DOE OSTI2023
The U.S. nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor nuclear power plants (NPPs), and it can be achieved more economically by using a risk-informed ecosystem, such as that being developed by the Risk-Informed Systems Analysis Pathway under the U.S. Department of Energy Light Water Reactor Sustainability Program. This program is promoting a wide range of research and development activities to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering a second license renewal. The Risk-Informed Systems Analysis Pathway has two main goals: (1) The deployment of methodologies and technologies that enable a better representation of the safety margins and factors that contribute to cost and safety, and (2) The development of advanced applications that enable cost-effective plant operation. As part of this pathway, the Enhanced Resilient Plant project refers to an NPP where safety is improved by implementing various measures, such as accident-tolerant fuels, diverse and flexible coping strategies, enhancements to plant components and systems, incorporation of augmented or new passive cooling systems, and utilization of advanced battery technologies. The objective of the Enhanced Resilient Plant project is to use novel methods and computational tools to enhance existing reactors’ safety while reducing operational costs. This report documents research and development conducted in support of deployment of accident-tolerant fuels. This project performed safety analyses for the steady-state normal operation, anticipated operational occurrences, and design-basis accidents of a representative four-loop pressurized water reactor model with Zr and FeCrAl accident-tolerant fuel clad with higher enrichment and burnup supporting plant refueling cycles of 18 and 24 months. The source terms and environmental impacts were studied for a large-break loss of coolant accident, including uncertainty analyses.
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗