At least 1,423 records · Page 79

Analyzing impact of $\mathrm{DER}$ on $\mathrm{FIDVR}$ - comparison of $\mathrm{EMT}$ simulation of a combined transmission and distribution grid with aggregated positive sequence models

The increase in percentage of distributed energy resources (DERs) brings in a degree of uncertainty in bulk power system planning and operations. Further, the presence of 1 - φ induction motors introduces the possibility of motor stalling and fault induced delayed voltage recovery (FIDVR). With newer versions of IEEE Std 1547™ there can be the opportunity to obtain dynamic voltage support from DERs. In this report, the impact of DERs providing dynamic voltage on the dynamic behavior of 1 - φ induction motors is examined in detail along with an exploration of the need for simulation platforms that go beyond positive sequence. The studies discussed here are carried out both in detailed electromagnetic time domain and in positive sequence domain for comparison.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrically Heated Testing of the Kilowatt Reactor Using Stirling Technology (KRUSTY) Experiment Using a Depleted Uranium Core

The Kilopower project aims to develop and demonstrate scalable fission-based power technology for systems capable of delivering 110 kW of electric power with a specific power ranging from 2.5 - 6.5 Wkg. This technology could enable high power science missions or could be used to provide surface power for manned missions to the Moon or Mars. NASA has partnered with the Department of Energys National Nuclear Security Administration, Los Alamos National Labs, and Y-12 National Security Complex to develop and test a prototypic reactor and power system using existing facilities and infrastructure. This technology demonstration, referred to as the Kilowatt Reactor Using Stirling TechnologY (KRUSTY), will undergo nuclear ground testing in the summer of 2017 at the Nevada Test Site. The 1 kWe variation of the Kilopower system was chosen for the KRUSTY demonstration. The concept for the 1 kWe flight system consist of a 4 kWt highly enriched Uranium-Molybdenum reactor operating at 800 degrees Celsius coupled to sodium heat pipes. The heat pipes deliver heat to the hot ends of eight 125 W Stirling convertors producing a net electrical output of 1 kW. Waste heat is rejected using titanium-water heat pipes coupled to carbon composite radiator panels. The KRUSTY test, based on this design, uses a prototypic highly enriched uranium-molybdenum core coupled to prototypic sodium heat pipes. The heat pipes transfer heat to two Advanced Stirling Convertors (ASC-E2s) and six thermal simulators, which simulate the thermal draw of full scale power conversion units. Thermal simulators and Stirling engines are gas cooled. The most recent project milestone was the completion of non-nuclear system level testing using an electrically heated depleted uranium (non-fissioning) reactor core simulator. System level testing at the Glenn Research Center (GRC) has validated performance predictions and has demonstrated system level operation and control in a test configuration that replicates the one to be used at the Device Assembly Facility (DAF) at the Nevada National Security Site. Fabrication, assembly, and testing of the depleted uranium core has allowed for higher fidelity system level testing at GRC, and has validated the fabrication methods to be used on the highly enriched uranium core that will supply heat for the DAF KRUSTY demonstration.

Briggs, Maxwell H.↗

Transmission-and-Distribution Dynamic Co-simulation Framework for Distributed Energy Resource Frequency Response

The rapid deployment of distributed energy resources (DERs) in distribution networks has made it challenging to balance the transmission system and stabilize frequency. DERs have the ability to provide frequency regulation services; however, existing frequency dynamic simulation tools - which were developed mainly for the transmission system - lack the capability to simulate distribution network dynamics with high penetrations of DERs. Although electromagnetic transient simulation tools can simulate distribution network dynamics, the computation efficiency limits their use for large-scale transmission-and-distribution (T&D) co-simulation. This paper presents an efficient open-source T&D dynamic co-simulation framework for DER frequency response based on the HELICS platform and off-the-shelf T&D simulators. The challenge of synchronizing the simulation time between the transmission network and the DERs in the distribution network is solved through the detailed modeling of DERs in frequency dynamic models while DER power flow models are also preserved in the distribution networks, thereby respecting local voltage constraints when dispatching DER power for frequency response. DER frequency response (primary and secondary) is simulated in case studies to validate the proposed framework. Last, the accuracy of the proposed co-simulation model is benchmarked, and a large T&D system simulation (2k transmission and 1M distribution nodes) is presented to demonstrate the efficiency and effectiveness of the overall framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance limitations in parallel processor simulations

A jet-engine model is partitioned and simulated on a parallel processor system consisting of five 8086/8087 floating-point computers. The simulation uses Heun's integration method. A near-optimal parallel simulation (in the sense of minimum execution time) achieves speedup of only 2.13 and efficiency of 42.6 percent, in effect wasting 57.4 percent of the available processing power. A detailed analysis identifies and graphically demonstrates why the system fails to achieve ideal performance (viz., speedup of 5 and efficiency of 100 percent). Inherent characteristics of the problem equations and solution algorithm account for the loss of nearly half of the available processing power. Overheads associated with interprocessor communication and processor synchronization account for only a small fraction of the lost processing power. The effects of these and other factors which limit parallel processor performance are illustrated through real-time timing-analyzer tracers describing the run/idle status of the parallel processors during the simulation.

O'Grady, E. Pearse↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

Two 25 cell stacks of the 13 inch x 23 inch cell size (about 4kW) remain on test after 4000 hours and 2900 hours, respectively, using simulated reformate fuel. These tests are focusing on the durability of fuel cell stack components developed through the end of 1983. Also, these stacks are serving as forerunners of a 25kW stack that will contain 175 cells of the same size and will employ the same technology base. The stack technology development program has focused on a new, low cost bipolar plate edge seal technique and evaluation of advanced cathode catalysts, an electrolyte replenishment system, and nonmetallic cooling plates in small stacks.

Kaufman, A.↗

Cumulative Measurement Errors for Dynamic Testing of Space Flight Hardware

Located at the NASA Johnson Space Center in Houston, TX, the Six-Degree-of-Freedom Dynamic Test System (SDTS) is a real-time, six degree-of-freedom, short range motion base simulator originally designed to simulate the relative dynamics of two bodies in space mating together (i.e., docking or berthing). The SDTS has the capability to test full scale docking and berthing systems utilizing a two body dynamic docking simulation for docking operations and a Space Station Remote Manipulator System (SSRMS) simulation for berthing operations. The SDTS can also be used for nonmating applications such as sensors and instruments evaluations requiring proximity or short range motion operations. The motion base is a hydraulic powered Stewart platform, capable of supporting a 3,500 lb payload with a positional accuracy of 0.03 inches. The SDTS is currently being used for the NASA Docking System testing and has been also used by other government agencies. The SDTS is also under consideration for use by commercial companies. Examples of tests include the verification of on-orbit robotic inspection systems, space vehicle assembly procedures and docking/berthing systems. The facility integrates a dynamic simulation of on-orbit spacecraft mating or de-mating using flight-like mechanical interface hardware. A force moment sensor is used for input during the contact phase, thus simulating the contact dynamics. While the verification of flight hardware presents unique challenges, one particular area of interest involves the use of external measurement systems to ensure accurate feedback of dynamic contact. The measurement systems for the test facility have two separate functions. The first is to take static measurements of facility and test hardware to determine both the static and moving frames used in the simulation and control system. The test hardware must be measured after each configuration change to determine both sets of reference frames. The second function is to take dynamic measurements during hardware motion and contact. While performing dynamic testing of an active docking system, researchers found that the data from the motion platform, test hardware and two external measurement systems exhibited frame offsets and rotational errors. While the errors were relatively small when considering the motion scale overall, they substantially exceeded the individual accuracies for each component. After evaluating both the static and dynamic measurements, researchers found that the static measurements introduced significantly more error into the system than the dynamic measurements even though, in theory, the static measurement errors should be smaller than the dynamic. In several cases, the magnitude of the errors varied widely for the static measurements. Upon further investigation, researchers found the larger errors to be a consequence of hardware alignment issues, frame location and measurement technique whereas the smaller errors were dependent on the number of measurement points. This paper details and quantifies the individual and cumulative errors of the docking system and describes methods for reducing the overall measurement error. The overall quality of the dynamic docking tests for flight hardware verification was improved by implementing these error reductions.

Winnitoy, Susan↗

A graph embedding‐based approach for automatic cyber‐physical power system risk assessment to prevent and mitigate threats at scale

Abstract Power systems are facing an increasing number of cyber incidents, potentially leading to damaging consequences to both physical and cyber aspects. However, the development of analytical methods for the study of large‐scale power infrastructures as cyber‐physical systems is still in its early stages. Drawing inspiration from machine‐learning techniques, the authors introduce a method inspired by the principles of graph embedding that is tailored for quantitative risk assessment and the exploration of possible mitigation strategies of large‐scale cyber‐physical power systems. The primary advantage of the graph embedding approach lies in its ability to generate numerous random walks on a graph, simulating potential access paths. Meanwhile, it enables capturing high‐dimensional structures in low‐dimensional spaces, facilitating advanced machine‐learning applications, and ensuring scalability and adaptability for comprehensive network analysis. By employing this graph embedding‐based approach, the authors present a structured and methodical framework for risk assessment in cyber‐physical systems. The proposed graph embedding‐based risk analysis framework aims to provide a more insightful perspective on cyber‐physical risk assessment and situation awareness for power systems. To validate and demonstrate its applicability, the method has been tested on two cyber‐physical power system models: the Western System Coordinating Council (WSCC) 9‐Bus System and the Illinois 200‐Bus System , thereby showing its advantages in enhancing the accuracy of risk analysis and comprehensiveness of situational awareness.

Sun, Shining↗

Modeling of Inductive Constant Power Load for Electromagnetic-Transient Simulations-Part II

This paper improves the dynamic constant power (CP) load model that was published in Part I, which is appropriate for electromagnetic-transient (EMT). The improved model conserves all features of its predecessor. For instance, it maintains a fixed power consumption (both active and reactive parts) and a fixed power factor for loads that are predominantly inductive. Furthermore, as the proposed model is a time-dependent system, it is applicable to both sinusoidal and non-sinusoidal case studies. However, the previous model cannot be easily integrated with numeric solvers because it simulated load data over one cycle all together, not sequentially in a time-step manner, due to the limitation involved with the power factor. The improved version, on the contrary, allows the load to be simulated at every time step, which would facilitate its integration with numeric solvers. The model's validity is confirmed by comparing its response with data that is synthesized from constant impedance load, and the result is satisfactory.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigation of Motor Stalling and FIDVR via Energy Storage Systems with Temporal Logic Specifications

The fault-induced delayed voltage recovery (FIDVR) phenomenon has been very common from the distribution system through the transmission system. It causes a delay on recovering significantly depressed local voltage after the fault is cleared, and it can also lead to more widespread cascading system failures. Mitigating this event with current control approaches is challenging and becoming a crucial issue. Here, a model predictive control-based strategy employing signal temporal logic specifications is proposed to help mitigate FIDVR. To this end, it investigates and extends a dynamic performance model allowing analytic insights into the system-wide impact of motor stalling and FIDVR. The proposed controller provides richer descriptions of voltage specifications addressing both magnitude and time simultaneously. We consider different control specifications with reactive power support from energy storage systems to prevent the voltage during/after the fault from dropping too low, and reduce the delay time of voltage recovery. The simulation results conducted with the IEEE 57 bus test network validate the proposed method and demonstrate the effectiveness of the mitigation strategy on FIDVR.

25 ENERGY STORAGE↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PV-BESS DC-Series Integration for Regulated DC Systems

DC-series integration introduces a novel approach to seamlessly integrate a solar photovoltaic (PV) array and a battery energy storage (BES) in series. This system, referred to as the PV-integrated battery energy storage system—dc series (PVBESS-DCS), simplifies integration and enhances power density by leveraging the inherent voltage-source characteristics of batteries and adopting the concept of partial power processing. However, addressing voltage variations of a PV array and a BES under different operational conditions remains a challenge to apply the PVBESS-DCS to a regulated dc system, where the dc-bus voltage is fixed. This article proposes a PVBESS-DCS solution tailored for regulated dc systems. Within this framework, we present a controllable series voltage source compensating for the voltage differences between the PV and BES sources and the dc bus. Thus, the system can perform PV maximum power point tracking and curtailment control while charging and discharging BES and connected to a regulated dc bus. Additionally, we present a single-stage multiport partial power processing dc–dc converter designed for the proposed PVBESS-DCS. It utilizes a triple active bridge dc–dc converter topology. Finally, this article presents operating principles, control strategies, simulation results, and experimental findings of the proposed PVBESS-DCS for regulated dc systems.

25 ENERGY STORAGE↗

Validation of Numerical Tools for Calculating Reactivity Feedback in Sodium Fast Reactors Using SEFOR Experimental Data

The Southwest Experimental Fast Oxide Reactor (SEFOR) was an experimental sodium-cooled fast breeder reactor operated from 1969 to 1972 with experiments designed to measure Doppler reactivity feedback in a wide temperature range from around 350 °F to temperatures approaching the melting point of mixed oxide fuel of around 5000 °F, providing valuable data for code validations. Co-supported by the Department of Energy (DOE) Fast Reactor Program (FRP) and the DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the SEFOR benchmark project focused on using the experimental data to validate numerical tools that are used in industry and academia to design and license sodium-cooled fast reactors (SFRs). By the end of FY-25, substantial progress was achieved in the SEFOR benchmark study. A variety of numerical tools commonly used for modeling SFRs were applied to develop models for SEFOR core configurations I-D, I-E, I-I, and I-J. These included Monte Carlo codes such as MCNP, Serpent, and Shift; deterministic codes such as the legacy Argonne Reactor Computation (ARC) suite and the high-fidelity NEAMS code Griffin; and the system analysis code SAS4A/SASSYS-1 (SAS). Using these models, both SEFOR zero-power experiments and power-ascending tests were successfully simulated. Comparisons were performed against experimental measurements of core criticalities, reflector worth, kinetics parameters (Λ/βeff), isothermal reactivity feedback (from 350 °F to 760 °F at zero power), and power-ascending reactivity feedback (as power increased from 0.4 MW to 17 MW). In general, these comparisons demonstrated very good agreement between numerical results and experimental data. In Fiscal Year 26 (FY-26), the SEFOR benchmark project will continue to address the modeling issues identified in FY-25. Effort will focus on the simulation of reactivity insertion transients in SEFOR core II using the ARC/SAS model. Future work will also focus on incorporating BISON into the SEFOR core modeling process to enable the first Multiphysics simulations of the isothermal tests based on the MOOSE framework.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Innovative Energy Management System for Microgrids with Multiple Grid-Forming Inverters

As increasingly more grid-forming (GFM) inverter-based resources replace traditional fossil-fueled synchronous generators as the GFM sources in microgrids, the existing microgrid energy management systems (EMS) need to be updated to control and coordinate multiple GFM inverters that consider system control objectives under different microgrid connection states. For each state, we formulate an optimization problem and apply a real-time feedback-based control algorithm; altogether, the control algorithms seamlessly connect the states into a generic microgrid EMS that controls the nodal voltages and frequencies, becomes a virtual power plant (VPP) when connected to the main grid, and coordinates power sharing responsibility among GFM sources when islanded. We showcase the EMS on a real-world simulation of a microgrid under the different states to demonstrate its operational effectiveness.

energy management systems↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fairness-based Distributed Energy Coordination for Voltage Regulation in Distribution Systems

The rapid adoption of photovoltaic (PV) systems combined with falling prices of energy storage is paving the way for a future in which customers could locally supply their energy needs and export surplus power to the grid. However, reverse power flow from multiple sites in a network can cause overvoltage that decreases system reliability and the utilization level of PV system. In this paper, we present a two-stage approach to solve the energy coordination problem in distribution networks. In the first stage, a household with PV and energy storage is optimized to allow customers to adopt different control strategies such as load following and tariff arbitrage. We show that such customer-led control strategies can cause reverse power flows during peak PV generation periods, thus resulting in overvoltage. In such cases, the second stage of the proposed approach is called upon to solve a fairness-based energy coordination problem that can maintain voltages within limits while maximizing the PV generation while fairly distributing the actions among all the PV systems. As a result, each of the resources in the network has equal opportunity to export power and shares the responsibility of voltage regulation. Simulation studies have been carried out on the IEEE 13-bus test feeder to verify the effectiveness of the proposed approach.

Distributed energy resources, fairness, overvoltag↗

Coupled Reactor and Engine Nuclear Thermal Propulsion Modeling Methodology

The design and development process of a Nuclear Thermal Propulsion (NTP) system requires extensive multiphysics modeling to couple the neutron physics and thermal feedback effects to determine the reactor’s power shape. Propulsion system performance codes utilize this power shape to determine NTP key performance parameters. While the power shape is heavily dependent on the temperature profile and geometry of the reactor, many analyses either assume a constant power shape, or use neutronics analysis to determine a power shape for a specific reactor configuration. The development of a coupling interface for a propulsion system performance code and a Monte Carlo neutron transport code (OpenMC) allows for the reactor power shape to be calculated in an iteration loop. The interface utilizes a file share system to transfer geometry dimensions, temperatures, and material identifiers to OpenMC, which is used to perform a neutron transport simulation of a design like the government Testing Reference Design reactor. The interface is then able to post-process the results from OpenMC and use the same file share system to share a power shape and other important neutron transport parameters to the system performance code. Initial results show that neglecting the changes to power shape when comparing reactor configurations can yield inaccurate results. Furthermore, utilizing propellants other than hydrogen gas can cause significant changes to the power shape, and thus, the thermal performance of a specific reactor design. This methodology is being expanded to allow for multiple families of NTP reactors to be analyzed, including block moderator, particle bed, and NERVA-derived reactors.

multiphysics coupling↗

Coupled Reactor and Engine Nuclear Thermal Propulsion Modeling Methodology

The design and development process of a Nuclear Thermal Propulsion (NTP) system requires extensive multiphysics modeling to couple the neutron physics and thermal feedback effects to determine the reactor’s power shape. Propulsion system performance codes utilize this power shape to determine NTP key performance parameters. While the power shape is heavily dependent on the temperature profile and geometry of the reactor, many analyses either assume a constant power shape, or use neutronics analysis to determine a power shape for a specific reactor configuration. The development of a coupling interface for a propulsion system performance code and a Monte Carlo neutron transport code (OpenMC) allows for the reactor power shape to be calculated in an iteration loop. The interface utilizes a file share system to transfer geometry dimensions, temperatures, and material identifiers to OpenMC, which is used to perform a neutron transport simulation of a design like the government Testing Reference Design reactor. The interface is then able to post-process the results from OpenMC and use the same file share system to share a power shape and other important neutron transport parameters to the system performance code. Initial results show that neglecting the changes to power shape when comparing reactor configurations can yield inaccurate results. Furthermore, utilizing propellants other than hydrogen gas can cause significant changes to the power shape, and thus, the thermal performance of a specific reactor design. This methodology is being expanded to allow for multiple families of NTP reactors to be analyzed, including block moderator, particle bed, and NERVA-derived reactors.

multiphysics coupling↗

OAO-3 end of mission power subsystem evaluation

End of mission tests were performed on the OAO-3 power subsystem in three component areas: solar array, nickel-cadmium batteries and the On-Board Processor (OBP) power boost operation. Solar array evaluation consisted of analyzing array performance characteristics and comparing them to earlier flight data. Measured solar array degradation of 14.1 to 17.7% after 8 1/3 years is in good agreement with theortical radiation damage losses. Battery discharge characteristics were compared to results of laboratory life cycle tests performed on similar cells. Comparison of cell voltage profils reveals close correlation and confirms the validity of real time life cycle simulation. The successful operation of the system in the OBP/power boost regulation mode demonstrates the excellent life, reliability and greater system utilization of power subsystems using maximum power trackers.

Tasevoli, M.↗