Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

(abstract) Space Science with Commercial Funding

The world-wide recession, and other factors, have led to reduced or flat budgets in real terms for space agencies around the world. Consequently space science projects and proposals have been under pressure and seemingly will continue to be pressured for some years into the future. A new concept for space science funding is underway at JPL. A partnership has been arranged with a commercial, for-profit, company that proposes to implement a (bandwidth-on-demand) information and telephone system through a network of low earth orbiting satellites (LEO). This network will consist of almost 1000 satellites operating in polar orbit at Ka-band. JPL has negotiated an agreement with this company that each satellite will also carry one or more science instruments for astrophysics, astronomy, and for earth observations. This paper discussed the details of the arrangement and the financial arrangements. It describes the technical parameters, such as the 60 GHz wideband inter-satellite links and the frequency, time, and position control, on which the science is based, and it also discusses the complementarity of this commercially funded space science with conventional space science.

observations↗

Field Work Proposal: PUBLIC OUTREACH EVENT FOR ACCELERATOR STEWARDSHIP TEST FACILITY PILOT PROGRAM

Jefferson Lab’s outreach efforts towards the goals of Accelerator Stewardship Test Facility Pilot Program consist of the lab’s efforts in three venues. The first venue, at the end of March is to meet with the members of Virginia Tech Corporate Research Center (VTCRC) (http://www.vtcrc.com/tenant-directory/) in Blacksburg, Virginia. Of the nearly 160 members, we expect that many engineering companies (including mechanical, electrical, bio, software) will be present. To this group, we will describe the capabilities of Jefferson Lab’s accelerator infrastructure. The description will include not only the facilities but also the intellectual expertise. No funding is requested for this effort. The second venue is to reach the industrial exhibitors at the 6th International Particle Accelerator Conference (IPAC’15). Jefferson Lab will host a booth at the conference to reach out to the >75 industrial exhibitors (https://www.jlab.org/conferences/ipac2015/SponsorsExhibitors.php) who represent a wide range of technologies. A number of these industries could benefit if they can access Jefferson Lab’s accelerator infrastructure. In addition to the booth, where written material will be available, we plan to arrange a session A/V presentation to the industry exhibitors. The booth will be hosted by Jefferson Lab’s Public Relations staff, assisted on a rotating basis by the lab’s scientists and engineers. The budget with IPAC’15 designations represents the request for funds for this effort. The third venue is the gathering of Southeastern Universities Research Association (SURA) university presidents. Here we plan to reach the research departments of the universities who can benefit by availing themselves to the infrastructure (material sciences, engineering, medical schools, material sciences, to name a few). Funding is requested to allow for attendance at the SURA Board Meeting. We are coordinating with DOE regarding these costs to raise the projected conference management cost ceiling in the Conference Management Tool.

99 GENERAL AND MISCELLANEOUS↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

National Aeronautics and Space Administration Budget Estimates, Fiscal Year 2011

The Budget includes three new robust exploration programs: (1) Technology demonstration program, $7.8 five years. Funds the development and demonstration of technologies that reduce the cost and expand the capabilities of future exploration activities, including in-orbit refueling and storage. (2) Heavy-Lift and Propulsion R&D, $3.1 billion over five years. Funds R&D for new launch systems, propellants, materials, and combustion processes. (3) Robotic precursor missions, $3.0 billion over five years. Funds cost-effective means to scout exploration targets and identify hazards and resources for human visitation and habitation. In addition, the Budget enhances the current Human Research Program by 42%; and supports the Participatory Exploration Program at 5 million per year for activities across many NASA programs.

Civil space programs↗

FY 2009 Annual Report of Joule Software Metric SC GG 3.1/2.5.2, Improve Computational Science Capabilities

The Joule Software Metric for Computational Effectiveness is established by Public Authorizations PL 95-91, Department of Energy Organization Act, and PL 103-62, Government Performance and Results Act. The U.S. Office of Management and Budget (OMB) oversees the preparation and administration of the President s budget; evaluates the effectiveness of agency programs, policies, and procedures; assesses competing funding demands across agencies; and sets the funding priorities for the federal government. The OMB has the power of audit and exercises this right annually for each federal agency. According to the Government Performance and Results Act of 1993 (GPRA), federal agencies are required to develop three planning and performance documents: 1.Strategic Plan: a broad, 3 year outlook; 2.Annual Performance Plan: a focused, 1 year outlook of annual goals and objectives that is reflected in the annual budget request (What results can the agency deliver as part of its public funding?); and 3.Performance and Accountability Report: an annual report that details the previous fiscal year performance (What results did the agency produce in return for its public funding?). OMB uses its Performance Assessment Rating Tool (PART) to perform evaluations. PART has seven worksheets for seven types of agency functions. The function of Research and Development (R&D) programs is included. R&D programs are assessed on the following criteria: Does the R&D program perform a clear role? Has the program set valid long term and annual goals? Is the program well managed? Is the program achieving the results set forth in its GPRA documents? In Fiscal Year (FY) 2003, the Department of Energy Office of Science (DOE SC-1) worked directly with OMB to come to a consensus on an appropriate set of performance measures consistent with PART requirements. The scientific performance expectations of these requirements reach the scope of work conducted at the DOE national laboratories. The Joule system emerged from this interaction. Joule enables the chief financial officer and senior DOE management to track annual performance on a quarterly basis. Joule scores are reported as success, goal met (green light in PART), mixed results, goal partially met (yellow light in PART), and unsatisfactory, goal not met (red light in PART). Joule links the DOE strategic plan to the underlying base program targets.

99 GENERAL AND MISCELLANEOUS↗

A two-phase methodology for technology selection and system design

A two-phase methodology that can be used to guide R&D managers in the evaluation and selection of competing technologies is presented. Deterministic multiattribute utility theory is used in the first phase to rank the technological alternatives; the example presented involves the evaluation of electric and hybrid passenger vehicles. In all, 39 individuals from eight automotive firms were interviewed to assess their risk preferences and attitudes toward the vehicle design. In the second phase, the decision-maker must allocate a fixed amount of resources to different projects for the technology selected, some of which may be undertaken in parallel, to maximize a given measure of performance. When parallel funding is pursued the best outcome is chosen. The problem is formulated as a probabilistic network and solved heuristically using Monte Carlo simulation. Results are presented for two decision-makers and three budget options. In each case, the heuristic finds the optimal allocation of funds.

Bard, Jonathan F.↗

Y-House: Your Match Final Report

Y-House is a project in Solar Decathlon 2015. The design objective of Y-House is to re-envision the micro-home through a focus on merging efficiency with spaciousness, personalized form and openness to the natural environment. The main project objective during Budget Period 1 was to complete the design of Y-House, including the research needed to fully specify its mechanical and electrical systems. The team also had an objective to finalize most of the construction planning before entering Budget Period 2. The main project objective in Budget Period 2 was to complete construction of Y-House for participation in the SD 2015 competition event in Irvine, California, in October 2015. During both budget periods, the team was continuously seeking sponsors to fund its mission.

14 SOLAR ENERGY↗

Fast Timing Counters for PSEC: MOU for Testing at MTEST

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and University of Chicago, Argonne National Laboratory (ANL), Saclay/lRFU and the University of Hawaii experimenters who have committed to participate in beam tests to be carried out during the 2008 Meson Test Beam Facility program. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate the appropriate amendments to this memorandum if adjustments are required. The experimenters require beam time at Fermilab during the 2008 Meson Test Beam Run to test time-of-flight particle detectors with the ultimate goal of achieving 1 psec timing resolution. Proposed applications are: diffractive Higgs production background reduction at the LHC; measuring the momentum of muons before and after a 6D cooling setup as proposed by the MANX experiment; particle identification at a Super-B factory, LHC detector upgrades, possible third generation Tevatron Collider flavor experiments, precision kaon measurements, and astro-particle experiments. In addition, the development and testing of the associated electronics and timing algorithms may be directly applicable to advances in medical imaging. Much more information can be found at the PSEC web site, at http://hep.uchicago.edu/psec/.

43 PARTICLE ACCELERATORS↗

Aluminum Ultra-conductors for Energy-Efficient Aerospace Busbar Applications (Abstract)

In this project, we will develop aluminum ultra-conductors with graphene additives demonstrating enhanced electrical conductivity at 90 °C compared to electric grade aluminum alloy AA1100 (43% IACS at 90 °C). While ultra-conductivity has been developed in copper and copper alloys, it is yet to be reported extensively in aluminum-based materials. This project will scale initial work done at PNNL on aluminum ultra-conductors using shear-assisted processing and extrusion (ShAPETM), a novel solid phase processing technique. Ultra-conductors are an emerging class of composites, comprised of a metal substrate with small quantities of nanocrystalline additives such as graphene or carbon nanotubes that demonstrate enhanced conductivity at relevant operating temperatures. Aluminum ultra-conductors can improve efficiency and power density while reducing the demand for copper in a wide range of applications, such as power transmission cables and electric motors. Busbars are an important component in aerospace systems that require lightweight and high-current power distribution including both future electric vertical take-off and landing (eVTOL) aircrafts and current aircraft electrical systems. We will accelerate aluminum ultra-conductor composite formulation development using combinatorial synthesis and testing methods aided by process/microstructure modeling, developed previously at PNNL. Eaton will test the properties of the ShAPE aluminum ultra-conductor feedstock (used to make the busbars) in relevant operating conditions (20 – 90 °C), predict the improvement in busbar performance when manufactured with ultra-conductors over commercial conductors (such as AA1100), and perform technoeconomic analysis to evaluate the potential for commercialization of ShAPE aluminum ultra-conductors. The project is expected to have a budget of $\$375$K, with $\$300$K in federal funding and $\$75$K in-kind cost-share contribution from Eaton over a period of performance of 24 months. Of the $\$300$K of federal funds, $\$140$K is allocated for CRADA activities that generate intellectual property (IP), and the remaining $\$160$K is reserved for modeling, material testing, characterization, travel, and reporting-related activities.

36 MATERIALS SCIENCE↗

Memorandum of Understanding for the 2010 MESON Test Beam Program T-1004: Total Absorption Dual Readout Calorimetry R&D

This is a memorandum of understanding between the Fermi National Accelerator Laboratory and experimenters from Fermilab, Caltech, University of Iowa, Argonne National Laboratory, Fairfield University, CERN, INFN Trieste/Udine, INFN Roma I, Shinshu University and the University of Cyprus who have committed to participate in beam tests to be carried out during the 2009/2010 MTBF program. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate amendments to this memorandum which will reflect such required adjustments. The tests have the objective to continue the development of elements and techniques related to total absorption dual readout calorimetry. Until this time, the R&D program has focused on simulations and tests using cosmic rays. The purpose of the program outlined here is to continue this work using particle beams to accelerate the process and to subject the counters and readout electronics to operating intensities and backgrounds with well-defined beam conditions and/or tracking of incident particles. The work will use new prototype electronics developed at Fermilab[1] which will lead to the assembly of future large-scale integrated systems, which may be the subject for a future proposal. For the purpose of this work, the T-1004 experimenters will require limited space and resources and need not always have control of the beam.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Memorandum of Understanding for the 2010-2011 Meson Test Beam Program T-994: JASMIN in the Meson Test Beam

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and Japan Atomic Energy Agency (JAEA) experimenters who have committed to participate in beam tests to be carried out during the 2010-2011 Meson Test Beam Facility program. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermi1ab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate the appropriate amendments to this memorandum if adjustments are required. The experimenters require beam time at Fermilab during the 2010-2011 Meson Test Beam Run to perform a precise measurement of secondary particles and activation of materials irradiated by high energy particles. This measurement will provide basic data for radiation safety design of high energy accelerators. The data will be used for validation of high energy multi-particle transport codes that are widely used for radiation safety design at high energy accelerators. The JASMIN Collaboration has already performed measurements of activation and secondary particles at the pbar vault and NuMI alcoves at Fermilab. The groups from JAEA and Fermilab have been supported by grant-aid of the Ministry of Education Science and Culture in Japan to perform data taking at the Fermilab Meson Test Beam Facility. The continued experiments at the pbar vault and NuMI alcoves after April 2009 are outlined in a separate MOU T993. The new measurements using the Meson Test Beam Facility (MTest) have as their purpose to obtain basic nuclear data and to develop instrumental techniques for characterization of particle fields of protons, neutrons, muons, etc. The data taken at MTest, in contrast to the data taken at pbar and NuMI, play an important role to the check validity of secondary particle generation models without the effect from attenuation.

43 PARTICLE ACCELERATORS↗

Memorandum of Understanding for the 2008-2009 Meson Test Beam Program T988: Air Fluorescence Yield (AIRFLY) for Ultra-High Energy Cosmic Rays

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and Argonne National Laboratory, Czech Academy of Science, Fermi National Accelerator Laboratory, Forschungszentrum Karlsruhe, University of Chicago, University of L' Aquila, University of Rome Tor Vergata experimenters who have committed to participate in beam tests to be carried out during the 2008-2009 Meson Test Beam Facility program. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate the appropriate amendments to this memorandum if adjustments are required.

43 PARTICLE ACCELERATORS↗

Memorandum of Understanding for the 2010 Meson Test Beam Program T-995: Muon Detector / Tail Catcher R&D

This is a memorandum of understanding between the Fermi National Accelerator Laboratory and experimenters from Fermilab, Indiana University, Northern Illinois University, University of Notre Dame, Wayne State University, INFN (Trieste / Udine, Roma I, Padova, Ferrara) who have committed to participate in beam tests to be carried out during the 2010 MTBF pro gram. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties. However, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate amendments to this memorandum which will reflect such required adjustments. The test objectives are to continue the development of extruded scintillator-based muon counters begun in T-956 with emphasis on the use of Si Pixelated Photon Detectors (PPDs). The R&D program outlined here continues the T-956 studies using particle beams to test long strip counters, up to 6m, and new prototype TB4 electronics developed at Fermilab which the experimenters expect will lead to the assembly of future large-scale integrated systems that may be the subject for a future proposal. For the purpose of this work, T-995 will require limited space and resources which may be compatible with other users' equipment in the testing area. The T-995 experimenters may not always require control of the beam. The T-995 experimenters will use some of the same apparatus that is to be used by the experimenters who will study total absorption dual readout calorimetry at MTest (experiment T-1004). The T-995 and T-I004 experimenters both use newly designed Fermilab electronics to digitize the shape of the PPD pulse corresponding to the scintillator output. Both projects will share most of the data acquisition software and typically they will share the same beam instrumentation (beam defining counters and coincidence circuits). Both sets of experimenters will share some of the same counting house logic and analysis software for on-line data analysis. Some of the T-995 and T-I004 manpower available to the two projects will work on both projects although many of the studies will not run concurrently.

43 PARTICLE ACCELERATORS↗

Regulatory Mechanism of Muscle Disuse Atrophy in Adult Rats

During the last phase of NAG 2-386 we completed three studies. The effects of 14 days of weightlessness; the vastus medialis (VM) from flight rats in COSMOS 2044 was compared with the VM from tail suspended rats and other controls. The type I and II fibers in the mixed fiber portion of the VM were significantly reduced in flight rats and capillary densities paralleled the fiber density changes. The results of this project compared favorably with those in the extensor digitorum longus following seven days of flight in SL 3. The cardiovascular projects focused on the blood pressure changes in head down tilted rats (HDT) and non-head down tilted (N-HDT) rats. Blood pressures (MAP, SP and DP) were significantly elevated through seven days of HDT and rapidly returned to control levels within one day after removal from the HDT position. The N-HDT showed some slight rise in blood pressure but these were not as great and they were not as rapid. The HDT rats were characterized as exhibiting transient hypertension. These results led to some of the microvascular and vascular graduate student projects of Dr. Bernhard Stepke. Also our results refute or, at least, do not agree with previous reports from other laboratories. Each animal, in our blood pressure projects, served as its own control thereby providing more accurate results. Also, our experiments focused on recovery studies which can, in and of themselves, provide guidelines for flight experiments concerned with blood pressure changes. Another experiment was conducted to examine the role of testicular atrophy in whole body suspended (WBS) and tail suspended (TS) rats. We worked in conjunction with Dr. D.R. Deaver's laboratory at Pennsylvania State University and Dr. R. P. Amann at Colorado State University. In the TS rats the testes are retracted into the abdominal cavity, unless a ligature is placed to maintain them in the external scrotal sac. The cryptorchid condition in TS rats results in atrophy of the testes and lowered levels of spermatid formation. Hormonal changes due to testes atrophy must be considered in future experiments where related effects may modify muscle, bone or other tissue changes. Also, some new assessments of past results (published by many researchers) may warrant revised interpretations. The blood pressure studies and the testicular function results were presented and reviewed during an invited lecture at the University of Bordeaux II during the Animals in Space Symposium in March 1993. In summary, each of these three projects complied with the objectives of the proposal and serve to demonstrate the utility of animal models in preparations and interpretations of space flight results. All funding has been expended in accordance with the approved budget.

Source record↗

JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

oversights↗

Uranium and strontium fate in waste-weathered sediments: Scaling of molecular processes to predict reactive transport

Objectives of the project: 1. Determine the process coupling that occurs between mineral transformation and contaminant (U and Sr) speciation in acid-uranium waste weathered Hanford sediments. 2. Establish linkages between molecular-scale contaminant speciation and meso-scale contaminant lability, release and reactive transport. 3. Make conjunctive use of molecular- to bench-scale data to constrain the development of a mechanistic, reactive transport model that includes coupling of contaminant sorption-desorption and mineral transformation reactions. Hypotheses tested: - Uranium and strontium speciation in legacy sediments from the U-8 and U-12 Crib sites can be reproduced in bench-scale weathering experiments conducted on unimpacted Hanford sediments from the same formations. - Reactive transport modeling of future uranium and strontium releases from the vadose zone of acid-waste weathered sediments can be effectively constrained by combining molecular-scale information on contaminant bonding environment with grain-scale information on contaminant phase partitioning, and meso-scale kinetic data on contaminant release from the waste-weathered porous media. - Although field contamination and laboratory experiments differ in their diagenetic time scales (decades for field vs. months to years for lab), sediment dissolution, neophase nucleation, and crystal growth reactions that occur during the initial disequilibrium induced by waste-sediment interaction leave a strong imprint that persists over subsequent longer-term equilibration time scales and, therefore, give rise to long-term memory effects. Enabling capabilities developed: Our team developed an iterative measure-model approach that is broadly applicable to elucidate the mechanistic underpinnings of reactive contaminant transport in geomedia subject to active weathering. Experimental design: Hypotheses were tested by comparing (with a similar set of techniques) the geochemical transformations and transport behaviors that occured in bench-scale studies of waste-sediment interaction with parallel model systems studies of homogeneous nucleation and neo-phase dissolution. Initial plans were to compare results with core sample extractions from the acid uranium waste impacted U-8 and U-12 Cribs at Hanford (see original proposal and letter of collaboration from J. Zachara). However, this part of the project was impossible because funding for core extractions were eliminated from the DoE budget. Three distinct crib waste aqueous simulants (whose composition is based on the most up-to-date information from field site investigations) were reacted with Hanford sediments in batch and column systems. Coupling of contaminant uptake to mineral weathering was monitored using a suite of methods both during waste-sediment interaction, and after, when waste-weathered sediments were subjected to infusion with circumneutral background pore water solutions. Our research was designed to adapt as needed to maintain a strong dialogue between laboratory and modeling investigations so that model development was increasingly constrained by emergent data and understanding. Potential impact of the project to DOE: Better prediction of contaminant uranium transport was achieved by employing multi-faceted lines of inquiry to build a strong bridge between molecular- and field-scale information. By focusing multiple lines and scales of observation on a common experimental design, our collaborative team revealed non-linear and emergent behavior in contaminated weathering systems. A goal of the current project was to expand our modeling capabilities, originally focused on hyperalkaline legacy waste streams, to include acidic weathering reactions that, as described above, were expected to result in profoundly different products. We were able to achieve this goal, and showed that these products nonetheless undergo analogous silicate and non-silicate transformation, ripening and aging processes. Our prediction that these weathering reactions would vary with waste stimulant chemistry resulted in data that was incorporated directly into a reactive transport model structure.

54 ENVIRONMENTAL SCIENCES↗

Benefits of a Full Waste Cost Recovery Program - 16322

A full waste cost recovery program has been established at the INL in order to fund disposition of all newly-generated hazardous, radioactive, and mixed waste at the INL. Significant improvements have resulted from implementation of this program at the INL, and it is anticipated that others could benefit from using a similar approach. The INL Waste Management Program (WMP) administers two site-wide service centers that collect revenue from programs and projects in order to pay waste disposition costs. These service centers are administered separately due to their unique scope and functions. The combination of these service centers provides the INL with a fully functional cost recovery program for all newly generated waste. This cost recovery program ensures that funding is available for disposition of all waste types and that waste costs are paid for by the generating programs or facilities. The implementation of these service centers in Fiscal Year 2014 has resulting in several significant improvements in waste disposition, including a substantial increase in awareness and emphasis on waste minimization and segregation. The service centers have virtually eliminated funding shortfalls from projects that end and have not budgeted for dispositioning waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗