Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Perspectives on Potential Advanced Construction Technologies for Nuclear Energy

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, the National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DNA parts and gene constructs for plant biodesign

Plant biodesign requires the knowledge of DNA parts (e.g., genes, promoters, terminators), along with their combinations (as gene constructs) linked to engineered traits. DNA parts with validated or predicted functions in plants have been deposited in various online databases. However, these existing databases focus on basic biological functions of individual DNA parts, leaving a gap between basic knowledge and bioengineering applications. To fill this knowledge gap, we have created a user-friendly, open-ended database as a knowledge graph linking DNA parts to gene constructs to traits. This database contains experimentally validated DNA parts and gene constructs documented in peer-reviewed publications. The DNA parts include 1) molecular components with biological functions, such as genes involved in various biological processes (e.g., metabolic and signal transduction pathways) and 2) molecular components with technical functions, such as gene expression, genome engineering and sequence splicing. The gene constructs deposited in this database include both single-gene and multi-gene constructs. This database allows users to submit DNA parts and gene construct compositions linked to engineered traits described in peer-reviewed publications, providing a public digital repository for sharing the biodesign information among the researchers in the fields of plant biotechnology and plant synthetic biology.

plant biodesign synthetic biology gene constructs ↗

Integrating Energy Efficiency Strategies with Industrialized Construction for Our Clean Energy Future: Preprint

NREL’s Industrialized Construction Innovation Team has developed an ambitious plan to accelerate the integration of energy efficiency (EE) strategies with Industrialized Construction (IC). The United States (U.S.) construction industry is beginning to use IC methods to build multifamily apartment buildings to address affordability and labor shortages. Apart from reducing cost of construction and delivery times, the IC method of permanent modular construction has the potential to facilitate the integration of a wide range of EE strategies and advanced controls into such buildings. While there may be unintended EE benefits to IC such as a tighter envelope due to higher construction quality, the process has not been leveraged specifically to enhance EE. NREL aims to claim this missed opportunity and integrate IC benefits with EE as well as advanced controls, distributed energy resources, and grid-friendly design strategies. The paper proposes an ‘IC Assessment Framework’ to achieve affordable zero-energy modular multifamily buildings. Through the selection criteria of Design for Manufacturing and Assembly, the framework aims to distill a broad range of proven EE strategies for site-built into a set of strategies that qualify as easy to integrate for off-site. The output is a Factory Information Model (FIM) that represents a process-based digital twin to enable advanced time-and-motion study, plugs into open source building energy modeling platform (EnergyPlus), and serves as a vital tool facilitating wider adoption of EE integration. Conclusively, the paper delineates next steps for upcoming pilots with NREL’s IC partners towards developing a transformational pathway for our Clean Energy Future.

30 DIRECT ENERGY CONVERSION↗

The AP1000{sup R} China projects move forward to construction completion and equipment installation

The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improving nuclear criticality safety in maintenance and construction activities at Y-12 national security complex

Maintenance and construction activities inside aging DOE nuclear facilities often impact nuclear criticality safety controls and requirements. Gaps in communication, training, and implementation of criticality safety guidance and controls in maintenance and construction work packages were identified at the Y-12 National Security Complex in 2016 when a maintenance package in the field was discovered to not have been reviewed by criticality safety. This incident resulted in a deficiency because criticality safety review is required any time maintenance or construction is working on equipment containing fissile material or their work impacts fissile material or fissile material activities. This review is required to protect the basis and requirements of criticality safety evaluations. To address these issues, the Y-12 criticality safety group reviewed a large number of maintenance packages, created a new method of communicating criticality safety controls to maintenance and construction, and developed a criticality safety training session designed specifically for maintenance and construction work planners. This paper presents the improvements in communication and implementation made between criticality safety, maintenance, and construction at the Y-12 National Security Complex and possible applications for other DOE sites. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Construction of occipital bone fracture using B-spline curves

Treating trauma to the cranio-maxillofacial region is a great challenge and requires expert clinical skills and sophisticated radiological imaging. The aim of reconstruction of the facial fractures is to rehabilitate the patient both functionally and aesthetically. In this article we employed B-spline curves to construct the occipital bone fracture using Digital Imaging and Communications in Medicine (DICOM) format data. The construction of occipital bone fracture starts with the boundary extraction followed by corner detection, construction of fractured part inner outer curve for each DICOM data using B-spline curves and finally the construction of fractured part in DICOM format. Method used in this article is based on DICOM data only and does not require any technique such as mirror imaging, technical help, reference skull, or to take average thickness of skull bone. Using the proposed method, the constructed fractured implant is custom made for every individual patient. At the end of this article we present a real case, in which we have constructed the occipital bone fracture using B-spline. The proposed method has been validated using post-operation DICOM data. For practical application, Graphical User Interface (GUI) has been developed.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Direct interpolative construction of the discrete Fourier transform as a matrix product operator

The quantum Fourier transform (QFT), which can be viewed as a reindexing of the discrete Fourier transform (DFT), has been shown to be compressible as a low-rank matrix product operator (MPO) or quantized tensor train (QTT) operator. However, the original proof of this fact does not furnish a construction of the MPO with a guaranteed error bound. Meanwhile, the existing practical construction of this MPO, based on the compression of a quantum circuit, is not as efficient as possible. We present a simple closed-form construction of the QFT MPO using the interpolative decomposition, with guaranteed near-optimal compression error for a given rank. This construction can speed up the application of the QFT and the DFT, respectively, in quantum circuit simulations and QTT applications. We also connect our interpolative construction to the approximate quantum Fourier transform (AQFT) by demonstrating that the AQFT can be viewed as an MPO constructed using a different interpolation scheme.

97 MATHEMATICS AND COMPUTING↗

Vision and Development of a Design, Implementation, and Verification Automation (DIVA) Software Platform for DNA Construction

Abstract DNA construction, while a prerequisite to many biological endeavors, is often a time-consuming distraction from an individual’s primary research objectives. We envisioned that with the right software infrastructure and cultural mindset, a single person could execute in parallel the batched DNA construction tasks of an entire research institute, at scales realizing efficiency gains through process and laboratory automation. In pursuit of this vision, we developed the Design, Implementation, and Verification Automation (DIVA) software platform. DIVA’s web interface enables researchers to design DNA constructs (using visual biological computer-aided design tools and biological parts repositories), submit designs for construction to dedicated staff, and track DNA construction as it progresses. DIVA supports the dedicated staff through the DNA construction process and records both successful and unsuccessful attempts toward improving the overall process. The platform is publicly available at public-diva.jbei.org and its open-source code through github.com/JBEI/DIVA.

Plahar, Hector [DOE Agile BioFoundry , , ,; DOE Jo↗

Universal construction of black hole microstates

We refine and extend a recent construction of sets of black hole microstates with semiclassical interiors that span a Hilbert space of dimension e S , where S is the black hole entropy. We elaborate on the definition and properties of microstates in statistical and black hole mechanics. The gravitational description of microstates employs matter shells in the interior of the black hole, and we argue that in the limit where the shells are very heavy, the construction acquires universal validity. To this end, we show it for very wide classes of black holes; we first extend the construction to rotating and charged black holes, including extremal and near-extremal solutions, with or without supersymmetry, and we sketch how the construction of microstates can be embedded in string theory. We then describe how the approach can include general quantum corrections, near or far from extremality. For supersymmetric black holes, the microstates we construct differ from other recent constructions in that the interior excitations are not confined within the near-extremal throat. Published by the American Physical Society 2024

Astronomy & Astrophysics↗

NovoGraph: Human genome graph construction from multiple long-read de novo assemblies

Genome graphs are emerging as an important novel approach to the analysis of high-throughput human sequencing data. By explicitly representing genetic variants and alternative haplotypes in a mappable data structure, they can enable the improved analysis of structurally variable and hyperpolymorphic regions of the genome. In most existing approaches, graphs are constructed from variant call sets derived from short-read sequencing. As long-read sequencing becomes more cost-effective and enables de novo assembly for increasing numbers of whole genomes, a method for the direct construction of a genome graph from sets of assembled human genomes would be desirable. Such assembly-based genome graphs would encompass the wide spectrum of genetic variation accessible to long-read-based de novo assembly, including large structural variants and divergent haplotypes. We present NovoGraph, a method for the construction of a human genome graph directly from a set of de novo assemblies. NovoGraph constructs a genome-wide multiple sequence alignment of all input contigs and creates a graph by merging the input sequences at positions that are both homologous and sequence-identical. NovoGraph outputs resulting graphs in VCF format that can be loaded into third-party genome graph toolkits. To demonstrate NovoGraph, we construct a genome graph with 23,478,835 variant sites and 30,582,795 variant alleles from de novo assemblies of seven ethnically diverse human genomes (AK1, CHM1, CHM13, HG003, HG004, HX1, NA19240). Initial evaluations show that mapping against the constructed graph reduces the average mismatch rate of reads from sample NA12878 by approximately 0.2%, albeit at a slightly increased rate of reads that remain unmapped.

59 BASIC BIOLOGICAL SCIENCES↗

Construction Cost Growth for New Department of Energy Nuclear Facilities

Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

42 ENGINEERING↗

Updated Draft ASME Boiler and Pressure Vessel Code Case for Use of Alloy 617 for Construction of Nuclear Components for Section III Division 5

Early in the United States’ very high temperature reactor program, several candidate nickel alloys were considered for use in construction of the intermediate heat exchanger. Based primarily on technical maturity, a downselection was made to focus on Alloy 617. After this downselection, the primary goal of the research and development program was to develop sufficient information on the high temperature properties of the material to qualify it for construction of high temperature nuclear components in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code. Alloy 617 is a solid solution strengthened material with nominal Ni Cr Co Mo composition, originally developed for aerospace applications such as burner can liners for turbine engines by Huntington Alloys. (Huntington Alloys is now Special Metals Division of Precision Castparts, Inc.) The ASME BPV Code allows use of Alloy 617 for construction of non nuclear pressure vessels, and Alloy 617 is used in fossil fired power plants. Section III, Division 1, Subsection NB of the ASME BPV Code was developed for construction of nuclear components in light water reactors and allows use of ferritic materials up to 700°F and austenitic alloys up to 800°F. Subsection NH of Section III Division 1 was written to allow higher temperature construction with a primary focus on sodium cooled reactors. Recently, a new Division 5 of Section III was published specifically for high temperature reactors (regardless of the primary working fluid) and incorporates both Subsections NB and NH. There are only five alloys currently allowed for use in high temperature nuclear components: 2.25Cr 1 Mo and V modified 9Cr 1Mo steels, Types 304 and 316 stainless steels, and the high nickel austenitic Alloy 800H. This very sparse set of allowed materials is in contrast with the collection of more than 150 materials that are allowed for use in non nuclear pressure vessel construction. A draft Code Case to add Alloy 617 to the list of qualified alloys for use in high temperature nuclear design was submitted to ASME in the early 1990s, but it was withdrawn prior to formal Code action.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Draft ASME Boiler and Pressure Vessel Code Cases and Technical Bases for Use of Alloy 617 for Constructions of Nuclear Component Under Section III, Division 5

The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code currently only allows five materials for use in construction of nuclear components for high temperature service. These are: 2.25Cr-1Mo and V-modified 9Cr-1Mo steels, Types 304 and 316 stainless steels and the high nickel Alloy 800H. Since 2005, the US high temperature gas-cooled reactor program has been characterizing elevated temperature mechanical properties of Alloy 617 as the leading candidate construction material for the intermediate heat exchanger. After analysis of these experimental results, along with historical data and additional results available through the Generation IV International Forum, Very High Temperature Reactor, Materials Program Management Board Materials Handbook, a draft ASME Code Case to allow nuclear construction with Alloy 617 for temperatures up to 1750°F (954°C) has been developed. This report contains the Code Case for Low Temperature Service Construction of Section III, Division 5, Subsection HB, Subpart A, Class A and Subsection HC, Subpart A, Class B components, which has been approved in Section II, Materials, and Section III, Rules for Construction of Nuclear Facility Components. Supporting technical justification for the low temperature Code Case is also included. This Code Case allows use of Alloy 617 up to 800°F (425°C). This report also contains an updated draft of a Section III, Division 5, Subsection HB, Subpart B, Class A Code Case for Alloy 617 to qualify it for use in construction of nuclear components up to 1750°F (954°C) for service life up to 100,000 hours. The draft contained in Appendix 4, subject to editorial revision and approval by the ASME Special Task Group on Alloy 617 Code Qualification, will be submitted for approval by letter ballot by the appropriate ASME Committees. The technical justification supporting the Code Case is presented in Appendix 5 of this report. This background document is part of the information package that will be submitted with the Code Case for ballot.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of National New Construction Weighting Factors for the Commercial Building Prototype Analyses (2008-2022)

The U.S. Department of Energy (DOE) tasked Pacific Northwest National Laboratory (PNNL) with updating commercial building construction weights for the purpose of estimating national and state-by-state energy savings impacts of changes made to various commercial energy codes and standards. A similar activity was last completed by PNNL in 2020 using disaggregate construction volume data acquired from the Dodge Data & Analytics database (formerly McGraw Hill) for the years 2003-2018 (Lei et al, 2020). As time passes, changes in economic and social demand reshape construction volume trends. For the current update, PNNL reviewed the same data source with the latest construction data for the years 2008-2022. For commercial building analyses, PNNL typically uses a suite of 16 prototype buildings simulated in the 19 ASHRAE climate zones with 16 of them present in the United States. The 2008-2022 commercial building weighting factors were derived using the same approach employed to develop the 2003-2018 set (Lei et al, 2020). Applying the construction volume data from the database to the prototypes and climate zones resulted in the following new construction area-based weighting factors. Table ES.1 shows the weighting factors including all building categories found in the database, and Table ES.2 shows the weighting factors normalized to include only buildings represented by the 16 prototypes. Section 3.0 also includes national- and state-level weighting factors by area and building count.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Illumina Unamplified Indexed Library Construction: An Automated Approach

Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.

59 BASIC BIOLOGICAL SCIENCES↗

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗