and validate proposed procedure modifications, an aid in evaluating requirements for new airports or new runways in old airports, a simple, parametric investigation of a wide range of issues and approaches, an ability to tradeoff air and ground technology and procedures contributions, and a way of considering probable blunder mechanisms and range of blunder scenarios. This study describes the steps of building the simulation and considers the input parameters, assumptions and limitations, and available outputs. Validation results and sensitivity analysis are addressed as well as outlining some IMC and Visual Meteorological Conditions (VMC) approaches to parallel runways. Also, present and future applicable technologies (e.g., Digital Autoland Systems, Traffic Collision and Avoidance System II, Enhanced Situational Awareness System, Global Positioning Systems for Landing, etc.) are assessed and recommendations made.

Ebrahimi, Yaghoob S.↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

Modeling Weather Impact on Ground Delay Programs

Scheduled arriving aircraft demand may exceed airport arrival capacity when there is abnormal weather at an airport. In such situations, Federal Aviation Administration (FAA) institutes ground-delay programs (GDP) to delay flights before they depart from their originating airports. Efficient GDP planning depends on the accuracy of prediction of airport capacity and demand in the presence of uncertainties in weather forecast. This paper presents a study of the impact of dynamic airport surface weather on GDPs. Using the National Traffic Management Log, effect of weather conditions on the characteristics of GDP events at selected busy airports is investigated. Two machine learning methods are used to generate models that map the airport operational conditions and weather information to issued GDP parameters and results of validation tests are described.

Wang, Yao↗

Prediction of Weather Impacts on Airport Arrival Meter Fix Capacity

This paper introduces a data driven model for predicting airport arrival capacity with a look-ahead time 2-8 hour forecast. The model is suitable for air traffic flow management by explicitly investigating the impact of convective weather on airport arrival meter fix throughput. Estimation of the arrival airport capacity under arrival meter fix flow constraints due to severe weather is an important part of Air Traffic Management (ATM). Airport arrival capacity can be reduced if one or more airport arrival meter fixes are partially or completely blocked by convective weather. When the predicted airport arrival demands exceed the predicted available airport's arrival capacity for a sustained period, Ground Delay Program (GDP) operations will be triggered by ATM system. Serious imbalances between demand and capacity occur most frequently when the airport capacity is severely degraded due to either bad airport terminal surface weather or inclement convective weather around airport arrival fixes. A model that predicts the weather-impacted airport arrival meter fix throughput may help ATM personnel to plan GDP operations more efficiently. This paper identifies the characteristics of air traffic flow across arrival meter fixes at Newark Liberty International Airport (EWR). The proposed approach, based on machine-learning methods, is developed to predict the weather impacted EWR arrival Meter Fix (MF) throughput. Sector forecast coverage is used to envision the weather impact on airport arrival MF flow, and the validation is accomplished by using Convective Weather Avoidance Model (CWAM) 0.5 to 2-hour and Collaborative Convective Forecast Product (CCFP) 4 to 8-hour look-ahead forecast data for the period of April-September in 2014. Furthermore, the regression tree ensemble learning of random forests approach for translating a sector forecast coverage model to an EWR arrival meter fix throughput model is examined. The results suggest that ATM decision makers in charge of MF flow control and GDP planning may benefit from adopting the airport arrival meter capacity prediction models to estimate the inclement weather impacts.

Wang, Yao X.↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Towards a Formal Semantics of Flight Plans and Trajectories

In the National Airspace System, ight plans are often used only as a planning tool by air trac controllers and aircraft operators. These plans are implicitly translated into trajectories by the pilot or by the ight management system, and subsequently own by the aircraft. This translation process inevitably introduces di erences between the plan and the trajectory. However, given the current intended usage, exact correspondence between the plan and the trajectory is not needed. To achieve greater capacity and eciency, future air trac management concepts are being designed around the use of trajectories where predictability is extremely important. In this paper, a mathematical relationship between ight plans and trajectories is explored with the goal of making feasible, highly accurate predictions of future positions and velocities of aircraft. The goal here is to describe, in mathematically precise detail, a formal language of trajectories, whereby all receivers of the trajectory information will be able to arrive at precisely the same trajectory predication and to do this without having aircraft broadcast a large amount of data. Although even a four-dimensional ight plan is simple in structure, this paper will show that it is inherently ambiguous and will explore these issues in detail. In e ect, we propose that a rigorous semantics for ight plans can be developed and this will serve as an important stepping stone towards trajectory-based operations in the National Airspace System.

Hagen, George E.↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗