Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BLACKOUT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Initial Core Physics and Safety Analyses Supporting the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a proposed integrated facility for investigations into the behavior of fuels and materials subjected to high, fast neutron fluxes prototypical of fast reactor environments. Detailed design of the reactor is currently being performed by a group of U.S. National Laboratories, including Argonne National Laboratory. The current design of the reactor is a 300 MW sodium-cooled pool-type fast reactor fueled with ternary U-20Pu-10Zr metallic fuel. This report documents reactor core physics and preliminary safety analyses that have been performed. The reference VTR core has 313 assembly positions, 66 of which contain fuel assemblies. The remaining assembly positions are loaded with reflector, shield, control rod duct, and test assemblies. Ten positions are available in the reference design for experimental or test assemblies, however the VTR will support test assemblies in any position in the core for alternate core loadings. The performance of the reference VTR core has been assessed for an assumed equilibrium cycle. The core power distribution and reactivity feedback coefficients have been calculated. Preliminary assessments of the reactivity coefficients have shown that each of them results in a negative reactivity change for increasing temperatures. Safety analysis of a VTR layout has been performed using the SAS4A/SASSYS-1 fast reactor safety analysis code. A model has been developed to represent the current core design and a reference heat transport system design. The model has been used to simulate and perform analysis of protected and unprotected loss of heat sink, station blackout, and transient overpower accident scenarios. These scenarios represent the three main ways to perturb the reactor core, through changes to the core inlet temperature, mass flow rate, or reactivity insertions and are credible bounding scenarios for the evaluated transient categories. The results of these simulations have been assessed against simplified criteria for Anticipated Operational Occurrences for the protected transients and for Beyond Design Basis Events for the unprotected transients. Because the primary heat transport system is able to transition quickly and effectively to natural circulation and because the shutdown heat removal system provides sufficient heat rejection capability, large margins for all criteria were predicted for all protected transients. Large margins were also predicted for the unprotected loss of heat sink and station blackout transients due to the strong negative reactivity feedbacks generated by the core. Because of the high power density in the reactor, smaller fuel melting margins are predicted for the unprotected transient overpower accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Winter Storm Elliott: Energy Emergency Alert Lessons Learned

Power blackouts in the United States in 2022 highlighted the need for better communication and planning among power grid stakeholders. This need was further demonstrated at a 2021 workshop held by the Grid Reliability Initiative Utilizing Data Standardization (GRIDS) Project. The GRIDS Project was established to understand and address the gaps in communication between the transmission and distribution operators. With the ongoing energy transition including electrification, distributed energy resource penetration, and so on, this project aims for improved energy emergency communications at the transmission-distribution interface. In 2022, Winter Storm Elliott affected 60% of the United States population (Weather Underground 2022), resulting in rolling blackouts in many areas of the eastern United States (Knoxville Utilities Board [KUB] 2023). Information presented here is based on the GRIDS workshop findings and subsequent research and interviews with stakeholders. After a brief summary of the effects of Winter Storm Elliott, this report covers the standard energy emergency communications processes currently in use, how the storm affected power management operations for the Tennessee Valley Authority (TVA) and its local utility companies, and related experiences in other states. The report concludes with lessons learned and recommendations for improvements and a path forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precursor Analysis Report: Industroyer2 and Wiper Malware Targeting Ukrainian Energy Provider 2022

The Industroyer2 and Wiper Malware Targeting Ukrainian Energy Provider 2022 Precursor Analysis Report leverages publicly available information about the Industroyer2 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. An adversary attempted to cause a blackout in Ukraine in April 2022 by using the Industroyer2 malware against a regional Ukrainian energy provider. The adversary targeted eight high-voltage electrical substations and utilized the malware in tandem with disk wipers for Windows, Linux, and Solaris operating systems in an attempt to make response and recovery efforts more difficult. The adversary reused a piece of the original Industroyer malware designed to open circuit breakers and de-energize target substations. The adversary gained initial access to the victim’s enterprise network through unknown means in February 2022 and was able to perform reconnaissance, pivot to the operations network, and reside in the system for at least 51 days. This gave the adversary a detailed understanding of the environment and allowed them to customize the Industroyer2 malware to the victim’s operations network. However, defenders detected and stopped the attack before the adversary could achieve their intended impact. Had the Industroyer2 attack been successful, it could have caused a blackout for more than two million people during the early stages of Russia’s invasion of Ukraine. Researchers and analysts identified 22 unique techniques (used in a sequence of 31 steps) utilized during the attack with a total of 297 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-three of the identified techniques used during the Industroyer2 cyber attack were precursors to the triggering event. Analysis identified 224 observables associated with these precursor techniques, 122 of which were assessed to have an increased likelihood of being perceived in the 51 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions

Large blackouts, such as the August 14-15, 2003 blackout in the northeasternUnited States and Canada, focus attention on the importance of reliable electric service. As public and private efforts are undertaken to improve reliability and prevent power interruptions, it is appropriate to assess their effectiveness. Measures of reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities to state public utility commissions for many years. This study examines current state and utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based primarily on reliability information for 2006 reported by 123 utilities to 37 state public utility commissions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pattern Mining and Anomaly Detection based on the Power System Synchrophasor Measurements

Real-time monitoring of power system dynamics using phasor measurement units (PMUs) data improves situational awareness and system reliability and potentially can help prevent blackouts due to early anomaly detection. The study presented in the paper is based on the actual PMU measurements of the U.S. western interconnection system. Given the nonlinear and nonstationary PMUs data, we developed a robust anomaly detection framework. Wavelet-based multi-resolution analysis, combined with moving-window-based outlier detection and anomaly scoring, were deployed to identify potential PMU events. The candidate events were evaluated using spatiotemporal correlation analysis, and then classified for a better understanding of the event types. The results demonstrated successful anomaly detection and classification, compared with the recorded real-world events.

Ren, Huiying↗

Effect of bedrest and positive radial acceleration upon peripheral visual response time.

Attempt to determine if peripheral visual response time (RT) could be used as a reliable advanced predictor of +G sub z-related blackout or grayout. The relatively high luminance of the peripheral stimuli used in the experiments may account for the finding that peripheral RT was not sensitive to impending blackout or grayout. The relatively consistent mean RTs within subjects across test days in bed is probably due to the relatively constant response characteristics of the retina and to the high repeatability of the stimuli.

Haines, R. F.↗

Material injection alleviation and plasma diagnostic measurements during the RAM C-III flight.

The results of a material injection RF blackout alleviation experiment and of plasma diagnostic measurements using electrostatic probes and an S-band reflectometer in a 25,000 ft/sec reentry flight are presented. Significant alleviation of RF blackout is observed at altitudes of from 270,000 feet to 120,000 feet due to injection of water and Freon E-3 on VHF, S-band, C-band, and X-band frequencies. Electrostatic probe data, attenuation data, and S-band diagnostic data show consistent plasma results. The relative effectiveness of water and Freon E-3 is discussed.

Schroeder, L. C.↗

Effect of prolonged bedrest and plus Gz acceleration on peripheral visual response time

Peripheral visual response time changes during +G sub z acceleration following fourteen days of bedrest are considered as well as what effect prolonged bedrest has upon this response. Eighteen test lights, placed 10 deg are apart along the horizontal meridian of the subject's field of view, were presented in a random sequence. The subject was instructed to press a button as soon as a light appeared. Response time testing occurred periodically during bedrest and continuously during centrifugation testing. The results indicate that: (1) mean response time is significantly longer to stimuli imaged in the far periphery than to stimuli imaged closer to the line of sight; (2) mean response time at each stimulus position tends to be longer at plateau g than during the preacceleration baseline period; (3) mean response time tends to lengthen as the g level is increased; (4) peripheral visual response time during +G sub x acceleration at 2, 3.2, and 3.8 g was not a reliable advanced indicator that blackout was going to occur; and (5) the subject's field of view collapsed rapidly just before blackout. Bedrest data showed that the distribution of response times to stimuli imaged across the subject's horizontal retinal meridian remained remarkably constant from day to day during both the bedrest and recovery periods.

Haines, R. F.↗

Shuttle communications design study

The design and development of a space shuttle communication system are discussed. The subjects considered include the following: (1) Ku-band satellite relay to shuttle, (2) phased arrays, (3) PN acquisition, (4) quadriplexing of direct link ranging and telemetry, (5) communications blackout on launch and reentry, (6) acquisition after blackout on reentry, (7) wideband communications interface with the Ku-Band rendezvous radar, (8) aeroflight capabilities of the space shuttle, (9) a triple multiplexing scheme equivalent to interplex, and (10) a study of staggered quadriphase for use on the space shuttle.

Cartier, D. E.↗

Space shuttle entry and landing navigation analysis

A navigation system for the entry phase of a Space Shuttle mission which is an aided-inertial system which uses a Kalman filter to mix IMU data with data derived from external navigation aids is evaluated. A drag pseudo-measurement used during radio blackout is treated as an additional external aid. A comprehensive truth model with 101 states is formulated and used to generate detailed error budgets at several significant time points -- end-of-blackout, start of final approach, over runway threshold, and touchdown. Sensitivity curves illustrating the effect of variations in the size of individual error sources on navigation accuracy are presented. The sensitivity of the navigation system performance to filter modifications is analyzed. The projected overall performance is shown in the form of time histories of position and velocity error components. The detailed results are summarized and interpreted, and suggestions are made concerning possible software improvements.

Jones, H. L.↗

Comparison of techniques for measuring +Gz tolerance in man

Two objective methods and one subjective method for measuring +Gz tolerance (inertial vector in a head-to-foot direction) were compared on the human centrifuge. Direct eye-level blood pressure (Pa), blood flow velocity in the superficial temporal artery (Qta), and subjective visual symptoms were used to determine tolerance to rapid-onset acceleration (1 G/s) on the USAFSAM human centrifuge. Seven 'relaxed' subjects with extensive centrifuge experience were exposed to gradually increasing +Gz plateaus until the subject reported 100% loss of peripheral centrifuge gondola lights (PLL) and 50% loss of central light (CLD); viz., blackout. Zero forward Qta occurred 6 s (range 4-9 s) before subjective blackout and when mean eye-level blood pressure had reached 20 + or - 1 mm Hg (SE). The results of this study indicate that flow changes in the superficial temporal artery reflect flow changes in the retinal circulation during +Gz stress.

Krutz, R. W., Jr.↗

Overview of the X-33 Extended Flight Test Range

On July 1, 1996, the National Aeronautics and Space Administration signed a Cooperative Agreement No. NCC8-115 with Lockheed Martin Skunk Works to develop and flight test the X-33, a scaled version of a reusable launch vehicle. The development of an Extended Test Range, with range instrumentation providing continuous vehicle communications from Edwards Air Force Base Ca. to landing at Malmstrom Air Force Base Montana, was required to flight test the mach 15 vehicle over 950 nautical miles. The cooperative agreement approach makes Lockheed Martin Skunk Works responsible for the X-33 program. When additional Government help was required, Lockheed "subcontracted" to NASA Field Centers for certain work. It was through this mechanism that Dryden Flight Research Center became responsible for the Extended Test Range. The Extended Test Range Requirements come from two main sources: 1) Range Safety and 2) Lockheed Martin Skunk Works. The range safety requirements were the most challenging to define and meet. The X-33 represents a vehicle that launches like a rocket, reenters the atmosphere and lands autonomously like an aircraft. Historically, rockets have been launched over the oceans to allow failed rockets to be destroyed using explosive devices. Such approaches had to be reconsidered for the X-33 flying over land. Numerous range requirements come from Lockheed Martin Skunk Works for interface definitions with the vehicle communication subsystems and the primary ground operations center, defined the Operations Control Center. Another area of considerable interest was the reentry plasma shield that causes "blackout" of the radio frequency signals, such as the range safety commands. Significant work was spent to analyze and model the blackout problem using a cooperative team of experts from across the country. The paper describes the Extended Test Range a, an unique Government/industry team of personnel and range assets was established to resolve design issues and accomplish the X-33 requirements. The paper will also provide an overview of the technical approaches used to meet program requirements. The advances used to develop the extended test range will be discussed to show how other hypersonic and Access to Space programs can benefit from the development of the extended test range. Acknowledgment: The work described in this paper was NASA supported through cooperative agreement NCC8-115 with Lockheed Martin Skunk Works.

Mackall, D.↗

Use of VIIRS DNB Data to Monitor Power Outages and Restoration for Significant Weather Events

NASA fs Short-term Prediction Research and Transition (SPoRT) project operates from NASA's Marshall Space Flight Center in Huntsville, Alabama. The team provides unique satellite data to the National Weather Service (NWS) and other agencies and organizations for weather analysis. While much of its work is focused on improving short-term weather forecasting, the SPoRT team supported damage assessment and response to Hurricane Superstorm Sandy by providing imagery that highlighted regions without power. The team used data from the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (Suomi NPP) satellite. The VIIRS low-light sensor, known as the day-night-band (DNB), can detect nighttime light from wildfires, urban and rural communities, and other human activity which emits light. It can also detect moonlight reflected from clouds and surface features. Using real time VIIRS data collected by our collaborative partner at the Space Science and Engineering Center of the University of Wisconsin, the SPoRT team created composite imagery to help detect power outages and restoration. This blackout imagery allowed emergency response teams from a variety of agencies to better plan and marshal resources for recovery efforts. The blackout product identified large-scale outages, offering a comprehensive perspective beyond a patchwork GIS mapping of outages that utility companies provide based on customer complaints. To support the relief efforts, the team provided its imagery to the USGS data portal, which the Federal Emergency Management Agency (FEMA) and other agencies used in their relief efforts. The team fs product helped FEMA, the U.S. Army Corps of Engineers, and U.S. Army monitor regions without power as part of their disaster response activities. Disaster responders used the images to identify possible outages and effectively distribute relief resources. An enhanced product is being developed and integrated into a web mapping service (WMS) for dissemination and use by a broader end user community.

Jedlovec, Gary↗

Contingency Analysis of Cascading Line Outage Events

As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Vehicle routing for the last mile of power system restoration

This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of a Traditional Probabilistic Risk Assessment Approach with Advanced Safety Analysis

As part of the Light Water Sustainability Program (LWRS) [1], the purpose of the Risk Informed Safety Margin Characterization (RISMC) [2] Pathway research and development (R&D) is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic and probabilistic approaches are combined in order to estimate a safety margin. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power is lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and contrast this with traditional risk analysis modeling for this type of accident scenario. We also describe our approach we are using to represent advanced flooding analysis.

97 MATHEMATICS AND COMPUTING↗

DYNAMIC AND CLASSICAL PRA: A BWR SBO CASE COMPARISON

As part of the Light-Water Sustainability Program (LWRS), the purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain the safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic (i.e., dynamic system simulators) and probabilistic (stochastic sampling strategies) approaches are combined in a dynamic PRA fashion in order to estimate safety margins. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power are lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and compare this with traditional risk analysis modeling for this type of accident scenario. In the RISMC approach the dataset obtained consists of set of simulation runs (performed by using codes such as RELAP5/3D) where timing and ordering of events is changed accordingly to the stochastic sampling strategy adopted. On the other side, classical PRA methods, which are based on event-tree (FT) and fault-tree (FT) structures, generate minimal cut sets and probability values associated to each ET branch. The comparison of the classical and RISMC approaches is performed not only in terms of overall core damage probability but also considering statistical differences in the actual sequence of events. The outcome of this comparison analysis shows similarities and dissimilarities between the approaches but also highlights the greater amount of information that can be generated by using the RISMC approach.

97 MATHEMATICS AND COMPUTING↗

The RISMC Approach to Perform Advanced PRA Analyses

The existing fleet of nuclear power plants is in the process of extending its lifetime and increasing the power generated from these plants via power uprates. In order to evaluate the impact of these two factors on the safety of the plant, the RISMC Pathway aims to develop simulation-based tools and methods to assess risks for existing nuclear power plants in order to optimize safety. This pathway, by developing new methods, is extending the state-of-the-practice methods that have been traditionally based on logic structures such as Event-Trees and Fault-Trees. These static types of models mimic system response in an inductive and deductive way respectively, yet are restrictive in the ways they can represent spatial and temporal constructs. RISMC analyses are performed by using a combination of thermal-hydraulic codes and a stochastic analysis tool currently under development at the Idaho National Laboratory, i.e. RAVEN. This paper presents a case study in order to show the capabilities of the RISMC methodology to assess impact of power uprate of a boiling water reactor system during a station blackout accident scenario. We employ the system simulator code, RELAP5-3D, coupled with RAVEN which perform the stochastic analysis. Our analysis is in fact performed by: 1) sampling values of a set of parameters from the uncertainty space of interest, 2) simulating the system behavior for that specific set of parameter values and 3) analyzing the set of simulation runs. Results obtained give a detailed investigation of the issues associated with a plant power uprate including the effects of station blackout accident scenarios. We are able to quantify how the timing of specific events was impacted by a higher nominal reactor core power. Such safety insights can provide useful information to the decision makers to perform risk informed margins management.

97 MATHEMATICS AND COMPUTING↗