Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSULTANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

TH-AB-207A-09: Tailoring TCM Schemes to a Task: Evaluating the Impact of Customized TCM Profiles On Detection of Lung Nodules in Simulated CT Lung Cancer Screening

Purpose: Recent work has shown that current TCM profile designs boost detection of low-contrast lung lesions in the lung apices, but yield reduced detection performance in the mid and lower lung regions relative to fixed tube current cases. This observed imbalance suggests that the TCM scheme might be tailored in new ways to maximize nodule detection throughout the entire lung. In this work, we begin a preliminary investigation into custom TCM profiles in an attempt to achieve uniform lesion detection throughout the extent of the lung. Methods: Low-contrast (25HU), 6mm nodules representing ground glass opacities were simulated at 1mm intervals over the length the lungs in a voxelized model of the XCAT phantom, one nodule per lung, per simulated scan. Voxel values represented attenuation values at 80keV. CT projection data was created by simulating a finite focal spot and using Joseph’s method for forward projection; scanner geometry was that of the Siemens Sensation 64 and the X-ray source was simulated as an 80keV monochromatic beam. Noise realizations were created using Poisson statistics, a realistic bowtie filter and varying tube current. 500 noise realizations were created for the custom TCM designs. All reconstruction was done with FreeCT-wFBP. An SKE/BKE task was used in conjunction with a 2D Hotelling Observer to calculate area-under-the-curve (AUC) as a proxy for “detectability.” AUC was plotted as a function of nodule Z-location to create a “detectability map.” The detectability map for the custom TCM curve was qualitatively assessed relative to previous results for the fixed TC and clinical TCM cases for uniformity. Results: Detection uniformity was improved throughout the mid and lower lungs, however detection remained disproportionately high in the upper lung region. Conclusion: Detection uniformity was improved with a custom TC profile. Future work will incorporate an analytic, task-specific approach to optimize the TC scheme for nodule detection. J. Hoffman: Part-time intern, Toshiba Medical Research Institute; M. McNitt-Gray: Institutional research agreement, Siemens Healthcare; Past recipient, research grant support, Siemens Healthcare; Consultant, Toshiba America Medical Systems; Consultant, Samsung Electronics; F. Noo: Institutional research agreement, Siemens Healthcare; Receives research funding from Siemens Healthcare.

60 APPLIED LIFE SCIENCES↗

TH-AB-207A-12: CT Lung Cancer Screening and the Effects of Further Dose Reduction On CAD Performance

Purpose: CT lung screening is already performed at low doses. In this study, we investigated the effects of further dose reduction on a lung-nodule CAD detection algorithm. Methods: The original raw CT data and images from 348 patients were obtained from our local database of National Lung Screening Trial (NLST) cases. 61 patients (17.5%) had at least one nodule reported on the NLST reader forms. All scans were acquired with fixed mAs (25 for standard-sized patients, 40 for large patients) on a 64-slice scanner (Sensation 64, Siemens Healthcare). All images were reconstructed with 1-mm slice thickness, B50 kernel. Based on a previously-published technique, we added noise to the raw data to simulate reduced-dose versions of each case at 50% and 25% of the original NLST dose (i.e. approximately 1.0 and 0.5 mGy CTDIvol). For each case at each dose level, a CAD detection algorithm was run and nodules greater than 4 mm in diameter were reported. These CAD results were compared to “truth”, defined as the approximate nodule centroids from the NLST forms. Sensitivities and false-positive rates (FPR) were calculated for each dose level, with a sub-analysis by nodule LungRADS category. Results: For larger category 4 nodules, median sensitivities were 100% at all three dose levels, and mean sensitivity decreased with dose. For the more challenging category 2 and 3 nodules, the dose dependence was less obvious. Overall, mean subject-level sensitivity varied from 38.5% at 100% dose to 40.4% at 50% dose, a difference of only 1.9%. However, median FPR quadrupled from 1 per case at 100% dose to 4 per case at 25% dose. Conclusions: Dose reduction affected nodule detectability differently depending on the LungRADS category, and FPR was very sensitive at sub-screening levels. Care should be taken to adapt CAD for the very challenging noise characteristics of screening. Funding support: NIH U01 CA181156; Disclosures (McNitt-Gray): Institutional research agreement, Siemens Healthcare; Past recipient, research grant support, Siemens Healthcare; Consultant, Toshiba America Medical Systems; Consultant, Samsung Electronics.

60 APPLIED LIFE SCIENCES↗

TH-B-204-00: Implanted Markers for Radiation Therapy and TG 199 Update

Implanted markers as target surrogates have been widely used for treatment verification, as they provide safe and reliable monitoring of the inter- and intra-fractional target motion. The rapid advancement of technology requires a critical review and recommendation for the usage of implanted surrogates in current field. The symposium, also reporting an update of AAPM TG 199 - Implanted Target Surrogates for Radiation Treatment Verification, will be focusing on all clinical aspects of using the implanted target surrogates for treatment verification and related issues. A wide variety of markers available in the market will be first reviewed, including radiopaque markers, MRI compatible makers, non-migrating coils, surgical clips and electromagnetic transponders etc. The pros and cons of each kind will be discussed. The clinical applications of implanted surrogates will be presented based on different anatomical sites. For the lung, we will discuss gated treatments and 2D or 3D real-time fiducial tracking techniques. For the prostate, we will be focusing on 2D-3D, 3D-3D matching and electromagnetic transponder based localization techniques. For the liver, we will review techniques when patients are under gating, shallow or free breathing condition. We will review techniques when treating challenging breast cancer as deformation may occur. Finally, we will summarize potential issues related to the usage of implanted target surrogates with TG 199 recommendations. A review of fiducial migration and fiducial derived target rotation in different disease sites will be provided. The issue of target deformation, especially near the diaphragm, and related suggestions will be also presented and discussed. Learning Objectives: Knowledge of a wide variety of markers Knowledge of their application for different disease sites Understand of issues related to these applications Z. Wang: Research funding support from Brainlab AG Q. Xu: Consultant for Accuray; Q. Xu, I am a consultant for Accuray planning service.

60 APPLIED LIFE SCIENCES↗

TH-B-204-01: Real-Time Tracking with Implanted Markers

Implanted markers as target surrogates have been widely used for treatment verification, as they provide safe and reliable monitoring of the inter- and intra-fractional target motion. The rapid advancement of technology requires a critical review and recommendation for the usage of implanted surrogates in current field. The symposium, also reporting an update of AAPM TG 199 - Implanted Target Surrogates for Radiation Treatment Verification, will be focusing on all clinical aspects of using the implanted target surrogates for treatment verification and related issues. A wide variety of markers available in the market will be first reviewed, including radiopaque markers, MRI compatible makers, non-migrating coils, surgical clips and electromagnetic transponders etc. The pros and cons of each kind will be discussed. The clinical applications of implanted surrogates will be presented based on different anatomical sites. For the lung, we will discuss gated treatments and 2D or 3D real-time fiducial tracking techniques. For the prostate, we will be focusing on 2D-3D, 3D-3D matching and electromagnetic transponder based localization techniques. For the liver, we will review techniques when patients are under gating, shallow or free breathing condition. We will review techniques when treating challenging breast cancer as deformation may occur. Finally, we will summarize potential issues related to the usage of implanted target surrogates with TG 199 recommendations. A review of fiducial migration and fiducial derived target rotation in different disease sites will be provided. The issue of target deformation, especially near the diaphragm, and related suggestions will be also presented and discussed. Learning Objectives: Knowledge of a wide variety of markers Knowledge of their application for different disease sites Understand of issues related to these applications Z. Wang: Research funding support from Brainlab AG Q. Xu: Consultant for Accuray; Q. Xu, I am a consultant for Accuray planning service.

60 APPLIED LIFE SCIENCES↗

TH-B-204-02: Application of Implanted Markers in Proton Therapy

Implanted markers as target surrogates have been widely used for treatment verification, as they provide safe and reliable monitoring of the inter- and intra-fractional target motion. The rapid advancement of technology requires a critical review and recommendation for the usage of implanted surrogates in current field. The symposium, also reporting an update of AAPM TG 199 - Implanted Target Surrogates for Radiation Treatment Verification, will be focusing on all clinical aspects of using the implanted target surrogates for treatment verification and related issues. A wide variety of markers available in the market will be first reviewed, including radiopaque markers, MRI compatible makers, non-migrating coils, surgical clips and electromagnetic transponders etc. The pros and cons of each kind will be discussed. The clinical applications of implanted surrogates will be presented based on different anatomical sites. For the lung, we will discuss gated treatments and 2D or 3D real-time fiducial tracking techniques. For the prostate, we will be focusing on 2D-3D, 3D-3D matching and electromagnetic transponder based localization techniques. For the liver, we will review techniques when patients are under gating, shallow or free breathing condition. We will review techniques when treating challenging breast cancer as deformation may occur. Finally, we will summarize potential issues related to the usage of implanted target surrogates with TG 199 recommendations. A review of fiducial migration and fiducial derived target rotation in different disease sites will be provided. The issue of target deformation, especially near the diaphragm, and related suggestions will be also presented and discussed. Learning Objectives: Knowledge of a wide variety of markers Knowledge of their application for different disease sites Understand of issues related to these applications Z. Wang: Research funding support from Brainlab AG Q. Xu: Consultant for Accuray; Q. Xu, I am a consultant for Accuray planning service.

60 APPLIED LIFE SCIENCES↗

TH-B-204-03: TG-199: Implanted Markers for Radiation Treatment Verification

Implanted markers as target surrogates have been widely used for treatment verification, as they provide safe and reliable monitoring of the inter- and intra-fractional target motion. The rapid advancement of technology requires a critical review and recommendation for the usage of implanted surrogates in current field. The symposium, also reporting an update of AAPM TG 199 - Implanted Target Surrogates for Radiation Treatment Verification, will be focusing on all clinical aspects of using the implanted target surrogates for treatment verification and related issues. A wide variety of markers available in the market will be first reviewed, including radiopaque markers, MRI compatible makers, non-migrating coils, surgical clips and electromagnetic transponders etc. The pros and cons of each kind will be discussed. The clinical applications of implanted surrogates will be presented based on different anatomical sites. For the lung, we will discuss gated treatments and 2D or 3D real-time fiducial tracking techniques. For the prostate, we will be focusing on 2D-3D, 3D-3D matching and electromagnetic transponder based localization techniques. For the liver, we will review techniques when patients are under gating, shallow or free breathing condition. We will review techniques when treating challenging breast cancer as deformation may occur. Finally, we will summarize potential issues related to the usage of implanted target surrogates with TG 199 recommendations. A review of fiducial migration and fiducial derived target rotation in different disease sites will be provided. The issue of target deformation, especially near the diaphragm, and related suggestions will be also presented and discussed. Learning Objectives: Knowledge of a wide variety of markers Knowledge of their application for different disease sites Understand of issues related to these applications Z. Wang: Research funding support from Brainlab AG Q. Xu: Consultant for Accuray; Q. Xu, I am a consultant for Accuray planning service.

60 APPLIED LIFE SCIENCES↗

Opinion: Making the Most of Colour Rendition Research

After decades of debate, new methods for characterizing color rendition have been formalized, providing an improved system of tools to aid technology developers and lighting specifiers. Solid-state lighting, previously burdened by legacy measures based on outdated science, is positioned to take advantage of these new tools to provide tailored, efficient lighting that better meets the needs of specific architectural lighting applications. This transition requires new guidance, however, presenting an opportunity for researchers. There are several key methodological considerations specific to experiments investigating color rendition that will help build a base of guidance that can be widely applied. The importance of these ideas mostly stems from new knowledge gained in the last five years, but their origins date back much further. 1.The spectral power distribution must be adequately varied to stress the measure(s) of color rendition being evaluated. Often, this means varying the gamut shape—the pattern of shift across different hues—to probe weaknesses of hue-averaged characterizations, avoiding misleading conclusions resulting from limited variation in the stimuli. 2.Evaluating the role of chromaticity on color quality evaluations requires careful accommodation of chromatic adaptation to prevent a centering bias. Asking for delayed responses may be insufficient if chromaticity changes are apparent to participants, just as side-by-side viewing of different chromaticities may not produce results that can be reliably applied in the field. It is also critical that color rendition and chromaticity conditions are varied independently. 3.The stimulus being viewed is the interaction of light and objects’ spectral reflectances. This interaction should be quantified in order to assess how derived guidelines will apply measures using standardized color sample sets. Although light source characterizations are typically used to model responses, the objects and their presentation may strongly influence evaluations. 4.Context is important. Many factors—some investigated, others hypothesized—can influence subjective evaluations of color quality, including illuminance level, type of scene, object familiarity, color composition, viewing duration, and viewer traits. Although their influence on research results is unavoidable, the effects of these contextual factors must be carefully considered in developing guidance. Appropriate experimental design can often mitigate negative consequences arising from these considerations. At a minimum, it is crucial to understand how each of these considerations can influence experimental outcomes, as well as the interpretation and application of the results in practice. Consulting other experts prior to conducting an experiment can help ensure appropriate, up-to-date research methods will be used, so that the results will be novel and useful—and not rejected during peer review. There is an interesting feedback loop: technology development provides new research tools, which allow for refined research methods and new results that lead to more technology development. It is time to make a concerted, collective effort to improve color rendition research so that the full potential of solid-state lighting and new characterization methods can be realized, ensuring that high-efficiency, high-utility, high-appeal lighting systems become standard.

Royer, Michael P.↗

Sodium Fast Reactor Safety and Licensing Research Plan – Volume II

Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Measurements of 222 Rn, 220 Rn, and CO 2 Emissions in Natural CO 2 Fields in Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity

An integrated field-laboratory program evaluated the use of radon and CO 2 flux measurements to constrain source and timescale of CO 2 fluxes in environments proximate to CO 2 storage reservoirs. By understanding the type and depth of the gas source, the integrity of a CO 2 storage reservoir can be assessed and monitored. The concept is based on correlations of radon and CO 2 fluxes observed in volcanic systems. This fundamental research is designed to advance the science of Monitoring, Verification, and Accounting (MVA) and to address the Carbon Storage Program goal of developing and validating technologies to ensure 99 percent storage performance. Graduate and undergraduate students conducted the research under the guidance of the Principal Investigators; in doing so they were provided with training opportunities in skills required for implementing and deploying CCS technologies. Although a final method or “tool” was not developed, significant progress was made. The field program identified issues with measuring radon in environments rich in CO 2 . Laboratory experiments determined a correction factor to apply to radon measurements made in CO 2 -bearing environments. The field program also identified issues with radon and CO 2 -flux measurements in soil gases at a natural CO 2 analog. A systematic survey of radon and CO 2 flux in soil gases at the LaBarge CO 2 Field in Southwest Wyoming indicates that measurements of 222 Rn (radon), 220 Rn (thoron), and CO 2 flux may not be a robust method for monitoring the integrity of a CO 2 storage reservoir. The field program was also not able to correlate radon and CO 2 flux in the CO 2 -charged springs of the Thermopolis hydrothermal system. However, this part of the program helped to motivate the aforementioned laboratory experiments that determined correction factors for measuring radon in CO 2 -rich environments. A graduate student earned a Master of Science degree for this part of the field program; she is currently employed with a geologic consulting company. Measurement of radon in springs has improved significantly since the field program first began; however, in situ measurement of 222 Rn and particularly 220 Rn in springs is problematic. Future refinements include simultaneous salinity measurements and systematic corrections, or adjustments to the partition coefficient as needed for more accurate radon concentration determination. A graduate student earned a Master of Science degree for this part of the field program; he is currently employed with a geologic consulting company. Both graduate students are poised to begin work in a CCS technology area. Laboratory experiments evaluated important process-level fundamentals that effect measurements of radon and CO 2 . Laboratory tests established that fine-grained source minerals yield higher radon emissivity compared to coarser-sized source minerals; subtleties in the dataset suggest that grain size alone is not fully representative of all the processes controlling the ability of radon to escape its mineral host. Emissivity for both 222 Rn and 220Rn increases linearly with temperature due to reaction of rocks with water, consistent with faster diffusion and enhanced mineral dissolution at higher temperatures. The presence of CO 2 changes the relative importance of the factors that control release of radon. Emissivity for both 222 Rn and 220 Rn in CO 2 -bearing experiments is greater at all temperatures compared to the experiments without CO 2 , but emissivity does not increase as a simple function of temperature. Governing processes may include a balance between enhanced dissolution versus carbonate mineral formation in CO 2 -rich waters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory

Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2015 update retains the management guidelines from the 1999 HMP for listed species, updates some descriptive information, and adds the New Mexico Meadow Jumping Mouse (Zapus hudsonius luteus) and Yellow-billed Cuckoo (Coccyzus americanus) which were federally listed in 2014 (Keller 2015: USFWS consultation number 02ENNM00- 2015-I-0538).

54 ENVIRONMENTAL SCIENCES↗

2014 Zero Waste Strategic Plan Executive Summary.

Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Services and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bench Scale Development and Testing of Aerogel Sorbents for CO 2 Capture Final Technical Report

The primary objective of this project was scaling up and evaluating a novel Amine Functionalized Aerogel (AFA) sorbent in a bench scale fluidized bed reactor. The project team (Aspen Aerogels, University of Akron, ADA-ES, and Longtail Consulting) has carried out numerous tests and optimization studies to demonstrate the CO 2 capture performance of the AFA sorbent in all its forms: powder, pellet, and bead. The CO 2 capture target performance of the AFA sorbent (all forms) were set at > 12 wt.% and > 6 wt.% for total and working CO 2 capacity, respectively (@ 40 °C adsorption / 100 – 120 °C desorption). The optimized AFA powders outperformed the performance targets by more than 30%, for the total CO 2 capacity (14 - 20 wt.%), and an average of 10 % more for working CO 2 capacity (6.6 – 7.0 wt.%, and could be as high as 9.6 wt. % when desorbed at 120 °C). The University of Akron developed binder formulations, pellet production methods, and post treatment technology for increased resistance to attrition and flue gas contaminants. In pellet form the AFA total CO 2 capacity was ~ 12 wt.% (over 85% capacity retention of that of the powder), and there was less than 13% degradation in CO 2 capture capacity after 20 cycles in the presence of 40 ppm SO 2 . ADA-ES assessed the performance of the AFA powder, pellet, and bead by analyzing sorption isotherms, water uptake analysis, cycling stability, jet cup attrition and crush tests. At bench scale, the hydrodynamic and heat transfer properties of the AFA sorbent pellet in fluidized bed conditions were evaluated at Particulate Solid Research, Inc. (PSRI). After the process design requirements were completed, by Longtail Consulting LLC, a techno-economic analysis was achieved using guidance from The National Energy Technology Laboratory (NETL) report. This report provides the necessary framework to estimate costs for a temperature swing post combustion CO 2 capture process using a bituminous coal fired, super-critical steam cycle power plant producing 550 MWe net generation with 90% CO 2 capture using a methylethylamine (MEA) solvent. Using the NETL report as guidance, the designed CO 2 capture system was analyzed on a cost basis to determine relative cost estimates between the benchmark MEA system and the AFA sorbent system.

20 FOSSIL-FUELED POWER PLANTS↗

Status of Federally Listed Threatened and Endangered Species at Los Alamos National Laboratory

Compliance with the Endangered Species Act at LANL is achieved through the implementation of the LANL Threatened and Endangered Species Habitat Management Plan (HMP; LANL 2017a). This plan is a formal agreement between the U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and the U.S. Fish and Wildlife Service for the management of endangered species and their habitats at LANL. Actions and activities approved in the HMP were reviewed by the U.S. Fish and Wildlife Service and do not require further consultations. Projects that cannot follow the HMP requirements must go through separate section 7 consultations. The controls for Endangered Species Act compliance are incorporated into an internal project review process through which all LANL projects are reviewed for environmental compliance (LANL 2017b).

54 ENVIRONMENTAL SCIENCES↗

Zero Waste Strategic Plan for SNL

Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to LandfilI by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Services and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Gasification to Produce Fischer-Tropsch Jet and Diesel Fuel

The primary objective of this project and the U.S. DOE’s integrated biorefinery (“IBR”) program was to demonstrate conversion of biomass and waste-derived feedstocks into military spec liquid fuels. Frontline’s proposed integrated process was to incorporate several novel technologies and innovative applications of existing technologies that would serve both to increase plant efficiency and also to lower the cost of the produced biofuels. The project was intended to demonstrate Frontline Bioenergy’s technologies for gasification and synthesis gas clean-up configuration to produce a syngas stream suitable for a proven Fischer-Tropsch (“F-T”) unit that would produce F-T intermediate products. These F-T intermediate products were to be upgraded to military spec diesel and jet fuel, including F76, JP5, and JP8. Specifically, these technologies consisted of: 1. Frontline’s PMFreeGas® ultra low particulate matter (PM) hot gas filtration technology 2. Application of Frontline’s TarFreeGas® ultra low-tar gasification technology 3. Frontline’s novel approach to syngas conditioning The proposed gasifier system was to operate at 10 tpd capacity while the F-T plant was capable of approximately one barrel per day. Although the gasifier output would have been roughly ten times the F-T plant’s required input, the 10 tpd capacity was chosen to enable scaling to commercial capacity. Project partners included i) SGC Energia, owner of the F-T technology and owner of the proposed demonstration site in Pasadena, Texas; ii) Stanley Consultants, a reputable engineering company that provided detailed electrical engineering services; and iii) Delphi Engineering & Construction LLC, a consulting company that provided project management advisory services. The integrated plant was never constructed due to lack of cost share funds. However, the commercialization plan and associated financial model suggested such a plant could be economically viable when the price of oil exceeds $70 per barrel. The price of feedstock plays a significant role in the profitability of the plant for a given value of oil. An integrated biorefinery capable of producing liquid transportation fuels and other chemical feedstocks would benefit the public by providing a sustainable pathway to convert domestically available feedstocks into fuels that might otherwise be imported from countries or regions of the world that are typically hostile to the United States.

09 BIOMASS FUELS↗

Dover Light & Power 10 MWe Coal Direct Chemical Looping (CDCL) (Large Pilot Plant Test - Phase I Feasibility)

A feasibility study was conducted to install a 10 MWe coal direct chemical looping large pilot plant at a host site. The coal direct chemical looping technology was based on The Ohio State University and Babcock & Wilcox iron-based metal oxide technology coupling a moving bed reduction reactor with a circulating fluidized-bed oxidation reactor. The host site was the Dover Light & power Plant in Dover, Ohio. The Electric Power Research Institute performed the host site evaluation. Trinity Consultants prepared the Environmental Information Volume. WorleyParsons Group performed the civil engineering. Clear Skies Consulting served as lead on the Industrial Advisory Committee.