Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

aThe increase over the last years of the testing activities related to superconducting quantum materials, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three regulatory valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SCALE Modeling of the Sodium Cooled Fast-Spectrum Advanced Burner Test Reactor

This report documents the modeling and simulation of a sodium-cooled fast reactor (SFR) as part of a U.S. Nuclear Regulatory Commission–sponsored project to assess the modeling and simulation capabilities for accident progression, source term, and consequence analysis for advanced reactor technologies with the Oak Ridge National Laboratory code SCALE and the Sandia National Laboratories (SNL) code MELCOR. Based on publicly available benchmark specifications, a fully heterogeneous 3D SCALE model of the 250 MWth Advanced Burner Test Reactor (ABTR) was developed to demonstrate SCALE’s capabilities for full-core reactivity analysis, fuel inventory prediction, and decay heat analysis of an SFR. The benchmark specifications contain modeling details for the ABTR core at the beginning of equilibrium cycle (BOEC) at operating conditions; they were derived from a 2006 preconceptual design report produced by Argonne National Laboratory. The ABTR was designed to demonstrate reactor-based transmutation of transuranics, that is, to “burn” transuranics recovered from light-water reactor (LWR) spent fuel. The ABTR’s fuel is designed to operate in 4 month cycles using uranium/transuranic (U/TRU) metallic fuel, with a TRU content of approximately 20%, at a conversion ratio of approximately 0.6. Various reactivity calculations were performed with SCALE for the ABTR and, where possible, compared with results available in the open literature. Additionally, SCALE was used to perform a full-core depletion calculation over the 4 month cycle to obtain the nuclide inventory at the end of equilibrium cycle (EOEC). These nuclide inventories, decay heat, power profiles, and reactivity feedback coefficients at EOEC represent the initial conditions for analyzing severe accident scenarios with MELCOR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Common Grid Services: Terms and Definitions Report

This document is prepared as part of the Department of Energy’s Grid Modernization Laboratory Consortium (GMLC) 2.5.2 project, whose goal is to develop and socialize a common set of grid service definitions relevant to grid-related interactions with distributed energy resources (DER: responsive generation, storage, and loads) and to advance the concept and requirements of the Energy Services Interface (ESI) to the point of launching related interface standards and guides that can be implemented in communication protocols and business process definitions. The notion of grid services is associated with the definition of an ESI because a key principle of the ESI is that it permits coordination between grid operators and DER facilities in a way that is service-oriented with an understanding of performance expectations. The project investigated the current state of North American grid service definitions from various market operators and utilities, as well as the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation, actively used today (Liu et al. 2022). This document builds on that work to propose terms and definitions for a set of grid service types that address operational objectives commonly found in power system operations. These grid service types derive from existing grid services used in bulk electric market operations, recognizing that each operational authority uses somewhat different names with variations on service performance parameters. Finding commonality at the wholesale or bulk system operation level will hopefully engender progress in seeking agreement on grid services for DER engagement at the distribution level in the emerging retail marketplace.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Modeling Radionuclide Vaporization from Sodium Pools for SFR Mechanistic Source Term Analysis

To assist both the advanced reactor industry and U.S. Nuclear Regulatory Commission (NRC) in the pursuit of reactor design and licensing, the U.S. Department of Energy (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has established a mechanistic source term (MST) research project under the Multiphysics Applications technical area. As part of this effort, an MST mod/sim development pathway was developed in FY21 under the NEAMS program, which outlines the high-level objectives and near-term tasks necessary to achieve the project objectives. One such recommended task was the assessment of a previously developed thermodynamic database to model radionuclide vaporization from liquid sodium pools (specifically in the context of MST analyses), which is the focus of this topic report. As such, a thermodynamic database was created in FactSage for liquid sodium pools containing oxygen and relevant elements which represent radionuclides pertinent to MST analyses. The database was demonstrated in calculating vapor fraction curves for each element in the system at concentrations relevant to SFR MST.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal Spectrum Molten Salt-Fueled Reactor Reference Plant Model

This report details a fully coupled neutronics thermal hydraulics reference plant model for a thermal spectrum molten salt-fueled reactor. The Multiphysics model is developed on the Nuclear Regulatory Commission's Comprehensive Reactor Analysis Bundle available on the Idaho National Laboratory high-performance computer, which natively and seamlessly couples Griffin and Sam codes of the Multiphysics Object-Oriented Simulation Environment (MOOSE) based applications. Griffin provides the reactor physics capabilities, k-eigenvalue, delayed neutron precursor concentrations, and transient solutions for stationary and flowing fuels. Sam provides the solution of mass, momentum, and energy conservation equations of the whole system with a set of system components for one-dimensional single-phase flow. The neutronics feedback model relies primarily on fuel and moderator temperatures, fuel salt density, and delayed neutron precursors distributions. This report presents our results for the coupled steady state core and an unprotected loss of flow event. Although this model is prototypical regarding capabilities in the Comprehensive Reactor Analysis Bundle, its results are consistent with experimental data of the pump transient tests that were performed at zero power of the Molten Salt Reactor Experiment (MSRE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

MTA Removable Beam Absorber

Once commissioned, the secondary production beamline in the MeV Test Area (MTA) will require a removable beam absorber for continuous beam operation. A 4"x 4" x 4" copper core encased within steel will absorb the full 15 Hz 400 MeV Fermilab Linac primary proton beam. However the residual activation will constrain work activities in the hall, so a 6” marble casing is proposed entombing the core. Marble has minimal residual activation. This presentation describes the initial concept and planned ANSYS analysis.

Blas, Efren↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗

SCALE 6.2 Lattice Physics Performance Assessment

The US Nuclear Regulatory Commission relies on the lattice physics analysis capabilities of the SCALE code system to perform confirmatory licensing analyses. Either SCALE lattice physics code—TRITON/NEWT or Polaris—can be used to generate cross section data used by the PARCS nodal core simulator for full-core neutronics calculations. This report presents an assessment of the accuracy of SCALE lattice physics codes for preparation of lattice physics data that are used to support simulator codes such as the NRC’s PARCS, for UO 2 -mixed oxide (MOX)/Zr fueled light water reactor (LWR) analyses. Due to the nature of lattice physics calculations, critical reactor experiment benchmarks cannot be modeled in explicit detail in a lattice physics code. However, this limitation does not mean that these measurement data are not usable for lattice physics studies. Therefore, either geometry approximations or axial buckling must be implemented to determine the critical water height. These modeling limitations have led to development of a three-phase assessment strategy. In the first phase, selected critical experiment benchmarks are modeled using the SCALE 3D continuous-energy (CE) Monte Carlo (MC) code KENO, which is the most rigorous neutron transport method available in SCALE, with no approximations in the spatial, angle, or energy treatments. Biases and statistical uncertainties in quantities of interest such as k eff and pin power distributions are determined by comparing CE KENO results to experimental data. This first phase in the accuracy assessment is to demonstrate and establish the use of CE KENO as a reference solution for the second phase. In the second phase, 14 numerical test suites are used to compare SCALE lattice physics calculations with CE KENO as a reference solution. In the third phase, SCALE lattice physics depletion calculations are performed, and the spent fuel isotopic results are compared with available radiochemical assay measurements. Isotopic measurement comparisons provide quantitative assessment of isotopic density distribution predictions with the depletion models in SCALE lattice physics codes. This report documents results for all test suites. The assessment was performed using standard production techniques unless otherwise noted. Both TRITON/NEWT and Polaris exhibited acceptable accuracy for most test cases. For the few test cases in which acceptable accuracy criteria were not met, further code and data development are planned. The computer codes used in this assessment are as follows: SCALE 6.2 rev19189 (pre-release of 6.2.1) was used for CE KENO, TRITON/NEWT and Polaris (PWR only) calculations; SCALE 6.2.2 was used for Polaris calculations to address several updates in support of support boiling water reactor (BWR) lattice geometries. For this work, there is no difference between SCALE 6.2.1 and SCALE 6.2.2 beyond the inclusion of the Polaris BWR analysis capability; The ENDF/B-VII.1 continuous energy and 252 group libraries deployed in SCALE 6.2 were generated with AMPX 6.2 that is distributed with SCALE.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

What Crime? Legal Jurisdiction over Civilians in the Pacific Proving Ground

In late 1948 the Atomic Energy Commission “designated Enewetak Atoll as a permanent proving ground.” Subsequently renamed, the Pacific Proving Ground (PPG), six nuclear tests, including Mike, were conducted on the atoll. When Mike vaporized an entire island, it became clear that Enewetak’s small islands were insufficient and Bikini Atoll, abandoned after Operation Crossroads, was made part of the PPG. Authority to create the PPG resided in a “Trusteeship” agreement between the United States and the United Nations. Following the first World War, the Marshall Islands became a “Mandate” of the League of Nations. After World War II, the League’s successor, the United Nations, converted the Marshall Islands to a “Strategic Trusteeship” with the United States as its administrator. The Strategic Trust designation gave the U.S. nearly unfettered control over the islands, including the right to establish the PPG.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2022

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2022. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off site population groups was estimated. Results are interpreted with respect to the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 Version 4.1 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

Comparison Between Pin-by-Pin Subchannel and System Level Thermal Hydraulic Results for High Burnup Loss-of-Coolant Applications

This milestone report summarizes recent work to investigate higher fidelity modeling and simulation practices for large-break loss-of-coolant accident (LBLOCA) analysis in high-burnup pressurized water reactor (PWR) cores. Because of current industry interest in extending fuel cycle lengths ranging from 18 to 24-months, the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has been investigating the susceptibility of high-burnup core designs to fuel fragmentation, release, and dispersal (FFRD) during accident conditions such as LBLOCA. This work has prioritized developing and demonstrating a methodology for calculating core-wide susceptibility to FFRD and addressing uncertainties identified in the analysis and the US Nuclear Regulatory Commission (NRC) Research Information Letter on FFRD. Part of this investigation seeks to quantify differences between system-level thermal hydraulic behavior and higher fidelity subchannel modeling methods to identify potential safety concerns or opportunities to minimize FFRD susceptibility. To this end, the NEAMS subchannel code, CTF, is being used, along with the NRC system analysis code TRACE, for analysis of LBLOCA in a core containing high-burnup fuel. This project includes two thrusts: (1) improving on the existing TRACE model for a 4-loop PWR for LBLOCA so that the model is higher fidelity and consistent with current USNRC best practices, and (2) using CTF to perform pin-resolved modeling of the core region of the reflood phase of a LBLOCA in a high-burnup PWR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Oak Ridge National Laboratory Annual Sustainability Report 2023

ORNL, managed under contract by UT-Battelle LLC, is DOE’s largest science and energy laboratory and, as such, executes the widest range of mission capabilities. Diverse expertise spans a broad range of scientific and engineering disciplines, enabling research and science achievements to accelerate the delivery of solutions to the marketplace. ORNL supports DOE’s national missions of scientific discovery, clean energy, and security. To execute these activities, ORNL has grown significantly over 80 years of continuous operations, consisting of facilities with commissioning dates ranging from the 1940s to the present—an extraordinary set of distinctive scientific facilities and equipment. The complexities of such a variety of facilities require teamwork among divisions, a wide variety of conservation projects, and creative strategies to achieve the desired energy and water savings. Such a diverse and unique set of major facilities, totaling over 5.5 million square feet, with 6,000 employees, requires an innovative plan to accomplish advancements in operational efficiencies. ORNL is tasked with the management of an extraordinary set of distinctive scientific facilities and equipment for DOE. ORNL is mission-driven, and its mission has grown substantially over the decades. ORNL’s core research capabilities provide broad science and technology support for DOE in the areas of energy, environment, and national security. Currently, ORNL is a world leader in materials, neutron, and nuclear science and engineering, and in high-performance computing and data analytics. ORNL’s vast portfolio of research facilities must be maintained and carefully upgraded to protect the nation’s investment in scientific analysis. The goal of sustainable and resilient operations is to enable more effective execution of ORNL’s science and technology mission. Sustainable operational practices and enhanced resilience strive for excellent results while remaining diligent in energy conservation, environmental stewardship, asset management, and community engagement. The Sustainable ORNL Program (Sustainable ORNL) Continuous improvements in operational and business processes must be integrated into the fabric of the ORNL culture to maximize the return from the investment made in modernizing facilities and equipment. The Sustainable ORNL program promotes the legacy of system-wide best practices, management commitment, and employee engagement that will lead ORNL into a future of efficient, resilient, and sustainable operations. ORNL leadership and Sustainable ORNL champions receive regular status reports on the progress of each project and focus area (i.e., roadmap) and periodic summary reports. More information can be found at the program’s website. The Sustainable ORNL roadmap structure endorses 15 vital roadmaps. The figure below summarizes the current project assignments and demonstrates that each project contributes to the wellbeing of the whole. Continuous employee engagement and regular status reports confirm the ideals of the program. The roadmap structure is not static; as the science mission advances and the needs of the organization evolve, the Sustainable ORNL roadmap structure elements are modified to align with developing priorities. In 2022, Sustainable ORNL made roadmap changes to better align ORNL to support new federal requirements that have been issued.

54 ENVIRONMENTAL SCIENCES↗

Initial Assessment of Erosion/Abrasion Issues Related to Gas-Cooled Reactors

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is investigating the graphite erosion concern detailed in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC), Section III, Division 5, “High Temperature Reactors.” The special consideration in Subsection HH, Subpart A (HHA)-3143, “Abrasion and Erosion,” was described in ASME BPVC Section III, Division 5, which was accepted with exception/limitation in a US Nuclear Regulatory Commission (NRC) Technical Review. This report describes ORNL’s FY 2023 comprehensive research of erosion-related reports and publications to further study the proposed gas flow velocity limitation to the erosion effect in graphite structure in the ASME BPVC. This report also proposes that a nondimensional fluid parameter, the Reynolds number, might be a better alternative than gas flow velocity for comparing erosion effects caused by carbonaceous dust in fast-flowing helium coolant in gas-cooled reactors (GCRs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗