Enhancing and Archiving the APS Catalog of the POSS I

We have worked on two different projects: 1) Archiving the APS Catalog of the POSS I for distribution to NASA's NED at IPAC, SIMBAD in France, and individual astronomers and 2) The automated morphological classification of galaxies. We have completed archiving the Catalog into easily readable binary files. The database together with the software to read it has been distributed on DVD's to the national and international data centers and to individual astronomers. The archived Catalog contains more than 89 million objects in 632 fields in the first epoch Palomar Observatory Sky Survey. Additional image parameters not available in the original on-line version are also included in the archived version. The archived Catalog is also available and can be queried at the APS web site (URL: http://aps.umn.edu) which has been improved with a much faster and more efficient querying system. The Catalog can be downloaded as binary datafiles with the source code for reading it. It is also being integrated into the SkyQuery system which includes the Sloan Digital Sky Survey, 2MASS, and the FIRST radio sky survey. We experimented with different classification algorithms to automate the morphological classification of galaxies. This is an especially difficult problem because there are not only a large number of attributes or parameters and measurement uncertainties, but also the added complication of human disagreement about the adopted types. To solve this problem we used 837 galaxy images from nine POSS I fields at the North Galactic Pole classified by two independent astronomers for which they agree on the morphological types. The initial goal was to separate the galaxies into the three broad classes relevant to issues of large scale structure and galaxy formation and evolution: early (ellipticals and lenticulars), spirals, and late (irregulars) with an accuracy or success rate that rivals the best astronomer classifiers. We also needed to identify a set of parameters derived from the digitized images that separate the galaxies by type. The human eye can easily recognize complicated patterns in images such as spiral arms which can be spotty, blotchy affairs that are difficult for automated techniques. A galaxy image can potentially be described by hundreds of parameters, all of which may have some relation to the morphological type. In the set of initial experiments we used 624 such parameters, in two colors, blue and red. These parameters include the surface brightness and color measured at different radii, ratios of these parameters at different radii, concentration indices, Fourier transforms and wavelet decomposition coefficients. We experimented with three different classes of classification algorithms; decision trees, k-nearest neighbors, and support vector machines (SVM). A range of experiments were conducted and we eventually narrowed the parameters to 23 selected parameters. SVM consistently outperformed the other algorithms with both sets of features. By combining the results from the different algorithms in a weighted scheme we achieved an overall classification success of 86%.

Humphreys, Roberta M.↗

Independent Peer Review of Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) Structural Analysis

Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.

Raju, Ivatury S.↗

Airborne Precision Spacing (APS) Dependent Parallel Arrivals (DPA)

The Airborne Precision Spacing (APS) team at the NASA Langley Research Center (LaRC) has been developing a concept of operations to extend the current APS concept to support dependent approaches to parallel or converging runways along with the required pilot and controller procedures and pilot interfaces. A staggered operations capability for the Airborne Spacing for Terminal Arrival Routes (ASTAR) tool was developed and designated as ASTAR10. ASTAR10 has reached a sufficient level of maturity to be validated and tested through a fast-time simulation. The purpose of the experiment was to identify and resolve any remaining issues in the ASTAR10 algorithm, as well as put the concept of operations through a practical test.

Smith, Colin L.↗

Commissioning Simulations for the APS Upgrade Lattice

A hybrid seven-bend-achromat lattice that features very strong focusing elements and a relatively small vacuum chamber has been proposed for the APS upgrade. Achieving design lattice parameters during commissioning will need to be accomplished quickly in order to minimize dark time for APS users. The paper will describe start-to-end simulation of the machine commissioning beginning from first-turn trajectory correction, progressing to orbit and lattice correction, and culminating in evaluation of the nonlinear performance of the corrected lattice

Sajaev, V.↗

Impedance measurement of vacuum chamber components for the Advance Photon Source(APS) Upgrade

The proposed Advance Photon Source Upgrade (APS-U) employs a multi-bend achromat (MBA) lattice to increase the photon brightness by two to three orders of magnitude. One of the main design challenges of the upgrade is to minimize rf heating and collective instabilities associated with the impedance of small-aperture vacuum components. As part of this effort, my research focuses on impedance measurement and simulation of various MBA vacuum components. Here, we present the summary of the impedance contributions for the APS-U and describe our planned impedance measurement technique, including some measurement results for the non-evaporative getter (NEG)-coated copper chamber and simulation results for other critical components using a novel Goubau line (G-line) set up.

Collective effects↗

CLEARING MAGNET DESIGN FOR APS-U

The Advanced Photon Source is in the process of developing an upgrade (APS-U) of the storage ring. The upgrade will be converting the current double bend achromat (DBA) lattice to a multi-bend achromat (MBA) lattice. In addition, the storage ring will be operated at 6 GeV and 200 mA with regular swap-out injection to keep the stored beam current constant [1]. The swap-out injection will take place with beamline shutters open. For radiation safety to ensure that no electrons can exit the storage ring, a passive method of protecting the beamline and containing the electrons inside the storage ring is proposed. A clearing magnet will be located in all beamline front ends inside the storage ring tunnel. This article will discuss the features and design of the clearing magnet scheme for APS-U.

Abliz, M.↗

Overview of Lattice Design and Evaluation for the APS Upgrade

The Advanced Photon Source (APS) is a 7-GeV synchrotron light source that has been in operation since 1996. Since that time, the effective emittance has been decreased from 8 nm to 3.1 nm, which is very competitive for a 3rd-generation light source. However, newer facilities such as PETRA-III, NSLS-II, and MAX-IV are pushing the emittance to significantly smaller values. MAX-IV in particular has set the current benchmark with an emittance of about 300 pm at 3 GeV. This was accomplished by use of a multi-bend achromat lattice, which takes advantage of the 1/M3 scaling of the emittance with respect to the number of dipoles M. In order to ensure that our facility remains competitive, APS is pursuing a major upgrade, which involves replacement of the existing double-bend lattice with a seven-bend achromat lattice, promising a 40-fold reduction in emittance. This paper describes the process of developing and evaluating candidate lattice designs. Two candidate 6-GeV lattices are described: one providing a natural emittance of 67 pm and the other providing 41 pm. Our analysis includes single-particle dynamics as well as single- and multi-bunch collective effects.

07 ISOTOPE AND RADIATION SOURCES↗

Repurposing Hanford Waste Tank AP-106 for Interim Storage of Treated Low-Activity Waste - 20044

Hanford Double-Shell Tank AP-106 is being repurposed to serve as the lag storage tank holding feed for the Direct Feed Low-Activity Waste (DFLAW) process at the Waste Treatment and Immobilization Plant (WTP). The repurposing process is the sequence of tank additions and transfers that will remove the Cs 137 inventory from AP-106. The repurposing process steps are designed to remove Cs-137 more effectively and efficiently as compared to regular supernatant transfers. The process steps are estimated to take 2-months to complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory-Scale Melter Systems for Simulated and Real AP-107 Tank Waste - 20483

The Hanford Waste Treatment and Immobilization Plant (WTP) will process and stabilize waste that is stored in underground tanks on the Hanford Site. At the WTP, the tank waste will be combined with glass-forming and modifying additives to form an aqueous and solid mixture called melter feed, which will then be vitrified in joule-heated melters. A small-scale melter system, the continuous laboratory-scale melter (CLSM), is designed to operate with a continuous feeding process while periodically pouring glass product and collecting off-gas. Two CLSMs were constructed: one in a non-radioactive environment for processing waste simulants and another in a fume hood capable of handling radioactive material for processing actual Hanford tank waste. The waste sample received for vitrification in the CLSM was from Hanford tank 241-AP-107. Approximately 12 liters of melter-feed slurry was vitrified into 7 kilograms of glass product over the course of 10 hours of charging to the CLSM. The partitioning of technetium-99 in the product streams was used to calculate the technetium-99 recovery and help determine when the vitrification process had reached a steady state. The average single-pass retention of technetium-99 in the glass product was then calculated for the processing of AP-107 waste in the CLSM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

APS-U, APS UPGRADE PROJECT, STORAGE RING VACUUM SY↗

From radio to TeV: the surprising spectral energy distribution of AP Librae

Following the discovery of high-energy (HE; E > 10 MeV) and very-high-energy (VHE; E > 100 GeV) γ-ray emission from the low-frequency-peaked BL Lac (LBL) object AP Librae, its electromagnetic spectrum is studied over 60 octaves in energy. Contemporaneous data in radio, optical and UV together with the (non-simultaneous) γ-ray data are used to construct the most precise spectral energy distribution of this source. We found that the data was modelled with difficulties with single-zone homogeneous leptonic synchrotron self-Compton (SSC) radiative scenarios due to the unprecedented width of the HE component when compared to the lower-energy component. Furthermore, the two other LBL objects also detected at VHE appear to have similar modelling difficulties. Nevertheless, VHE γ-rays produced in the extended jet could account for the VHE flux observed by HESS.

79 ASTRONOMY AND ASTROPHYSICS↗

A HIGH BANDWIDTH BIPOLAR POWER SUPPLY FOR THE FAST CORRECTORS IN THE APS UPGRADE*

The APS Upgrade of a multi-bend achromat (MBA) storage ring requires a fast bipolar power supply for the fast correction magnets. The key performance requirement of the power supply includes a small-signal bandwidth of 10 kHz for the output current. This requirement presents a challenge to the design because of the high inductance of the magnet load and a limited input DC voltage. A prototype DC/DC power supply utilizing a MOSFET H-bridge circuit with a 500 kHz PWM has been developed and tested successfully. The prototype achieved a 10-kHz bandwidth with less than 3-dB attenuation for a signal 0.5% of the maximum operating current of 15 amperes. This paper presents the design of the power circuit, the PWM method, the control loop, and the test results.

A HIGH BANDWIDTH BIPOLAR POWER SUPPLY↗

SIMULATIONS OF BOOSTER INJECTION EFFICIENCY FOR THE APS-UPGRADE

The APS-Upgrade will require the injector chain to provide high single bunch charge for swap-out injection. One possible limiting factor to achieving this is an observed reduction of injection efficiency into the booster synchrotron at high charge. We have simulated booster injection using the particle tracking code elegant, including a model for the booster impedance and beam loading in the RF cavities. The simulations point to two possible causes for reduced efficiency: energy oscillations leading to losses at high dispersion locations, and a vertical beam size blowup caused by ions in the Particle Accumulator Ring. We also show that the efficiency is much higher in an alternate booster lattice with smaller vertical beta function and zero dispersion in the straight sections.

APS-U↗

INTERLEAVING LATTICE DESIGN FOR APS LINAC

The design of the lattice for the Advanced Photon Source (APS) injector linac suitable for the interleaving operation of the thermionic and photocathode rf electron guns is presented.

APS LINAC*↗

COMPARISON OF NONLINEAR DYNAMICS OPTIMIZATION METHODS FOR APS-U

Many different objectives and genetic algorithms have been proposed for storage ring nonlinear dynamics performance optimization. These optimization objectives include nonlinear chromaticities and driving/detuning terms, on-momentum and off-momentum dynamic acceptance, chromatic detuning, local momentum acceptance, variation of transverse invariant, Touschek lifetime, etc. In this paper, the effectiveness of several different optimization methods and objectives are compared for the nonlinear beam dynamics optimization of the Advanced Photon Source upgrade (APS-U) lattice. The optimized solutions from these different methods are preliminarily compared in terms of the dynamic acceptance, local momentum acceptance, chromatic detuning, and other performance measures.

APS-U∗↗

SIMULATION STUDIES OF A PROTOTYPE STRIPLINE KICKER FOR THE APS-MBA UPGRADE

A prototype dual-blade stripline kicker for the APS multi-bend achromat (MBA) upgrade has been designed and developed. It was optimized with 3D CST Microwave Studio. The high voltage (HV) feedthrough and air-side connector were designed and optimized. Electromagnetic fields along the beam path, the deflecting angle, the high electric fields and their locations were calculated with 15kV differential pulse voltage applied to the kicker blades through the feedthroughs. Beam impedance and the power dissipation on different parts of the kicker and external loads were studied for a 48-bunch fill pattern. Our results show that the prototype kicker with its HV feedthroughs meets the specified requirements. The results of TDR (time-domain reflectometer) test, high voltage pulse test and beam test of the prototype kicker assembly agreed with the simulations.

APS MBA UPGRADE↗

PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE

The APS multi-bend achromatic (MBA) upgrade storage ring plans to support two bunch fill patterns: a 48-bunch and a 324-bunch. A “swap out” injection scheme is required. In order to provide the required kick to injected beam, to minimize the beam loss and residual oscillation of injected beam, and to minimize the perturbation to stored beam during injection, the rise, fall, and flat-top parts of the kicker pulse must be within a 16.9-ns interval. Stripline-type kickers are chosen for both injection and extraction. We developed a prototype kicker that supports a ±15kV differential pulse voltage. We performed high voltage discharge, TDR measurement, high voltage pulse test and beam test of the kicker. We report the final design of the fast kicker and the test results.

APS MBA UPGRADE↗

Aerosol Polarimetry Sensor (APS): Design Summary, Performance and Potential Modifications

APS is a mature design that has already been built and has a TRL of 7. Algorithmic and retrieval capabilities continue to improve and make better and more sophisticated used of the data. Adjoint solutions, both in one dimensional and three dimensional are computationally efficient and should be the preferred implementation for the calculation of Jacobians (one dimensional), or cost-function gradients (three dimensional). Adjoint solutions necessarily provide resolution of internal fields and simplify incorporation of active measurements in retrievals, which will be necessary for a future ACE mission. Its best to test these capabilities when you know the answer: OSSEs that are well constrained observationally provide the best place to test future multi-instrument platform capabilities and ensure capabilities will meet scientific needs.

algorithms↗