Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Industrial Support

A presentation details the relationship between openlab and CERN, a science-industry partnership to drive R&D and innovation first begun in 2002. The goal is to test in a research environment what will ultimately be used in industry in the future.

AUSTRALIA↗

Design-Space Data: Informing Common Design Decisions with Pre-Simulated Data

Design Space Exploration (DSE) analysis techniques represent a data-centric approach to integrating performance analysis in early design phases when there is the greatest potential to cheaply improve the energy efficiency of a building. We focus on a novel extension of DSE called Universal Design Space Exploration (UDSE), which leverages massive databases of pre-simulated analysis that represent all possible outcomes of common analysis workflows. These databases, called Design Spaces, become “universal” when a single pre-simulated design space can be re-applied to future unknown projects. Unlike current simulation methods, which require a design to exist before it can be analyzed and often take minutes or hours to simulate, UDSE leverages pre-simulation to deliver rapid and relevant insight as new designs are conceptualized. The data underpinning UDSE enables advanced statistical and Artificial Intelligence methods, allowing UDSE to deliver a greater understanding of the larger problem being explored, rather than simply delivering analysis of several pre-conceived design options. We believe that UDSE can provide instantaneous, relevant analysis for all building design projects at negligible cost. This paper has two main goals, to develop a relevant Universal Design Space that showcases the potential of UDSE and to release this data freely to industry and academia; thereby lowering the barrier to entry to digital literacy in statistics, ML and AI within the architecture, engineering, construction (AEC) industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Construction and Skilled Trades (CAST) Test Preparation, Final Report for period 10/1/2016 - 03/31/2017

Within the energy and utilities sectors, the most significant barrier for consideration and submittal of diverse applicants for skilled labor opportunities is their inability to successfully pass the industry’s Construction And Skilled Trades (CAST) examination. The exam is collectively accepted as the benchmark for prospective candidates and assess if they have the baseline skills and knowledge to apply for skilled positions within those industries. It is an exam that was created by the Edison Electric Institute. Students were taught for a full 40-hr week M-F. We conducted one class in each of the following locations: Philadelphia, Chicago and Washington, DC. The students learned and practiced curriculum prepared by the utility industry for increased success for the examination. They were also taught how to successfully navigate the final barrier of employment opportunity: behavior-based interviewing. They were then directed to the website in order to apply for the positions they desired, and then scheduled to take the exam. We were targeting at least 70% of those who sit for the exam to pass the first time. If they were unsuccessful, candidates could re-test within 3 months. We then sent their resumes directly to the hiring recruiters and managers so that they received prime consideration. Our target number of applicants who were successful in being invited for interviews was 15 candidates.

99 GENERAL AND MISCELLANEOUS↗

Advances in alternative cementitious binders

There is a burgeoning interest in the development, characterization, and implementation of alternatives to Portland cement as a binder in concrete. The construction materials industry is under increasing pressure to reduce the energy used in production of Portland cement clinker and the associated greenhouse gas emissions. Further, Portland cement is not the ideal binder for all construction applications, as it suffers from durability problems in particularly aggressive environments. Several alternative binders have been available for almost as long as Portland cement, yet have not been extensively used, and new ones are being developed. In this paper, four promising binders available as alternatives to Portland cement are discussed, namely calcium aluminate cement, calcium sulfoaluminate cement, alkali-activated binders, and supersulfated cements. The history of the binders, their compositions and reaction mechanisms, benefits and drawbacks, unanswered questions, and primary challenges are described.

36 MATERIALS SCIENCE↗

Advanced Building Construction Collaborative (Final Technical Report)

This report summarizes the outcomes of RMI’s five-year U.S. Department of Energy–funded Advanced Building Construction Collaborative (ABC-C), which accelerated adoption of high-performance construction through industry collaboration, market research, technology commercialization, and demand aggregation. It highlights the Collaborative’s achievements—including engagement of more than 130 organizations, support for over $637 million in funding for ABC companies, and recommendations to scale advanced building construction through coordinated market, policy, and investment strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CRADA NFE-08-01456 Evaluation of Alumina-Forming Austenitic Stainless Steel Alloys in Industrial Gas Turbines

Oak Ridge National Laboratory (ORNL) and Solar Turbines Incorporated (Solar) participated in an in-kind cost share cooperative research and development agreement (CRADA) effort under the auspices of the Energy Efficiency and Renewable Energy (EERE) Technology Maturation Program to explore the feasibility for use of developmental ORNL alumina-forming austenitic (AFA) stainless steels as a material of construction for industrial gas turbine recuperator components. ORNL manufactured lab scale foil of three different AFA alloy compositions and delivered them to Solar for creep properties evaluation. One AFA composition was selected for a commercial trial foil batch. Both lab scale and the commercial trial scale foils were evaluated for oxidation and creep behavior. The AFA foil exhibited a promising combination of properties and is of interest for future scale up activities for turbine recuperators. Some issues were identified in the processing parameters used for the first trial commercial batch. This understanding will be used to guide process optimization of future AFA foil material production.

Brady, Michael P↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Blast Effects on Buildings (Final Report)

Lawrence Livermore National Laboratory (LLNL) has conservatively reduced the explosive safety standards suggested by the Small Quantities in Research Laboratories (SQRL) program testing by 60%. For this reason, further research into the detailed effects of small amounts of explosives in typically constructed rooms is needed in order to improve their factor of safety. The team was tasked with designing an experiment to investigate the effect of different variables on drywall under explosive blasts. In order to meet this objective, the team conducted a comprehensive literature review to gain an understanding of industry-standard construction practices and review previous tests conducted by the Army corp of engineers. Since the team used PBXN-5 rather than C4, as in SQRL, an initial shot was conducted to compare damage levels. From those results and the physical constraints of the testing chamber, the team redesigned multiple single-panel drywall frames to capture the entirety of the incurred damage. Proposed designs were narrowed down using a decision matrix. From the study of previous tests and literature review, variables were chosen that the team hypothesized to have an impact on drywall strength. The variables that were tested were chosen from the results of that work and specific variables the sponsor was interested in, and they were paint, humidity/moisture content, and explosive positioning relative to the studs. Detailed plans were made for each variable according to what conditions the team wanted to investigate. For humidity, this involved testing low, ambient, and high conditions by treating the panels in a chamber. Preliminary shots were performed to test the structural integrity of the frame and streamline the test diagnostics which involved a high-speed camera placed behind the drywall, outside of the chamber, and a pressure probe placed behind the drywall, inside the chamber. Once the instrumentation, diagnostics, and frame design were finalized, a quantitative damage criteria matrix was created to categorize the results of the main shot series. In conjunction with evidence from the high-speed video, the achieved damage levels indicate that high moisture content drywall is better able to withstand explosive blasts. Larger stud damage and lower drywall damage occurred when the explosive was located directly in front of a stud. Paint had no noticeable impact on strength. Ultimately, the team conducted a total of 17 tests, leaving the door open for future in-depth research into the impact of humidity.

36 MATERIALS SCIENCE↗

Net Zero Energy Manufactured Homes May Be on their Way

This article, published in Home Energy Magazine, describes a research project sponsored by the U.S. Department of Energy's Building America program, to construct and test the first manufactured home in the United States built to the performance criteria of DOE's Zero Energy Ready Home program. A 15-month study was conducted to compare the real-world performance of the DOE Zero Energy Ready home and two other manufactured homes - one built to just above industry standard construction and one built to the ENERGY STAR Certified Home criteria. The homes were built by Clayton Homes' Southern Energy Division and testing was sponsored by DOE's Building America program and conducted by the Levy Partnership. The DOE ZERH had increased initial construction costs of $6,607 compared to the standard home versus $4,340 for the ENERGY STAR home but reduced energy bills by $50 per month compared to a $33/month savings for the ENERGY STAR home, and monthly savings will continue for the life of the home. Savings were especially noticeable in the summer in this cooling-dominated test location. The DOE ZERH cut cooling costs in half compared to the ENERGY STAR home which performed only slightly better than the standard home in summer, while winter savings between the two advanced homes were more similar. Two technology advances were tested in the DOE ZERH home. Instead of the typical ducted heating and cooling system, the DOE ZERH home was equipped with a ductless heat pump; to condition the bedroom, holes were cut into bedroom walls and small fans were installed to pull air into those rooms, while door undercuts and transfer grilles provide return paths. A novel dense-pack attic insulation was also implemented.

DOE Zero Energy Ready Home↗

Net Zero Energy Manufactured Homes May Be on their Way

This article, published in Home Energy Magazine, describes a research project sponsored by the U.S. Department of Energy's Building America program, to construct and test the first manufactured home in the United States built to the performance criteria of DOE's Zero Energy Ready Home program. A 15-month study was conducted to compare the real-world performance of the DOE Zero Energy Ready home and two other manufactured homes - one built to just above industry standard construction and one built to the ENERGY STAR Certified Home criteria. The homes were built by Clayton Homes' Southern Energy Division and testing was sponsored by DOE's Building America program and conducted by the Levy Partnership. The DOE ZERH had increased initial construction costs of $6,607 compared to the standard home versus $4,340 for the ENERGY STAR home but reduced energy bills by $50 per month compared to a $33/month savings for the ENERGY STAR home, and monthly savings will continue for the life of the home. Savings were especially noticeable in the summer in this cooling-dominated test location. The DOE ZERH cut cooling costs in half compared to the ENERGY STAR home which performed only slightly better than the standard home in summer, while winter savings between the two advanced homes were more similar. Two technology advances were tested in the DOE ZERH home. Instead of the typical ducted heating and cooling system, the DOE ZERH home was equipped with a ductless heat pump; to condition the bedroom, holes were cut into bedroom walls and small fans were installed to pull air into those rooms, while door undercuts and transfer grilles provide return paths. A novel dense-pack attic insulation was also implemented.

U.S. Department of Energy Building Technologies Pr↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring the Potential of Factory Installed Solar + Storage for Homebuilding

In recent years, an increasing number of grid disruptions due to intense weather events, natural disasters, and high peak loads resulted in increased interest in energy-resilient homes. Solar + storage (S+S) as an energy resiliency solution can provide continuity, onsite generation, and backup power during critical events. This project explored factory-installed solar plus storage (FISS) to overcome first cost and installation barriers and bring this resiliency solution to scale for single-family affordable and market-rate homebuyers. Guided by the principles of Lean manufacturing, the team explored how factories building high-performance zero energy modular homes can incorporate S+S into their existing construction system while improving quality and productivity and reducing the costs of the resilient energy system.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Teleoperation of Construction Robots Using Human Interaction: Case Study Examples: Preprint

The integration of advanced teleoperation methods in construction robotics has the potential to enhance productivity and safety in demanding environments. Among different methods, hand gestures have emerged as an intuitive approach, enabling seamless communication between human operators and robotic systems. This study demonstrates the use of hand gestures for controlling a model robotic excavator and a virtual robotic arm in construction applications. Two case study examples are presented. In the first case study, a series of hand gestures are performed to control a model robotic excavator's bucket and arm movements. The second case study focuses on using hand gestures to control a virtual robotic arm to perform a material handling task in a simulated environment. In both cases, the performed hand gestures are all successfully captured and interpreted by the gesture-based teleoperation method to conduct the corresponding tasks, which demonstrates the application of the gesture-based control method for various types of construction robots. Also, the limitations of the gesture-based teleoperation method (e.g., recognition delay, sensitivity to motion outliers) are discussed. Future work will focus on developing a digital twin system to support gesture-based teleoperation for a wider range of construction robots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Alkali-activated materials

This paper, which forms part of the UNEP White Papers series on Eco-Efficient Cements, provides a brief discussion of the class of cementing materials known as ‘alkali-activated binders’, which are identified to have potential for utilization as a key component of a sustainable future global construction materials industry. These cements are not expected to offer a like-for-like replacement of Portland cement across its full range of applications, for reasons related to supply chain limitations, practical challenges in some modes of application, and the need for careful control of formulation and curing. However, when produced using locally-available raw materials, with well-formulated mix designs (including in particular consideration of the environmental footprint of the alkaline activator) and production under adequate levels of quality control, alkali-activated binders are potentially an important and cost-effective component of the future toolkit of sustainable construction materials.

36 MATERIALS SCIENCE↗

Building the Efficiency Workforce: Preprint

Demand for high-performance homes and buildings is growing due to their marketability, environmental benefits, and increasing affordability. Growth for energy efficient technologies and building upgrades has driven expansion across many traditional industries including construction trades (which added almost 21,000 jobs) and professional services (which added 35,000 employees) in 2018, according to the 2019 U.S. Energy Employment Report (USEER). As buildings become more automated, digitized and interconnected, the workforce that supports the design, build, operations and maintenance of these buildings must evolve. The U.S. Department of Energy’s Building Technologies Office (BTO) has engaged NREL to provide a framework upon which BTO can develop their next generation workforce development strategy. The strategy will be designed to increase quantity of workers with the skills to adequately design, install, maintain and operate high- performance buildings across all building sectors (residential, commercial, industrial). This paper will summarize past BTO workforce development efforts, identify current skills gaps and hiring challenges, and present anticipated future workforce needs based on new technologies currently being developed by labs and industry. Through a literature review and a series of industry and academic workshops, NREL will present a framework that includes multiple options to best prepare the next generation workforce.

buildings↗

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗