Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WORK”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Phase Distribution Phenomena for Simulated Microgravity Conditions: Experimental Work

This report summarizes the work accomplished at Rensselaer to study phase distribution phenomenon under simulated microgravity conditions. Our group at Rensselaer has been able to develop sophisticated analytical models to predict phase distribution in two-phase flows under a variety of conditions. These models are based on physics and data obtained from carefully controlled experiments that are being conducted here. These experiments also serve to verify the models developed.

Singhal, Maneesh↗

Extrinsic germanium photoconductors for far-IR astronomy: Research results and works in progress

Some Ge:Ga and Ge:Sb photoconductor materials and detectors that are currently under development are reported. The best Ge:Ga devices exhibit dark currents of lower than 200 electrons/s, with a concurrent responsivity of 2 A/W and a detective quantum efficiency (DQE) of 5 percent. For higher backgrounds, an operating temperature of 3 K can be used. This increases the DQE to 7 percent and the responsivity to 4.5 A/W. Investigations were initiated into n-type Ge:Sb as an alternative photoconductive material. Two crystals of Ge:Sb were grown and a number of test detectors were fabricated and evaluated. At 2 K, the best device produced dark currents of less than 100 electrons/s with concurrent responsivity of 1 A/W and DQE of 4 percent, and at 3 K, produced currents of 10(exp 5) electrons/s with a DQE of 7 percent and a responsivity of 4 A/W. Using p-type Ge:Ga crystals, two dimensional monolithic photoconductor arrays are being constructed. Future work will focus on measuring pixel-to-pixel homogeneity, cross talk issues, overall sensitivity and suitability for photometric instruments.

Beeman, J. W.↗

The World Wide Web as a Medium of Instruction: What Works and What Doesn't

A conference was held on March 18-20, 1997 to investigate the lessons learned by the Aeronautics Cooperative Agreement Projects with regard to the most effective strategies for developing instruction for the World Wide Web. The conference was a collaboration among the NASA Aeronautics and Space Transportation Technology Centers (Ames, Dryden, Langley, and Lewis), NASA Headquarters, the University of Idaho and The Pennsylvania State University. The conference consisted of presentations by the Aeronautics Cooperative Agreement Teams, the University of Idaho, and working sessions in which the participants addressed teacher training and support, technology, evaluation and pedagogy. The conference was also undertaken as part of the Dryden Learning Technologies Project which is a collaboration between the Dryden Education Office and The Pennsylvania State University. The DFRC Learning Technology Project goals relevant to the conference are as follows: conducting an analysis of current teacher needs, classroom infrastructure and exemplary instructional World Wide Web sites, and developing models for Web-enhanced learning environments that optimize teaching practices and student learning.

McCarthy, Marianne↗

Proposal Improvements That Work

Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

Dunn, F.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A major objective of the grant was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo Probe, and to receive, analyze, and interpret data received from the spacecraft. The grantee was competitively selected to be Principal Investigator of Jupiter's atmosphere structure on the Galileo Probe. His primary motivation was to learn as much as possible about Jupiter's atmosphere by means of a successful atmosphere structure experiment, and to support the needs and schedule of the Galileo Project. After a number of launch delays, the Flight instrument was shipped to Kennedy Space Center 2 years after the start of this collaboration, on April 14, 1989, at which time it was determined from System level tests of the ASI on the Probe that the instrument was in good working order and ready for flight. The spacecraft was launched on October 18, 1989. Data analysis of test and calibration data taken over a period of years of instrument testing was continued in preparation for the encounter. The initial instrument checkout in space was performed on October 26, 1989. The data set received by telemetry was thoroughly analyzed, and a report of the findings was transmitted to the Probe Operations Office on Feb. 28, 1990. Key findings reported were that the accelerometer biases had shifted by less than 1 mg through launch and since calibration at Bell Aerospace in 1983; accelerometer scale factors, evaluated by means of calibration currents, fell on lines of variation with temperature established in laboratory calibrations; pressure sensor offsets, correlated as a function of temperature, fell generally within the limits of several years of ground test data; atmospheric and engineering temperature sensor data were internally consistent within a few tenths of a degree; and the instrument electronics performed all expected functions without any observable fault. Altogether, this checkout was highly encouraging of the prospects of instrument performance, although performed greater than 5 years prior to Jupiter encounter. Capability of decoding the science data from the Experiment Data Record to be provided at encounter was developed and exercised using the tape recording of the first Cruise Checkout data. A team effort was organized to program the selection and combination of data words defining pressure, temperature, acceleration, turbulence, and engineering quantities; to apply decalibration algorithms to convert readings from digital numbers to physical quantities; and to organize the data into a suitable printout. A paper on the Galileo Atmosphere Structure Instrument was written and submitted for publication in a special issue of Space Science Reviews. At the Journal editor's request, the grantee reviewed other Probe instrument papers submitted for this special issue. Calibration data were carefully taken for all experiment sensors and accumulated over a period of 10 years. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature, and acceleration sensors, and the supporting engineering temperature sensors. This report was distributed to experiment coinvestigators and the Probe Project Office.

Seiff, Alvin↗

Report of Working Group 1: Non-stationary processes

Working Group 1 considered the observable signatures of chromospheric and coronal heating mechanisms in the quiet sun. Several areas where new observations involving the Solar and Heliospheric Observatory (SOHO) instruments could be used are pointed out. The initial successes of SOHO are reviewed and the confirmation of the dynamic nature of the non-magnetic chromosphere is considered. The combined evolution of magnetic photospheric features and the transition region and the coronal plasma is analyzed. The time dependence of chromospheric, transition region and coronal features are discussed.

Judge, P. G.↗

SOFIA Science Working Group

The SOFIA Science Working Group was established to help develop the plans and specifications for the next-generation airborne observatory ("SOFIA"), which is now under development. The P.I. has developed several astronomical instruments for the Kuiper Airborne Observatory, NASA's previous airborne astronomy platform (which was decommisioned in 1995 in preparation for SOFIA). SOFIA, which will be a 747 SP aircraft carrying a 2.7 meter diameter telescope, is a joint project sponsored by NASA and DLR (the German space agency), and is now under development by a consortium including Universities Space Research Association (USRA), Raytheon, Sterling Software, and United Airlines. Rather than develop the SOFIA observatory in-house, NASA decided to privatize the project by issuing a Request for Proposals (RFP). The respondents to this RFP were consortia of private organizations which together had the required facilities and expertise to be able to carry out the project; the winner was the group led by USRA. One of the main roles of the SSWG was to help develop the technical specifications for the SOFIA observatory. In particular, the SSWG provided advice to NASA on the specifications that were written into the RFP, particularly those which had an important impact on the scientific productivity of the observatory. These specifications were discussed at the meetings of the SSWG, which were held primarily at NASA/Ames (in California) and at NASA Headquarters (in Washington DC). Apart from these meetings, members of the SSWG were expected to perform more detailed analyses of the impact of certain parameters and specifications on the performance of astronomical instruments. The SSWG ended its activities with the selection of the USRA team in January 1997.

Zmuldzinas, J.↗

STS-31: Hubble in VPF Lift to Work Platform

This videotape shows the Hubble Space Telescope being moved in the clean room Vertical Processing Facility (VPF) to the work platform. The Hubble Space Telescope was deployed on April 25, 1990 from the space shuttle Discovery during STS-31.

Source record↗

Commercial Contributions to the Success of the HEDS Enterprise: A Working Model

The future of NASA involves the exploration of space beyond the confines of orbit about the Earth. This includes robotic investigations and Human Exploration and Development of Space (HEDS). The HEDS Strategic Plan states: "HEDS will join with the private sector to stimulate opportunities for commercial development in space as a key to future settlement. Near-term efforts will emphasize joint pilot projects that provide clear benefit to Earth from the development of near-Earth space." In support of this endeavor, NASA has established the Commercial Development of Space as a prime goal and is exploring all the ways in which NASA might make contributions to this development. NASA has long supported the development of space for commercial use. In 1985 it formally established and provided funds to support a program which created a number of joint ventures between universities and industry for this purpose. These were known as Centers for the Commercial Development of Space (CCDS). In 1999 NASA established a broader policy on commercialization with the aim of encouraging near-term commercial investment in conjunction with the International Space Station. Joint pilot projects will be initiated to stimulate this near-term investment. The long-term development of commercial concepts utilizing space access continues through the activities of the Commercial Space Centers (CSC), a sub-set of the original CCDS group. These Centers primarily require access to space for the conduct of their work. The remainder of the initial Centers focus on the development of tools and infrastructure to support users of the space environment. It is in this arena that long term development for commercial use and infrastructure development will occur. This paper will provide a retrospective examination of the Commercial Centers, the variety of models employed, the lessons learned, and the progress to date. This review will provide the bases for how successful models can be employed to accelerate private investment in the development of the infrastructure necessary for the success of the HEDS enterprise.

Nall, Mark↗

PM Science Working Group Meeting on Spacecraft Maneuvers

The EOS PM Science Working Group met on May 6, 1997, to examine the issue of spacecraft maneuvers. The meeting was held at NASA Goddard Space Flight Center and was attended by the Team Leaders of all four instrument science teams with instruments on the PM-1 spacecraft, additional representatives from each of the four teams, the PM Project management, and random others. The meeting was chaired by the PM Project Scientist and open to all. The meeting was called in order to untangle some of the concerns raised over the past several months regarding whether or not the PM-1 spacecraft should undergo spacecraft maneuvers to allow the instruments to obtain deep-space views. Two of the Science Teams, those for the Moderate-Resolution Imaging Spectroradiometer (MODIS) and the Clouds and the Earth's Radiant Energy System (CERES), had strongly expressed the need for deep-space views in order to calibrate their instruments properly and conveniently. The other two teams, those for the Advanced Microwave Scanning Radiometer (AMSR-E) and the Atmospheric Infrared Sounder (AIRS), the Advanced Microwave Sounding Unit (AMSU), and the Humidity Sounder for Brazil (HSB), had expressed concerns that the maneuvers involve risks to the instruments and undesired gaps in the data sets.

Parkinson, Claire L.↗

Outline: Recent work at JPL Under MSREP

MSREP is a multi-faceted program with radiation effects in new technologies, development of testing and hardness assurance methods, continual evaluation of space and laboratory test data and support to NASA Projects. Other work in progress includes: 1) Device Scaling and New Phenomena; 2) Radiation Effects in Microprocessors; 3) Latchup Testing and Latchup Mitigation; and 4) Revised Radiation Design Approaches. This paper is in viewgraph form.

Source record↗

Comparison of Cirrus Cloud Models: A Project of the GEWEX Cloud System Study (GCSS) Working Group on Cirrus Cloud Systems

The GEWEX Cloud System Study (GCSS, GEWEX is the Global Energy and Water Cycle Experiment) is a community activity aiming to promote development of improved cloud parameterizations for application in the large-scale general circulation models (GCMs) used for climate research and for numerical weather prediction. The GCSS strategy is founded upon the use of cloud-system models (CSMs). These are "process" models with sufficient spatial and temporal resolution to represent individual cloud elements, but spanning a wide range of space and time scales to enable statistical analysis of simulated cloud systems. GCSS also employs single-column versions of the parametric cloud models (SCMs) used in GCMs. GCSS has working groups on boundary-layer clouds, cirrus clouds, extratropical layer cloud systems, precipitating deep convective cloud systems, and polar clouds.

Starr, David O'C.↗

Living and Working in Space

This document is a presentation about some of the challenges of living and working in space. The presentation shows slides of the Apollo 11 liftoff, Skylab in orbit, a Space Shuttle launch, and a slide of the International Space Station. It reviews the needs and effluents of the astronauts per day, and the Environmental Control and Life Support (ECLS) systems. It shows a flow diagram of the Space Station Regenerative ECLS, which shows the various systems, and how they interact to control the environment and recycle the air, and water. There are other slides some of which show astronauts eating, brushing teeth, shaving, and sipping from a sip bottle while exercising.

Monsi Roman↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

NASA's Design and Development of a Field Goniometer Instrument Using Solid Works

With NASA suffering severe funding cutbacks, engineers at NASA are required to produce state-of-the-art hardware with limited personnel and financial resources. In light of these constraints, the new NASA mandate is to build better, faster and cheaper. In April of 1998, Stennis Space Center's Commercial Remote Sensing Program contracted to the Systems Engineering Division at NASA Ames Research Center to develop a device known as a Field Goniometer. A Field Goniometer is a device that measures bi-directional reflectance of a target, such as vegetation, relative to the sun and an imaging system in an aircraft or spacecraft. The device is able to provide a spectral fingerprint of the surface it is measuring in wavelengths from 350nm-2500nm using a hyperspectral imager. To accomplish this project, several obstacles had to be overcome. First, the design had to be completed in less than four months. Second, due to the complexity of the design, the use of solid modeling was highly desirable but most of the group's solid modelers were assigned to other jobs. Third, the amount of funding available from the customer was one half to one third the funding typically expended for a job of this nature. Our choices for this project were to design with standard 2-D CAD systems currently used in-house or train additional engineers on our existing solids package or purchase a new solid model package. The use of a 2D CAD system was very undesirable due to the complexity of the design. Using our existing solids modeler would have required a learning curve for our engineers that would be incompatible with our schedule. Prior to this project, a member of our design group researched the solid modeling industry and decided to purchase SolidWorks. After examining the product for ease of use, modeling capability, training time required and cost, we decided our highest probability of success would be to design with Solidworks. During the design phase, our fabrication group was able to provide input at the very early stages, which added significant benefit to the final product. Fabrication cost and schedule savings have been realized by having complex part geometries translated directly from the SolidWorks design models to Surfcam and other computer-aided manufacturing (CAM) software. This direct model translation capability optimized the fabrication processes. The end result was that we were able to successfully complete the project on time and on budget. Other advantages of using SolidWorks, as cited by the design team, include a rapid negotiation of the initial learning curve, the ability to develop solid model hardware prototypes (used to communicate the design intent to both the customer and the fabricator), and the ability to work as a team collaborating on a large, complex model. These types of tools and efforts represent our response to NASA's challenge to produce higher quality products within shorter design and fabrication times.

Turner, Mark↗