Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Peer-to-peer communication control for resilient operations of networked cyberphysical systems

This report includes two main accomplishments of the peer-to-peer communication control for resilient operation of networked microgrids project in FY24, which include a scheme for cyberattack-aware coordination of networked microgrids for supporting voltages of bulk power systems and a scheme for price signal-based operations of EV-rich networked microgrids with mixed ownership. First, the cyberattack-aware scheme enables networked microgrids to distributedly determine the amount of reactive power injection to support the voltage of bulk power system (BPS) in a fair manner. In this scheme, a risk-informed algorithm is presented to generate the peer-to- peer (P2P) communication graph with minimal risk of attack on communication links. To deal with cyberattacks on MG controllers, the resilient consensus algorithm (CA) is utilized for MG controllers to robustly estimate the total reactive power headroom, from which the MGs can accurately provide the needed amount of reactive power injection for supporting the voltage of BPS. The CA implementation and performance within the P2P communication framework are demonstrated on the IEEE 39-bus system with 6 microgrids contained in the distribution feeder under different cyberattack scenarios. Second, the price-based scheme enables the usage of the real-time price signal for the operations of electric vehicle (EV)-rich networked-microgrids with mixed ownership, in which not all the microgrids can communicate with the distribution system operator (DSO). In this scheme, a max consensus is introduced to enable the real-time price signal to be propagated from the DSO to all the microgrids, from which each microgrid controller will manage the DERs to balance the load demand and the power injection from the EV charging stations within its microgrid. Numerical results over one day with 288 slots of 5-minute intervals on the modified 123-node test feeder including 3 microgrids with high penetration of EV are presented to evaluate how the price signal affects the operations of networked microgrids under different charging strategies of the EV charging stations. The result indicates that our proposed EVCS (dis)charging strategy, which leverages the flexibility of EVs to support the grid through discharging during peak demand, proves to be a cost-effective solution that reduces operational costs while improving the social welfare of EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Molten Salt Loop Operational Experience and Test Campaigns in FY24

The Facility to Alleviate Salt Technology Risks (FASTR) at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) was developed to demonstrate technology for high-temperature chloride salt systems (Figure 1). FASTR is primarily constructed using alloy C-276 and is designed to operate at temperatures of up to 725°C. The facility is loaded with 250 kg of NaCl-KCl-MgCl 2 salt. This salt provides a relevant test environment for de-risking technology while avoiding the costs and hazards associated with beryllium-based or uranium-bearing salts. The facility’s major components include a centrifugal pump for salt circulation, an air-based heat exchanger to reject heat, a suite of instrumentation, and trace heating to prevent salt freezing. The salt was purified in 2020 and 2022, and the pumped loop first operated in December 2022. FASTR is a unique US capability for high-temperature molten halide salt testing. FASTR’s scale, co located purification system, and relatively large power (465 kW) differentiates it from other testing systems. Furthermore, access to the DOE-supported facility and efficient communication of results— which are generally disseminated publicly—distinguish FASTR as being broadly significant throughout the molten salt reactor community. FASTR is similar to ORNL’s Liquid Salt Test Loop (LSTL), although FASTR contains chloride-based salt instead of the fluoride-based salt (LiF-NaF-KF) found in LSTL. Furthermore, FASTR is approximately 2× larger than LSTL in terms of pipe size and length, power, salt volume, flow rate, and number of thermocouples. The LSTL first operated in 2016. At the end of FY23, there was a suspected gas leak in the LSTL that halted operation. At the start of FY24, a leak in the LSTL pump’s tank gas space was confirmed. Because the gas-space leak prevented operation of LSTL, FY24 efforts were focused on operation of FASTR. This report summarizes the progress made during FY24 in support of the DOE Office of Nuclear Energy (DOE-NE) work package, AT-24OR070202 Salt Loop and Capability for Testing Sensors and Off Gas Components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operation of Argonne's Liquid Salt-Liquid Metal Separation Testbed for U/TRU Product Processing

Argonne National Laboratory has constructed a liquid salt-liquid metal separation testbed for use in the development and advancement of cathode processing of U/TRU co‑deposits generated by pyroprocessing of used nuclear fuel. The U/TRU product recovered from the electrorefiner contains adhered and entrained salt that must be removed prior to consolidation of the U/TRU alloy for use in advanced reactor fuel fabrication. The bottom pour operation utilizes the low melting points of U/TRU co‑deposits and higher densities of molten metals compared to molten salts to separate and consolidate the U/TRU product. Argonne’s testbed is designed to support the development and optimization of bottom-pouring configurations for batch and semi-continuous operations, integration of process monitoring and control technologies, and determination of operational requirements for implementing in an industrial setting. Scoping tests were performed to demonstrate operational aspects of the testbed, including operation using single-pour spout and dual-pour spout configurations, effectiveness of salt containment and extent of salt vaporization, and the use of sensor probes to detect the location of the interface between the metal and salt phases during pouring. Recommendations for process optimization testing for further development of bottom pour processing to separate U/TRU alloys from adhered salt were made based on the results of scoping tests. Completing the recommended activities will increase the technical readiness level (TRL) of the liquid salt-liquid metal separation operation and consolidation of U/TRU alloys to support industrialization of pyroprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Inlet Guide Vane Performance for Discharge Compressor Operation near the Dome of an sCO 2 Pumped Heat Energy Storage

Southwest Research Institute® (SwRI®) developed and tested a Variable Inlet Guide Vane (IGV herein) assembly on an integrally-geared sCO 2 compressor (IGC) to demonstrate compressor operation at both the compressor design point and near the dome and to define the operating limits of the compressor by monitoring for two-phase flow, flow turbulence from the IGVs, and compressor choke and surge as the CO 2 inlet temperature is varied. Performance testing was conducted on an existing integrally-geared, two-stage main compressor designed for near-critical-point operation with CO 2 . This testing campaign validated the IGV design and operation, as well as improved the understanding and confidence in operating compressors and predicting performance characteristics near the critical point where fluid properties change rapidly with temperature. In addition to improving the robust operating limits of an sCO 2 compressor, the development of an IGV for the IGC system improved off-design compressor efficiency by 12%.

25 ENERGY STORAGE↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.

54 ENVIRONMENTAL SCIENCES↗

Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.

On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

13 HYDRO ENERGY↗

On Computation of Koopman Operator from Sparse Data

In this paper, we propose a novel approach to compute the Koopman operator from sparse time series data. In recent years there has a considerable interest in operator theoretic methods for data-driven analysis of dynamical systems and existing techniques for the approximation of the Koopman operator require rich enough data-sets. However, in many applications, the data set may not be rich enough to approximate the operators to acceptable limits. In this paper, using ideas from robust optimization, we propose an algorithm to compute the Koopman operator from sparse data. In particular, we enrich the sparse data set with artificial data points and use robust optimization techniques to obtain the transfer operator. We illustrate the efficiency of our proposed approach in three different dynamical systems, namely, a linear system, a nonlinear system and a dynamical system governed by a partial differential equation.

Sinha, Subhrajit↗

Block-Structured Operator Inference for Coupled Multiphysics Model Reduction

This work presents a block-structured formulation of Operator Inference as a way to learn structured reduced-order models for multiphysics systems. The approach specifies the governing equation structure for each physics component and the structure of the coupling terms. Once the multiphysics structure is specified, the reduced-order model is learned from snapshot data following the nonintrusive Operator Inference methodology. In addition to preserving physical system structure, which in turn permits preservation of system properties such as stability and second-order structure, the block-structured approach has the advantages of reducing the overall dimensionality of the learning problem and admitting tailored regularization for each physics component. The numerical advantages of the block-structured formulation over a monolithic Operator Inference formulation are demonstrated for aeroelastic analysis, which couples aerodynamic and structural models. For the benchmark test case of the AGARD 445.6 wing, block-structured Operator Inference provides an average 20% online prediction speedup over monolithic Operator Inference across subsonic and supersonic flow conditions in both the stable and fluttering parameter regimes while preserving the accuracy achieved with monolithic Operator Inference.

42 ENGINEERING↗

Improving Microalgal Biomass Productivity Using Weather-Forecast-Informed Operations

The operation of microalgal cultivation systems, such as culture dilution associated with harvests, affects biomass productivity. However, the constantly changing incident light and ambient temperature in the outdoor environment make it difficult to determine the operational parameters that result in optimal biomass growth. To address this problem, we present a pond operation optimization tool that predicts biomass growth based on future weather conditions to identify the optimal dilution rate that maximizes biomass productivity. The concept was tested by comparing the biomass productivities of three dilution scenarios: standard batch cultivation (no dilution), fixed-rate dilution (harvest 60% of the culture every three days), and weather-forecast-informed dilution. In the weather-forecast-informed case, the culture was diluted daily, and the dilution ratio was optimized by the operation optimization tool according to the future 24 h weather condition. The results show that the weather-forecast-informed dilution improved the biomass productivity by 47% over the standard batch cultivation and 20% over the fixed-rate dilution case. These results demonstrate that the pond operation optimization tool could help pond operators to make decisions that maximize biomass growth in the field under ever-changing weather conditions.

59 BASIC BIOLOGICAL SCIENCES↗

Capacity Optimization of a Centralized Charging Station in Joint Operation with a Wind Farm

In the context of large-scale wind power integration and rapid development of electric vehicles (EVs), a joint operation pattern was proposed to use a centralized charging station (CCS) to address high uncertainties incurred by wind power integration. Additionally, this would directly remove the significant indeterminacy of wind power. Because the CCS is adjacent to a wind power gathering station, it could work jointly with wind farms to operate in power system as an independent enterprise. By combining the actual operational characteristics of the wind farm and the CCS, a multidimensional operating index evaluation system was created for the joint system. Based on the wind farm’s known capacity, a multi-target capacity planning model was established for CCS to maximize the probability of realizing diverse indices of the system based on dependent-chance goal programming. In this model, planning and dispatching are combined to improve the feasibility of results in the operational stage. This approach takes the effects of randomness into account for wind power and battery swapping. The model was solved through combining Monte Carlo simulation and a genetic algorithm (GA) based on segmented encoding. Finally, as shown in the simulation results, the proposed model could comprehensively include factors such as initial investment, wind power price, battery life, etc., to optimize CCS capacity and to ultimately improve the operating indices of the joint system.

17 WIND ENERGY↗

Development of 80- and 100- Mile Work Day Cycles Representative of Commercial Pickup and Delivery Operation

When developing and designing new technology for integrated vehicle systems deployment, standard cycles have long existed for chassis dynamometer testing and tuning of the powertrain. However, to this day with recent developments and advancements in plug-in hybrid and battery electric vehicle technology, no true 'work day' cycles exist with which to tune and measure energy storage control and thermal management systems. To address these issues and in support of development of a range-extended pickup and delivery Class 6 commercial vehicle, researchers at the National Renewable Energy Laboratory in collaboration with Cummins analyzed 78,000 days of operational data captured from more than 260 vehicles operating across the United States to characterize the typical daily performance requirements associated with Class 6 commercial pickup and delivery operation. In total, over 2.5 million miles of real-world vehicle operation were condensed into a pair of duty cycles, an 80-mile cycle and a 100-mile cycle representative of the daily operation of U.S. class 3-6 commercial pickup and delivery trucks. Using novel machine learning clustering methods combined with mileage-based weighting, these composite representative cycles correspond to 90th and 95th percentiles for daily vehicle miles traveled by the vehicles observed. In addition to including vehicle speed vs time drive cycles, in an effort to better represent the environmental factors encountered by pickup and delivery vehicles operating across the United States, a nationally representative grade profile and key status information were also appended to the speed vs. time profiles to produce a 'work day' cycle that captures the effects of vehicle dynamics, geography, and driver behavior which can be used for future design, development, and validation of technology.

100 mile↗

Characterizing the performance of a POPS miniaturized optical particle counter when operated on a quadcopter drone

We first validate the performance of the Portable Optical Particle Spectrometer (POPS), a small light-weight and high sensitivity optical particle counter, against a reference scanning mobility particle sizer (SMPS) for a month-long deployment in an environment dominated by biomass burning aerosols. Subsequently, we examine any biases introduced by operating the POPS on a quadcopter drone, a DJI Matrice 200 V2. We report the root mean square difference (RMSD) and mean absolute difference (MAD) in particle number concentrations (PNCs) when mounted on the UAV and operating on the ground and when hovering at 10 m. When wind speeds are low (less than 2.6 m s –1 ), we find only modest differences in the RMSDs and MADs of 5 % and 3 % when operating at 10 m altitude. When wind speeds are between 2.6 and 7.7 m s –1 the RMSDs and MADs increase to 26.2 % and 19.1 %, respectively, when operating at 10m altitude. No statistical difference in PNCs was detected when operating on the UAV in either ascent or descent. We also find size distributions of aerosols in the accumulation mode (defined by diameter, d, where 0.1 ≤ d ≤ 1 µm) are relatively consistent between measurements at the surface and measurements at 10 m altitude, while differences in the coarse mode (here defined by d > 1 µm) are universally larger. Our results suggest that the impact of the UAV rotors on the POPS PNCs are small at low wind speeds, but when operating under a higher wind speed of up to 7.6 m s –1 , larger discrepancies occur. In addition, it appears that the POPS measures sub-micron aerosol particles more accurately than super-micron aerosol particles when airborne on the UAV. These measurements lay the foundations for determining the magnitude of potential errors that might be introduced into measured aerosol particle size distributions and concentrations owing to the turbulence created by the rotors on the UAV.

47 OTHER INSTRUMENTATION↗

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗