At least 145 records · Page 8

Regional Energy Deployment System (ReEDS) Model Documentation (Version 2020)

The Regional Energy Deployment System (ReEDS) model is a capacity expansion and dispatch model that is primarily used for the contiguous U.S. electric power sector. The model relies on system-wide least cost optimization to estimate the type and location of future generation and transmission capacity. This document describes details of how the model is formulated, how it functions, and many of the key inputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regional Energy Deployment System (ReEDS) Model Documentation: 2025

The Regional Energy Deployment System (ReEDS) model is a capacity expansion and dispatch model that is primarily used for the contiguous U.S. electric power sector. The model relies on system-wide least cost optimization to estimate the type and location of future generation and transmission capacity. This document describes details of how the model is formulated, how it functions, and many of the key inputs.

15 GEOTHERMAL ENERGY↗

cerf: A Python package to evaluate the feasibility and costs of power plant siting for alternative futures

Long-term electric power sector planning and capacity expansion is a key area of interest to stakeholders across a wide range of organizations because it helps in making informed decisions about investments in infrastructure within the context of potential future vulnerabilities under various natural and human stressors. Future power plant siting costs will depend on a number of factors including the characteristics of the electricity capacity expansion and electricity demand (e.g., fuel mix of future electric power capacity, and the magnitude and geographic distribution of electricity demand growth) as well as the geographic location of power plants. Electricity technology capacity expansion plans modeled to represent alternate future conditions meeting a set of scenario assumptions are traditionally compared against historical trends which may not be consistent with current and future conditions. We present the `cerf` Python package (a.k.a., the Capacity Expansion Regional Feasibility model) which helps evaluate the feasibility and structure of future, scenario-driven electricity capacity expansion plans by siting power plants in areas that have been deemed the least cost option while considering dynamic future conditions. We can use `cerf` to gain insight to research topics such as: 1) under what conditions future projected electricity expansion plans from models such as GCAM-USA are possible to achieve, 2) where and which on-the-ground barriers to siting (e.g., protected areas, cooling water availability) may influence our ability to achieve certain expansions, and 3) how electricity infrastructure build-outs and value may evolve into the future when considering locational marginal pricing (LMP) based on the supply and demand of electricity from a grid operations model.

20 FOSSIL-FUELED POWER PLANTS↗

Bias Correcting NOAA's High-Resolution Rapid Refresh (HRRR) Wind Resource Data for Grid Integration Applications [Slides]

Many weather years of high-quality wind data are widely accepted in the grid integration community to be important for studying wind energy technical potential, energy system operations, and grid resilience. NREL makes high-quality wind and solar resource data available. NREL's Grid-Atmosphere workshop (March 2024) identified NREL National Solar Radiation Database as widely used in grid integration modeling, but there is less agreement on commonly used wind datasets. One important factor identified by ESIG's 2023 report 'Weather Dataset Needs for Planning and Analyzing Modern Power Systems' for gold standard wind data is regular updates. To address the need for regular updates, NREL's team can now process all currently available and regularly updated High-Resolution Rapid Refresh (HRRR) outputs. HRRR is an hourly-updated operational forecast product produced by the National Oceanic and Atmospheric Administration (NOAA) (Dowell et al., 2022). One barrier to NREL using HRRR is systematic bias and consistency with NREL's existing wind datasets (e.g. WIND Toolkit, 'WTK') across weather years. To address this barrier, we show that the HRRR can be interpolated and bias-corrected to be consistent with NRE's existing datasets. We call the new dataset BC-HRRR (bias-corrected HRRR). As with historical datasets like the WTK, BC-HRRR is intended for use in grid integration modeling (e.g., capacity expansion, production cost, and resource adequacy modeling). BC-HRRR's (2015-present) consistency with WTK (2007-2013) allows NREL to extend internal grid integration tooling with 15+ weather years of wind data with low-overhead extensibility to future years as they are made available by NOAA. The rest of this slide deck documents the BC-HRRR processing methods, validation, and its implications for intended use.

17 WIND ENERGY↗

Bias Corrected NOAA HRRR Wind Resource Data for Grid Integration Applications

To address the need for regularly updated wind resource data, NREL has processed the High-Resolution Rapid Refresh (HRRR) outputs for use in grid integration modeling. The HRRR is an hourly-updated operational forecast product produced by the National Oceanic and Atmospheric Administration (NOAA) (Dowell et al., 2022). Several barriers have prevented the HRRR's widespread proliferation in the wind energy industry: missing timesteps (prior to 2019), challenging file format for wind energy analysis, limited vertical height resolution, and negative bias versus legacy WIND Toolkit data (2007-2013). NREL has applied re-gridding, interpolation, and bias-correction to the native HRRR data to overcome these limitations. This results in the now-publicly-available bias corrected and interpolated HRRR (BC-HRRR) dataset for weather years 2015 to 2023. Bias correction is necessary for wind resource consistency across weather years to be used simultaneously in planning-focused grid integration studies alongside the original WIND Toolkit data. We show that quantile mapping with the WIND Toolkit as a historical baseline is an effective method for bias correcting the interpolated HRRR data: the BC-HRRR has reduced mean bias versus comparable gridded wind resource datasets (+0.12 m/s versus Vortex) and has very low mean bias versus ground measurement stations (+0.01 m/s) (Buster et al., 2024). BC-HRRR's consistency with the legacy WIND Toolkit allows NREL to extend grid integration analysis to 15+ weather years of wind data with low-overhead extensibility to future years as they are made available by NOAA. As with historical datasets like the WIND Toolkit, BC-HRRR is intended for use in grid integration modeling (e.g., capacity expansion, production cost, and resource adequacy modeling) both independently and alongside the legacy WIND Toolkit.

Array↗

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emerging Trends in Power System Planning Models

This presentation highlights NREL's power system modeling capabilities, both existing and the future direction of improvements. Specific enhancements to the ReEDS (Regional Energy Deployment System) model and a new electricity market design testbed called EMIS (Electricity Markets and Investment Suite) were described. This content was part of a broader discussion to help inform the National Academies of Sciences, Engineering, and Medicine Committee on the Future of Electric Power in the U.S. on existing power system models and improvements needed in these models to capture the increasing complexity and interconnectedness of the power system.

capacity expansion modeling↗

Harmonized geospatial data to support infrastructure siting feasibility planning for energy system transitions

Climate change, energy system transitions, and socioeconomic change are compounding influences affecting the growth of electricity demand. While energy efficiency initiatives and distributed resources can address a significant amount of this demand, the United States will likely still need new utility-scale generation resources. The energy sector uses capacity expansion planning models to determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. To help address these challenges, we have developed the Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package, a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers 264 suitability layers for use with 56 power plant technologies in a harmonized format that can be easily ingested by geospatially-enabled modeling software allowing for customization to robustly address science objectives when evaluating varying future conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Potential Availability of and Supply Curves for Low-Cost, Dispatch-Constrained Electricity

Among other changes, variable renewable energy (VRE) - primarily wind and solar photovoltaics - is achieving a growing share of total generation. High VRE penetrations may result in an increased level of curtailment and thus suppress the value of additional VRE. This VRE, that either would not be built due to price suppression or would be curtailed, can be considered a resource that we define as low-cost, dispatch-constrained electricity (LDE). LDE could be used for various applications which value low-cost electricity and can operate at reduced capacity factors. Examples include electrolytic hydrogen production and carbon capture. This report provides initial estimates of the quantity and availability of the potential LDE resource in the U.S. under scenarios with high VRE penetrations. It also provides supply curves that can be used in subsequent analysis of the opportunity to use the LDE. We modeled several scenarios using capacity expansion and production cost models for LDE prices ranging from $\$ $0/MWh to $\$ $30/MWh. These LDE prices, coupled with low renewable energy cost assumptions, resulted in VRE penetrations ranging from 48-66% in 2050. The resulting LDE supplies range from 100 - 300 TWh/yr at a price of $\$ $0/MWh to 3,500 - 4,200 TWh/yr at $\$ $30/MWh. Increasing LDE prices increases wind and photovoltaics deployment; however, other generation technology capacities do not decrease equivalently in our models. Thus, additional generation is available but the capacity of traditional dispatchable generation is only reduced slightly. The available LDE is concentrated in the central and southwest U.S. regions because of their high wind and solar resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Water and Climate Impacts on ERCOT Long-Term Systems Assessment

Water and climate change pose many potential challenges to the electric power system. Substantial water is withdrawn every day to support thermoelectric power generating unit operations, and changes to water supply have the potential to affect generation dispatch. Climate change can accelerate growing demand for electricity, which can necessitate additional generating capacity, often in locations with limited water supply. Drought conditions also threaten thermoelectric power plant operations due to streamflow and reservoir levels dropping below intake structures, or water temperatures exceeding a power plants' permitted operating conditions. Here we explore how future climate change might influence decisions related to electricity capacity expansion planning in Electric Reliability Council of Texas (ERCOT) using a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on the future water supply for thermoelectric and hydropower generation for four future climate projections. Separately, temperature impacts on electricity load are evaluated for these scenarios. These climate impacts are applied to five alternative electricity futures in an electricity capacity expansion model that projects future generation and transmission capacity additions in ERCOT. Results indicate that climate has a measurable influence on future generation and transmission capacity needs, with temperature-driven increases in peak and average load resulting in 5-15 GW additional generating capacity and up to 1 GW additional transmission capacity. Additional capacity is a diverse mix of PV, natural gas, and wind, depending on the makeup of economic, policy and technology assumptions. Climate impacts increase total system costs 2-5%, while the marginal cost of energy and emissions are not affected substantially by climate change effects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How structural differences influence cross-model consistency: An electric sector case study

Multiple models are often employed to describe a range of possible outcomes for one or more scenarios, yielding insights into causal relationships and their uncertainties. Electric sector capacity expansion scenarios are a common topic of such efforts due to the economic influence of the electric sector, but model results typically span a broad solution space despite efforts to harmonize input assumptions, making decision implications difficult to discern. This study investigates the relationship between input harmonization and cross-model scenario consistency under disparate electric sector scenarios. We compare cross-model consistency between two state-of-the-art electric sector capacity expansion models (GCAM-USA and ReEDS) for six electric sector scenarios comprising alternate assumptions about fossil fuel resource availability, technology innovation, and long-term economy-wide transitions under four harmonization configurations varying model representations of electricity demand, fuel prices, renewable resources, and capacity retirements. These comparisons reveal that cross-model consistency can vary across scenarios under a given harmonization configuration, suggesting that harmonization efforts must often be scenario-specific if comparable cross-model consistency is desired. Model structural differences can hinder consistency, and the impact of these differences can depend on the scenario. Ultimately, thorough harmonization can reveal insights into cross-model consistency, which can be used to tighten uncertainty bounds and improve the decision-making implications of multi-model activities.

Cohen, Stuart↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Geothermal Representation in Power System Models

Power system models generally fail to capture the range of characteristics geothermal resources provide and the value they potentially contribute to decarbonization and reliability of future electricity grids as firm, dispatchable, non-combustion power resources. This study reviews the results of power system modeling efforts to investigate geothermal deployment potential in the United States, including the U.S. DOE GeoVision analysis and ongoing modeling and analysis efforts to support planning and development of future grids with 100% renewable energy in California. Several themes are identified that could be implemented immediately to improve the accuracy of geothermal representation in power system models: consistency of model inputs, modeling of baseload and dispatchable geothermal resources, accurate valuation of grid services, improved representation of capacity factor, use of contemporary LCOE estimates, improved understanding of the evolution of geothermal value, and use of accurate resource potential constraints. Many of the models reviewed produced significantly different amounts of geothermal resource selection - even when modeling the same region and time period. This highlights the variability of inputs and assumptions among models, so creating a consistent set of geothermal inputs is a first step toward more accurate representation of geothermal in models. Research opportunities are identified that could help improve geothermal data inputs in modeling efforts, including analyses of historical data, sensitivity to model inputs, and comparative value of geothermal generators as baseload or dispatchable resources. Outcomes of such research can inform the geothermal community about how best to guide geothermal development toward wider deployment in support of future electricity grids through improved understanding of the evolution of geothermal value over time and the characteristics that contribute to that value.

capacity expansion models↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗