Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pump systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Lunar Polar Exploration with Beamed Powered Rovers

Use of a laser to transmit power to a photovoltaic array has been proposed many times, including significant work done at NASA Glenn during the 1990s, but until recently the technology has lagged behind the ambitious requirements. The current NASA objective of lunar polar exploration provides the need, and evolution of higher-power and more efficient lasers provides the opportunity. Exploration of the ice-bearing craters near the lunar poles, where complete absence of sunlight precludes solar power, have been identified as a significant technology challenge for NASA’s future exploration. An approach to solve this is to use a laser to send power from the illuminated crater rim to a photovoltaic receiver on a rover inside the permanently dark region. A conceptual design was done of a prototype laser power system to be included on a proposed flight demonstration of the Kilopower space reactor. For the design, the laser transmitter is mounted on a small rover capable of moving to a location in line of sight of the receiving rover, e.g., on a crater rim with a view into the permanently dark region to be explored. A 250-watt laser diode bar transmits power at 808 nm, using a 10.5 cm optical beam director. The beam is received by a GaAs solar array mounted on the exploring rover, where it is converted into electrical power at ~50% optical to electrical efficiency. For the flight demonstration, 50 meters of laser transmission was required. The design showed a total laser mass of 7.8 kg is capable of producing the beam needed, not including the thermal control system. The demonstration design demonstrates 50-m transmission, but it would be valuable to have longer point-to-point beaming on the moon. Long beam paths require higher coherence than the diode laser bars of the demonstration system. The development of high-efficiency diode-pumped fiber lasers meets this technology need: and diode-pumped fiber lasers using the Er/Yb system can be purchased commercially with overall conversion efficiency of greater than 50% at wavelength 1.06 micrometers. Two technologies for a photovoltaic converter for this wavelength are the InGaAs photovoltaic cell, using technology developed for multi-junction space solar cells, or newly-developed high-quantum efficiency silicon cells. The next step to mature the technology would be a lunar flight demonstration. In the future, this has the potential to enhance and enable future human exploration of the moon, harvesting and utilizing the ice resources of these permanently-shadowed craters.

Geoffrey A Landis↗

Case Study of a Heating Only Central GSHP System Using a Shallow Aquifer for a Warehouse

High initial cost and lack of public awareness of ground source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights findings of a case study of one of the ARRA-funded GSHP demonstration projects, which is a heating only central GSHP system using shallow aquifer as heat source and installed at a warehouse and truck bay at Kalispell, MT. This case study is based on the analysis of measured performance data, utility bills, and calculations of energy consumptions of conventional central heating systems for providing the same heat outputs as the central GSHP system did. The evaluated performance metrics include energy efficiency of the heat pump equipment and the overall GSHP system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of GSHP system compared with conventional heating systems. This case study also identified areas for reducing uncertainties in performance evaluation, improving operational efficiency, and reducing installed cost of similar GSHP systems in the future. Publication of ASHRAE at the annual conference in Seattle.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supercontinuum generation in oxide and semiconductor materials (InP, Si, GaN, GaAs, PbMoO 4 , YVO 4 , ZGP, TiO 2 , diamond) pumped by radiation of the Cr:ZnS fs-MOPA system

Ultrashort light sources in the middle-infrared range are highly beneficial for applications such as gas molecular spectroscopy, remote sensing, atmospheric science, medical treatments, and light–matter interaction studies. Ultrafast lasers utilizing chromium-doped ZnS/Se (Cr:ZnS/Se) have proven to be robust and stable solutions within this spectral region. Nonlinear spectral broadening is fundamentally important, as it pushes the pulse duration limits imposed by the bandwidth of laser media. In this study, we demonstrate the spectral broadening and supercontinuum generation in several bulk materials, including InP, Si, GaN, GaAs, PbMoO 4 , YVO 4 , diamond, and TiO 2 , using pump radiation with up to 4 W average power centered at 2.35 µm from a Cr:ZnS femtosecond MOPA system. Some of the investigated materials have excellent potential as effective media for middle-infrared supercontinuum generation, demonstrating the feasibility of developing a single-cycle pulse middle-infrared laser system.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Saturn Facility Oil Transfer Automation System

The Saturn accelerator, owned by Sandia National Laboratories, has been in operation since the early 1980s and still has many of the original systems. A critical legacy system is the oil transfer system which transfers 250,000 gallons of transformer oil from outside storage tanks to the Saturn facility. The oil transfer system was identified for upgrade to current technology standards. Using the existing valves, pumps, and relay controls, the system was automated using the National Instruments cRIO FGPA platform. Engineered safety practices, including a failure mode effects analysis, were used to develop error handling requirements. The uniqueness of the Saturn Oil Automated Transfer System (SOATS) is in the graphical user interface. The SOATS uses an HTML interface to communicate to the cRIO, creating a platform independent control system. The SOATS was commissioned in April 2013.

02 PETROLEUM↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

Solar-powered pump

Collector pump of solar-heating systems is powered by concentrating solar collector separate from main collector. Solar driven pump eliminates need for electrical supplies to intregal components.

Source record↗

Cryogenic leak testing of tube fittings/valves

A high pressure and variable temperature cryogenic leak testing system was conceived and designed in order to conduct leakage testing of pipe fittings/valves in liquid hydrogen supply lines of the Space Shuttle. The system can create a continuous testing environment of variable temperature, 5.5 to about 300 K, and variable pressure, 0.01 to about 70 x 10 exp 5 Pa, with a large sample space, 90 mm diameter x 228 mm length, and at low operating cost. In terms of cryogenic leak testing the system has a special capability for extensive applications. The system comprised a variable temperature cryostat, a high pressure sample chamber, a vacuum pumping station, gas flow control system, pressure and temperature control systems, and leak detecting and measuring systems. A general discussion of cryogenic leak testing methods is also presented.

Jia, L. X.↗

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU↗

Ti : sapphire laser synchronised with femtosecond Yb pump laser via nonlinear pulse coupling in Ti : sapphire active medium

A laser system utilising the method of synchronous pumping of a Ti : sapphire laser by a high-power femtosecond Yb{sup 3+}-doped laser is described. The pulse repetition rate of the Ti : sapphire laser is successfully locked to the repetition rate of the Yb laser for more than 6 hours without the use of any additional electronics. The measured timing jitter is shown to be less than 1 fs. A simple qualitative model addressing the synchronisation mechanism utilising the cross-phase modulation of oscillation and pump pulses within a Ti : sapphire active medium is proposed. Output parameters of the Ti : sapphire laser as functions of its cavity length are discussed in terms of this model. (paper)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Advanced spacecraft thermal control techniques

The problems of rejecting large amounts of heat from spacecraft were studied. Shuttle Space Laboratory heat rejection uses 1 kW for pumps and fans for every 5 kW (thermal) heat rejection. This is rather inefficient, and for future programs more efficient methods were examined. Two advanced systems were studied and compared to the present pumped-loop system. The advanced concepts are the air-cooled semipassive system, which features rejection of a large percentage of the load through the outer skin, and the heat pipe system, which incorporates heat pipes for every thermal control function.

Fritz, C. H.↗

Development of an In-Flight Refill Unit for Replenishing Research Animal Drinking Water

The Spacelab Life Sciences 2 (SLS-2) mission became NASA's longest duration Shuttle mission, lasting fourteen days, when Columbia landed on 1 Nov. 1993. Located within the Spacelab were a total of 48 laboratory rats which were housed in two Research Animal Holding Facilities (RAHF's) developed by the Space Life Sciences Payloads Office (SLSPO) at Ames Research Center. In order to properly maintain the health and well-being of these important research animals, sufficient quantities of food and water had to be available for the duration of the mission. An inflight Refill Unit was developed by the SLSPO to replenish the animals' drinking water inflight using the Shuttle potable water system in the middeck galley as the source of additional water. The Inflight Refill Unit consists of two major subsystems, a Fluid Pumping Unit (FPU) and a Collapsible Water Reservoir (CWR). The FPU provides the system measurement and controls, pump, water lines, and plumbing necessary to collect water coming into the unit from the potable water system and pump it out and into the RAHF drinking water tanks. The CWR is a Kevlar(trademark) reinforced storage bladder, connected to the FPU, which has a capacity of 6 liters in its expanded volume and functions to store the water collected from the potable water system and allows for the transport of the water back to the Spacelab where it is pumped into each of two RAHFs. Additional components of the FPU system include the inlet and outlet fluid hoses, a power cable for providing 28 volt direct current spacecraft electrical power to the pump within the FPU, a tether system for the unit when in use in Spacelab, and an adapter for mating the unit to the orbiter waste collection system in order to dump excess water after use in Spacelab. This paper will present the design process and development approach for the lnflight Refill Unit, define some of the key design issues which had to be addressed, and summarize the inflight operational performance of the unit during the SLS-2 mission.

Savage, P. D.↗

Development of a compact dilution refrigerator for zero gravity operation

A compact dilution refrigerator design based on internal charcoal adsorption is being tested for operation in zero gravity. This refrigerator is self-contained with no external pumps or gas handling system and provides reliable operation since it has no moving parts. All operations are performed with heaters and are completely computer controlled. The refrigerator is capable of providing many hours of operation at very low temperature before the charcoal pumps must be recycled.

Roach, Pat R.↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

ARIES↗

Control Strategies to Reduce the Energy Consumption of Central Domestic Hot Water Systems

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Control Strategies to Reduce the Energy Consumption of Central Domestic Hot Water Systems

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗