Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Working at the Speed of Innovation: Impedance Mismatch in Rapid and Innovation Projects

In this paper we report on the results of an ethnographic study of a rapid design innovation (RDI) experiment in NASA Aeronautics. This work is based on the study of the Aeronautics Autonomy Testbed Capability (AATC) team in the Convergent Aeronautics Solutions (CAS) project. This paper focuses on and summarizes one of the key over-arching findings from the study: there is a significant mismatch in the organizational culture in the rest of the organization compared with that required for RDI. And, if this organizational cultural mismatch is not addressed, the likelihood of any organization being able to advance a new and different type of work (such as RDI) will be jeopardized. We delineate several aspects of the two different cultures identified in order to enable leaders and practitioners to better understand what contributes to the cultural dissonance and the implications of the differences in the cultures. As well, we identify ways in which those differences can be addressed. Research from organization and other social sciences are incorporated to highlight the differences. The implications of the research suggest that the significant cultural differences trigger a strong and resistive response from the dominant culture that may negate leadership’s strategy to build the new capacity for RDI. While the research results noted the pervasive nature of innovation throughout the workplace, the type of innovation envisioned in RDI is a rare type of innovation that requires significantly new methods, work processes, tools, and skills such that approaches used in the dominate culture cannot be adopted by expediting the existing approaches. Examples include: innovation teaming and leadership; the need for adaptive leadership that changes the relationship of a research leader to the other researchers; and, an interdisciplinary teaming approach which shapes team relationships and activities. Each of these aspects requires new teaming, tools, and skills in order to succeed. Thus, when introducing RDI activities where there is a different dominant culture, teams need to be: well trained; protected; recognized and rewarded. And, team leaders must also be trained in the unique types of teaming and innovation tools used in RDI. Both RDI teaming and team leadership must be sanctioned, supported, and rewarded by leadership. Because of the cultural mismatch, in some organizations looking to add RDI to their existing and established organizations, sep to avoid or mitigate the negative impact of the culture mismatch.

Crain, Cathleen↗

An international study on THM modelling of the full-scale heater experiment at Mont Terri laboratory

We present results from an international model comparison study of the Full-Scale Emplacement (FE) experiment in Opalinus Clay at the Mont Terri Laboratory, Switzerland. Based on a provided parameter set the teams decided which parameters they adopted for their models, whether they considered the excavation and the ventilation phase in addition to the heating phase and if they included technical features like the shotcrete or the EDZ. The teams were able to reproduce the measured parameters temperature, relative humidity and pore pressure. The modelled results for temperature agree very closely between the teams especially in the sensors in Opalinus Clay. All teams were able to reproduce the redistribution of water in the bentonite backfill due to heating. The evolution of the relative humidity showed similar trends with differences in the intensity of the dry out effect. To model the pore pressure evolution is more complex because it comprises the full interaction of the coupled THM processes. The spread between the pore pressure modelled by the teams was larger, with some teams overestimating the pressure increase due to heating and some teams overestimating the extent of drainage. The agreement of modelled results with measurements improves with larger distance to the heater. We conclude that the EDZ and the shotcrete potentially influence the behaviour of the rock causing higher differences closer to the heater. Further research is needed to better implement those influences into the models. Based on the calibrated models, the future evolution of temperature, relative humidity and pore pressure was predicted over the next 10 years following a change of the heat power applied in 2023 and 2024. Again, the predicted temperatures agree very closely between the teams. Most teams do not expect an increase in relative humidity during the next 10 years after the initial dry-out.

58 GEOSCIENCES↗

Rejoinder

We would like to thank all of the discussants for their thoughtful and insightful comments. We heartily agree with Willis Jensen’s remark that the collection of views from multiple different perspectives possible with a discussion paper has added greatly to the overall contribution. Roger Hoerl compactly and eloquently summarized our thoughts about the role of statisticians on teams: “to objectively lead a team of subject matter experts through the minefield of problem resolution.” We agree with Benjamin Slade that this leadership role can be achieved either through formally leading the team or by being an active, engaged member of the team with an eye on the overall goals of the team and impacting the structure of the decision-making process. Hoerl also highlights what solutions interdisciplinary teams should be seeking – namely those that are “the best business … or scientific solution[s], rather than the best statistical solutions.” If this is how we define the objective of the team’s problem-solving or decision-making efforts, then establishing ourselves as fully-included team members or even working towards leading the team efforts should become easier.

97 MATHEMATICS AND COMPUTING↗

Evaluation of amine-incorporated porous polymer networks (aPPNs) as sorbents for post­combustion CO 2 capture

This is the final report for the TAMU project “Evaluation of amine-incorporated porous polymer networks (aPPNs) as sorbents for post­combustion CO 2 capture.” During this project, a team consisting of the Zhou group at Texas A&M University and framergy Inc. were tasked with developing a porous polymer network (PPN) based sorbent system for CO 2 capture applications. The three year project was divided up into 3 individual budget periods. During budget period 1 the team develop multiple novel PPN based sorbents and began initial CO 2 capture experiments. During the course of this research the team determined that two sorbents were the standout targets, PPN-150-DETA and PPN-151-DETA. During budget period 2 the team further developed these two materials, gathering data to determine their performance under both wet and dry conditions, determine their CO 2 adsorption capacities, heats of adsorption, regenerative energy demands, and mechanical attrition. In addition, budget period 2 saw the development of 50 g and 250 g batches of both sorbents, while still maintaining >0.10 g/g uptake capacity under wet gas conditions. Following budget period 2 testing, the team opted to continue on with PPN-151-DETA due to its superior CO 2 cycling capabilities, with a consistent uptake capacity observed over 30 cycles at the lab scale. During budget period 3 the team further developed the material at scale, producing a 1 kg batch of material. Following this, the team performed multiple long-term cycling tests in the presence and absence of SO 2 using a 100 mL column. During this testing the team observed that the material loses significant uptake capacity due to SO 2 , as well as shows some level of DETA loss, which resulted in instrument breakdown and a request for a no-cost extension. The team was able to finalize the experiment with a test using a 1.5 L column in the absence of SO 2 , with the final cycle uptakes being around 0.035 g/g due to the need to harshly activate the material to prevent DETA desorption.

20 FOSSIL-FUELED POWER PLANTS↗

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASK Magazine

What makes a successful team? In this issue our contributors look closely at the subject and come up with several answers. Working on team chemistry is the "Activation Energy" Dr. Owen Gadeken's story is about. Scott Cameron thinks it's getting to know people one to one. Tony Maturo says it's getting the most out of your support staff. Dr. Michael Hecht finds the best people he can and build the team around their talents. Teamwork is a theme we explore often in Academy Sharing Knowledge (ASK), but never so directly as in this issue. You'll not only find formulas for building successful teams, you'll see examples of ones in action, strategies for how project managers can motivate their teams, and expert advice on how to choose who to work with and who not to work with. It seems like all the stories make one common point: everyone on a team counts. Few project managers can pull off a project alone, and when the whole team is performing to everyone's potential, the chances of pulling off a successful project goes up exponentially. If that doesn't seem like enough by itself, listen to this... Discerning fans of ASK will note the last two issues our Special Feature was "There are no Mistakes, Only Lessons." We have not abandoned this feature, but for now we want to broaden our repertoire. In this issue we add a new Special Feature, "My Metaphor," starting with Paul Espinosa's article "My Big Wall" about his rock climbing adventures on El Capitan in Yosemite National Park. If you think getting to Mars is work, read what it's like to scale a 3,000-foot rock face. This issue we're also welcoming two new members to our Review Board, Hugh Woodward and Jody Kusek. Hugh and Jody are our first reviewers from outside NASA, and we are delighted to have them on our team. Read their bios on the ASK Review Board page and see why we feel privileged to have them on our team.

Post, Todd↗

The Namibia Early Flood Warning System, A CEOS Pilot Project

Over the past year few years, an international collaboration has developed a pilot project under the auspices of Committee on Earth Observation Satellite (CEOS) Disasters team. The overall team consists of civilian satellite agencies. For this pilot effort, the development team consists of NASA, Canadian Space Agency, Univ. of Maryland, Univ. of Colorado, Univ. of Oklahoma, Ukraine Space Research Institute and Joint Research Center(JRC) for European Commission. This development team collaborates with regional , national and international agencies to deliver end-to-end disaster coverage. In particular, the team in collaborating on this effort with the Namibia Department of Hydrology to begin in Namibia . However, the ultimate goal is to expand the functionality to provide early warning over the South Africa region. The initial collaboration was initiated by United Nations Office of Outer Space Affairs and CEOS Working Group for Information Systems and Services (WGISS). The initial driver was to demonstrate international interoperability using various space agency sensors and models along with regional in-situ ground sensors. In 2010, the team created a preliminary semi-manual system to demonstrate moving and combining key data streams and delivering the data to the Namibia Department of Hydrology during their flood season which typically is January through April. In this pilot, a variety of moderate resolution and high resolution satellite flood imagery was rapidly delivered and used in conjunction with flood predictive models in Namibia. This was collected in conjunction with ground measurements and was used to examine how to create a customized flood early warning system. During the first year, the team made use of SensorWeb technology to gather various sensor data which was used to monitor flood waves traveling down basins originating in Angola, but eventually flooding villages in Namibia. The team made use of standardized interfaces such as those articulated under the Open Cloud Consortium (OGC) Sensor Web Enablement (SWE) set of web services was good [1][2]. However, it was discovered that in order to make a system like this functional, there were many performance issues. Data sets were large and located in a variety of location behind firewalls and had to be accessed across open networks, so security was an issue. Furthermore, the network access acted as bottleneck to transfer map products to where they are needed. Finally, during disasters, many users and computer processes act in parallel and thus it was very easy to overload the single string of computers stitched together in a virtual system that was initially developed. To address some of these performance issues, the team partnered with the Open Cloud Consortium (OCC) who supplied a Computation Cloud located at the University of Illinois at Chicago and some manpower to administer this Cloud. The Flood SensorWeb [3] system was interfaced to the Cloud to provide a high performance user interface and product development engine. Figure 1 shows the functional diagram of the Flood SensorWeb. Figure 2 shows some of the functionality of the Computation Cloud that was integrated. A significant portion of the original system was ported to the Cloud and during the past year, technical issues were resolved which included web access to the Cloud, security over the open Internet, beginning experiments on how to handle surge capacity by using the virtual machines in the cloud in parallel, using tiling techniques to render large data sets as layers on map, interfaces to allow user to customize the data processing/product chain and other performance enhancing techniques. The conclusion reached from the effort and this presentation is that defining the interoperability standards in a small fraction of the work. For example, once open web service standards were defined, many users could not make use of the standards due to security restrictions. Furthermore, once an interoperable sysm is functional, then a surge of users can render a system unusable, especially in the disaster domain.

Mandl, Daniel↗

Flight Plasma Diagnostics for High-Power, Solar-Electric Deep-Space Spacecraft

NASA’s Asteroid Redirect Robotic Mission (ARRM) mission concept plans included a set of plasma and space environment instruments, the Plasma Diagnostic Package (PDP), to fulfill ARRM requirements for technology extensibility to future missions. The PDP objectives were divided into the classes of 1) Plasma thruster dynamics, 2) Solar array-specific environmental effects, 3) Plasma environmental spacecraft effects, and 4) Energetic particle spacecraft environment. A reference design approach and interface requirements for ARRM’s PDP was generated by the PDP team at JPL and GRC. The reference design consisted of redundant single-string avionics located on the ARRM spacecraft bus as well as solar array, driving and processing signals from multiple copies of several types of plasma, effects, and environments sensors distributed over the spacecraft and array. The reference design sensor types were derived in part from sensors previously developed for USAF Research Laboratory (AFRL) plasma effects campaigns such as those aboard TacSat-2 in 2007 and AEHF-2 in 2012. ARRM project leadership also encouraged the PDP team to convene a team of topical subject matter experts from across the country to review and confirm the reference design and to consider effective alternatives and/or enhancements to the reference design. This activity was proposed and accepted as an interactive, informal JPL “A-team” study and a cadre of 25 participants gathered in early 2017 for discussions. The outcome of the two-day A-team study was that the PDP reference design would allow the most important induced-environment unknowns to be measured in the appropriate space environment. Another outcome addressed technology developments of new or improved space plasma environmental sensors. The A-team study concluded that selected developments would lead to improved measurements that could efficiently provide important and otherwise unavailable information about plasma thruster operation in the space environment as well as the plasma induced spacecraft environment. Specifically, the A-team group recommended greater sensor diversity, by inclusion of deployed sensor capabilities in the thruster plume, or by occasional gimbaling of the thruster(s) toward the sensor arrays. The A-team also recommended developing high-speed probes, optical plasma probes, energy selective probes, and direct erosion/deposition sensors, among others; and recommended the inclusion of cameras as well as, since ARRM was to be recovered in cis-lunar orbit by a crewed mission, astronaut assessments of thruster induced environments and collection of sample coupons. Overall, the PDP A-team study provided a clear, consensus supported validation of the reference design PDP approach and pointed out important directions for future flight plasma sensor development.

Choi, Maria↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗

Simulating Mars: Enabling Testing of the Perseverance Rover Sampling and Caching Subsystem on Earth

The development of the Sampling and Caching Subsystem (SCS) on the JPL Perseverance Rover lies at the intersection of testing, robotics, and geology. The SCS team established three primary system test campaigns and venues to aid in the development of SCS through verification and validation testing – Qualification Model Dirty Testing (QMDT) to provide a venue for testing in a Martian environment, Vehicle System Testbed (VSTB) for testing while integrated with the mobility subsystem on Martian-like terrain, and the Flight Software Testbed (FSWTB) for conducting tests using the flight motor controllers and software system on a hexapod which had the ability to simulate rover tilt. Each venue contributed a vital piece to the SCS building blocks. However, the QMDT venue operating within a 10-ft diameter Thermal Vacuum chamber to simulate Martian environment provided a sui generis opportunity to fine tune the entire sampling and caching process while building the team’s knowledge base about rock drillability, system life, and target selection. On Earth, because Martian rocks are not readily available, the development team must utilize geoanalogs to the rocks and regolith on Mars. Geologists on the team helped establish a set of standard rock types to use for Mars missions, like Basalt, Sandstone, Mudstone, Gypsum, and other related geoanalogs. These geoanalogs are characterized with a standard suite of tests for density, compressibility, and other characteristics to categorize potential drillability. This concept of drillability is what links the geoanalogs on Earth to the samples we collect on Mars. With the simulant characteristics defined, these geoanalog rocks are ready to be drilled into as we do on the Martian surface. A key aspect of interacting with the surface on Mars is rock target identification and selection. The Perseverance robotic system uses the on-board cameras, instrumentation, and software to collect enough information to identify potential scientific targets. With the targets identified, SCS can place the Corer and abrade the surface or collect a sample. For a ground test activity like QMDT, the test team did not have all of the camera and instrumentation systems that the rover does, so the team developed ground test equivalents to process a rock, build a target map, and define the target. The team constructed a Rock Scanning Station to build a 3D point cloud of the rock. This point cloud was then processed and evaluated with predefined and programmed criteria in a Target Downselect Tool. A primary output of the Target Downselect Tool is a defined target that can be uploaded directly to the robotic software system to simulate and build the robotic sequences used in tests. With these insights and programmatic definition of targets, the QMDT test team was able to make the same decisions that the Perseverance surface operations team does. In addition, valuable lessons learned from developing the target selection ground tools and using them were implemented into the tools used for surface operations.

Kim, Junggon↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Mobile loading transuranic waste at small quantity sites in the Department of Energy complex-10523

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), operates mobile loading operations for all of the large and small quantity transuranic (TRU) waste sites in the Department of Energy (DOE) complex. The mobile loading team performs loading and unloading evolutions for both contact handled (CH) and remote handled (RH) waste. For small quantity sites, many of which have yet to remove their TRU waste, the mobile loading team will load shipments that will ship to Idaho National Laboratory, a centralization site, or ship directly to the Waste Isolation Pilot Plant (WIPP). For example, Argonne National Laboratory and General Electric Vallecitos Nuclear Center have certified programs for RH waste so they will ship their RH waste directly to WIPP. Many of the other sites will ship their waste to Idaho for characterization and certification. The Mobile Loading Units (MLU) contain all of the necessary equipment needed to load CH and RH waste into the appropriate shipping vessels. Sites are required to provide additional equipment, such as cranes, fork trucks, and office space. The sites are also required to provide personnel to assist in the shipping operations. Each site requires a site visit from the mobile loading team to ensure that all of the necessary site equipment, site requirements and space for shipping can be provided. The mobile loading team works diligently with site representatives to ensure that all safety and regulatory requirements are met. Once the waste is ready and shipping needs are met, the mobile loading team can be scheduled to ship the waste. The CH MLU is designed to support TRUPACT-II and HalfPACT loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for TRUPACT-II and HalfPACT loading and shipment certification. The RH MLU is designed to support removable lid canister (RLC) and RH-72B cask loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for RLC and RH-72B Cask loading and shipment certification. To date, the mobile loading team has successfully made 2,131 CH and RH TRU waste shipments. The mobile loading team continues to provide each site with safe and compliant loading ofTRU waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visions of success and achievement in recreation-related USDA Forest Service NEPA processes

The National Environmental Policy Act (NEPA) is incorporated into the planning and decision-making culture of all natural resource agencies in the U.S. Yet, we know little about how the attitudes and internal interactions of interdisciplinary (ID) teams engaged in NEPA processes influence process outcomes. We conducted a web-based survey of 106 ID team leaders involved with environmental analyses (EA) or environmental impact statements (EIS) for projects dealing with recreation and travel management on national forests. We explore how they define success in these processes and identify factors most powerfully associated with perceptions of positive outcomes. The survey revealed a tremendous diversity in definitions of success. Strong correlations between the perceived importance of particular indicators of success and their achievement suggest that pre-conceived notions may often help to shape process outcomes. Regression analyses revealed the following factors as the best predictors of ID team leaders' perception of an 'excellent outcome': achievement of the agency mission, whether compromise had taken place between the interested parties, team satisfaction and harmony, timely process completion, and project implementation. Yet, respondents consistently ranked compromise with interested parties and team member satisfaction among the least important measures of successful NEPA processes. Results suggest that clarifying appropriate measures of success in NEPA processes across the agency could make ID team performance more consistent. The research also suggests that greater attention to ID team interactions, both internally and between teams and interested publics, could result in better outcomes.

54 ENVIRONMENTAL SCIENCES↗

EERE Showcase Event (Solar Decathlon 2015)

The goal of the Orange County Great Park Corporation (Great Park) is to successfully host the U.S. Department of Energy Solar Decathlon 2015. In furtherance of that goal, tasks to be performed within the current reporting period include the following: Task 1.0 Arrange Site Team Visits for January 2015 The Great Park arranged appropriate meeting space for the site team visits over a three-day period, January 8, 2015 through January 10, 2015. Instead of a meeting in Hanger 244, the DOE requested a different meeting space. The working team met in the Operations offices on January 8th. The student teams were welcomed at the City of Irvine’s Lakeview Senior Center on January 9th, and came back on January 10th for breakout sessions. Task 2.0 Outreach Activities The following outreach activities related to the U.S. Department of Energy Solar Decathlon 2015 occurred during and prior to the event: • Promoted the return of the Solar Decathlon 2015 on the City’s website. (cityofirvine.org) • Promoted the return of the Solar Decathlon 2015 through the City’s and Great Park’s social media channels, including Facebook and Twitter. (facebook.com/cityofirvine, facebook.com/orangecountygreatpark, twitter.com/City_of_Irvine, twitter.com/ocgreatpark) • Promoted the return of the Solar Decathlon 2015 and student visit through a City Council Announcement. • Worked to set-up meetings between the U.S. Department of Energy team and potential donors/key stakeholders in Irvine. • Began ICTV filming and coverage of the Solar Decathlon 2015 teams. This includes student team interviews, interview with Richard King and b-roll footage. • Facilitated an interview with Sarah Farrar and the Orange County Register during the recent student visit in January • Information in May was provided to Irvine Unified School District and Tustin Unified School District promoting the three Education Days that the DOE will host during the event. More DOE information is due in August, which will be forwarded to the school districts that will provide important information for school tours. • A promotional ICTV video has been sent through the Irvine Chamber of Commerce and to dozens of businesses in Irvine promoting the Solar Decathlon 2015 and inviting attendance. • Cover story of Fall Inside Irvine magazine detailed teams competing in Solar Decathlon. Magazine goes to more than 100,000 Irvine residences. • Produced public service announcement with KPCC radio to air 9/28-10/16. Outreach also included a web banner on the station’s website. • Full-page advertisements in special sections of the Orange County Register, including UCI 50th Anniversary magazine that went to over 1 million readers of the Register, the Riverside Press Enterprise and the L.A. Times; Best of Orange County magazine; and Solar Decathlon special section. • Full-page ad in Urban Land magazine Sept./Oct. issue. • Produced ad for Irvine Global Village Festival brochure (tens of thousands in attendance at event.) • Ten posters displayed at Irvine Company properties throughout the City, including the Irvine Spectrum Center. • Rack cards promoting Solar Decathlon displayed at Irvine Spectrum Center, Discovery Science Center, Orange County Farm Bureau (at farmers markets) and at City facilities. • Tote bags promoting Solar Decathlon filled with magnets and rack cards on the event distributed at Irvine Global Village Festival, Great Park farmers market and UCI Festival of Discovery; some 8,000 bags handed out. • E-blast from City of Irvine Community Services Department included information on Solar Decathlon. (List contains 51,000 recipients.) • E-blast to Irvine Co. mailing list sent out 9/30. Web banner posted at shopirvinespectrumcenter.com. • E-blast sent to Orange County Register mailing list on 10/6. • Web banner posted on Orange County Register’s homepage. • E-blast sent by Irvine Chamber of Commerce on 10/9. • E-blast using City’s GovDelivery to 2,100 on 10/12. • Produced additional ads for the Orange County Register to fulfill the in-kind agreement between the DOE and the Register: Friday, Oct. 9, Local front page strip ad; Saturday, Oct. 10, half-page Home & Garden section ad; Sunday, Oct. 11, full page Local section ad; Wednesday, Oct. 14, ½ page Main or Local ad; Friday, Oct. 16, full Local or Main section ad; Saturday, Oct. 17, half-page Home & Garden section ad; Sunday Oct. 18, full page Local or Main ad. • Produced two additional Register ads promoting final days of the event: Full page Main or Local ad for Thursday, Oct. 15 and full page ad in Irvine World News weekly publication. • Produced separate press releases on Solar Decathlon, Volunteer Effort, Children’s Activities Area and Final Days. • Produced and distributed Children’s Activities Days rack cards. • Continued to promote the event on the City’s webpage, Great Park webpage and social media channels. • ICTV produced the “Solar Decathlon Minute” videos, which were posted on the City’s YouTube channel and the solardecathlon.gov website. • Four-minute video promoting Solar Decathlon shown on iShuttles in the City in weeks leading up to event. • Promoted a “Business Day” to local businesses in which businesses could sign up for tour led by Solar Decathlon docents. • Access Irvine Special Event Button running 9/28-10/18/15. • Access Irvine Push Notification on 10/15/15. • Facebook ad boost 10/13-10/18.

14 SOLAR ENERGY↗

Agile Strategy Living Laboratory Reflection Paper

Getting my team members to all agree that we needed to pursue possible solutions for our documentation review process was an idea that came across very well with the team. This specific topic has be something that as a team we have been having struggles with recently due to the shear amount of documents that have been flowing through the team’s hands to review. We all realized that the process had areas that we could change that would eliminate confusion for new employees, reduce backload, and improve efficiency and quality of the documentation reviews. The key personnel on our team that have the most direct control and impact over this process are the production control specialists, documentation preparation and review is their primary job function. They are denoted in the action pack as “doc spec 1” and this individual has 12 years of expertise in their role. The engineers are denoted as “engineer 1, 2, 3” respectively. Engineer 1 has 10 years of experience in this team, engineer 3 has 38 years of experience on the team, and engineer 2 is myself with 5 years of expertise with this team and 5 with the department of defense.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗