Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Design, Activation, and Operation of the J2-X Subscale Simulator (JSS)

The purpose of this paper is to give a detailed description of the design, activation, and operation of the J2-X Subscale Simulator (JSS) installed in Cell 1 of the E3 test facility at Stennis Space Center, MS (SSC). The primary purpose of the JSS is to simulate the installation of the J2-X engine in the A3 Subscale Rocket Altitude Test Facility at SSC. The JSS is designed to give aerodynamically and thermodynamically similar plume properties as the J2-X engine currently under development for use as the upper stage engine on the ARES I and ARES V spacecraft. The JSS is a scale pressure fed, LOX/GH fueled rocket that is geometrically similar to the J2-X from the throat to the nozzle exit plane (NEP) and is operated at the same oxidizer to fuel ratios and chamber pressures. This paper describes the heritage hardware used as the basis of the JSS design, the newly designed rocket hardware, igniter systems used, and the activation and operation of the JSS.

Saunders, Grady P.↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

The Hubble Space Telescope: UV, Visible, and Near-Infrared Pursuits

The Hubble Space Telescope continues to push the limits on world-class astrophysics. Cameras including the Advanced Camera for Surveys and the new panchromatic Wide Field Camera 3 which was installed nu last year's successful servicing mission S2N4,o{fer imaging from near-infrared through ultraviolet wavelengths. Spectroscopic studies of sources from black holes to exoplanet atmospheres are making great advances through the versatile use of STIS, the Space Telescope Imaging Spectrograph. The new Cosmic Origins Spectrograph, also installed last year, is the most sensitive UV spectrograph to fly io space and is uniquely suited to address particular scientific questions on galaxy halos, the intergalactic medium, and the cosmic web. With these outstanding capabilities on HST come complex needs for laboratory astrophysics support including atomic and line identification data. I will provide an overview of Hubble's current capabilities and the scientific programs and goals that particularly benefit from the studies of laboratory astrophysics.

Wiseman, Jennifer↗

Design, Development and Test Challenges: Separation Mechanisms for the Orion Pad Abort-1 Flight Test

On May 6, 2010, NASA launched the first successful integrated flight test, Pad Abort-1, of the Orion Project from the White Sands Missile Range in Las Cruces, New Mexico. This test demonstrated the ability to perform an emergency pad abort of a full-scale 4.8 m diameter, 8200 kg crew capsule. During development of the critical separation mechanisms for this flight test, various challenges were overcome related to environments definition, installation complications, separation joint retraction speed, thruster ordnance development issues, load path validation and significant design loads increases. The Launch Abort System retention and release (LAS R&R) mechanism consisted of 6 discrete structural connections between the LAS and the crew module (CM) simulator, each of which had a preloaded tension tie, Superbolt torque-nut and frangible nut. During the flight test, the frangible nuts were pyrotechnically split, permitting the CM to separate from the LAS. The LAS separation event was the driving case in the shock environment for many co-located hardware items. During development testing, it was necessary to measure the source shock during the separation event so the predicted shock environment could be validated and used for certification testing of multiple hardware items. The Lockheed Martin test team measured the source separation shock due to the LAS R&R function, which dramatically decreased the predicted environment by 90% at 100 Hz. During development testing a hydraulic tensioner was used to preload the joint; however, the joint relaxation with the tensioner proved unsatisfactory so the design was modified to include a Superbolt torque-nut. The observed preload creep during lab testing was 4% after 30 days, with 2.5% occurring in the first 24 hours. The conversion of strain energy (preload) to kinetic energy (retraction) was measured to be 50-75%. Design features and careful monitoring of multiple strain gauges on each tension tie allowed a pure tensile load to be applied after stacking at the launch pad. Following installation, preload in each joint was monitored for 24 hours. Due to unforeseen complications and the influence of temperature on the portable data acquisition system, the team encountered difficulty in tracking the joint relaxation. In some cases, bond-line failure of the strain gauges occurred.

Dinsel, Alison↗

Noncontacting Laser Inspection System for Dimensional Profiling of Space Application Thermal Barriers

A noncontacting, two-dimensional (2-D) laser inspection system has been designed and implemented to dimensionally profile thermal barriers being developed for space vehicle applications. In a vehicle as-installed state, thermal barriers are commonly compressed between load sensitive thermal protection system (TPS) panels to prevent hot gas ingestion through the panel interface during flight. Loads required to compress the thermal barriers are functions of their construction, as well as their dimensional characteristics relative to the gaps in which they are installed. Excessive loads during a mission could damage surrounding TPS panels and have catastrophic consequences. As such, accurate dimensional profiling of thermal barriers prior to use is important. Due to the compliant nature of the thermal barriers, traditional contact measurement techniques (e.g., calipers and micrometers) are subjective and introduce significant error and variability into collected dimensional data. Implementation of a laser inspection system significantly enhanced the method by which thermal barriers are dimensionally profiled, and improved the accuracy and repeatability of collected data. A statistical design of experiments study comparing laser inspection and manual caliper measurement techniques verified these findings.

Taylor, Shawn C.↗

Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. To achieve a substrate condition suitable for the application of a coating system, both new and old (in-situ) substrates must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The level of cleanliness or anchor profile desired is typically a function of the type of coating to be applied and the specification being adhered to. In high performance environments, cleanliness and surface profile requirements for carbon steel (the dominant substrate for facilities, structures and equipment) dictates the use of abrasive media. Many of the abrasive media currently used across NASA and Air Force Space Command (AFSPC) installations generate large quantities of fugitive particulate emissions and waste. The high quantities of airborne dust and waste generated from these operations pose significant environmental concern. Efforts to contain emissions and the reduce quantity of waste generated have significant implications on project cost; this is often a deterrent to engaging in maintenance activities. In response to recent technological developments and NASA's and AFSPC's need to undertake environmentally conscious corrosion prevention projects, a review of the industry needs to be undertaken to evaluate surface preparation technologies (materials and processes) for embrace. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.

Lewis, Pattie↗

The NASA VLBI2010 Proof-of-Concept Demonstration and Future Plans

The next generation geodetic VLBI instrument is being developed with a goal of 1 mm position uncertainty in twenty-four hours. We have implemented a proof-of-concept system for a possible VLBI2010 signal chain, from feed through recorder, on the Westford (Massachusetts, USA) 18-m and MV-3 (Maryland, USA) 5-m antennas. Data have been obtained in four 512 MHz bands spanning the range 3.5 to 11 GHz to investigate the sensitivity and phase delay capability of the system. Using a new phase cal design, the phases have been aligned across four bands spanning 2 GHz with an RMS deviation of approximately eight degrees. Several components of the system will be improved for the prototype version of VLBI2010, including the feed, digital backend, and recorder, and these will be installed on a 12-m antenna that has been purchased and is ready for installation at the Goddard Space Flight Center outside of Washington, D.C., USA, site of the MV-3 antenna.

Niell, Arthur↗

LAURA Users Manual: 5.4-54166

This users manual provides in-depth information concerning installation and execution of Laura, version 5. Laura is a structured, multi-block, computational aerothermodynamic simulation code. Version 5 represents a major refactoring of the original Fortran 77 Laura code toward a modular structure afforded by Fortran 95. The refactoring improved usability and maintainability by eliminating the requirement for problem dependent re-compilations, providing more intuitive distribution of functionality, and simplifying interfaces required for multi-physics coupling. As a result, Laura now shares gas-physics modules, MPI modules, and other low-level modules with the Fun3D unstructured-grid code. In addition to internal refactoring, several new features and capabilities have been added, e.g., a GNU-standard installation process, parallel load balancing, automatic trajectory point sequencing, free-energy minimization, and coupled ablation and flowfield radiation.

Mazaheri, Alireza↗

International Space Station Water Balance Operations

In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) Environmental Control and Life Support Systems (ECLSS), which includes the Oxygen Generation Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of water balance . In November of 2010, the Sabatier system, which converts H2 and CO2 into water and methane, was brought on line. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water, which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification (spec) rates of crew urine output, condensate output, O2 requirements, toilet flush water, and drinking needs are well documented and used as the best guess planning rates when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent upon a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS from Mission Control in Houston. This paper reviews the various inputs to water planning, rate changes, and dynamic events, including but not limited to: crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water storage availability, and Carbon Dioxide Removal Assembly (CDRA), Sabatier, and OGA capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints, and finally the operational challenges and means by which flight controllers manage this new concept of "water balance."

Tobias, Barry↗

Hardware Design Improvements to the Major Constituent Analyzer

The Major Constituent Analyzer (MCA) onboard the International Space Station (ISS) is designed to monitor the major constituents of the ISS's internal atmosphere. This mass spectrometer based system is an integral part of the Environmental Control and Life Support System (ECLSS) and is a primary tool for the management of ISS atmosphere composition. As a part of NASA Change Request CR10773A, several alterations to the hardware have been made to accommodate improved MCA logistics. First, the ORU 08 verification gas assembly has been modified to allow the verification gas cylinder to be installed on orbit. The verification gas is an essential MCA consumable that requires periodic replenishment. Designing the cylinder for subassembly transport reduces the size and weight of the maintained item for launch. The redesign of the ORU 08 assembly includes a redesigned housing, cylinder mounting apparatus, and pneumatic connection. The second hardware change is a redesigned wiring harness for the ORU 02 analyzer. The ORU 02 electrical connector interface was damaged in a previous on-orbit installation, and this necessitated the development of a temporary fix while a more permanent solution was developed. The new wiring harness design includes flexible cable as well as indexing fasteners and guide-pins, and provides better accessibility during the on-orbit maintenance operation. This presentation will describe the hardware improvements being implemented for MCA as well as the expected improvement to logistics and maintenance.

Combs, Scott↗

Vehicle Transponder for Preemption of Traffic Lights

The purpose of this article is to describe, in more detail, the transponder installed in each vehicle that participates in the emergency traffic-light-preemption system described in the immediately preceding article. The transponder (see figure) is a fully autonomous data--collection, data-processing, information-display, and communication subsystem that performs robustly in preemption of traffic lights and monitoring of the statuses of street intersections. This transponder monitors the condition of the emergency vehicle in which it is installed and determines when the vehicle has been placed in an emergency-response condition with its siren and/or warning lights activated. Upon detection of such a condition, the transponder collects real-time velocity and acceleration data from the onboard diagnostic (OBD) computer of the vehicle. For this purpose, the transponder contains an OBD interface circuit, including a microprocessor that determines the manufacturer and model of the vehicle and then sends the appropriate commands to the OBD computer requesting the speed and acceleration data. At the same time, data from an onboard navigation system are collected to determine the location and the heading of the vehicle. Then acceleration, speed, position, and heading data are processed and combined with a vehicle-identification number and the resulting set of data is transmitted to monitoring and control units located at all intersections within communication range. When the unit at an intersection determines that this vehicle is approaching and has priority to preempt the intersection, it transmits a signal declaring the priority and the preemption to all participating vehicles (including this one) in the vicinity. If the unit at the intersection has determined that other participating vehicles are also approaching the intersection, then this unit also transmits, to the vehicle that has priority, a message that the other vehicles are approaching the same intersection. The texts of these messages, plus graphical symbols that show the directions and numbers of the approaching vehicles, are presented on the display panel of a computer that is part of the transponder.

Foster, Conrad↗

Intersection Monitor for Traffic-Light-Preemption System

The figure shows an intersection monitor that is a key subsystem of an emergency traffic-light-preemption system that could be any of the systems described in the three immediately preceding articles and in Systems Would Preempt Traffic Lights for Emergency Vehicles (NPO-30573), NASA Tech Briefs, Vol. 28, No. 10 (October 2004), page 36. This unit is so named because it is installed at an intersection, where it monitors the phases (in the sense of timing) of the traffic lights. The mode of operation of this monitor is independent of the type of traffic-light-controller hardware or software in use at the intersection. Moreover, the design of the monitor is such that (1) the monitor does not, by itself, affect the operation of the traffic- light controller and (2) in the event of a failure of the monitor, the trafficlight controller continues to function normally (albeit without preemption). The monitor is installed in series with the traffic-light controller at an intersection. The control signals of interest are monitored by use of high-impedance taps on affected control lines. These taps are fully isolated and further protected by high-voltage diodes that prevent any voltages or short circuits that arise within the monitor from affecting the controller. The signals from the taps are processed digitally and cleaned up by use of high-speed logic gates, and the resulting data are passed on to other parts of the traffic-light-preemption intersection subsystem. The data are compared continuously with data from vehicles and used to calculate timing for reliable preemption of the traffic lights. The pedestrian crossing at the intersection is also monitored, and pedestrians are warned not to cross during preemption.

Bachelder, Aaron↗

Boundary Layer Transition Flight Experiment Overview

In support of the Boundary Layer Transition Flight Experiment (BLT FE) Project, a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for STS-119, STS-128, STS-131 and STS-133 as well as Space Shuttle Endeavour for STS-134. Additional instrumentation was installed in order to obtain more spatially resolved measurements downstream of the protuberance. This paper provides an overview of the BLT FE Project with emphasis on the STS-131 and STS-133 results. A high-level overview of the in-situ flight data is presented, along with a summary of the comparisons between pre- and post-flight analysis predictions and flight data. Comparisons show that empirically correlated predictions for boundary layer transition onset time closely match the flight data, while predicted surface temperatures were significantly higher than observed flight temperatures. A thermocouple anomaly observed on a number of the missions is discussed as are a number of the mitigation actions that will be taken on the final flight, STS-134, including potential alterations of the flight trajectory and changes to the flight instrumentation.

Berger, Karen T.↗

Detecting Negative Obstacles by Use of Radar

Robotic land vehicles would be equipped with small radar systems to detect negative obstacles, according to a proposal. The term "negative obstacles" denotes holes, ditches, and any other terrain features characterized by abrupt steep downslopes that could be hazardous for vehicles. Video cameras and other optically based obstacle-avoidance sensors now installed on some robotic vehicles cannot detect obstacles under adverse lighting conditions. Even under favorable lighting conditions, they cannot detect negative obstacles. A radar system according to the proposal would be of the frequency-modulation/ continuous-wave (FM/CW) type. It would be installed on a vehicle, facing forward, possibly with a downward slant of the main lobe(s) of the radar beam(s) (see figure). It would utilize one or more wavelength(s) of the order of centimeters. Because such wavelengths are comparable to the characteristic dimensions of terrain features associated with negative hazards, a significant amount of diffraction would occur at such features. In effect, the diffraction would afford a limited ability to see corners and to see around corners. Hence, the system might utilize diffraction to detect corners associated with negative obstacles. At the time of reporting the information for this article, preliminary analyses of diffraction at simple negative obstacles had been performed, but an explicit description of how the system would utilize diffraction was not available.

Mittskus, Anthony↗

Ares I-X Ascent Base Environments

Plume induced base heating environments were measured during the flight of the NASA Constellation Ares I-X developmental launch vehicle, successfully flown on October 28, 2009. The Ares IX first stage is a four segment Space Shuttle derived booster with base consisting of a flared aft skirt, deceleration and tumble motors, and a thermal curtain surrounding the first stage 7.2 area ratio nozzle. Developmental Flight Instrumentation (DFI) consisted of radiometers, calorimeters, pressure transducers and gas temperature probes installed on the aft skirt and nozzle to measure the base environments. In addition, thermocouples were also installed between the layers of the flexible thermal curtain to provide insight into the curtain response to the base environments and to assist in understanding curtain failure during reentry. Plume radiation environment predictions were generated by the Reverse Monte Carlo (RMC) code and the convective base heating predictions utilized heritage MSFC empirical methods. These predictions were compared to the DFI data and results from the flight videography. Radiation predictions agreed with the flight measured data early in flight but gauge failures prevented high altitude comparisons. The convective environment comparisons demonstrated the need to improve the prediction methodology; particularly for low altitude, local plume recirculation. The convective comparisons showed relatively good agreement at altitudes greater than 50,000 feet.

Mobley, B. L.↗

Apparatus for Testing Flat Specimens of Thermal Insulation

An apparatus has been developed to implement an improved method of testing flat-plate specimens of thermal-insulation materials for cryogenic application. The method includes testing under realistic use conditions that could include vacuum and mechanical loading at a pressure up to 70 psi (=0.48 MPa). The apparatus can accommodate a rigid or flexible specimen having thickness up to 1.25 in. (=3.2 cm) and diameters between 6 and 10 in. (about 15.2 and 25.4 cm, respectively). Typical test conditions include boundary temperatures between 77 K and 373 K and vacuum/interstitial gas filling at a pressure between 10(exp -6) torr (=1.3 x 10(exp -4) Pa) and 760 torr (atmospheric pressure =0.1 MPa). The interstitial gas could be N2, He, CO2, or any other suitable gas to which the insulation is expected to be exposed in use. Relative to prior apparatuses and testing methods, this apparatus and the testing method that it implements offer advantages of relative simplicity and ease of use. The basic principle of operation of the apparatus is that of boil-off calorimetry, using liquid nitrogen or any other suitable liquid that boils at a desired temperature below ambient temperature. Comparative rates of flow of heat through the thicknesses of the specimens (heat-leak rates) and apparent-thermal-conductivity values are obtained from tests of specimens. Absolute values of heat-leak rates and apparent thermal conductivities are computed from a combination of (1) the aforementioned comparative values and (2) calibration factors obtained by testing reference specimens of materials that have known thermal-insulation properties. The apparatus includes a full complement of temperature sensors, a vacuum pump and chamber, a monitoring and control system, and tools and fixtures that enable rapid and reliable installation and removal of specimens. A specimen is installed at the bottom of the vacuum chamber, and a cold-mass assembly that includes a tank is lowered into position above and around the specimen (see figure). A spring-based compensating fixture helps to ensure adequate thermal contact with possibly irregular specimen surfaces. For a high-compression test, the springs can be replaced with spacers. A flat circular load cell at the bottom of the chamber measures the compressive load on the specimen. Once the desired compressive-load, temperature, and vacuum/gas-filling conditions are established, testing begins. During a test, all measurements are recorded by use of a portable data-acquisition system and a computer. The total heat-leak rate is measured and calculated as the boil-off flow rate multiplied by the latent heat of vaporization. The parasitic heat leak (to the side of the specimen and to the top and side of the cold-mass tank) is reduced to a small fraction of the total heat leak by use of a combination of multilayer-insulation (MLI) shield rings, reflective film, a fiberglass/epoxy centering ring, and a bulk fill of aerogel beads. This combination eliminates the need for a cryogenic guard chamber used in a typical prior apparatus to reduce the parasitic heat leak.

Fesmire, James E.↗

Fastener Starter

The Fastener Starter is a creative solution to prevent the loss of small fasteners during their installation. This is the only currently available tool that can firmly grip and hold a single screw, bolt, nut, washer, spacer, or any combination of these parts. Other commercially available fastener starters are unable to accommodate a variety of parts simultaneously. The Fastener Starter is a more capable and easier tool to use than prior tools. Its compact size allows it to be used effectively in cramped, difficult-to-see locations. Its design also allows it to be used with or without handles and extenders in other difficult-to-reach locations. It provides better protection against cross threading and loss of fasteners and associated parts. The Fastener Starter is non-magnetic and does not off-gas, thus meeting flight hardware requirements. The Fastener Starter incorporates a combination of features of several commercially available tools, providing an improved means of installing small fasteners. The Fastener Starter includes a custom molded insert that can be removed easily and replaced with a conventional tool bit (e.g., a screwdriver or hex-driver bit). When used with the insert, the Fastener Starter prevents cross threading and damage to internal threaded holes. This is achieved by allowing the fastener to slip within the tool insert when used without a conventional tool bit. Alternatively, without the insert and with a tool bit, the Fastener Starter can torque a fastener. The Fastener Starter has a square recess hole that accepts a conventional square drive handle or extension to accommodate a variety of applications by providing flexibility in handle style and length.

Chandler, Faith↗

Risk Assessment Using the Three Dimensions of Probability (Likelihood), Severity, and Level of Control

Traditional hazard analysis techniques utilize a two-dimensional representation of the results determined by relative likelihood and severity of the residual risk. These matrices present a quick-look at the Likelihood (Y-axis) and Severity (X-axis) of the probable outcome of a hazardous event. A three-dimensional method, described herein, utilizes the traditional X and Y axes, while adding a new, third dimension, shown as the Z-axis, and referred to as the Level of Control. The elements of the Z-axis are modifications of the Hazard Elimination and Control steps (also known as the Hazard Reduction Precedence Sequence). These steps are: 1. Eliminate risk through design. 2. Substitute less risky materials for more hazardous materials. 3. Install safety devices. 4. Install caution and warning devices. 5. Develop administrative controls (to include special procedures and training.) 6. Provide protective clothing and equipment. When added to the two-dimensional models, the level of control adds a visual representation of the risk associated with the hazardous condition, creating a tall-pole for the least-well-controlled failure while establishing the relative likelihood and severity of all causes and effects for an identified hazard. Computer modeling of the analytical results, using spreadsheets and three-dimensional charting gives a visual confirmation of the relationship between causes and their controls.

Watson, Clifford C.↗