Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wire”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

The potential of wire arc directed energy deposition

A diverse team of materials scientists, systems engineers and computational scientists at the Manufacturing Demonstration Facility at Oak Ridge National Laboratory (ORNL) is working closely with industry to employ WA-DED to transform the current manufacturing supply chains and change industry perception of metal-AM-fabricated components.

36 MATERIALS SCIENCE↗

Elimination LArTPC Simulation Uncertainty With Modifcations to TPC Wire Waveforms

This paper introduces a novel approach to reducing systematic uncertainties in LArTPC detector simulations, which arise from known detector effects that are challenging and computationally intensive to model. The proposed method involves modifying simulated waveforms based on observed discrepancies in ionization signals from the TPC between actual data and simulations. This approach reduces the sensitivity to detailed detector modeling and decreases the computational resources required for accurate simulations.

Mktchyan, Karen↗

Customized Hermetic Feedthrough Developed to Isolate Fluids

A common problem occurs when refrigerant fluids wick inside the insulation of thermocouple wires through a compressor's casing feedthrough and then leak into the adjacent disconnect box outside the casing. Leaking fluids create an unfavorable situation inside the disconnect box and may contaminate the fluids. To address this problem, NASA Lewis Research Center s Manufacturing Engineering Division developed a customized hermetic feedthrough for a bank of Worthington compressors. In these compressors, bearing temperatures are measured by internal thermocouples embedded in bearings located inside the compressor casings. The thermocouple wires need to be routed outside the casing and read at another location. These wires are short and are terminated to a disconnect strip inside the casing. The bearings operate at about 170 F, but because the casing is filled with R12 refrigerant oil, the casing has a maximum temperature of about 100 F. The operating conditions of these compressors permit the use of an epoxy that is compatible with the R12 fluid. The desired finished product is a stainless steel tube that has been filled solid with epoxy after thermocouple wires bonded and sealed by epoxy have been inserted through its length. Shrink tubing extends from both ends of the tube. The process that was developed to isolate the thermocouple wires from the R12 fluid follows. For this application, use an 8-in.-long piece of 0.500-in. 304 stainless steel tube with six pairs of 24-gauge stranded, PTFE-insulated (polytetrafluoroethylene) type "T" thermocouple wires for each feedthrough. Use shrink tubing to strain relief the insulated wires at their exit from the stainless steel tube. Cut the wire to length and identify the location of the stainless steel tube sleeve with masking tape. Then, remove the outer insulation from a 2-in. section of wire that will be inside the tube, and carefully strip to bare wire a 1-in. section in the middle of the section with the outer insulation removed. For an effective seal, the epoxy must penetrate between the strands when stranded conductors are used. Make the seal with epoxy bond on the bare wire. The bare wire must be encapsulated with a thin layer of the epoxy that leaves only a very low profile. These encapsulated wires must cure before the assembly can be continued. Then, inspect the cured wires for complete encapsulation before going to the next step. Insert the wires in the stainless steel tube and orient them so that the epoxied stripped sections are staggered within the tube; then, apply shrink tubing to one end of the cleaned wires, positioning it inside the edge of the tube. The small gaps between the wires on the other end will be used to inject the epoxy into the tube. Let the epoxy cure inside the tube, free of any voids. Then, continue to fill the tube until the entire 8-in. length is nearly filled, allowing room for the other strain-relieving shrink tubing. Since this first design, the process has been adjusted to fit many needs and situations. Customized feedthroughs have been assembled from various wire types, wire gauges, and/or stainless steel tube passages. The fittings selected to mount these feedthroughs allow their use in other areas, such as pressure or vacuum systems.

Meredith, Roger D.↗

Multiwire thermocouples: Frequency response

Experimental measurements are made with a novel two wire thermocouple. Signals from two wires of unequal diameters are recorded from the thermocouple suspended in constant flow with a periodic temperature fluctuation. It is demonstrated that the reconstructed signal from the two wire thermocouple requires no compensation for omega less than or equal to 2 omega(sub 1) where omega is the natural frequency of the smaller wire. A compensation factor is recommended for larger frequencies omega greater than 2 omega(sub 1). Theory and experimental measurements are compared with a novel three wire thermocouple. Signals from three wires of unequal diameters are recorded from the thermocouple suspended in constant flow with a periodic temperature fluctuation. It is demonstrated that the reconstructed signal from the three wire thermocouple requires no compensation for omega less than or equal to 5 omega(sub 1) where omega (sub 1) is the natural frequency of the smaller wire. The latter result represents a significant improvement compared to previous work with two wire thermocouples. A correction factor has also been derived to account for wires of arbitrary diameter. Measurements are recorded for multiwire thermocouples consisting of either two or three wires of unequal diameters. Signals from the multiwire probe are recorded for a reversing gas flow with a periodic temperature fluctuation. It is demonstrated that the reconstructed signal from the multiwire thermocouple requires no compensation provided omega/omega(sub 1) is less than 2.3 for two wires or omega/omega(sub 1) is less than 3.6 for three wires where omega(sub 1) is the natural frequency of the smaller wire based on the maximum gas velocity. The latter results were possible provided Fourier transformed data were used and knowledge of the gas velocity is available.

Forney, L. J.↗

Core-Cutoff Tool

A tool makes a cut perpendicular to the cylindrical axis of a core hole at a predetermined depth to free the core at that depth. The tool does not damage the surrounding material from which the core was cut, and it operates within the core-hole kerf. Coring usually begins with use of a hole saw or a hollow cylindrical abrasive cutting tool to make an annular hole that leaves the core (sometimes called the plug ) in place. In this approach to coring as practiced heretofore, the core is removed forcibly in a manner chosen to shear the core, preferably at or near the greatest depth of the core hole. Unfortunately, such forcible removal often damages both the core and the surrounding material (see Figure 1). In an alternative prior approach, especially applicable to toxic or fragile material, a core is formed and freed by means of milling operations that generate much material waste. In contrast, the present tool eliminates the damage associated with the hole-saw approach and reduces the extent of milling operations (and, hence, reduces the waste) associated with the milling approach. The present tool (see Figure 2) includes an inner sleeve and an outer sleeve and resembles the hollow cylindrical tool used to cut the core hole. The sleeves are thin enough that this tool fits within the kerf of the core hole. The inner sleeve is attached to a shaft that, in turn, can be attached to a drill motor or handle for turning the tool. This tool also includes a cutting wire attached to the distal ends of both sleeves. The cutting wire is long enough that with sufficient relative rotation of the inner and outer sleeves, the wire can cut all the way to the center of the core. The tool is inserted in the kerf until its distal end is seated at the full depth. The inner sleeve is then turned. During turning, frictional drag on the outer core pulls the cutting wire into contact with the core. The cutting force of the wire against the core increases with the tension in the wire and, hence, with the frictional drag acting on the outer sleeve. As the wire cuts toward the center of the core, the inner sleeve rotates farther with respect to the outer sleeve. Once the wire has cut to the center of the core, the tool and the core can be removed from the hole. The proper choice of cutting wire depends on the properties of the core material. For a sufficiently soft core material, a nonmetallic monofilament can be used. For a rubber-like core material, a metal wire can be used. For a harder core material, it is necessary to use an abrasive wire, and the efficiency of the tool can be increased greatly by vacuuming away the particles generated during cutting. For a core material that can readily be melted or otherwise cut by use of heat, it could be preferable to use an electrically heated cutting wire. In such a case, electric current can be supplied to the cutting wire, from an electrically isolated source, via rotating contact rings mounted on the sleeves.

Gheen, Darrell↗

Research on High Temperature Ceramic Insulation for Electrical Conductors

Three methods for applying ceramic coatings to wires were examined in depth and a fourth (chemical vapor deposition) was studied briefly. CVD coatings were not reported in the thesis because it was realized early in the study that the deposition rate of the coatings was too slow to be used in a commercial process. Of the methods reported in the thesis, slurry coating was the most promising. This method consists of slowly drawing a platinum wire through a thixotropic slurry of alumina in a vehicle composed of polyvinyl butyral, methyl ethyl ketone, and toluene. The coatings produced by this method were continuous and free of cracks after sintering. The sintered coatings crack when the wire is bent around sharp corners, but most of the coating remains in place and still provides electrical insulation between the wire and any metallic structure to which the wire may be attached. The coating thickness was 0.61 mm (16 micrometers). The electrical resistivity of the intact coating was 340 M-Ohm-cm at 800 C and 23 M-Ohm-cm at 1050 C. Therefore, these coatings more than meet the electrical requirements for use in turbine engines. Although adherence of the coating to the wire was generally excellent, a problem was noted in localized areas where the coating flaked off. Further work will be needed to obtain good coating adherence along the entire length of the wire. The next most promising coatings were made by electrophoretic deposition (EPD) of Al2O3 onto platinum wires, using mixtures of ethanol and acetone as the suspending liquid. These EPD coatings were made only on short lengths of wire because the coating is too fragile to allow spooling of the wire. The worst coatings were those made by electrophoretic deposition from aqueous suspensions. Continuous slurry coating of wire was achieved, but due to lack of suitable equipment, the wire had to be cut into short lengths for sintering.

Kreidler, Eric R.↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Evaluation Of Risk And Possible Mitigation Schemes For Previously Unidentified Hazards

This report presents the results of arc track testing conducted to determine if such a transfer of power to un-energized wires is possible and/or likely during an arcing event, and to evaluate an array of protection schemes that may significantly reduce the possibility of such a transfer. The results of these experiments may be useful for determining the level of protection necessary to guard against spurious voltage and current being applied to safety critical circuits. It was not the purpose of these experiments to determine the probability of the initiation of an arc track event only if an initiation did occur could it cause the undesired event: an inadvertent thruster firing. The primary wire insulation used in the Orbiter is aromatic polyimide, or Kapton , a construction known to arc track under certain conditions [3]. Previous Boeing testing has shown that arc tracks can initiate in aromatic polyimide insulated 28 volts direct current (VDC) power circuits using more realistic techniques such as chafing with an aluminum blade (simulating the corner of an avionics box or lip of a wire tray), or vibration of an aluminum plate against a wire bundle [4]. Therefore, an arc initiation technique was chosen that provided a reliable and consistent technique of starting the arc and not a realistic simulation of a scenario on the vehicle. Once an arc is initiated, the current, power and propagation characteristics of the arc depend on the power source, wire gauge and insulation type, circuit protection and series resistance rather than type of initiation. The initiation method employed for these tests was applying an oil and graphite mixture to the ends of a powered twisted pair wire. The flight configuration of the heater circuits, the fuel/oxider (or ox) wire, and the RCS jet solenoid were modeled in the test configuration so that the behavior of these components during an arcing event could be studied. To determine if coil activation would occur with various protection wire schemes, 145 tests were conducted using various fuel/ox wire alternatives (shielded and unshielded) and/or different combinations of polytetrafuloroethylene (PTFE), Mystik tape and convoluted wraps to prevent unwanted coil activation. Test results were evaluated along with other pertinent data and information to develop a mitigation strategy for an inadvertent RCS firing. The SSP evaluated civilian aircraft wiring failures to search for aging trends in assessing the wire-short hazard. Appendix 2 applies Weibull statistical methods to the same data with a similar purpose.

Linzey, William↗

Miniature High-Force, Long-Stroke SMA Linear Actuators

Improved long-stroke shape-memory-alloy (SMA) linear actuators are being developed to exert significantly higher forces and operate at higher activation temperatures than do prior SMA actuators. In these actuators, long linear strokes are achieved through the principle of displacement multiplication, according to which there are multiple stages, each intermediate stage being connected by straight SMA wire segments to the next stage so that relative motions of stages are additive toward the final stage, which is the output stage. Prior SMA actuators typically include polymer housings or shells, steel or aluminum stages, and polymer pads between successive stages of displacement-multiplication assemblies. Typical output forces of prior SMA actuators range from 10 to 20 N, and typical strokes range from 0.5 to 1.5 cm. An important disadvantage of prior SMA wire actuators is relatively low cycle speed, which is related to actuation temperature as follows: The SMA wires in prior SMA actuators are typically made of a durable nickel/titanium alloy that has a shape-memory activation temperature of 80 C. An SMA wire can be heated quickly from below to above its activation temperature to obtain a stroke in one direction, but must then be allowed to cool to somewhat below its activation temperature (typically, less than or equal to 60 C in the case of an activation temperature of 80 C) to obtain a stroke in the opposite direction (return stroke). At typical ambient temperatures, cooling times are of the order of several seconds. Cooling times thus limit cycle speeds. Wires made of SMA alloys having significantly higher activation temperatures [denoted ultra-high-temperature (UHT) SMA alloys] cool to the required lower return-stroke temperatures more rapidly, making it possible to increase cycle speeds. The present development is motivated by a need, in some applications (especially aeronautical and space-flight applications) for SMA actuators that exert higher forces, operate at greater cycle speeds, and have stronger housings that can withstand greater externally applied forces and impacts. The main novel features of the improved SMA actuators are the following: 1) The ends of the wires are anchored in compact crimps made from short steel tubes. Each wire end is inserted in a tube, the tube is flattened between planar jaws to make the tube grip the wire, the tube is compressed to a slight U-cross-section deformation to strengthen the grip, then the crimp is welded onto one of the actuator stages. The pull strength of a typical crimp is about 125 N -- comparable to the strength of the SMA wire and greater than the typical pull strengths of wire-end anchors in prior SMA actuators. Greater pull strength is one of the keys to achievement of higher actuation force; 2) For greater strength and resistance to impacts, housings are milled from aluminum instead of being made from polymers. Each housing is made from two pieces in a clamshell configuration. The pieces are anodized to reduce sliding friction; 3) Stages are made stronger (to bear greater compression loads without excessive flexing) by making them from steel sheets thicker than those used in prior SMA actuators. The stages contain recessed pockets to accommodate the crimps. Recessing the pockets helps to keep overall dimensions as small as possible; and, 4) UHT SMA wires are used to satisfy the higher-speed/higher-temperature requirement.

Cummin, Mark A.↗

Findings from NASA's 2015-2017 Electric Sail Investigations

Electric Sail (E-Sail) propulsion systems will enable scientific spacecraft to obtain velocities of up to 10 astronomical units per year without expending any on-board propellant. The E-Sail propulsion is created from the interaction of a spacecraft's positively charged multi-kilometer-length conductor/s with protons that are present in the naturally occurring hypersonic solar wind. The protons are deflected via natural electrostatic repulsion forces from the Debye sheath that is formed around a charged wire in space, and this deflection of protons creates thrust or propulsion in the opposite direction. It is envisioned that this E-Sail propulsion system can provide propulsion throughout the solar system and to the heliosphere and beyond. Consistent with the concept of a "sail," no propellant is needed as electrostatic repulsion interactions between the naturally occurring solar wind protons and a positively charged wire creates the propulsion. The basic principle on which the Electric Sail operates is the exchange of momentum between an "electric sail" and solar wind, which continually flows radially away from the sun at speeds ranging from 300 to 700 kilometers per second. The "sail" consists of an array of long, charged wires which extend radially outward 10 to 30 kilometers from a slowly rotating spacecraft. Momentum is transferred from the solar wind to the array through the deflection of the positively charged solar wind protons by a high voltage potential applied to the wires. The thrust generated by an E-Sail is proportional to the area of the sail, which is given by the product of the total length of the wires and the effective wire diameter. The wire is approximately 0.1 millimeters in diameter. However, the effective diameter is determined by the distance the applied electric potential penetrates into space around the wire (on the order of 10 meters at 1 astronomical unit). As a result, the effective area over which protons are repelled is proportional to the size of the region of electric potential, or the plasma sheath region, surround the wires of the array. A large sheath is, therefore, beneficial to the generation of thrust. However, this benefit must be balanced with the additional fact that electron collection is proportional to sheath size. Electrons collected by the wire array must be injected back into the solar wind in order to maintain the potential on the wires - which requires power. The primary power requirement for E-Sail operation is, therefore, also proportional to sheath size.

Wiegmann, Bruce. M.↗

Ultra-low magnetization and hysteresis loss in APC Nb 3 Sn superconductors

For the accelerator magnets of the next hadron collider, reducing superconductor persistent-current magnetization is not only important for achieving the desired field quality, but also crucial for its sustainability because the magnetization loss is the major heat load to the magnet cold mass. For conventional Nb 3 Sn conductors this requires reduction of effective subelement size (D eff ). For the restacked-rod-process (RRP ® ) conductors a physical subelement size (D sub ) as small as 35 µm (corresponding to a D eff close to 45 µm) can be reached, but at a significant price in J c . Another way to reduce the magnetization is by introducing artificial pinning centers (APC) using the internal oxidation approach. APC conductors outperform conventional Nb 3 Sn wires in two aspects: 1) higher J c at high fields, and 2) much lower J c and magnetization at low fields (e.g. below 5 T). Here, in this work we explored the fabricability of APC wires with small D sub . A 180-stack APC wire was produced and drawn to 0.7- and 0.5 mm diameters with good quality, with D sub s of 34 and 24 µm (D eff s of 36 and 25 µm), respectively. For the 34 µm-D sub wire, its non-Cu J c is higher than that of an RRP ® wire used for the High-Luminosity Large Hadron Collider (HL-LHC) project above 13 T (e.g. 36% higher at 4.2 K, 18 T), while its non-Cu magnetization at 1 T, ΔM(1 T), is only 29% of the RRP ® wire. Its non-Cu hysteresis loss for a cycle between 1 and 14 T, Q h (1–14 T), is 37% of the RRP ® wire. For the 24 µm-D sub wire, its non-Cu J c surpasses the HL-LHC RRP ® wire above 17.5 T, while its ΔM(1 T) and Q h (1–14 T) are only 17% and 23% of the RRP® wire, respectively. Its non-Cu Q h (±3 T) even meets the specification of the International Thermonuclear Experimental Reactor project.

Xu, X [Fermi National Accelerator Laboratory (FNAL↗

An Obstacle Alerting System for Agricultural Application

Wire strikes are a significant cause of helicopter accidents. The aircraft most at risk are aerial applicators. The present study examines the effectiveness of a wire alert delivered by way of the lightbar, a GPS-based guidance system for aerial application. The alert lead-time needed to avoid an invisible wire is compared with that to avoid a visible wire. A flight simulator was configured to simulate an agricultural application helicopter. Two pilots flew simulated spray runs in fields with visible wires, invisible wires, and no wires. The wire alert was effective in reducing wire strikes. A lead-time of 3.5 sec was required for the alert to be effective. The lead- time required was the same whether the pilot could see the wire or not.

DeMaio, Joe↗